Loading...
HomeMy WebLinkAbout20171328 Ver 1_Shoreline Stabilization_20171016DUKE ENERGY INTERNAL USE ONLY: _ Construction DUKE FAF Paid ApplicationENERGY Date Received:E : i , vrrvnn inp Application Complete Duke Energy Lake Services Permit No. 2 HEP Fund Mail Code EC12Q 0 ' l — -T ! 526 S Church st 3 WC 28202 site 0 1.WEMOfAPPLICATION* � PermitfTag�. 11 APPLICANT INFORMATION (applicant mail' address and contact Infortnatton) n� • Primary Phone* - AS Name* � W��i► -) Secondary Phone City-��- States` � Zip Code'���� Fax Number ldLl�" Email" KK - HL PROPERTY INFORMATION (location of permit)a,., . -..... u -------------- '�/�j�/'� �LA��� County"' City* C State* Zip Code* 'Z County Parcel ID number (e.g. Pin, Tax 10, TMS Number...) Lake*; Lot(s) 1� Plat Book/Page Subdivision Zo enter the Latitude and longitude of the property, please use a Latitude (e.g. 35.12345)* nfrwrnatinn_ ValUes service/s0'ft atcet-- �WA- •..�4,•••• - -r i Degrees format (35.1245L Locigrtude � g -80.12345)* should be provided in Decimal.Y. service http:l/itouchmap� comAadong.htmi example .:....,,......�...,...�:..- IV. PROPOSED ACTNITY u. „ ..... -�. Is Dock m � (' Maintenance of Existing Structure � Covered? C New/Modification of Existing Structure ew/Modification of Existing Shoreline Stabilization C Maintenance of Existing Shoreline Stabilization # of Slips ���yi, »x rc, ,g 4,:,re & Stabilization ( Maintenance of Existing Structure & Stabilization Transfer of Ownership ( CttfiEt (p)ease devcrik�e t3eiovw) of Jetts Area over land (sq ft) Shoreline Stabilization (feet) Length of .Stabilization Brief Descripti of the Activity Describe Briefly the Existing V W� Structures Over Land and water (include sq fr) Area over water (Sq ft) Total Square Feet } Distance From Shoreline��i(,l { �� ' ✓J Materials f't P F -- OCT 16 2011 S'iG= V. Dock Builder or Engineer Mame/Con Address City1 State 9 Zip Code Email V6 Chaclslist of Required Documents (to include with Application Sulamissionl ent Survey (stamped/signed by a professionat iicensed.surveyor showing the location of the existing or proposed Rlication ture and/or survey of the existing or proposed stabilization) os along property shoreline and photos of any existi��i tructures and/or stabilization in or near the water fee (check only, payable to Duke Energy) gned User Agreement Letter pplicable local, state, and federal permits 0 Pian and profile drawing showing all measurements and elevations Habitat Enhancement payment (if applicable) AM Approval Process • Application is reviewed and determined if complete. Fields with an asterisk are required. • if application is not complete or does not include all items and information listed in the checklist, the application will be returned as incomplete. • A Duke Energy representative will visit the site to conduct a visual inspection. • Applicant will be notified of approval or denial. • Applicant is to have the notice, to be supplied by Duke Energy upon application approval, posted and must be viewable from water. The notice must remain posted until a representative inspects the project and determines the project is complete and within the application specifications. Vt!!. Olrectlons by Road Mentions by Road" way.mac l/ e vv `fsu -t.. JX. Application Submission .. Please complete, print and sign th6 application. Then enclose all items from the checklist above in an envelope and submit all the information to the address below. Duke Energy Lake Sery%es Print Form Malt Code EC12Q 526 S. Church St. Charlotte, NC 28202 I agree that the information contained within is accurate:. c:.,-„va o.> State of North Carotin Department of Environment and Natural'Resources Division of water Resources D_W�_R 15A NCAC 02H .0500 — Water Quality Certification, Shoreline Stabilization Dtvislon of Water Resources FORM: SSGP 10-2013 Shoreline Stabilization Application Form Three copies of the application (including attachments) and the application fee should be sent to: Division of Water Resources 401 & Buffer Permitting Unit 1617 Mail Service Center Raleigh, NC 27699-1617 I. Applicant information 115A NCAC 02H .0502(a)] 1. Owner information Name: /.4,445 Mailing Address I 3v T��rj r_. vr— Telephone Number: `7 _ 1f � r S S F7 S Fax Number: E-mail Address: 1,gAlC L.4s T5R't C.