Loading...
HomeMy WebLinkAbout20170630 Ver 1_More Info Received - Email_20171020Strickland, Bev From: teaIleneng@comporium.net Sent: Friday, October 20, 2017 10:28 AM To: Mitchell, Robert K; david.w.brown@usace.army.mil; Leslie, Andrea J Subject: [External] 401/404 for Medinger Boathouse Foundation, Lake Toxaway, Transylvania County, NC Attachments: Cla.pdf, C2a.pdf, C3a.pdf, C4a.pdf, C5a.pdf, C6a.pdf, C7a.pdf, C8a.pdf, C9a.pdf, PCN Form - Medinger Boathouse REV l.doc CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you verify that the attachment and content are safe. Send all suspicious email as an attachment to report.spam@nc.gov. ----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Kevi n Please find the attached revised plans for the Medinger Boathouse at Lake Toxaway, Transylvania County, NC. The Boathouse location has been revised so the foundation does not extend beyond the shoreline into the waters of Lake Toxaway. I will forward you the PCN signature page signed by Mrs. Medinger as soon as I receive it. Please let me know if you need any additional information. Thank you. Terry Allen, PE, MSE T.E. ALLEN ENGINEERING, PC P.O. Box 103 Rosman, NC 28772 828-877-4883 Office 828-553-3004 Cell 0 W ATERQG � r Office Use Only: Corps action ID no. DWQ project no. Form Version 1.3 Dec 10 2008 Page 1 of 13 PCN Form — Version 1.3 December 10, 2008 Version Pre -Construction Notification PCN Form A. Applicant Information 1. Processing 1a. Type(s) of approval sought from the Corps: ®Section 404 Permit El Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: 3 & 18 or General Permit (GP) number: 1 c. Has the NWP or GP number been verified by the Corps? ® Yes ❑ No 1d. Type(s) of approval sought from the DWQ (check all that apply): ® 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization 1 e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ❑ Yes ® No For the record only for Corps Permit: ❑ Yes ® No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. ❑ Yes ® No 1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ❑ Yes ® No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ® No 2. Project Information 2a. Name of project: REMOVE & REPLACE BOATHOUSE at MEDINGER RESIDENCE 2b. County: Transylvania 2c. Nearest municipality / town: Brevard 2d. Subdivision name: Lake Toxaway 2e. NCDOT only, T.I.P. or state project no: 3. Owner Information 3a. Name(s) on Recorded Deed: Leslie B. Medinger, Trustee 3b. Deed Book and Page No. Date: 01/2017 Book: 00790 Page: 0493 Plat Book: F16 Page: 876 3c. Responsible Party (for LLC if applicable): 3d. Street address: 163 Lake Point Drive ( Lot 27, Block B) 3e. City, state, zip: Lake Toxaway, NC 28747 3f. Telephone no.: 704-668-1118 3g. Fax no.: 912-398-9559 3h. Email address: Page 1 of 13 PCN Form — Version 1.3 December 10, 2008 Version 4. Applicant Information (if different from owner) 4a. Applicant is: ❑ Agent ❑ Other, specify: 4b. Name: 4c. Business name (if applicable): 4d. Street address: 4e. City, state, zip: 4f. Telephone no.: 4g. Fax no.: 4h. Email address: 5. Agent/Consultant Information (if applicable) 5a. Name: Terry Allen, PE 5b. Business name (if applicable): T.E. ALLEN ENGINEERING, PC 5c. Street address: P.O. Box 103 5d. City, state, zip: Rosman, NC 28772 5e. Telephone no.: 828-877-4883 5f. Fax no.: 5g. Email address: tealleneng@comporium.net Page 2 of 13 PCN Form — Version 1.3 December 10, 2008 Version B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): PIN 8522-12-1739-000 1 b. Site coordinates (in decimal degrees): Latitude: 35.12204 Longitude: - 82..94351 (DD.DDDDDD) (-DD.DDDDDD) 1 c. Property size: 0.599 acres 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to proposed project: Lake Toxaway 2b. Water Quality Classification of nearest receiving water: B, Trout 2c. River basin: Savannah Page 3 of 13 PCN Form — Version 1.3 December 10, 2008 Version 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: This home site located in Toxaway Estates, a private residential development in western Transylvania County, NC. The lot borders Lake Toxaway which has a classification of B: Trout. The general land use is residential. There is an existing 14'x18' Boathouse located on site, which is to be removed and replaced with a new 28'x30' Boathouse. 3b. List the total estimated acreage of all existing wetlands on the property: none 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: none 3d. Explain the purpose of the proposed project: The existing boathouse foundation is failing and the structure is unsafe to occupy. This project is to remove and replace the existing boathouse structure and foundation. Page 4 of 13 PCN Form — Version 1.3 December 10, 2008 Version 3e. Describe the overall project in detail, including the type of equipment to be used: NEW WORK - REMOVE & REPLACE EXISTING BOATHOUSE - LOCAL VARIANCE REQUIRED; This Project is to remove the existing 14'x18' Boathouse and replace with a new 28'x30' Boathouse as described herein. The Foundation for the Boatslip portion of the new Boathouse shall reinforced concrete.. The Foundation for the Kayak Storage portion of the new Boathouse shall be a cast -in-place concrete retaining wall. The work will also include a 12'x14' new wooden Dock. The Architectural features of the new Boathouse shall comply with the 2016 edition of the Lake Toxaway Community Association Architectural Review Standards. The existing property lines and the Side Yard Setback shall be located, marked and flagged by a Professional Land Surveyor prior to beginning work. Verify actual setback requirement with the most current Lake Toxaway Community Association Architectural Review Standards. Perform incidental excavation as necessary to install the new Boathouse Foundation. Work to be performed using hand labor & small equipment. All work shall be performed "IN -THE -DRY" . This will be accomplished by installing a temporary coffer dam around the proposed work area, or by scheduling the work during a lake draw down. Where a coffer dam is used, the work area will be dewatered by pumping. All dewatering discharge shall have a turbidity of not more than 10 NTUs above background or as otherwise specified in DWQ's Turbidity Standards (15A NCAC 02B.0211(3.)(k.)). To satisfy the required turbidity limit, the dewatering pump discharge shall be filtered through a Bag Filtration Unit equal to Model BF -400 from Rain -for - Rent with a 100 to 1 micron nominal rating. The turbidity level of all discharge shall be monitored with calibrated turbidity meters and the filtration equipment shall be adjusted as necessary to insure compliance with Water Quality Standards. The water around the work areas shall likewise be monitored with calibrated turbidity meters and the turbidity curtains shall be installed in addition to the coffer dam as needed to insure compliance with Water Quality Standards. Uncured concrete shall not be allowed to come into direct contact with surface waters. This will be accomplished by establishing a "dry work area" as described above. "High Early" cementious material shall be in the stone work to minimize curing time. DOCK PILINGS INSTALLED IN WATER - Pilings may be placed by auger, jetting or drop hammer. Pilings shall receive a final set by drop hammer or other approved method, acceptable to the Building Inspector to ensure compaction of material at end bearing. The tip -elevation for all pilings shall be field determined during installation. All pilings shall bear on satisfactory insitu material having a minimum bearing capacity of 3000 PSF. The minimum embedment