Loading...
HomeMy WebLinkAbout20171375 Ver 1_PCN Form Submission_20171030Action History (UTC-05:00) Eastern Time (US & Canada) �brrrit by Anonymous User 10/30/2017 12:25:35 PM (Start Event) Accept by Carpenter,Kristi 10/30/2017 12:53:21 PM (DOT Initial Review) • The task was assigned to Carpenter,Kristi . The due date is: November 2, 2017 5:00 PM 10/30/2017 12:26 PM �� � 6fvlslaa of Water Resources Pre-Construction Notification (PCN) Form For Nationwide Permits and Regional General Permits (along with corresponding Water Quality Certifications) June 28, 2017 Ver 1.8 * Please note: fields marked with a red asterisk below are required. You will not be ab/e to submit the form until all mandatory questions are ans�red. Below is a link to the DRAFT online help file. http://edocs.deq.nc.gov/WaterResources/0/doc/549884/Page1.aspx A. Processing Information County (or Counties) where the project is located:* Johnston Is this a NCDOT Project?* C� Yes �' No (NCDOT only) T.I.P. or state project number: U-5795 WBS # 4366.1.1 (for NCDOT use only) � 1a. Type(s) of approval sought from the Corps:* rJ Section 404 Permit (wetlands, streams and waters, Clean Water Act) r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) 1b. What type(s) of permit(s) do you wish to seek authorization?* fJ Nationwide Permit (NWP) r Regional General Permit (RGP) Nationwide Permit (NWP) Number: NWP Number Other: List all MN nurrbers you are applying for not on the drop dow n list. 14 - Linear transportation 1c. Type(s) of approval sought from the DWR:* check all that apply � 401 Water Quality Certification - Regular � Non-404 Jurisdictional General Permit r 401 Water Quality Certification - Express r Riparian Buffer Authorization 1d. Is this notification solelyfor the record because written approval is not required? For the record only for DWR 401 Certification: I For the record only for Corps Permit: 1e. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? * l" Yes C•' No C•' Yes C' No If so, attach the acceptance letter from rritigation bank or in-lieu fee program C' Yes C•' No 1f. Is the project located in any of NC's twenty coastal counties?* C' Yes �' No B. Applicant Information 1a. Who is the Primary Contact?* Chad Coggins 1b. Primary Contact Email:* tccoggins@ncdot.gov 1c. PrimaryContact Phone:* (xxx)xxx-xxxx (252)717-8699 1d. Who is applying for the permit? r Owner r% Applicant (other than owner) r AgenUConsultant (Check all that apply) 2. Owner I nformation 2a. Name(s) on recorded deed: State of NC i 2b. Deed book and page no.: 2c. Responsible party: (for Corporations) 2d.Address Street Address Address Line 2 �' R�stal / Zip Code 2e. Telephone Number: I(xxx)xxx-xxxx 2f. Fax Number: (xxx)xxx-xxxx 2g. Email Address:* I tccoggins@ncdot.gov 3. Applicant Information (if different from owner) 3a. Applicant is: G Agent C' Other If other please specify. 3b. Name: Chad Coggins 3c. Business Name: State / Rovince / F�gion Country (if applicable) 3d.Address Street Address PO Box 3165 Address Line 2 �� Wilson Fbstal / Zip Code 27893 3e. Telephone Number: (252)717-8699 (xxx)x�c-�ocx 3f. Fax Number: (xxx)xxx-xxxx 3g. Email Address:* tccoggins@ncdot.gov State / Rovince / F�gion NC Country USA C. Project Information and Prior Project History 1. Project Information 1a. Name of project:* U-5795 1b. Subdivision name: (if appropriate) 1c. Nearest municipality/town:* Selma 1d. Driving directions* If it is a new project and can not easily be found in a C� rrapping system Rease provide directions. 195 to US70 esit West on US 70 1 st right is Ricks road 2. Project Identification 2a. Property Identification Number: (t�uc RN or parcel ID) 2b. Propertysize: (in acres) 2c. Project Address Street Address Address Line 2 Qty Fbstal / Zip Code State / Rovince / F�gion Country 2d. Site coordinates in decimal degrees Please collect site coordinates in decimal degrees. Use between 4-6 digits (unless you are using a survey-grade GPS device) after the decimal place as appropriate, based on howthe location was determined. (For e�cample, most mobile phones with GPS provide locational precision in decimal degrees to map coordinates to 5 or 6 digits after the decimal place.) Latitude:* Longitude:* I 35.52358 -78.29215 ex:34.208504 -77.796371 3. Surface Waters 3a. Name of the nearest body of water to proposed project:* UT to Bawdy Creek 3b. Water Resources Classification of nearest receiving water:* C NSW Surface Water Lookup 3c. What river basin(s) is your project located in?* Neuse RiverBasin Lookup 4. Project Description 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* Urban with some agriculture and forestry within vicinity 4b. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR) Gick the upload button or drag and drop files here to attach docurrent U-5795 TOPO.pdf 675.72KB Fle type rrust be pdF 4c. