HomeMy WebLinkAbout20050675 Ver 3_Certification of Completion_20090112Certification of Completion S N ."
DENR.970R!li?NA?DH
;?E??-AND` Ftit?D
DWQ Project No.: L15 -N45 V643 County: -?U 0/0-bT-0 /J
Applicant: lit LL I A r1 e d P64 L 0
Project Name: M0,,s L,1"&6 B us1,?1655 194ai-
Date of Issuance of Certification or Authorization:
Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification and Buffer Rules, and any
subsequent modifications, the applicant is required to return this certificate to the 401 Oversight/Express Permitting Unit,
North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This form may be
returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send
certificates from all of these.
Applicant's Certification
I, OLLIAM P. U'NCAc._ I V , hereby state that, to the best of my abilities, due care and diligence was
used in the observation of the construction such that the construction was observed to be built within substantial
compliance and intent of the 401 Water Quality Ce ification and Buffer Rules, the approved plans and specifications,
and other supporting mate als.
Signature. ? Date: 69 f
,- ? /
Agent's Certification
1, , hereby state that, to the best of my abilities, due care and diligence was
used in the observation of the construction such that the construction was observed to be built within substantial
compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications,
and other supporting materials.
Signature:
Date:
If this project was designed by a Certified Professional
1, , as a duly registered Professional
Landscape Architect, Surveyor, etc.) in the State of North Carolina having (p been authorized to observe (periodically,
eriodically,
weekly, full time) the construction of the project, for the Permittee hereby state that,, to the best of my abilities, due care
and diligence was used in the observation of the construction such that the construction was observed to be built within
substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and
specifications, and other supporting materials.
Signature: Registration No. Date