depth shall not be less than 6 -Feet. The actual embedment depth shall be as required to insure pilings bear on satisfactory insitu material having a minimum bearing capacity of 3000 PSF. All building materials shall be suitable of exterior use. All Pilings for the Boat Dock that are to be located in -water shall be pressure treated for fresh water immersion. The Boathouse Foundation Wall shall not extend beyond the existing shoreline into the waters for Lake Toxaway. Page 5 of 13 PCN Form — Version 1.3 December 10, 2008 Version 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the past? Comments: El Yes ®No El Unknown 4b. If the Corps made the jurisdictional determination, what type of determination was made? El Preliminary El Final 4c. If yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? ❑ Yes ® No ❑ Unknown 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ❑ Yes ® No 6b. If yes, explain. Page 6 of 13 PCN Form — Version 1.3 December 10, 2008 Version C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ❑ Wetlands ❑ Streams - tributaries ❑ Buffers ® Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number — Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ — non -404, other) (acres) Temporary T W1 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W2 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W3 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W4 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W5 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W6 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ 2g. Total wetland impacts 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) or intermittent DWQ — non -404, width (linear Temporary (T) (INT)? other) (feet) feet) S1 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S2 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S3 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S4 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S5 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S6 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ 3h. Total stream and tributary impacts 3i. Comments: Page 7 of 13 PCN Form — Version 1.3 December 10, 2008 Version 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. 4b. 4c. 4d. 4e. Open water Name of waterbody impact number — (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or Temporary T 27 CY for Boathouse Foundation 01 ®P ❑ T Lake Toxaway Boathouse Footprint = 14'x30' Lake 0.01 Acres = 420 SF 02 ❑ P ®T Lake Toxaway Temporary Coffer Dam 45'x15' 0.02 Acre = 675 SF 03 ❑ PEI T 04 ❑ PEI T 4f. Total open water impacts 0.03 Acres 4g. Comments: Foundation work will be accomplished "in the dry" by installing a temporary coffer dam around the proposed work area. Where coffer dams are used, the dewatering discharge will be filtered to DWQ Water Quality Standards prior to release. 5. Pond or Lake Construction If pond or lake construction proposed, the complete the chart below. 5a. 5b. 5c. 5d. 5e. Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or purpose (acres) number of pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 5f. Total 5g. Comments: 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: Page 8 of 13 PCN Form — Version 1.3 December 10, 2008 Version 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. ❑ Neuse ❑ Tar -Pamlico ❑ Other: Project is in which protected basin? ❑ Catawba ❑ Randleman 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number — Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) or for Stream name mitigation (square feet) (square feet) Temporary T impact re wired? B1 ®P❑T F-1 Yes ❑ No B2 ❑ P ❑ T ❑ Yes ❑ No B3 ❑P❑T F-1 Yes ❑ No 6h. Total buffer impacts 6i. Comments: D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. All work shall be performed "IN -THE -DRY' . This will be accomplished by installing a temporary coffer dam around the proposed work area, or by scheduling the work during the upcoming lake draw down. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. To minimize disturbance during construction, the work will be accomplished with the smallest mechanical equipment practicable. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for ❑ Yes ® No impacts to Waters of the U.S. or Waters of the State? 2b. If yes, mitigation is required by (check all that apply): ❑ DWQ ❑ Corps ❑ Mitigation bank 2c. If yes, which mitigation option will be used for this El Payment to in -lieu fee program project? ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type Quantity Page 9 of 13 PCN Form — Version 1.3 December 10, 2008 Version 3c. Comments: 4. Complete if Making a Payment to In -lieu Fee Program 4a. Approval letter from in -lieu fee program is attached. ❑ Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: ❑ warm ❑ cool ❑cold 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non -riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ❑ Yes ❑ No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund). 6h. Comments: Should project exceed 10% or 100' in 1000', a trout buffer waiver will be sought from NCDENR - Div of Land Resources Page 10 of 13 PCN Form — Version 1.3 December 10, 2008 Version E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1 a. Does the project include or is it adjacent to protected riparian buffers identified ❑ Yes ® No within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why. ❑ Yes ❑ No Comments: 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? % 2b. Does this project require a Stormwater Management Plan? [E] Yes ® No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: ❑ Certified Local Government 2e. Who will be responsible for the review of the Stormwater Management Plan? ❑ DWQ Stormwater Program ❑ DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? ❑ Phase II 3b. Which of the following locally -implemented stormwater management programs ❑ NSW ❑ USMP apply (check all that apply): ❑ Water Supply Watershed ❑ Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 4. DWQ Stormwater Program Review ❑ Coastal counties ❑ HQW 4a. Which of the following state -implemented stormwater management programs apply ❑ ORW (check all that apply): ❑ Session Law 2006-246 ❑ Other: 4b. Has the approved Stormwater Management Plan with proof of approval been attached? ❑ Yes ❑ No 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 11 of 13 PCN Form — Version 1.3 December 10, 2008 Version F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public (federal/state/local) funds or the ❑ Yes ® No use of public (federal/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ❑ No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) ❑ Yes ❑ No Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑ Yes ® No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after -the -fact permit application? ❑ Yes ® No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ❑ Yes ® No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non -discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. N.A. Page 12 of 13 PCN Form — Version 1.3 December 10, 2008 Version 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat? ❑ Yes ® No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts? ❑ Yes ® No 5c. If yes, indicate the USFWS Field Office you have contacted. F-1 Raleigh ❑ Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ® No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? ❑ Yes ® No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA -designated 100 -year floodplain? ❑ Yes ❑ No 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination? Leslie B. Medinger, Trustee Applicant/Agent's Printed Name Date Applicant/Agent's Signature (Agent's signature is valid only if an authorization letter from the applicant is provided.) Page 13 of 13 PCN Form - Version 1.3 December 10, 2008 Version N° 0 0 0 - 00-0 O� CU N cD rt -p (D y, N (D � 0 '� '� CF N O N `< D S S� 0 N 0 Q rt° A X O J (D 7 S -0 a 0 -0 A 0 0 <, a ,�+ ,•+ p u1 w O X, (D A O1 (D (D r+ p C O I p a c �� ((D c C.c -0 CD c:(D s� zr(D a� 0 � o cop m m v° ° (D (D D o m =r ° Oc_< D o� Nrn ° �m o o 0� o -i Ap wpm aAp mom- ����prn °� �p�aA°p*mac°cnrtS ° °o--°0G(D mrn D -rn°= O`D c°n pcn ° Qv� '< p 0 � (n� ° 0 0 � a� o ao � �� v0 ° nc m �� ��° �c � Q �n0� �rtrtrt�-0 Q LO rn op°pornaQ on ° 0 amu, p w cn �, m ° �p �.:3 cn -� a� p � c rtp ° p p S 0' rt (D 7 0 a a (D r r U1 7 0 p — S 0 a (n O �7 0 S O p (p � 0--(D' �. _ --0 Z Z C Q' p p A �< a A p O p (D 7 0 Q p 0 \Q a� onto-� o �n ° p 0 Q rn rn �° M 5.