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR) C7ick the upload button or drag and drop files here to attach docurrent Fle type rrust be pdf 4d. List the total estimated acreage of all existing wetlands on the property: 0 4e. List the total estimated linear feet of all existing streams on the property: (interrrittent and perennial) 70 4f. Explain the purpose of the proposed project: The purpose of the project is to increase mobility and safety through the corridor 4g. Describe the overall project in detail, including the type of equipment to be used: The project will add a center turn lane wiiich will provide a designated area for left turning vehicles for This will increase safety by providing a sanctuary to left turning vehicles thus preventing rear end collisions as well as increasing the mobility by removing the turning vehicles from the through lanes. Typical heavy road building equipment will be used. 4h. Please upload project drawins for the proposed project. Gick the upload button or drag and drop files here to attach docurrent i U-5795_Permit Drawings_20171025.pdf 2.07M6 Fle type rrust be pdf 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the propertyor proposed impact areas?* C� Yes �' No �' Unknown Comments: i NCDOT Div 4 DEO 5b. If the Corps made a jurisdictional determination, what type of determination was made? * C' Preliminary c" Approved r Unknown Corps AID Number: Exarrple: SAV�2017-99999 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Othe r: Chad Coggins NCDOT 5d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5d1. Jurisdictional determination upload Qick the upload button or drag and drop files here to attach docurrent Fle type rrust be f�F 6. Project History 6a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past?* C' Yes C� No !' Unknown 7. Future Project Plans 7a. Is this a phased project?* C' Yes �' No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? This includes other separate and distant crossing for linear projects that require Department of the Army authorization but don't require pre-construction notification. D. Proposed I m pacts I nventory 1. Impacts Summary � 1a. Where are the impacts associated with your project? (check all that apply): r Wetlands rJ Streams-tributaries r Buffers � Open Waters r Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Site #- 3b.lmpact 3c. Type of 3d. Stream 3e. Stream 3f. 3g. Stream 3h. Impact Reason for type impact name Type Jurisdiction width length impact type Row1 Site1 P Fill UTto Intermittent Both Average 64 I�p label (e.g. F2rrrenent (� or Bawdy F2rennial (� or g (linear feet) Finad C7ossing 1) Tenporary (� Creek interrrittent (IN� (feet) *' All Perennial or Intermittent streams must be verified by DWR or delegated local government. 3i. Total jurisdictional ditch impact in square feet: 0 3i. Total permanent stream impacts: 64 3i. Total temporary stream impacts: 0 3i. Total stream and tributary impacts: 64 3j. Comments: 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 5. Pond or Lake Construction If pond or lake construction is proposed, then complete the chart below. 6. Buffer Impacts (for DWR) If project will impact a protected riparian buffer, then complete the chart below. Individually list all buffer impacts below. E. Impact Justification and Mitigation I 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:* Leaving in existing crossing only extending pipe and fi�ang outlet conditions to contain increased flows. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques:* Minimization efforts that will be implemented for this project include temporary matting for slopes and ditchlines; ground cover and stabilization requirements meeting NPDES guidelines; and minmizing drainage outlet velocities with minimal pipe slopes and rip-rap dissipator pads at pipe outlets, wtiere applicable. Clearing and Grubbing as well as Final Grading erosion control plans have been prepared for this project in order to minimize erosion and sediment during all phases of the project. Other erosion and sediment control measures include using rock checks and wattles in ditchlines, installing rock inlet protection (or other approved devices) at pipe and grate inlets, and installation of silt fence along slopes to contain runoff within the project limits. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? C' Yes C•' No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: under thresholds F. Stormwater Management and Diffuse Flow Plan (required by DWR) � 1a. Does this project require a Stormwater Management Plan? G Yes C' No 1b. