Loading...
HomeMy WebLinkAbout20171254 Ver 1_More Info Received_201711011-7 -125 Lf 2caj : t1 I f t I --�-- 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then indivii ually list all open water impacts below. 4a. Open water impact number Permanent(P)or Temporary T 4b. Name of waterbody (if applicable) 4c. Type of impact 4d. Waterbody type 4e. Area of impact (acres) 01 Choose one Choose O2 - Choose one Choose 03 - Choose one Choose 04 - Choose one Choose 4f. Total open water impacts 4g. Comments: No open water Impacts will result from the construction of this project. 5. Pond or Lake Construction If pond or lake construction proposed, the complete the chart below. 5a. Pond ID number 5b. Proposed use or purpose of pond 5c. 5d. Wetland Impacts (acres) Stream Impacts (feet) 5e. Upland (acres) Flooded Filled Excavated Flooded Filled Excavated P1 Choose one P2 Choose one 5f: Total: 5g. Comments: No ponds or lakes will be constructed as part of this project. 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. Project is in which protected basin? ❑x Neuse j] Tar -Pamlico ❑ Catawba )] Randleman ❑ Other: 6b. Buffer Impact number— Permanent(P)or Tem ora T) 6c. Reason for impact 6d. Stream name 6e. Buffer mitigation required? 6f. Zone 1 impact (square feet). 6g. Zone 2 impact (square feet B1 P Road & rip rap stabilization UT to Smith Creek No 7,663 3,931 B2 - Yes/No. B3 - Yes/No B4 - Yes/No B5 - Yes/No B6 Yes/No 6h. Total Buffer Impacts: 7,663 3,931 6i. Comments: Page 5 of 10