° c� �1° p ,°, 7 r -r A A p p `< S p rt (D Q (n 0 O Q 0`<� rn c� °o Q rn ZDW_ �° rn c ° vrn, �� �° a— oro o p (D co ° rn-0 W. rt0 0aprt ' °OAp+'fl(pD o rtcn0 <7-mSjA_(D ofi ooav�3 E: (D a< nX-3T ° om p A0-� prn(�D • irn(A0n ' o 0 3 _ (D ( (D 3-SIn 7 OOa p.00 a 0 m O Q(D 0 0-0 -00 pAOao A�a O<0 �0 o oa�D0Or -�(D < ° Z3 0 s(D 0 o °0°`n ° 0 o 3�(D (o p � c rt<� O ° O 0 o °° En o ���`o <o p Z' -i D o O(rt(°a=S Srtcn 0 rt3- n 0X 0 (D S �0° � D � 0n�A N p OO -0 = w (D Q -• (n X jfi--5'00 D p O (D fin SNp ry X 0 CL fi0 n XD0° a crn7�C(D a CD 0 Qnp D S(n °(Drt O -A w p CD( ? ��o Cno�-Aosa(<°Dp1 �S�( Q0 0 - c c ooz (D. �m° °-LQ N O O p - N O a(D p a= paa p O N0 a (n 3 0 pC(D n cn n O p j S °(D mO n S 0 0amcn ° ° PD ° oca 6�p mj ai N p(77 Qr° ° Q 3 nO0 0 Drt a- C0 0 p D Z3 a O p �n ---1 p N�rt p .p O O-0WZS 0rtO . O�OlrNIWI�WlQW-� -rrr1 --1I O- n ^�u�ODuoou ° n0 ° (D a`nrt�`<��Q 0- (1) U) irnai o p ° 0 0 (n 0- U) 0 o p (D 0 0 cn O _ ° ° O � rt �`0< s. v�n°O°o-0`O co m(n oo cfl 53 -SJ p S u_S) rt0=) A a *o a°cti' `(p<n°C cO°ppn °° Z O(D O Drt _ 3 cc O °O aO -1A-0 �O O 0 O p 0 O X- a 33 N D O Oto * ON= C D A A "0 :3 3(D (n (D w rtw n cc,M —D S M Dm Wmo_ ° 0O(D ° 0-0 0 D(0 o O O,� o 0.,Q- => Lc CD p S O � O O p p A j O Zm° (D CTO w a prta0rta <S N 7 (n S tS 0 a OO� (D S7 S< AD�O cr (D < (n 7 (n 0 w i 0 3 5 0 c c X 0 N 0 0 7= rt• 3 7( 2 m aD< a 10 0 -0 A ° v C p a0 (D N —7 0 7 (D Ap �rt p ( O -O A z a O (n - 0 art: O fip°Om� =Azr0 mO co w � ai° �� Q fi Sarn ° oo mo o� 3 UacQ 5ao rQ-o a c° a°� a 6<p0fi0rt0 w Q N - � o C 01 �O�a(D W t3 Ortm rtA X° w 0 00 D p • n � Dao_p .p �� � 0,a0 0p -(Dnn�o � v�m0 D o a0 Szp cnaa' 7 (D(D 9000-0—cmnQ0 p< w S (nCA '0 a0 LO �aaAco co Q 0 D 0m ZTcDCDN p � ° fip A ZY�vv n ' o ° nJ C (D p S -I I— W "0 p lA 6�,rtC pSrt 17 m m D O p A:� O p o (I) w CD (D 0 0� 0 l p o- o w cD corn _ o Sn? x M 3 D O ID C7 r�r c CD tOn N ((n ° N p,= O (D 0 �' n A O 0-0 f O- 0-(Dmrmilm; �a-1 Z' = o o F 0 �' rn ° rtp v m 5'(n a� ZZ ch 7 -i cc (D rr 7c rt 1 _� ° p O a rt-.rta(D 0 fiA C N D (D cp Z7 rt `G p_ p fi N 7' - p 0 Q p O l (D (p `G p rt (<D a CD CD fV0 p A Q N p h O 0 °< n to �< O 0 3 N ° 0 0 7' rt am D� �C'< <O �rt00 O� a� ?��(D3 p �p5 C r v Q rt 0- O' (D C CD `t O 3 p O rt ,� (D (D �I Dnm� °0.°'+a x0� �fi °ar° rtSIrn fi wog O z -(D Z cn p A p_ co � S cp rn a Q zO p �0� �� ucDi a (D $ s REMOVE & REPLACE BOATHOUSE MEDINGER RESIDENCE T.E. ALLEN ENGINEERING, PC Prepared for: Mark & Leslie Medinger 21 Seawatch Drive FIRM I C-1997 163 Lake Point Drive PO BOX 103 Savannah GA 31411 - Lake Toaaway, Transylvania County ROSMAN, NORTH CAROLINA 28772 912-398-9559 (828) 877-4e83 912-665-2250 North Carolina MOBILE (828) 553-3004 Lesm02ll@gmail.com PIN: 8522-12-1739-000 email : tealleneng®comporium.net BidStrong®aol.com CD cn 0 rt rtrt0 SU) TI -TI tn0 0 -P' F =SSA p 2.-0 M C,4 O 2.Q-0 N O =0rt0w( — 0 r0r 0 0 0 0 (D (D p o 0 0 (D O Q O (D (Dfi tQ 0 A O tQ 0 �' O a (D C O a p ITI 04 A o -a(n o stn ctQ �� o o a ac z =tn O ° p tQtQ cn TI oruo0 D o°° Q I o rt n :' 1 F rtn o SCD cn CD rto D QMc Sz Q p cn to o sO co �'0 a�.� 0 rt� Q �0 0 A Do CD rt r o n `tD.� 0'< m 0 Q 0 o n rn .._ I S° = 1 tTrt m rn -0-0 0 Q m to =� rt�� arto NS ° cn rt Q^Q Q o� �n� n nn0 Z m (D�a00 0on-1a A o00O0`<°�rt ��<a�� 0ON000Q� O 0O' '+ D n (D ZT Zr da� n fi rtO� �rt fi �.��mi� �'�.Q 0.� a� (D`< �.S N S (D rt II 0 0 (D 0 0 n p 0• CD CD Z) 0• 11 11 0 C Q C7 rt 00 rA•.-o 3 a 0 S (D 0 N� rt p � D v o a p rtn m D o' _ ac a0 tp nm z �. n r. < 0 (DN N p��G Q C S? o N 0 0 7 0 C a o �• prt W N 0 o 0 N° �U, silts �'-0 II m a atn o to 3 `< rt< �'< 0- o° fi= a N rt ° a° corn°o� t°nN I1 ��ha�°moo �• rto °a �QOnhW�.O m :3 -0 Q _ _ to o cto a 00 to m -p -- * (D �. 0 0O to to 0 _ (D + < En Q , 0 C7 ao m < O <to o otn soo o °o °�' °o o 0 o 0 .1 , 3Oo n I -cno o -0 a0ooNa1<=a a �� s D�cnas D Q< oAo=°o c p c:77 co to( oZZ�Q �° Q rno O rn Q =0 3 +' o p m= rt rt = c DC�DDA Z (D 7 S ,� (� = A= tQ 1 Q tT tQ to ° Q n o n n N (n a° 0 0 rt (D C N 0 o 0 a S N r+ a (1) A Crl Crl rt S p) O 0 (D Q 77 N rt r+ 0 S 0 CD ,O -r (OA N LO -0 ° : 0 n S 7 Ci (2D 7 D 0 � � (b � S _ Q Ort (D S a Q = S D Q 0 7. 0 A 0 (/1 _ .Z7 - rt m -° __ r o (D M0 O- tQ too rn D fs� 10 = C� tJ ° �a -1 ZQ 0 nD CD Q C N 0 O M to 0 g Q to A C/) <3 m tooc - a rt -0 (Do 0 00(1) op= Q rtU) 0 rt u(D Q A ( CD S rtp atiG alD 0 (D cn 0 D TO CQ CD W0 ; N 0 o O c-0 O C OQO O(D — Q (rtfiDN Fzi p_ rt = O O rt rt o p �N (D atS� 'r(D � =.A 0 (D (D =fip < CD- C O rt c -. Q �. (D °- (D Q -0 O — 0 cn a gQ rt- a tQ rt o Q fi Q c a° o < sW rn o = 0 ' rn rn (o `< ° = mto 0 0 to o 3(n -1 --h N o I n Cr- Dn A ( A wp DDb toCTS D(no --hcozr zra �Io D O O �0 O°Q O a 1 O /CNb (T —O = (0 O0 rt A (D (D (D �° Oo (p CD O1Q 0 S N r co w -0 3 O ODD- �fl o m to Q � m _ = O (n Q (n to cr 0 r (DQW I < O(D 3 =sz o ccn _ mo o rt��n Q o,- o 0 Q 5* ao mO rt CD (D '� I� A o D (D Ort N -p N ,0+ = TI 3 �) zTCD0 ° 3 N a D I C pacno>=rQc 0 rt�a rn o �2 =3 0-0 o` (n D Q o a7 Z 0 Q c 0 (D tQ �< (n r O S- — 0) G7 O rtr� : p 0 S O�N N D(n' �_ 'Z SO0 0 N otQ o t�rto S0 ZA D m Q 0 l+ O M O NcD n 0S a S -a D xQ 0S O 0 n 0-0 OW Drt p N D 3 Q s 3 S (D 0 (lD rt (D 0 p 0 O N r o K A (D 0 D (A ° + 0 q � D M 3= a(n C 0 7 Q �-0 _ S O 0 Q (D � O -1 rt O a Q p (D a rt A rn rt +0 Q c Drt (p rtp. —O ap a- DDm D o D 1 ax m �� r+ �,o):. Z 0 0 0-0 tQ (D z CD 0 C �' O N 0 i1pS !n = (D rt !n 3 O 5 A Ort U) O O (D CX) a ,+ CP a O rt S 0--, S S= C (D A - (D < (A rt O Q S (D Q tQ a 0 0< G7 0 0.0 S co (D tQ TI �OmmDO o°� c: m�(D (D(°�-CD 0tQ 3 ao ma° 0x oca DZm C7 ° (�° �Q 1 �� °(nom (D 0 =CDrt ca -Ot Aa)r Z -a -p p O S p Amm; O _ Q Q - (A O z ch c' rt�5.o ° m Q E c(=o (n� 0 D m =r 0 (0 m N oQo (Do X0n o (n (� 0 L = C- C) lac s0 � O v a D rt 0 Dmoo o o _(D CD �I - N zT °D nm_03N 3 3 QO (� ZOrCD w Q OO �o O(D Q oQO p CD Q - N az#z D = $ s REMOVE & REPLACE BOATHOUSE MEDINGER RESIDENCE T.E. ALLEN ENGINEERING, PC Prepared for: Mark & Leslie Medinger 21 Seawatch Drive FIRM I C-1997 m 1F3 Lake Point Drive PO BOX 103 Savannah GA 31411 N - Lake Toaaway, Transylvania County ROSMAN, NORTH CAROLINA 28772 912-398-9559 (828) 877-4883 912-665-2250 North Carolina MOBILE (828) 553-3004 Lesm02ll@gmail.com PIN: 8522-12-1739-000 email : tealleneng®comporium.net BidStrong®aol.com 0 O z O (n C7 D r M 0 Z C) Z oD -0 \ rt r« ZJ � Prepared for: Mark & Leslie Medinger 21 Seawatch Drive o D N r PO BOX 103 p GO Z m - K X (D o o 3 � I � Z � 3�r.