HomeMy WebLinkAbout20171371 Ver 1_PCN Form Submission_20171027Action History (UTC-05:00) Eastern Time (US & Canada)
�brrrit by Anonymous User 10/27/2017 1:10:25 PM (Start Event)
Accept by Carpenter,Kristi 10/27/2017 3:20:39 PM (DOT Initial Review)
• The task was assigned to Carpenter,Kristi . The due date is: November 1, 2017 5:00 PM
10/27/2017 1:10 PM
�� �
6fvlslaa of Water Resources
Pre-Construction Notification (PCN) Form
For Nationwide Permits and Regional General Permits
(along with corresponding Water Quality Certifications)
June 28, 2017 Ver 1.8
*
Please note: fields marked with a red asterisk below are required. You will not be ab/e to submit the form until all mandatory questions are ans�red.
Below is a link to the DRAFT online help file. http://edocs.deq.nc.gov/WaterResources/0/doc/549884/Page1.aspx
A. Processing Information
County (or Counties) where the project is located:*
Madison
Is this a NCDOT Project?*
C� Yes �' No
(NCDOT only) T.I.P. or state project number:
B-4777
WBS #
38548.3.1
(for NCDOT use only)
� 1a. Type(s) of approval sought from the Corps:*
rJ Section 404 Permit (wetlands, streams and waters, Clean Water Act)
r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act)
1b. What type(s) of permit(s) do you wish to seek authorization?*
fJ Nationwide Permit (NWP)
r Regional General Permit (RGP)
Nationwide Permit (NWP) Number:
NWP Number Other:
List all MN nurrbers you are applying for not on the drop dow n list.
03 - Maintenance
1c. Type(s) of approval sought from the DWR:*
check all that apply
� 401 Water Quality Certification - Regular
� Non-404 Jurisdictional General Permit
r 401 Water Quality Certification - Express
r Riparian Buffer Authorization
1d. Is this notification solelyfor the record because written approval is not required?
For the record only for DWR 401 Certification:
I For the record only for Corps Permit:
1e. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts?
*
C•' Yes !" No
C' Yes C•' No
If so, attach the acceptance letter from rritigation bank or in-lieu fee program
C' Yes C•' No
1f. Is the project located in any of NC's twenty coastal counties?*
C' Yes �' No
B. Applicant Information
1a. Who is the Primary Contact?*
I Roger D. Bryan
1b. PrimaryContact Email:*
rdbryan@ncdot.gov
1c. PrimaryContact Phone:*
(xxx)xxx-xxxx
(828)251-6171
1d. Who is applying for the permit?
r% Owner r Applicant (other than owner) r AgenUConsultant
(Check all that apply)
2. Owner I nformation
i 2a. Name(s) on recorded deed:
2b. Deed book and page no.:
2c. Responsible party:
(for Corporations)
2d.Address
Street Address
Address Line 2
�'
R�stal / Zip Code
2e. Telephone Number:
(xxx)xxx-xxxx
2f. Fax Number:
(xxx)xxx-xxxx
2g. Email Address:*
rdbryan@ncdot.gov
State / Rovince / F�gion
Country
C. Project Information and Prior Project History
1. Project Information
1a. Name of project:*
B-4777, Bridge 8 and 9, NC 251
1b. Subdivision name:
(if appropriate)
1c. Nearest municipality/town:*
Marshall
1d. Driving directions*
If it is a new project and can not easily be found in a GPS rrapping system Rease provide directions.
The bridge project is located at the intersection of Ivy River Road and NC 251 just east of Marshall.
2. Project Identification
2a. Propertyldentification Number:
(tax RN or parcel ID)
2b. Propertysize:
(in acres)
2c. Project Address
Street Address
Address Line 2
�Y
Fbstal / Zip Code
State / Rovince / F�gion
Country
2d. Site coordinates in decimal degrees
Please collect site coordinates in decimal degrees. Use between 4-6 digits (unless you are using a survey-grade GPS device) after the decimal place as
appropriate, based on howthe location was determined. (For e�mple, most mobile phones with GPS provide locational precision in decimal degrees to
map coordinates to 5 or 6 digits after the decimal place.)
i Latitude:*
35.77643
ex:34.208504
3. Surface Waters
Longitude:*
-82.64754
-77.796371
3a. Name of the nearest body of water to proposed project:*
Ivy River
3b. Water Resources Classification of nearest receiving water:*
C
Surface Water Lookup
3c. What river basin(s) is your project located in?*
French Broad
RiverBasin Lookup
4. Project Description
4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:*
Two e�sting bridges near the confluence of Ivy River and French Broad River. Land use dominated by roadway
and wooded riparian areas.
4b. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for
DWR)
Gick the upload button or drag and drop files here to attach docurrent
B-4777 Madison Topo Map.pdf 526.61 KB
Fle type rrust be pdF
4c. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site.
(for DWR)
Gick the upload button or drag and drop files here to attach docurrent
Fle type rrust be pdF
4d. List the total estimated acreage of all existing wetlands on the property:
0.0
4e. List the total estimated linear feet of all existing streams on the property:
(interrrittent and perennial)
200
4f. Explain the purpose of the proposed project:
Replace the two existing bridges with an single bridge between the ewsting structures. Demolition of the two
ebsting old bridges.
