Loading...
HomeMy WebLinkAbout20160052 Ver 3_US 70 Shoulder Reconstruction - US 70 Sites PCN G-L 4 and 5_20171030Action History (UTC-05:00) Eastern Time (US & Canada) �brrrit by Anonymous User 10/30/2017 1:23:00 PM (Supplemental Submital) Accept by Carpenter,Kristi 10/30/2017 2:37:55 PM (DOT - E�asting Project) • The task was assigned to Carpenter,Kristi 10/30/2017 1:23 PM Water Resources ENVIRONMENTAL OUALITY Staff Review: Submittal Type: l" New Project C' Pre-Application Submittal C�' More Information Response New Project - Please check the new project type if you are trying to submit a new project that needs an official approval decision. Pre-Application Submittal - Please check the pre-application submittal if you just want feedback on your submittal and do not have the expectation that your submittal will be considered a complete application requiring a formal decision. More Information Response - Please check this type if you are responding to a request for information from staff and you have and ID# and version for this response. ID#* 20160052 Version* 3 Is this project in a CAMAAEC area?* �' Yes �' No Reviewer List:* Select Reviewing Office:* Garcy Ward:eads\gpward Washington Regional Office - (252) 946-6481 Project Submittal Interim Form subrritted: 10/30/2017 Project Contact Information: Name: Bill Brame Jr Who is subrritting the inforrration? Email Address: bbrame@ncdot.gov Project Information: Existing ID #:* Existing Version:* 20160052 3 Project Name: US 70 Shoulder Reconstruction Is this a public transportation project? l•' Yes C' No TI P#: WBS#: 2.101611 (Applies to DOT projects only) County (ies) * Carteret Describe the attachments: Revised sheets 4 and 5 of PCN. Shows wetland impacts and open water impacts Please upload all files that need to be submited. US 70 Sites PCN G-L 4 and 5.pdf Only pdF files are accepted. rJ By checking the box and signing box below, I certify that: 570.89KB o I have given true, accurate, and complete information on this form; o I agree that submission of this form is a"transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions AcY') o I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions AcY'); o I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND o I intend to electronically sign and submit the form. Signature: ��� c ,� � C. Proposed Impacts Inventory � . Impacts Snmmary � a. Which sections were completed below for your project (check all that apply): ❑X Wetl�nds ❑�tre�ms — tributaries ❑ Buffers ❑X Open Waters ❑ Pond Construction 2. Wetland Impacts If there �re wetl�nd impacts proposed on tt�e site, then complete this question for e�ch wetl�nd �re� impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetl�nd imp�ct Type of imp�ct Type of wetl�nd Eorested Type of jurisdiction Are� of number Corps (404, f 0) or imp�ct Permanent (P) or DW(� (40�, other) (acres) Tem or� T W j P �houlder Maintenance Choose one No DW(� 0.03 qj2 - Choose one Choose one Yes/No - �j� - Choose one Choose one Yes/No - W4 - Choose one Choose one Yes/No - W5 - Choose one Choose one Yes/No - qjg - Choose one Choose one Yes/No - 2B. Total Wetland Impacts: 0.03 2h. Comments: 3. Stream Impact$ Tf there �re perenni�l or intermittent stre�m imp�cts (includin@ tempor�ry imp�cts) proposed on the site, then complete this question for �Il stream sites imp�cted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. �tream impact Type of impact �tream name Perennial (PEIt) or Type of Average Impact number intermittent (INT)? jurisdiction stre�m length Permanent (P) or width (linear Tempor�ry (T) ��etj feet) �j - Choose one - - �2 - Choose one - - �3 - Choose one - - �4 - Choose one - - �g - Choose one - - �g - Choose one - - 3h. Total stream and tributary impacts 3i. Comments: Page 4 of � 0 PCN Eorm — Version i.4 Danuary 200� 4. Open Water Impacts If tl�ere �re proposed imp�cts to I�kes, ponds, estu�ries, tribut�ries, sounds, the Atl�ntic Ocean, or �ny other open w�ter of the U.�. then individuall list all o en water im acts below. 4a. 4b. 4c. 4d. 4e. Open w�ter N�me of w�terbody impact number (if applicable ) Type of impact Waterbody Area of impact (acres) Permanent (P) or type Tem ora T Qj P Fi� Sound 0.0682 O2 - Choose one Choose 03 - Choose one Choose 04 - Choose one Choose 4f. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If ond or l�ke construction ro osed, then com lete the ch�rt below. 5a. Sb. 5c. 5d. 5e. Pond ID number Proposed use or Wetl�nd Imp�cts (�cres) �tre�m Imp�cts (feet) Upl�nd purpose of pond (acres) Flooded Fi�ed Excavated Flooded Filled Excavated p� Choose one P2 Choose one 5f. Total: 5g. Comments: 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. �ize of pond w�tershed (acres): 5k. Method of construction: 6. Bnffer Impacts (for DWf�1) Tf project will imp�ct � protected rip�ri�n buffer, then complete the ch�rt below. Tf yes, then individu�lly list �ll buffer imp�cts below. If an im acts re uire miti ation, then ou MUST fill out �ection D of this form. 6a. Project is in which protected b�sin? ❑ Neuse � Tar-Pamlico � C�t�wb� � Randleman ❑ Other: 6b. 6c. 6d. 6e. 6f. 6@. Buffer Impact Reason for impact �tream name Buffer Zone i Zone 2 number — mitig�tion imp�ct imp�ct Permanent (P) or required? (square (square Tem or� T feet feet B � - Yes/No $2 - YesMo B3 - Yes/No B4 - Yes/No B5 - Yes/No B6 - Yes/No 6h. Total Bnffer Impacts: 6i. Comments: Page 5 of i 0