��. O � rt CA O � O z rt en Q Lesm02ll@gmail.com 0 0 S o 3 I rr c rn CD�o c 3 p O p p : cp m O = O c o 3 C (D N 0 M OM ;a rn r n� OZ .Z7 � C7 I Oz Z0 `i o+ 0 `< DSO (ACDfi c��m3c� rtr+7 r+W rn DrtDv�0 �e water S CD c ! `D e�aak o c N Wim° CD 00 003 WCD rn 0 U Y ,114 0 Z O Oo M 0-0,1140' + O D v LT1 D (D NOT TO $ z \\\l � I T.E. ALLEN ENGINEERING, PC Prepared for: Mark & Leslie Medinger 21 Seawatch Drive (D r r rt 1F3 Lake Point Drive PO BOX 103 Savannah GA 31411 Z r n O N ROSMAN, NORTH CAROLINA 28772 o o 3 � I � Z � 7 r+ O � rt CA O � O 0 r p Lesm02ll@gmail.com 0 rr Op S PIN: 8522-12-1739-000 O n rr c ,fir O (D p cp O CD O 0 7' U Y ,114 0 Z O Oo M 0-0,1140' + O D v LT1 D (D NOT TO $ s REMOVE & REPLACE BOATHOUSE MEDINGER RESIDENCE T.E. ALLEN ENGINEERING, PC Prepared for: Mark & Leslie Medinger 21 Seawatch Drive FIRM I C-1997 1F3 Lake Point Drive PO BOX 103 Savannah GA 31411 m Lake Toaaway, Transylvania County ROSMAN, NORTH CAROLINA 28772 912-398-9559 (828) 877-4883 912-665-2250 North Carolina MOBILE (828) 553-3004 Lesm02ll@gmail.com PIN: 8522-12-1739-000 email : tealleneng®comporium.net BidStrong®aol.com 0 3 3 0 O u (D m S (D (A 3 1 3 O 0 3 3 0� 7' = p" a -0 O 0' 3 (D M0 Q Q_ N =r-6-1 - p Q C 0'0 0 Q O ::E -2 Dr �� < (7 D (n (n Z p r+0 -'Q Q Q 0 3 o rn Q m �p ficD 3 CD aQ =0-0 p fiQ •CDD °� o° �(D m� �c yho 0 Ei•rtc ( Q r° o Q_3 0 -,Q Q Q o m =3 '< "0 zi �° Q.rn� o c<D Q m rn� a� �7N rn rn T� 00 Q 7 - �, (D ,� (D 0 Q Q j n 3 - rt p rt (D O zr 0 O (D = - O 0- Q_ p 7 O 0- 5. p 0� �G iQ Z O fi (D Q l�7 p rt CD zT '((DD < fi= rt3(D rt3 �(D <� O ��-0• rt -00-0 rt(D (D 0 -fl-Q (828) 877-4883 n -.0 Q O 2•ip 1< ip _a (D (D (D �' O �.cp Q D (D CD Q 7''0 0,3 Q a 0 0 O S r DNO 00 rt CD 0 CD Q Oip Q �'0 :3� �•� �, �� w o� Q c -ao 0 o'0 tea- � n �� m 0 aQ, o CA CD a p= p C (D - 0 O O p rt 0 �1 (n 0 0 C CD ort (n Q Q TI _= (n 7 �• 0 7 rt 0 0 S 0 (D �< Q Z D O CD rt 0 ?l (D Z5�. (11 to (D Q S N z (11 o 0 o = V) O 0 C Q (n m M O C P 26'-9� 20'-0• — -Tdge--F F-o-ote� F- -Edge--oT-Tooler Edge=of—F44teL- --I------------- �I N ,i t.------------------ Edge-of-Footer - --Edge-of-Footer New Boathouse II Edge -of -Footer I I 29_6. I L Edae-of-Footer -0 Q MUc/)-Un(n O r+ p La, O_ip Q O N oQc' �D c) `Q 0 6 - rQCD �o<or — O 0 0- 0 0 0' Q Q m (D r rt .T. _ Q (D .--� 00 (D aQ a\ Q Q (n z Q sZY o (D a J P -rl (-) - 0 o fV 7 n Q--% M C) r 0 O(DQ 7 h 0 O 0 � O Q Q_ '11Q p -a- O D (n p �° o co �a 0 0 2� Q o 0 0 0 0 0 (D v, —`n =r- v E. �'Qh� o X m 0Qm m -O c � O �c a0 � (D U) �rt .p' Q6�•�3 Q -((nn rn 3 5'�� o o (n (D (Drt `< cn 3`Q m O p p rtrt0 �fi m'0- �° 5- (D p o O 0 a 0 0 zr l0 . ,+ O X O Q C O Q(0 Q O Q ��D3-00— - 0a o Manz �'(c'Drn =r �D�o 8-3 UO 0 m ° rt- (o Q_ ao 0 7. v, aoo 0�n'� 3� om zr o0'0o'0 0oQ3m rto Q n 0 0-O 0 0 3 5 c,4 5: o Q o �n 5.0-0S0 ,�,�rn ~,s �� oo (nom rt�T O n ca Q oQ QQ CD x- Q(n mp�.oOpC rt p m Q_ 7�� (D Q N co zr < 0 O (D Q (D a $ s REMOVE & REPLACE BOATHOUSE MEDINGER RESIDENCE T.E. ALLEN ENGINEERING, PC Prepared for: Mark & Leslie Medinger 21 Seawatch Drive FIRM I C-1997 m 1F3 Lake Point Drive PO BOX 103 Savannah GA 31411 P - Lake Toaaway, Transylvania County ROSMAN, NORTH CAROLINA 28772 912-398-9559 (828) 877-4883 912-665-2250 North Carolina MOBILE (828) 553-3004 Lesm02ll@gmail.com PIN: 8522-12-1739-000 email : tealleneng®comporium.net BidStrong®aol.com $ 00 o 0 O p N(I) x ,N+ Q (LTi o REMOVE & REPLACE BOATHOUSE MEDINGER RESIDENCE p ip 7 Z 7 M (D 0 0 Prepared for: Mark & Leslie Medinger 21 Seawatch Drive FIRM I C-1997 fia 0 to J O rn PO BOX 103 0- o 0 o Lake 'Foaaway, Transylvania County (D N ,e p 0 (D o I (n (D (D a (828) 877-4883 912-665-2250 I fi —ha�pco= rt= p 0(D_�j ocao MOBILE (828) 553-3004 Lesm02ll@gmail.com O fi `< 0 (n `< i -I O 7 p p O Op = email : tealleneng®comporium.net a< U (n 0 C (D p + p 7 m Zr noon 0vim cD O Z cn a (n Wall Ht Varies, 12 -Ft Max j�mn� CCTI) JMC) (n co M C) (n D ------- -------- —Property Line—_ - — ------------ om0 1 .d L> fi O D n 00 0 r- I o --j -4 I Z 0 O= COR'�(nR' ;An (n Z O rrnn 12.. C -, a (n o .............. rn M fTl.0.01 Z TI 0 O A CONCRETE FND RETAINING WA L M C Z7 Z �J D 48" + - fTl > Min Controlling w O Depth 0 Z 0 M II Z � + D M r o r o o _ - 0 - 0 �'a g I I +$ 0 n i2. " m m � v ` 0 11 0 C) D r M v D Ef- CONCRETE FID RETAINING WALL z C) nI 00nN I Zmom -0 = nON p NC N () CO O 3 O < fi 00 —4 > Q(D > p oo O� �� mZDOC) (� �nzfs� UidN _ ° v � m _ a s . o' -h (Drto cn o n� a m z�°a� E 1 I y o o_o c/)o o o- �c�D (cn x� mm- chM N 0) o�n pZD �0 n Za0 r ac D m cn� p-�((cnD � D =nm O (D .OC p @ pI Q 0 =3 Z3 rt`p 0Z n�� =� z� Q o 7 co O Cert (pDDmo a Z _ (D 0)0 NOT TO SCAL $ s REMOVE & REPLACE BOATHOUSE MEDINGER RESIDENCE T.E. ALLEN ENGINEERING, PC Prepared for: Mark & Leslie Medinger 21 Seawatch Drive FIRM I C-1997 m 1F3 Lake Point Drive PO BOX 103 Savannah GA 31411 Lake 'Foaaway, Transylvania County ROSMAN, NORTH CAROLINA 28772 912-398-9559 (828) 877-4883 912-665-2250 North Carolina MOBILE (828) 553-3004 Lesm02ll@gmail.com PIN: 8522-12-1739-000 email : tealleneng®comporium.net BidStrong®aol.com \�\\/� CL \�/m\ f0DX-A m= - g= 2 - zFn E)\$S 299 7 ` 0 n-> a a c s ° 5 g /�22 /\� _� 3 �\ e§ Lam Toxaway,Transylvania County % / 27 g �\$¥ a 2 /00 .eƒ ] so @g &.mm n /\ e e\® e\ Be7eng0ad.mm g2e \ °� ƒ\/ ƒ %(D \f /� / G /« --n0 eE_$ J e \_\ / / a o / cD c /& / 2 _$ / 2 =r0 �/� \\ o- u-3 0 x G 7 nae- 2J�\ 2-e /\ _ 2 °0 5\ \22 E E\ _= / &_ oo _ » / \ Ew J \e w e 2 e ? \ " § 3' & ) T 3 ( D mke D. D. e = 0 £- \ e>\0 ' g- / \J ± _= J ] 0 /\ §\ / *$ n n c /0 En �\ -0\ 0 o e 2��� `e 22 ~m J 0 & n o o e e \1< / , c x g 0 z \ > \ 0 f > E . : !�| REMOVE & REPLACE BOATHOUSE �EDl9GER RESIDENCE T.E. AL EN ENGINEERING, PC Prepared for: Mark& a+» U king r 2 smwld Drive la,m ] � !Ga Lake Point Ohv m e m savannah GA 31411 .ROSMAN, Lam Toxaway,Transylvania County mm m@¥ 28772 $2-38-g5g \-2250 North Carolina - j877-4883 o so @g &.mm PIN: 8522-12-1739-000 email, tealleneng0comporium.net Be7eng0ad.mm z n o O z o C7 0 � o m m D z z G7 D r F- m m z N O Z SO 70 m Z TI O C7 Z G7 I m Z G7 m ZJ ZJ m Cn 0 m Z C� m NOT TO $ s REMOVE & REPLACE BOATHOUSE MEDINGER RESIDENCE T.E. ALLEN ENGINEERING, PC Prepared for: Mark & Leslie Medinger 21 Seawatch Drive FIRM I C-1997 163 Lake Point Drive Savannah GA 31411 Lake Toaaway, Transylvania County ROSMAN, NOM CAROLINA 28772 912-398-9559 D D 912-665-2250 North Carolina Lesm02ll@gmail.com r r CC) N PIN: 8522-12-1739-000 c0 00 �I O Cn � ID = 2 F— m m N O m J m Cn - N m I i m � O D O .-. rD P, 41 N N N CO OO OO CO ri m : m cD = c7 00 � c rn cn_ -Pt = O _ rn (D O N Cnn GJ Z O m (!) Cf) rn rn rn m m cin cin 41 41 O Z rn rn rn o 0 0RO cl) TI O c Cn CT i -Pt -Pt Cl C N m m m m fTl I- I- I- I I I I- I- I- C) C7 00 N - WN C) 00 N c0 O� I r- OO � z O z Z n70 O m CD m D �J rn rn rn rn rn 01C71 -P� - = m Z m ® © ® @ @ ® @ D O - O N N N N N N n Z O m O0 N r N O Z CD W m co cn D 0 0 0 0 0 0 0 0 c0 CO J J v m U Cn O 00 C7 C7 C7 ZUkz4k m m Zttk m Z*z Cn cn Cn z4k Cn Zk Cn O Z Q T1 O m :�O CJ .ZJ C 1 O CO L f Z7 0 � D �) Nr m 0 `. Z m O rn rn rn m m cin cin -P,41 O m O m (0 (0 "o N mW c/) 00 0 0 V 0 0 0 _ 0 co >� n m n n n n n n n omm N r 0 NOT TO $ s REMOVE & REPLACE BOATHOUSE MEDINGER RESIDENCE T.E. ALLEN ENGINEERING, PC Prepared for: Mark & Leslie Medinger 21 Seawatch Drive FIRM I C-1997 163 Lake Point Drive Savannah GA 31411 Lake Toaaway, Transylvania County ROSMAN, NOM CAROLINA 28772 912-398-9559 D D 912-665-2250 North Carolina Lesm02ll@gmail.com r N PIN: 8522-12-1739-000 c0 00 �I O Cn � ID = 2 M =m � I D .