4g. Describe the overall project in detail, including the type of equipment to be used:
Temporary impacts will be necessary to install causeways for bridge demolition and construction. A total of 6 small
causeways will be constructed, with only one causeway in place at any time. See permit drawings for detailed
phasing.
4h. Please upload project drawins for the proposed project.
C7ick the upload button or drag and drop files here to attach docurrent
B-4777 Madison Permit Drawings.pdf 5.33MB
Fle type rrust be pdf
5. Jurisdictional Determinations
5a. Have the wetlands or streams been delineated on the propertyor proposed impact areas?*
C' Yes r No �' Unknown
Comments:
5b. If the Corps made a jurisdictional determination, what type of determination was made? *
C' Preliminary l" Approved r Unknown
Corps AID Number:
Exarrple: SAVu2017-99999
5c. If 5a is yes, who delineated the jurisdictional areas?
Name (if known):
Agency/Consultant Company:
Othe r:
5d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation.
5d1. Jurisdictional determination upload
aick the upload button or drag and drop files here to attach docurrent
Fle type rrust be FDF
6. Project History
6a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past?*
f Yes C•' No f" Unknown
7. Future Project Plans
7a. Is this a phased project?*
C' Yes �' No
Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the
proposed project or related activity? This includes other separate and distant crossing for linear projects that require Department of the
Army authorization but don't require pre-construction notification.
No
D. Proposed I m pacts I nventory
1. Impacts Summary
� 1a. Where are the impacts associated with your project? (check all that apply):
� Wetlands I7 Streams-tributaries
r Open Waters r Pond Construction
r Buffers
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted.
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites
impacted.
3a. Site #- 3b.lmpact 3c. Type of 3d. Stream 3e. Stream 3f. 3g. Stream 3h. Impact
Reason for type impact name Type Jurisdiction width length
impact type
Row 1 Area 1 T Rip Rap Fill Ivy River Perennial Both Average 26
CBUSewBy F2rrranent (F) or F2rennial (FB� or 80 (linear feet)
N�p label (e.g. Terrporary (� interrrittent (IN� (feet)
Row 2
Row 3
Row 4
Row 5
Row 6
Finad Qossing 1)
Area 2 T Rip Rap Fill Ivy River
Causeway F�rrranent (P� or
N�p label (e.g. Terrporary (�
Rnad Qossing 1)
Area 3 T Rip Rap Fill Ivy River
CauseWay F2rrrenent (F) or
N�p label (e.g. Terrporary (�
Finad Qossing 1)
Area 4 T Rip Rap Fill Ivy River
Causeway F�rrranent (F'� or
N�p label (e.g. Terrporary (�
F�ad Qossing 1)
Area 5 T Rip Rap Fill Ivy River
Causeway F2rrrenent (� or
N�p label (e.g. Terrporary (�
Raad Q'ossing 1)
Area 6 T Rip Rap Fill Ivy River
Causeway F2rrranent (F'� or
N�p label (e.g. Terrporary (�
F�ad Qossing 1)
Perennial Both Average
F�rennial (� or gp
interrrittent (IfVn
(feet)
Perennial Both ,4verage
F2rennial (� or g�
interrrittent (IN�
(feet)
Perennial Both Average
F�rennial (Fff� or $�
interrrittent (IfVi)
(feet)
Perennial Both ,4verage
F2rennial (�) or gp
interrrittent (IN�
(feet)
Perennial Both Average
F2rennial (FH� or 80
interrrittent (IfV�
(feet)
"" All Perennial or Intermittent streams must be verified by DWR or delegated local government.
3i. Total jurisdictional ditch impact in square feet:
0
36
(linear feet)
36
(linear feet)
38
(linear feet)
36
(linear feet)
31
(linear feet)
3i. Total permanent stream impacts:
0
3i. Total temporarystream impacts:
203
3i. Total stream and tributary impacts:
203
3j. Comments:
I The maximum temporary impact of a single causeway will be 38 linear feet. Only one causeway will be in place at
any given phase of the project.
4. Open Water Impacts
If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list
all open water impacts below.
5. Pond or Lake Construction
If pond or lake construction is proposed, then complete the chart below.
6. Buffer Impacts (for DWR)
If project will impact a protected riparian buffer, then complete the chart below. Individually list all buffer impacts below.
E. Impact Justification and Mitigation
1. Avoidance and Minimization
1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:*
The new bridge was designed to prevent piers within the normal flow channel of the Ivy River. The bridge opening
is large enough to pass high flow events. Only temporary impacts are required for the project.
1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques:*
Temporary causeways are the minimum necessary to conduct demolition and construction procedures.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State?
C' Yes C•' No
2b. If this project DOES NOT require Compensatory Mitigation, explain why:
No permanent impacts to jurisdictional waters.
F. Stormwater Management and Diffuse Flow Plan (required by DWR)
1a. Does this project require a Stormwater Management Plan?
C' Yes �' No
1e. If this project DOES NOT require a Stormwater Management Plan, explain why:
This is a NC DOT project that is covered by NPDES Permit NCS000250.
