Loading...
HomeMy WebLinkAbout20060284 Ver 1_Certification of Completion_20090107 > I L..J-w`^ --/ o ? William G Ross Jr ,Secretary North Carolina Department of Environment and Natural Resources 151 Alan W Klimek P E Director ' DWQ Project No.: ZO06'02 8 Y County: 4G"41 v /or TF ? v C Applicant: O 7 O. o /5'# ? rPer?v,' e , 1, t? t' Project Name: /3 " en Z Z 45? . S ?O D !n? p?- 7ygr Ir C r r Date of Issuance of 401 Water Quality Certification: I Ze ZOO Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401/Wetlands Unit, North Carolina Division of Water Quality, 1621 Mail Service Center, Raleigh, NC, 27699-1621 This form may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer It is not necessary to send certificates from all of these Applicant's Certification 1, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting matenals Date Signature Agent's Certification hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials Signature Date , Engineer's Certification ?- Partial ? Final I; 1, ' im J. 4500, Nf c7r0 , as a duly registered Professional Engineer in the State of North Carolina. having been authorized to observe (periodically, weekly, full time) the construction of the project,for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and irtent of the 401 ,i Water Quality Certification and Buffe Rules, the ap ved plans and specifications, and other supporting matenals Signature / Registration No ?? 2 y 1 Date -',/ ZZ O !` Ilil! Jill' 0 N C Division of Water Quality 1650 Mad Service Center Customer Service 1 800 623-7748 o? ,141V ? p? ?n sTQ?` Q=11 Raleigh, NC 27699-1650 (919) 733-1786