-. rD P, 41 N N N CO OO OO CO --j r cD = c7 v m c/) c/) m Z Cf) rn rn rn m m cin cin 41 41 DC rn rn rn o 0 0RO D r Z 0 0 0 0 0 0 0 0 O N :CJ C) C7 C) C) C7 c) C7 C) C) 0 m O z Z m D �J rn rn rn rn rn 01C71 -P� - = O m m ® © ® @ @ ® @ D N N N N N N N N N r N O Z D 0 0 0 0 0 0 0 0 O ND C7 C7 C7 C7 C7 C7 C7 C7 C7 r NOT TO $ s REMOVE & REPLACE BOATHOUSE MEDINGER RESIDENCE T.E. ALLEN ENGINEERING, PC Prepared for: Mark & Leslie Medinger 21 Seawatch Drive FIRM I C-1997 163 Lake Point Drive Savannah GA 31411 Lake Toaaway, Transylvania County ROSMAN, NOM CAROLINA 28772 912-398-9559 912-665-2250 North Carolina Lesm02ll@gmail.com PIN: 8522-12-1739-000 BidStrong®aol.com Q -P� p 1— Z3 -P� o� O 0 -P� CAS Cf)—(D 0 cn O UiN + - O L— O 1- S 3 Q fi'O o 00 ' O (now o r2 3 0- p Cf) ::�iN 0 CD O 0DC'40 rt 0 0 O rt a + � o ((DD 7 0) - N D O 0 (D (D 7 rt ° "`� I Q 0 Om �. (D Q D -1 _ p' �zT (D 0 (D 0 Q (D r-n�rty;� n 0+ O (D V n (n0 Q 0 = X co 3D 1 (A I 0+ 3 C � D j (Da r- oo h Q o �� N �(D �`< D O c Q o (D0o(nz0 0 (n o m N Q a G �_ rn 3-0 m� n �o ° o r* -1 z3 I NGS—=m n cn 3Q D �'� a -o -o- 10 a n D (D a � 0 N ° 0 D0 <� 3 Do Q Z 0-p — O 0 aC7��;S3 0 CT (n1 O 0 CD rt 3 C (D m 7 rt� 0-0 D 0 CD (n � -. -. 0 I m 0 Cn C) (D a -0 O Z nco p c 7 - (� n Q (D Q 0 Q I (D �p p — 7 (D Q ° rt —aCD (D CD Q (D = o m m I o rt 0 m 0 rt 0 Q (D W= p O fi cn� m �� c o °< D D N NG70 fi n Q o c� a o 0) 0 2•m 3 3Q zTa3 O =rt�� CD c n -bn° ��° D II 0 000-0 (n (l ° CD z CD z m O° cD M o 0 N Q (D N ° 0* -D 7 p c�D z N Q 0- m N a 3� CD E m=r0 0 --0 i 3� �n�� 2. ° W O II �� c a c ° 77 x "� m 3 30 ° m =a r' 0 a- � ° m -% ° n0 0 C/) o � ? h� � � � (D a iQ .Z7 � 0 CD rt CD U) C Q Q � U� 0 ZT (D -. 0 �• 3 p' CT m C) 0 O (n• 0 I � I (n 7 rt— w (D 3 Q N (D Ln Q 5 — rn cn Q D O(D Q 3`Q N �O �G7=0- cn - (D —� p Z,+= p O Q O �, p 7 .+ nrtOnp'fi 0= 0 7 :3 Q (D n NnQ, 0 N m 7 u, 0 0- (D o G ° CD fi �, m m-1 p —a ° m n (D a 6 w nN o O rtC O (n �7 a0 D —� 0 rt ° (U O cD m CD 0- 0 0 l a 0� 0-r h= N N CD O CD as f 0 Q N m D p Z7 3 CD tG CD C rtcD Q:N Z3 i° ln•O p�-Q�`< a� a Z fi D ��� K\ 0 o Q O �° c 0'Q 0 cD 0� A• O ° 7•� N ,x+ N (n I NZ0 (D c a3� (n00� y,�' 0 � nN (� (D (D �o 0 rt a Q p (n O a (D rt = Q — tQ Q U1 7 W o (D CD 3() (n O 3 (D° CD CD mea°(D °=r N In rQ °°acaDa CD m Q ° o (D 53• D0 a -1 Q o oJo� 0� o p p 5, o N70 LO Z3 s Q Q = p m O D n N p T— ((D Q o 5' 00 a rt a . b 3 Un — QO 00 N UJ 00 0- 1 Q C.,J T CD UJ 0 D O7 (� (Ti Ort—O - m fi rt�CDCD 0 rtfi0 CD -p O (D CP 3m—' < < 7• �3 (D 0 °oma Qr- n Z° _ (7 rt -0 0 = C 0 O rt -9 0 - n N O 0r E -p (D 3 D 003p a Q (° n N I CD 0(D D m (D Z (5 'O O o 5 rn rto m z 5'0 < o In < a (n z D Ca Q mgmM _ r ° (D 5 m oCD Q' � (D N X30 .O �n oV (D =o� 0 -a CD a Z(D (D (,� =. 0 0 a (n Z '� rt �' '� 3 2.0 D 7 0 p 0 O (D CT � O Z ,Nr 7 cn 0 (D 0- Q 3 (DD 0- 7 N LO Q p w N D n rt ,-+ N 7 = 3 S Q 0 Q r0 -r (D D '� (D (a rt° �0 (n (D Q p U p �• rt rt N � Z3 c�D a 0 �' ° cD (D Q 0 OO 3 (D 0 (D-1 o m x Q Q Z) 0 ,� o (D m a (n m m N �ouCDiv°,�oo D l Ortl (D < < �.u, Q °'v, Q O O 0 0 0 w ,� 0 7 p a (D m 0 (D c CD (n 3 = L m rQr �.rtQ —ate Q a fi Q0 Q p C 000 +Q Q 0 m m (n Q a 3. 3 rt 0 �. 0° (n O S— N 0 CD S Q Q Q 00 D Cr CD (D 0 N O zT O (n CD ( 0%Q 0 Q— Z3 O rt 0 00 c 0 Q . a N Q _ O X 7 O 'O (D (D 3 7 p 3 0 C V) CD rt Q O (D `° -° < p 0 v ' O O O fi d Q D TI (0-D 0 a rt 0 0 (D 0- 7 (ND Q a c O. (D a (D (n � Q (n 0m SS(D rt�0 (n +° p — cn (D CA rt(A O�< a � 70 r O (p N Q 0 �< 0° 3-1 0 — D 0 x p (p a n� o Z �(n =0 S <n C O (D p (n 0 (n 3 rt (D 5' Q _ a 00 Q a N D o °� z (T= :3 < Z3 =r WQx= �o Q o� �7 = 0 S= O Op Q- CDD (D _ rt 7 rt CD O p Q n Q C w (D 0 Q 0 Q Q � c + iQ + Q (n Q 0 (n D' 0 (D fi i iQ (D d 01-1 — r I S lD Q �< (D N Z O0 (D CD TO m $ s REMOVE & REPLACE BOATHOUSE MEDINGER RESIDENCE T.E. ALLEN ENGINEERING, PC Prepared for: Mark & Leslie Medinger 21 Seawatch Drive FIRM I C-1997 163 Lake Point Drive Savannah GA 31411 c 0 _ Lake Toaaway, Transylvania County ROSMAN, NORTH CAROUNA 28772 912-398-9559 912-665-2250 North Carolina Lesm02ll@gmail.com PIN: 8522-12-1739-000 BidStrong®aol.com a Dc`< 0cnK:- o a ac rtcn - (— wr-— U—U 0 g a O < (T-((SSO 5.00 r n• fmT1 d 0 O Q• p O� °° �_ o p B O O 0 fl o La p o O co fl p c Z n D n 7 S O a `, 3° 7 3 D n CD a CD 0— T 3 O O r- -a O (n =� �fT1 'n Dn�� m p a° o a �(n o — �mfl'��.7 — n o� o ao �a� p o zrtn z -4X x.z �� G (D m m��n co o o �0 �� c aro rtn O fiZo� �o(D n ,-� �° a °qo o ��+ tet° fi rn o � �cn o �.� fi0 CD fT1p' 0z�'. n m D n �° ah Z3° n m 0 n_cn °;O= N N n- Lo Z D— p n D z N Z3 aa 0 0 6 0 O 0 O CD O _ C CD Z0 m=0 n N �� �� m Dp D �� p ��0 (D o� O 0 � (n Z 0 C7 CD _ m 0 0 O CDD 7, S r -r �, �• ,•-r S O O D CD — D 0 O O (n (n G7 — 0 fi m I �_ (n CD - — CD am600r-° ° �0-, o m m D7 CD o fl o n O< o (D ° cD o 0 0 rt C7 — D Z< n N C =$ -I fi S "O I r (D rt 7= 7 tp' �G (D y, 0� r�-r 0 rt O (n S 3 -a— rt CD S CD —'0 O r �' `< ��0 a m �, m (D c° a- (D �� n 0 Q 00 -0 0 � o °o °o m rto ° o (DD N C)° Z W 0 N p ,Cn+ 7, a Ei ,� < _ In 0 a-1 O- 0 n 0 7 n. 0 Cn CD �m�?o CD fiC m ° a z �0 Z O I < 0 �`n`< 0 0 3 -0 CD C 0 (D n- � � O C) (n �. -a cD O� 0� fi* O a a j to r 0 0 n E (n' N m CA = — C N (nn d = CS tQ 0 CCD fi O• CD o f O O — a(D�< a`< 00 -,La (n O cn =(n to O m0 O =� � SO CD 3O �'-Q QCD O m , CD h CT (n -F = tn• 0 O (D 3 a 4 n � a O Sar- CD SS(D 07 n0 C O �a "O n (D •O —O S° D2m zD(D D a° O ° o - Z7 ° Q �' m a� -.c (D (D -1 CDLQm < o Q O cD -0--0 D( n pJ `� Z o ° O S (p O W (O rt N 0- n O v d (D to 0 (�D a 7 n a0 a� ifs °n_o I a° o m ° �n m� � na o C �� 0(D (3D =�, o _ _ o O fmTl + S 3 D Q o r r a (D zT (D O� CD ° — (-D CD (D ° to (D Q 00 0 to n _S 0 ((D — CD C d 0 n CD CD D T w -0 3 O (SD Q c 0 (D =r CD f=T1 N fi a t a n cD �' S 00 cn O a `°zT _ fi 0 F90 � fi rrn � � 0 mO() a CD (n ti � � (n rr=O Q a� O U a �. C-) �, a CD 7 7 O 0 S O? N fi�� � fi5 - o Dza 5.0 =5 3m (T� fi fTl S O La (n (D (D C (D Otn 0 (D �< S 0 rt n (D m (D CD a O_005'(n D-0 0 DO ��0 O g n m— am0 -°O r r Q (D ° 3 3 (DCD p O p 0 (aD ° '� O 1 7 0 O 0 -1 (D N O N .< n .< cn n a(D D n N C7 —N �'m0 a O n a n hD rxrZ:0 (n `< O � 3 m 0 0 0-° `� a °c 0 <o n 0 Danz ° noa 0cn cD� _ o fiacn n r'n Ln +�' Dn v� rrfin I I CD _I (D p� �A rT1 CTrtD C (D �+ — -1 0 -.0 0 n -h � n �• ,�+ I (D r+ N M ' CD S n 0 7 CT -,° O— C 7 n CD S to (D fi O n a I (n 0 I O 7 n (n 3 (n (D I �u :3 s p c 0 n -•n m a �mm -G aoZy N m ha� o G 0� CD n 3° a_ pc7 p o �o m co ��1 DWO vi acD �o� rn 0 �r- � (n O n a o �Q a0 X00 0 °° o OD o� X- —,rtZ Zfi C) '�+a CS=• -O T. O -1 r. C fiD (n X N m '� (D O3 0 c O O A• CD ° l0 `< d (D � _ '� S °- (D k� n S (n 7 7 n S _— (D S 0 � r -r r0'F a° I° m rn an D76 Ocn � (TO rn N 0 C(D a -. C) x S° .0 l ad a -a ° Sa�O o 3 O 4 O �G rn n own D3 0n rn(D 700-1o��x 0'<0ZZ �T!�0 0 m -0 '� (D (D S O n 3 X. �• 7 (n N mmDO a�.aDo �� o o �° n a� ao -o a3a �m Q?D�� o ° 0ppm a 0 ° CD.3o p�(n 0 ° a o'(m (D (D r Z m �< `< CO 0 a rn i r+ 2. D n (DD m rmn m (D O (D O C 7 n (D = O O 1< n to O Z m m c= �� s na z C o x I +i� p i n r0+ I CD a pp n S� z m ocn�-0o �< I � (D N0o O O—ten ND z ry n 0m n OD +o (n,(Dn\ -1-0 Am CCD G�Do Om D �. I 0— S r 0 n co a 77 -< r v (D O� (D C7 n 7 r O a �< S ((D fi 0 C n r fi o n CO O o 0 �• I I D Z N 0 `< CD lD (n � (DD O S 0 U LO a+ OZ m 0 a� co co n O rn (D Z 0 NOT TO $ s REMOVE & REPLACE BOATHOUSE MEDINGER RESIDENCE T.E. ALLEN ENGINEERING, PC Prepared for: Mark & Leslie Medinger 21 Seawatch Drive FIRM I C-1997 163 Lake Point Drive Savannah GA 31411 CD - Lake Toaaway, Transylvania County ROSMAN, NOM CAROUNA 28772 912-398-9559 912-665-2250 North Carolina Lesm02ll@gmail.com PIN: 8522-12-1739-000 BidStrong®aol.com 0 O z O (n C7 D r M 0 Z C) Z oD -0 \ rt r« ZJ � Prepared for: Mark & Leslie Medinger 21 Seawatch Drive o D N r PO BOX 103 p GO Z m - K X (D o o 3 � I � Z � 3�r.