HomeMy WebLinkAboutAddInfoRequest_ACP_RRO
November 8, 2017
Ms. Leslie Hartz
Atlantic Coast Pipeline, LLC
c/o Dominion Energy Transmission, Inc.
707 East Main Street
Richmond, VA 23219
Subject: Request for Additional Information
Stormwater Project No. SWG040095
Atlantic Coast Pipeline Project
Nash County
Dear Ms. Hartz:
The Division of Energy, Mineral and Land Resources (DEMLR), received a Stormwater
Management Permit Application for the subject project on October 30, 2017. A preliminary
review of that information has determined that the application is not complete. The following
information is needed to continue the stormwater review:
1. Submit an original signed application form, not a photocopy.
2. The plans provided are not to scale, and not legible. Provide 2 sets of full-sized plans to
scale. Additionally, construction plans and details need to be provided for each area with
impervious area. (See 15A NCAC 02H .1042 & Sect. A.7. of SWG040000)
3. Provide pdfs of all revisions, 2 hardcopies of revised plan sheets, and 1 hardcopy of other
documents. Pdfs must be uploaded using the form at:
https://edocs.deq.nc.gov/Forms/SW_Project_Submittal
Please note that this request for additional information is in response to a preliminary review.
The requested information should be received by this Office prior to December 7, 2017, or
the application will be returned as incomplete. The return of a project will necessitate
resubmittal of all required items, including the application fee.
If you need additional time to submit the information, please submit your request for a time
extension to the Division at the contact below. The request must indicate the date by which you
expect to submit the required information. The Division is allowed 90 days from the receipt of
a completed application to issue the permit.
The construction of any impervious surfaces, other than a construction entrance under an
approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject
to enforcement action pursuant to NCGS 143-215.6A.
Please reference the State assigned project number SWG040095 on all correspondence. If you
have any questions concerning this matter please feel free to contact me at
Robert.Patterson@ncdenr.gov or (919) 807-6369.
Sincerely,
Robert D. Patterson, PE
Environmental Engineer
Stormwater Program
ec: Bill Denton, PE - Raleigh Regional Office
Tiffini Smith - ERM