2. Diffuse Flow Plan
2a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection
Rules?
C' Yes C No
If no, explain why:
French Broad is not covered under Riparian Buffer Protection Rules.
G. Supplementary Information
1. Environmental Documentation
1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?*
C� Yes �' No
1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the
requirements of the National or State (North Carolina) Environmental PolicyAct (NEPA/SEPA)?*
C' Yes C•' No
Comments:*
The project falls under Minimum Criteria Rules for replacement of an existing bridge.
2. Violations (DWR Requirement)
2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or
DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)? *
C' Yes �' No
2b. Is this an after-the-fact permit application?*
C' Yes C•' No
2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s):
3. Cumulative Impacts (DWR Requirement)
3a. Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact
nearby downstream water quality?*
C' Yes �' No
3b. If you answered "no," provide a short narrative description.
I The project will actually result in a reduction in impervious area at the site.
4. Sewage Disposal (DWR Requirement)
4a. Describe, in detail, the treatment methods and dispositions (non-discharge or discharge) of wastewater generated from the
proposed project. If the wastewater will be treated at a treatment plant, list the capacity available at that plant.
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or habitat?*
C� Yes �' No
5b. Have you checked with the USFWS concerning Endangered Species Act impacts?*
G Yes C' No
5c. If yes, indicate the USFWS Field Office you have contacted.
Asheville
5d. Is this a DOT project located within Division's 1-8?*
C' Yes
C•' No
5e. Will you cut anytrees in order to conduct the work in waters of the U.S.?*
C' Yes �' No
5f. Does this project involve bridge maintenance or removal?*
C� Yes C' No
5f(1). If yes, have you inspected the bridge for signs of bat use such as staining, guano, bats, etc.? Representative photos of signs of bat
use can be found in the NLEB SLOPES, Appendix F, pages 3-7.
G Yes C' No
Link to the NLEB SLOPES document: http://sav�reg.usace.army.mil/NLEB/1-30-17-signed_NLEB-SLOPES&apps.pdF
If you answered "Yes" to 5f(1), did you discover anysigns of bat use?*
C' Yes C•' No C' Unknown
If yes, please show the location of the bridge on the permit drawings/project plans.
Qick the upload button or drag and drop files here to attach docurrent
Fle rrust be f�F
5g. Does this project involve the construction/installation of a wind turbine(s)?**
C' Yes C•' No
If yes, please show the location of the wind turbine(s) on the permit drawings/project plans.
Qick the upload button or drag and drop files here to attach docurrent
Fle rrust be f�F
5h. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as
jackhammers, mechanized pile drivers, etc.?*
C' Yes �' No
If yes to either, please provide details to include type of percussive activity, purpose, duration, and specific location of this activity on
the property.
C7ick the upload button or drag and drop files here to attach docurrent
Fle rrust be FDF
5i. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat?*
Discussion with US FWS representative Marella Buncick.
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as an Essential Fish Habitat?*
C' Yes C•' No
6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?*
Current maps
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
Link to the State Historic Preservation Office Historic Properties Map (does not include archaeological data: http://gis.ncdcr.gov/hpoweb/
7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural
preservation status (e.g., National Historic Trust designation or properties significant in North Carolina historyand archaeology)?*
C' Yes �' No
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?*
The project was reviewed by NCDOT under our PA for Cultural Resources.
7c. Historic or Prehistoric Information Upload
C7ick the upload button or drag and drop files here to attach docurrent
B-4777_Archeaology_No Survey form.pdf 699.78KB
B-4777_Archt_13-03-0037NoEligProps.pdf 2.26M6
Fle rrust be F�F
8. Flood Zone Designation (Corps Requirement)
Link to the FEMA Floodplain Maps: https://msc.fema.gov/portal/search
8a. Will this project occur in a FEMA-designated 100-year floodplain?*
�' Yes �' No
8b. If yes, explain how project meets FEMA requirements:
The proposed structure will not affect flood elevations within the area.
8c. What source(s) did you use to make the floodplain determination?*
FEMA mapping
Miscellaneous attachments not previously requested.
C7ick the upload button or drag and drop files here to attach docurrent
B-4777 Madison Corps Cover Sheet.pdf 9.34KB
i B-4777 Madison Cover Letter.pdf 92.98K6
Fle rrust be Ft7F
Signature
*
fJ By checking the box and signing below, I certify that:
■ I have given true, accurate, and complete information on this form;
■ I agree that submission of this PCN form is a"transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic
Transactions AcY');
■ I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic
Transactions AcY');
■ I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND
■ I intend to electronically sign and submit the PCN form.
Full Name:*
Roger D. Bryan
Signature
��� �. ���
Date
10/27/2017
Initial Review
Is this project a public transportation project?
C� Yes C' No
Qily change this if the project has been reassigned.
Has this project met the requirements for acceptance in to the review process?*
C� Yes
C' No
BIMS # Assigned*
i 20171371
Version#*
Reviewing Office *
Asheville Regional Office - (828) 296-4500
Select Project Reviewer*
Kevin Barnett:eads\khbarnett