��. O � rt CA O � O z rt en Q Lesm02ll@gmail.com 0 0 S o 3 I rr c rn CD�o c 3 p O p p : cp m O = O c o 3 C (D N 0 M OM ;a rn r n� OZ .Z7 � C7 I Oz Z0 `i o+ 0 `< DSO (ACDfi c��m3c� rtr+7 r+W rn DrtDv�0 �e water S CD c ! `D e�aak o c N Wim° CD 00 003 WCD rn 0 U Y ,114 0 Z O Oo M 0-0,1140' + O D v LT1 D (D NOT TO $ z \\\l � I T.E. ALLEN ENGINEERING, PC Prepared for: Mark & Leslie Medinger 21 Seawatch Drive (D r r rt 1F3 Lake Point Drive PO BOX 103 Savannah GA 31411 Z r n O N ROSMAN, NORTH CAROLINA 28772 o o 3 � I � Z � 7 r+ O � rt CA O � O 0 r p Lesm02ll@gmail.com 0 rr Op S PIN: 8522-12-1739-000 O n rr c ,fir O (D p cp O CD O 0 7' U Y ,114 0 Z O Oo M 0-0,1140' + O D v LT1 D (D NOT TO $ s REMOVE & REPLACE BOATHOUSE MEDINGER RESIDENCE T.E. ALLEN ENGINEERING, PC Prepared for: Mark & Leslie Medinger 21 Seawatch Drive FIRM I C-1997 1F3 Lake Point Drive PO BOX 103 Savannah GA 31411 m Lake Toaaway, Transylvania County ROSMAN, NORTH CAROLINA 28772 912-398-9559 (828) 877-4883 912-665-2250 North Carolina MOBILE (828) 553-3004 Lesm02ll@gmail.com PIN: 8522-12-1739-000 email : tealleneng®comporium.net BidStrong®aol.com CD cn 0 rt rtrt0 SU) TI -TI tn0 0 -P' F =SSA p 2.-0 M C,4 O 2.Q-0 N O =0rt0w( — 0 r0r 0 0 0 0 (D (D p o 0 0 (D O Q O (D (Dfi tQ 0 A O tQ 0 �' O a (D C O a p ITI 04 A o -a(n o stn ctQ �� o o a ac z =tn O ° p tQtQ cn TI oruo0 D o°° Q I o rt n :' 1 F rtn o SCD cn CD rto D QMc Sz Q p cn to o sO co �'0 a�.� 0 rt� Q �0 0 A Do CD rt r o n `tD.� 0'< m 0 Q 0 o n rn .._ I S° = 1 tTrt m rn -0-0 0 Q m to =� rt�� arto NS ° cn rt Q^Q Q o� �n� n nn0 Z m (D�a00 0on-1a A o00O0`<°�rt ��<a�� 0ON000Q� O 0O' '+ D n (D ZT Zr da� n fi rtO� �rt fi �.��mi� �'�.Q 0.� a� (D`< �.S N S (D rt II 0 0 (D 0 0 n p 0• CD CD Z) 0• 11 11 0 C Q C7 rt 00 rA•.-o 3 a 0 S (D 0 N� rt p � D v o a p rtn m D o' _ ac a0 tp nm z �. n r. < 0 (DN N p��G Q C S? o N 0 0 7 0 C a o �• prt W N 0 o 0 N° �U, silts �'-0 II m a atn o to 3 `< rt< �'< 0- o° fi= a N rt ° a° corn°o� t°nN I1 ��ha�°moo �• rto °a �QOnhW�.O m :3 -0 Q _ _ to o cto a 00 to m -p -- * (D �. 0 0O to to 0 _ (D + < En Q , 0 C7 ao m < O <to o otn soo o °o °�' °o o 0 o 0 .1 , 3Oo n I -cno o -0 a0ooNa1<=a a �� s D�cnas D Q< oAo=°o c p c:77 co to( oZZ�Q �° Q rno O rn Q =0 3 +' o p m= rt rt = c DC�DDA Z (D 7 S ,� (� = A= tQ 1 Q tT tQ to ° Q n o n n N (n a° 0 0 rt (D C N 0 o 0 a S N r+ a (1) A Crl Crl rt S p) O 0 (D Q 77 N rt r+ 0 S 0 CD ,O -r (OA N LO -0 ° : 0 n S 7 Ci (2D 7 D 0 � � (b � S _ Q Ort (D S a Q = S D Q 0 7. 0 A 0 (/1 _ .Z7 - rt m -° __ r o (D M0 O- tQ too rn D fs� 10 = C� tJ ° �a -1 ZQ 0 nD CD Q C N 0 O M to 0 g Q to A C/) <3 m tooc - a rt -0 (Do 0 00(1) op= Q rtU) 0 rt u(D Q A ( CD S rtp atiG alD 0 (D cn 0 D TO CQ CD W0 ; N 0 o O c-0 O C OQO O(D — Q (rtfiDN Fzi p_ rt = O O rt rt o p �N (D atS� 'r(D � =.A 0 (D (D =fip < CD- C O rt c -. Q �. (D °- (D Q -0 O — 0 cn a gQ rt- a tQ rt o Q fi Q c a° o < sW rn o = 0 ' rn rn (o `< ° = mto 0 0 to o 3(n -1 --h N o I n Cr- Dn A ( A wp DDb toCTS D(no --hcozr zra �Io D O O �0 O°Q O a 1 O /CNb (T —O = (0 O0 rt A (D (D (D �° Oo (p CD O1Q 0 S N r co w -0 3 O ODD- �fl o m to Q � m _ = O (n Q (n to cr 0 r (DQW I < O(D 3 =sz o ccn _ mo o rt��n Q o,- o 0 Q 5* ao mO rt CD (D '� I� A o D (D Ort N -p N ,0+ = TI 3 �) zTCD0 ° 3 N a D I C pacno>=rQc 0 rt�a rn o �2 =3 0-0 o` (n D Q o a7 Z 0 Q c 0 (D tQ �< (n r O S- — 0) G7 O rtr� : p 0 S O�N N D(n' �_ 'Z SO0 0 N otQ o t�rto S0 ZA D m Q 0 l+ O M O NcD n 0S a S -a D xQ 0S O 0 n 0-0 OW Drt p N D 3 Q s 3 S (D 0 (lD rt (D 0 p 0 O N r o K A (D 0 D (A ° + 0 q � D M 3= a(n C 0 7 Q �-0 _ S O 0 Q (D � O -1 rt O a Q p (D a rt A rn rt +0 Q c Drt (p rtp. —O ap a- DDm D o D 1 ax m �� r+ �,o):. Z 0 0 0-0 tQ (D z CD 0 C �' O N 0 i1pS !n = (D rt !n 3 O 5 A Ort U) O O (D CX) a ,+ CP a O rt S 0--, S S= C (D A - (D < (A rt O Q S (D Q tQ a 0 0< G7 0 0.0 S co (D tQ TI �OmmDO o°� c: m�(D (D(°�-CD 0tQ 3 ao ma° 0x oca DZm C7 ° (�° �Q 1 �� °(nom (D 0 =CDrt ca -Ot Aa)r Z -a -p p O S p Amm; O _ Q Q - (A O z ch c' rt�5.o ° m Q E c(=o (n� 0 D m =r 0 (0 m N oQo (Do X0n o (n (� 0 L = C- C) lac s0 � O v a D rt 0 Dmoo o o _(D CD �I - N zT °D nm_03N 3 3 QO (� ZOrCD w Q OO �o O(D Q oQO p CD Q - N az#z D = $ s REMOVE & REPLACE BOATHOUSE MEDINGER RESIDENCE T.E. ALLEN ENGINEERING, PC Prepared for: Mark & Leslie Medinger 21 Seawatch Drive FIRM I C-1997 m 1F3 Lake Point Drive PO BOX 103 Savannah GA 31411 N - Lake Toaaway, Transylvania County ROSMAN, NORTH CAROLINA 28772 912-398-9559 (828) 877-4883 912-665-2250 North Carolina MOBILE (828) 553-3004 Lesm02ll@gmail.com PIN: 8522-12-1739-000 email : tealleneng®comporium.net BidStrong®aol.com N° 0 0 0 - 00-0 O� CU N cD rt -p (D y, N (D � 0 '� '� CF N O N `< D S S� 0 N 0 Q rt° A X O J (D 7 S -0 a 0 -0 A 0 0 <, a ,�+ ,•+ p u1 w O X, (D A O1 (D (D r+ p C O I p a c �� ((D c C.c -0 CD c:(D s� zr(D a� 0 � o cop m m v° ° (D (D D o m =r ° Oc_< D o� Nrn ° �m o o 0� o -i Ap wpm aAp mom- ����prn °� �p�aA°p*mac°cnrtS ° °o--°0G(D mrn D -rn°= O`D c°n pcn ° Qv� '< p 0 � (n� ° 0 0 � a� o ao � �� v0 ° nc m �� ��° �c � Q �n0� �rtrtrt�-0 Q LO rn op°pornaQ on ° 0 amu, p w cn �, m ° �p �.:3 cn -� a� p � c rtp ° p p S 0' rt (D 7 0 a a (D r r U1 7 0 p — S 0 a (n O �7 0 S O p (p � 0--(D' �. _ --0 Z Z C Q' p p A �< a A p O p (D 7 0 Q p 0 \Q a� onto-� o �n ° p 0 Q rn rn �° M 5.° c� �1° p ,°, 7 r -r A A p p `< S p rt (D Q (n 0 O Q 0`<� rn c� °o Q rn ZDW_ �° rn c ° vrn, �� �° a— oro o p (D co ° rn-0 W. rt0 0aprt ' °OAp+'fl(pD o rtcn0 <7-mSjA_(D ofi ooav�3 E: (D a< nX-3T ° om p A0-� prn(�D • irn(A0n ' o 0 3 _ (D ( (D 3-SIn 7 OOa p.00 a 0 m O Q(D 0 0-0 -00 pAOao A�a O<0 �0 o oa�D0Or -�(D < ° Z3 0 s(D 0 o °0°`n ° 0 o 3�(D (o p � c rt<� O ° O 0 o °° En o ���`o <o p Z' -i D o O(rt(°a=S Srtcn 0 rt3- n 0X 0 (D S �0° � D � 0n�A N p OO -0 = w (D Q -• (n X jfi--5'00 D p O (D fin SNp ry X 0 CL fi0 n XD0° a crn7�C(D a CD 0 Qnp D S(n °(Drt O -A w p CD( ? ��o Cno�-Aosa(<°Dp1 �S�( Q0 0 - c c ooz (D. �m° °-LQ N O O p - N O a(D p a= paa p O N0 a (n 3 0 pC(D n cn n O p j S °(D mO n S 0 0amcn ° ° PD ° oca 6�p mj ai N p(77 Qr° ° Q 3 nO0 0 Drt a- C0 0 p D Z3 a O p �n ---1 p N�rt p .p O O-0WZS 0rtO . O�OlrNIWI�WlQW-� -rrr1 --1I O- n ^�u�ODuoou ° n0 ° (D a`nrt�`<��Q 0- (1) U) irnai o p ° 0 0 (n 0- U) 0 o p (D 0 0 cn O _ ° ° O � rt �`0< s. v�n°O°o-0`O co m(n oo cfl 53 -SJ p S u_S) rt0=) A a *o a°cti' `(p<n°C cO°ppn °° Z O(D O Drt _ 3 cc O °O aO -1A-0 �O O 0 O p 0 O X- a 33 N D O Oto * ON= C D A A "0 :3 3(D (n (D w rtw n cc,M —D S M Dm Wmo_ ° 0O(D ° 0-0 0 D(0 o O O,� o 0.,Q- => Lc CD p S O � O O p p A j O Zm° (D CTO w a prta0rta <S N 7 (n S tS 0 a OO� (D S7 S< AD�O cr (D < (n 7 (n 0 w i 0 3 5 0 c c X 0 N 0 0 7= rt• 3 7( 2 m aD< a 10 0 -0 A ° v C p a0 (D N —7 0 7 (D Ap �rt p ( O -O A z a O (n - 0 art: O fip°Om� =Azr0 mO co w � ai° �� Q fi Sarn ° oo mo o� 3 UacQ 5ao rQ-o a c° a°� a 6<p0fi0rt0 w Q N - � o C 01 �O�a(D W t3 Ortm rtA X° w 0 00 D p • n � Dao_p .p �� � 0,a0 0p -(Dnn�o � v�m0 D o a0 Szp cnaa' 7 (D(D 9000-0—cmnQ0 p< w S (nCA '0 a0 LO �aaAco co Q 0 D 0m ZTcDCDN p � ° fip A ZY�vv n ' o ° nJ C (D p S -I I— W "0 p lA 6�,rtC pSrt 17 m m D O p A:� O p o (I) w CD (D 0 0� 0 l p o- o w cD corn _ o Sn? x M 3 D O ID C7 r�r c CD tOn N ((n ° N p,= O (D 0 �' n A O 0-0 f O- 0-(Dmrmilm; �a-1 Z' = o o F 0 �' rn ° rtp v m 5'(n a� ZZ ch 7 -i cc (D rr 7c rt 1 _� ° p O a rt-.rta(D 0 fiA C N D (D cp Z7 rt `G p_ p fi N 7' - p 0 Q p O l (D (p `G p rt (<D a CD CD fV0 p A Q N p h O 0 °< n to �< O 0 3 N ° 0 0 7' rt am D� �C'< <O �rt00 O� a� ?��(D3 p �p5 C r v Q rt 0- O' (D C CD `t O 3 p O rt ,� (D (D �I Dnm� °0.°'+a x0� �fi °ar° rtSIrn fi wog O z -(D Z cn p A p_ co � S cp rn a Q zO p �0� �� ucDi a (D $ s REMOVE & REPLACE BOATHOUSE MEDINGER RESIDENCE T.E. ALLEN ENGINEERING, PC Prepared for: Mark & Leslie Medinger 21 Seawatch Drive FIRM I C-1997 163 Lake Point Drive PO BOX 103 Savannah GA 31411 - Lake Toaaway, Transylvania County ROSMAN, NORTH CAROLINA 28772 912-398-9559 (828) 877-4e83 912-665-2250 North Carolina MOBILE (828) 553-3004 Lesm02ll@gmail.com PIN: 8522-12-1739-000 email : tealleneng®comporium.net BidStrong®aol.com 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ❑ Yes ® No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ❑ ® impacts? Yes No F1 Raleigh 5c. If yes, indicate the USFWS Field Office you have contacted. ❑ Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? 