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: Minimization efforts that will be implemented for this project include temporary matting for slopes and ditchlines; ground cover and stabilization requirements meeting NPDES guidelines; and minmiang drainage outlet velocities with minimal pipe slopes and rip-rap dissipator pads at pipe outlets, where applicable. Clearing and Grubbing as well as Final Grading erosion control plans have been prepared for this project in order to minimize erosion and sediment during all phases of the project. Other erosion and sediment control measures include using rock checks and wattles in ditchlines, installing rock inlet protection (or other approved devices) at pipe and grate inlets, and installation of silt fence along slopes to contain runoff within the project limits. 1c. What is the overall percent imperviousness of this project? % 1d. Who will be responsible for the review of the Stormwater Management Plan?* r Certified Local Government r DWR 401 & Buffer Permitting Branch 2. Diffuse Flow Plan r DEMLR Stormwater Review �7 DWR Transportation Permitting Branch 2a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? C' Yes !•' No If no, explain why: no buffered stream present just an outfall ditch with an OHWM 5. DWR 401 Stormwater Review 5a. Is the Stormwater Management Plan (including BMP Supplemental Forms and Operation and Maintenance Agreements) attached? �' Yes C' No Stormwater Management Plan Upload C7ick the upload button or drag and drop files here to attach docurrent U-5795_SMP.pdf file type rrust be pdf G. Supplementary Information � 1. Environmental Documentation 33.1 KB 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?* C� Yes �' No 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental PolicyAct (NEPA/SEPA)?* C' Yes �' No Comme nts: * MCDC available upon request 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)? * C' Yes C•' No 2b. Is this an after-the-fact permit application?* C' Yes C•' No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWR Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact I nearby downstream water quality?* C' Yes C•' No 3b. If you answered "no," provide a short narrative description. just adding center turn lane to alleviate congestion and better through movements 4. Sewage Disposal (DWR Requirement) 4a. Describe, in detail, the treatment methods and dispositions (non-discharge or discharge) of wastewater generated from the proposed project. If the wastewater will be treated at a treatment plant, list the capacity available at that plant. no wastewater generated 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat? * C' Yes �' No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* C' Yes C•' No 5c. If yes, indicate the USFWS Field Office you have contacted. 5d. Is this a DOT project located within Division's 1-8?* G Yes C' No 5i. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat?* NCNHP and field surveys 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* C' Yes �' No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* GIS 7. Historic or Prehistoric Cultural Resources (Corps Requirement) Link to the State Historic Preservation Office Historic Properties Map (does not include archaeological data: http://gis.ncdcr.gov/hpoweb/ 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? * �' Yes l" No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?* NCDOT HEU Clearance 7c. Historic or Prehistoric Information Upload C7ick the upload button or drag and drop files here to attach docurrent Johnston SR 2302 No Survey form.pdf 4.O8MB 15-08-0017_NoEligibleProps.pdf 6.63M6 Fle rrust be F�F 8. Flood Zone Designation (Corps Requirement) Link to the FEMA Floodplain Maps: https://msc.fema.gov/portal/search 8a. Will this project occur in a FEMA-designated 100-year floodplain?* C' Yes �' No 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination?* FRIS Miscellaneous attachments not previously requested. C7ick the upload button or drag and drop files here to attach docurrent Fle rrust be FDF Signature ___ ____ ___ ____ ___ _____. * fJ By checking the box and signing below, I certify that: ■ I have given true, accurate, and complete information on this form; ■ I agree that submission of this PCN form is a"transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions AcY'); ■ I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions AcY'); ■ I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND ■ I intend to electronically sign and submit the PCN form. I Full Name:* Chad Coggins Signature ��r�1���Pjr,rlr�rJ Date 10/30/2017 Initial Review Is this project a public transportation project? �' Yes C' No Only change this if the project has been reassigned. Has this project met the requirements for acceptance in to the review process?* �' Yes C' No BIMS # Assigned* 20171375 Version#* Reviewing Office * Central Office - (919) 707-9000 Select Project Reviewer* Rob Ridings:eads\rgridings