6. Essential Fish Habitatuirement Cor s Re ( p Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ® No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal ❑ governments have designated as having historic or cultural preservation Yes No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA -designated 100 -year floodplain? ❑ Yes ❑ No 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination? Leslie B. Medinger, Trustee Applicant/Agent's Printed Name Applicant/Agent's ignatufre Date (Agent's sign'oture is valid only if an authorization letter from the applicant 1 11 isprovided.) age 12 of 13 PCN Form — Version 1.3 December 10, 2008 Version 0 W ATERQG � r Office Use Only: Corps action ID no. DWQ project no. Form Version 1.3 Dec 10 2008 Page 1 of 13 PCN Form — Version 1.3 December 10, 2008 Version Pre -Construction Notification PCN Form A. Applicant Information 1. Processing 1a. Type(s) of approval sought from the Corps: ®Section 404 Permit El Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: 3 & 18 or General Permit (GP) number: 1 c. Has the NWP or GP number been verified by the Corps? ® Yes ❑ No 1d. Type(s) of approval sought from the DWQ (check all that apply): ® 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization 1 e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ❑ Yes ® No For the record only for Corps Permit: ❑ Yes ® No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. ❑ Yes ® No 1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ❑ Yes ® No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ® No 2. Project Information 2a. Name of project: REMOVE & REPLACE BOATHOUSE at MEDINGER RESIDENCE 2b. County: Transylvania 2c. Nearest municipality / town: Brevard 2d. Subdivision name: Lake Toxaway 2e. NCDOT only, T.I.P. or state project no: 3. Owner Information 3a. Name(s) on Recorded Deed: Leslie B. Medinger, Trustee 3b. Deed Book and Page No. Date: 01/2017 Book: 00790 Page: 0493 Plat Book: F16 Page: 876 3c. Responsible Party (for LLC if applicable): 3d. Street address: 163 Lake Point Drive ( Lot 27, Block B) 3e. City, state, zip: Lake Toxaway, NC 28747 3f. Telephone no.: 704-668-1118 3g. Fax no.: 912-398-9559 3h. Email address: Page 1 of 13 PCN Form — Version 1.3 December 10, 2008 Version 4. Applicant Information (if different from owner) 4a. Applicant is: ❑ Agent ❑ Other, specify: 4b. Name: 4c. Business name (if applicable): 4d. Street address: 4e. City, state, zip: 4f. Telephone no.: 4g. Fax no.: 4h. Email address: 5. Agent/Consultant Information (if applicable) 5a. Name: Terry Allen, PE 5b. Business name (if applicable): T.E. ALLEN ENGINEERING, PC 5c. Street address: P.O. Box 103 5d. City, state, zip: Rosman, NC 28772 5e. Telephone no.: 828-877-4883 5f. Fax no.: 5g. Email address: tealleneng@comporium.net Page 2 of 13 PCN Form — Version 1.3 December 10, 2008 Version B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): PIN 8522-12-1739-000 1 b. Site coordinates (in decimal degrees): Latitude: 35.12204 Longitude: - 82..94351 (DD.DDDDDD) (-DD.DDDDDD) 1 c. Property size: 0.599 acres 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to proposed project: Lake Toxaway 2b. Water Quality Classification of nearest receiving water: B, Trout 2c. River basin: Savannah Page 3 of 13 PCN Form — Version 1.3 December 10, 2008 Version 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: This home site located in Toxaway Estates, a private residential development in western Transylvania County, NC. The lot borders Lake Toxaway which has a classification of B: Trout. The general land use is residential. There is an existing 14'x18' Boathouse located on site, which is to be removed and replaced with a new 28'x30' Boathouse. 3b. List the total estimated acreage of all existing wetlands on the property: none 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: none 3d. Explain the purpose of the proposed project: The existing boathouse foundation is failing and the structure is unsafe to occupy. This project is to remove and replace the existing boathouse structure and foundation. Page 4 of 13 PCN Form — Version 1.3 December 10, 2008 Version 3e. Describe the overall project in detail, including the type of equipment to be used: NEW WORK - REMOVE & REPLACE EXISTING BOATHOUSE - LOCAL VARIANCE REQUIRED; This Project is to remove the existing 14'x18' Boathouse and replace with a new 28'x30' Boathouse as described herein. The Foundation for the Boatslip portion of the new Boathouse shall reinforced concrete.. The Foundation for the Kayak Storage portion of the new Boathouse shall be a cast -in-place concrete retaining wall. The work will also include a 12'x14' new wooden Dock. The Architectural features of the new Boathouse shall comply with the 2016 edition of the Lake Toxaway Community Association Architectural Review Standards. The existing property lines and the Side Yard Setback shall be located, marked and flagged by a Professional Land Surveyor prior to beginning work. Verify actual setback requirement with the most current Lake Toxaway Community Association Architectural Review Standards. Perform incidental excavation as necessary to install the new Boathouse Foundation. Work to be performed using hand labor & small equipment. All work shall be performed "IN -THE -DRY" . This will be accomplished by installing a temporary coffer dam around the proposed work area, or by scheduling the work during a lake draw down. Where a coffer dam is used, the work area will be dewatered by pumping. All dewatering discharge shall have a turbidity of not more than 10 NTUs above background or as otherwise specified in DWQ's Turbidity Standards (15A NCAC 02B.0211(3.)(k.)). To satisfy the required turbidity limit, the dewatering pump discharge shall be filtered through a Bag Filtration Unit equal to Model BF -400 from Rain -for - Rent with a 100 to 1 micron nominal rating. The turbidity level of all discharge shall be monitored with calibrated turbidity meters and the filtration equipment shall be adjusted as necessary to insure compliance with Water Quality Standards. The water around the work areas shall likewise be monitored with calibrated turbidity meters and the turbidity curtains shall be installed in addition to the coffer dam as needed to insure compliance with Water Quality Standards. Uncured concrete shall not be allowed to come into direct contact with surface waters. This will be accomplished by establishing a "dry work area" as described above. "High Early" cementious material shall be in the stone work to minimize curing time. DOCK PILINGS INSTALLED IN WATER - Pilings may be placed by auger, jetting or drop hammer. Pilings shall receive a final set by drop hammer or other approved method, acceptable to the Building Inspector to ensure compaction of material at end bearing. The tip -elevation for all pilings shall be field determined during installation. All pilings shall bear on satisfactory insitu material having a minimum bearing capacity of 3000 PSF. The minimum embedment depth shall not be less than 6 -Feet. The actual embedment depth shall be as required to insure pilings bear on satisfactory insitu material having a minimum bearing capacity of 3000 PSF. All building materials shall be suitable of exterior use. All Pilings for the Boat Dock that are to be located in -water shall be pressure treated for fresh water immersion. The Boathouse Foundation Wall shall not extend beyond the existing shoreline into the waters for Lake Toxaway. Page 5 of 13 PCN Form — Version 1.3 December 10, 2008 Version 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the past? Comments: El Yes ®No El Unknown 4b. If the Corps made the jurisdictional determination, what type of determination was made? El Preliminary El Final 4c. If yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? ❑ Yes ® No ❑ Unknown 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ❑ Yes ® No 6b. If yes, explain. Page 6 of 13 PCN Form — Version 1.3 December 10, 2008 Version C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ❑ Wetlands ❑ Streams - tributaries ❑ Buffers ® Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number — Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ — non -404, other) (acres) Temporary T W1 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W2 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W3 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W4 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W5 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W6 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ 2g. Total wetland impacts 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) or intermittent DWQ — non -404, width (linear Temporary (T) (INT)? other) (feet) feet) S1 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S2 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S3 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S4 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S5 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S6 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ 3h. Total stream and tributary impacts 3i. Comments: Page 7 of 13 PCN Form — Version 1.3 December 10, 2008 Version 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. 4b. 4c. 4d. 4e. Open water Name of waterbody impact number — (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or Temporary T 27 CY for Boathouse Foundation 01 ®P ❑ T Lake Toxaway Boathouse Footprint = 14'x30' Lake 0.01 Acres = 420 SF 02 ❑ P ®T Lake Toxaway Temporary Coffer Dam 45'x15' 0.02 Acre = 675 SF 03 ❑ PEI T 04 ❑ PEI T 4f. Total open water impacts 0.03 Acres 4g. Comments: Foundation work will be accomplished "in the dry" by installing a temporary coffer dam around the proposed work area. Where coffer dams are used, the dewatering discharge will be filtered to DWQ Water Quality Standards prior to release. 5. Pond or Lake Construction If pond or lake construction proposed, the complete the chart below. 5a. 5b. 5c. 5d. 5e. Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or purpose (acres) number of pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 5f. Total 5g. Comments: 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: Page 8 of 13 PCN Form — Version 1.3 December 10, 2008 Version 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. ❑ Neuse ❑ Tar -Pamlico ❑ Other: Project is in which protected basin? ❑ Catawba ❑ Randleman 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number — Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) or for Stream name mitigation (square feet) (square feet) Temporary T impact re wired? B1 ®P❑T F-1 Yes ❑ No B2 ❑ P ❑ T ❑ Yes ❑ No B3 ❑P❑T F-1 Yes ❑ No 6h. Total buffer impacts 6i. Comments: D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. All work shall be performed "IN -THE -DRY' . This will be accomplished by installing a temporary coffer dam around the proposed work area, or by scheduling the work during the upcoming lake draw down. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. To minimize disturbance during construction, the work will be accomplished with the smallest mechanical equipment practicable. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for ❑ Yes ® No impacts to Waters of the U.S. or Waters of the State? 2b. If yes, mitigation is required by (check all that apply): ❑ DWQ ❑ Corps ❑ Mitigation bank 2c. If yes, which mitigation option will be used for this El Payment to in -lieu fee program project? ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type Quantity Page 9 of 13 PCN Form — Version 1.3 December 10, 2008 Version 3c. Comments: 4. Complete if Making a Payment to In -lieu Fee Program 4a. Approval letter from in -lieu fee program is attached. ❑ Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: ❑ warm ❑ cool ❑cold 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non -riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ❑ Yes ❑ No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund). 6h. Comments: Should project exceed 10% or 100' in 1000', a trout buffer waiver will be sought from NCDENR - Div of Land Resources Page 10 of 13 PCN Form — Version 1.3 December 10, 2008 Version E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1 a. Does the project include or is it adjacent to protected riparian buffers identified ❑ Yes ® No within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why. ❑ Yes ❑ No Comments: 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? % 2b. Does this project require a Stormwater Management Plan? [E] Yes ® No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: ❑ Certified Local Government 2e. Who will be responsible for the review of the Stormwater Management Plan? ❑ DWQ Stormwater Program ❑ DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? ❑ Phase II 3b. Which of the following locally -implemented stormwater management programs ❑ NSW ❑ USMP apply (check all that apply): ❑ Water Supply Watershed ❑ Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 4. DWQ Stormwater Program Review ❑ Coastal counties ❑ HQW 4a. Which of the following state -implemented stormwater management programs apply ❑ ORW (check all that apply): ❑ Session Law 2006-246 ❑ Other: 4b. Has the approved Stormwater Management Plan with proof of approval been attached? ❑ Yes ❑ No 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 11 of 13 PCN Form — Version 1.3 December 10, 2008 Version F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public (federal/state/local) funds or the ❑ Yes ® No use of public (federal/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ❑ No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) ❑ Yes ❑ No Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑ Yes ® No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after -the -fact permit application? ❑ Yes ® No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ❑ Yes ® No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non -discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. N.A. Page 12 of 13 PCN Form — Version 1.3 December 10, 2008 Version 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat? ❑ Yes ® No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts? ❑ Yes ® No 5c. If yes, indicate the USFWS Field Office you have contacted. F-1 Raleigh ❑ Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ® No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? ❑ Yes ® No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA -designated 100 -year floodplain? ❑ Yes ❑ No 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination? Leslie B. Medinger, Trustee Applicant/Agent's Printed Name Date Applicant/Agent's Signature (Agent's signature is valid only if an authorization letter from the applicant is provided.) Page 13 of 13 PCN Form - Version 1.3 December 10, 2008 Version