-f�f �� - C C04 2. Agent/ Contact Person Information A signed and dated copy of the Agent Authorization letter (a form can be downloaded here: http://www saw usace arrry rr�z /Porta sl /docsLreguiatoralr� docs/Permitb/Sr'.MPLE AGENT AUTHO RIZATION FORM.Wf1 must be attached if the Agent has signed this application form. Name: CLW Company Affiliation: Mailing Address: Telephone Number: Fax Number: E-mail Address: Person to receive the Certification Approval: 11, Project Information (15A NCAC 02H .0502(a) & (b)] 1. Attach a vicinity map (i:e. street mars) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. 2. :Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, structures (buildings, retaining walls, docks, impervious surfaces, etc.), rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and FORM: SSGP 10-2013 Page 1 of 3 construction access corridors. You may use the diagram provided at the end of this application form. 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.) 4. Location of the property (where work is to be conducted) o County: r'� Nearest Town: Subdivision name or site address (include phase/lot number): Vi-__r=G,s 69 Directions to site - please include road names and numbers, landmarks, etc.: Latitude (in dedmaidegrees) % .0 Longitude (decimal Describe the existing land use or condition of the site at the time of this application (residential, undeveic 5. Property size (acres): 7. Lake/ river/ ocean ad B. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary): UMH aAl -e- OE W- 9. Will work be conducted from land? From water? 0 10. Total amount of disturbance (including all excavation, backfill, rip rap, retaining wails, etc.) below the normal pool lake levy/Normal Water Level in square feet or acres: _2__:MJA ', 11. Total amount of disturbance (including all clearing, backfill, excavation, rip rap, retaining wails, etc.) above the normal pool lake level/ Normal Water Level and 50 feet land -ward in square feet or acres: t- 12. Please describe the vegetation above the normal pool lake leveV Normal. Water Level and S0 feet landward to be impacted (number of trees, for instance): IYOCS, �i�l... �.�, �.� � A {✓�:: [ r4 -5;a 7 tic � i ' �(� p Owner/Agent's Signature's Printed tame Date (15A NCAC 02H .0502MI `Agent's signature is valid only if on authorization letter from the owner is provided. FORM: SSGP 10-2013 Page 2 of 3 Lake Full Pond/ Normal YV&Lkeg Shoreline �� 1041 12'7 -?✓- -tom • \ , 4° L ; iP2 1277 - 3 CW 44- • 1 f Jt�5iv C+ - Please approximately sketch the following information on this plan (provide dimensions far each item, such as toff x 1 oo ft)*: 1. . AN proposed vegetation clearing 2. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation 3. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation 4. Location of any proposed structures such as buildings, retaining wails, docks, etc. S. Location of any excavation or dredging below the l=ull pond/ Normal Water Level elevation 6. Location of construction access corridors FORM: SSCP 10-2013 Page 3 of 3 �ZOILFIL9`t�`� reN � m,„: r OunF146t� nPFAsr ' M.M w .oTOFFxce rm rt+E n(auaer. s urr,a m p! FF�6M aWx �fI �iHE tliv bA� rU MF tlT' 6 E�wE A •�' NNETAAHS AT FART NiJE !" // MR �r ,J GHAPTIIC SCALE (d1 rt'•) . ym• ten. vAe � xa6, cxm.4A ratE�awx mkxn 4Y�Fv. NNEY m At FARE WYUE nRe cekt nw t 4ttIE URF TMp�pv � wmoC amrery r-: �:,�;cR rTbr� RawuE 91E aur os o,yw��T is sw�cofthftvsk,koft Ml ASM I— 64 . Lk. LO M,MFF. RO 16413 1M [N{) =-ONO cm. (TM) 32i-0006 bn -.t} gFjrl R'. hW Wt'en, e m RORtl ' - x,L',tl--of-gRiT 6R,rF W T YR xa'R�TAfNMIWx FIu tKw, WE NDT 9V �T.vER y % o¢o wat o and wu�iiE A � �rFC1Wp f2k{A4M re a6woL wA MRR RwR.aFRt� ,� Au�� . 0 �r �� �EG •Mx ae Mt t vur. X;: adwo9 6152: Ms v� m nM. ` uax ,Fibl 6etaU4c 'N rbe () sxur mr+:9,i+t B �iau Q M[ smb wuw, i tt.nF�SF, ,t3frM ItIIZu6 dmt i3Rt a�tRRd!6R .: �Vy el, Frye ;� >(,Rw.tpl wRRt xoT� Fry R4va ttil w� xmav,¢2. WWROFF'��N�v� - S 6� 1�jIFY�� TMp�pv � wmoC amrery r-: �:,�;cR rTbr� RawuE 91E aur os o,yw��T is sw�cofthftvsk,koft Ml ASM I— 64 . Lk. LO M,MFF. RO 16413 1M [N{) =-ONO cm. (TM) 32i-0006 bn -.t} gFjrl R'. hW Wt'en, e m RORtl ' - x,L',tl--of-gRiT 6R,rF W T YR xa'R�TAfNMIWx FIu tKw, WE NDT 9V �T.vER y % o¢o wat o and wu�iiE A � �rFC1Wp f2k{A4M re a6woL wA MRR RwR.aFRt� ,� Au�� . 0 �r �� �EG •Mx ae Mt t vur. X;: adwo9 6152: Ms v� m nM. ` uax ,Fibl 6etaU4c 'N rbe () sxur mr+:9,i+t B �iau Q M[ smb wuw, i tt.nF�SF, ,t3frM ItIIZu6 dmt i3Rt a�tRRd!6R .: �Vy el, Frye ;� >(,Rw.tpl wRRt xoT� Fry R4va JI�uFyva �o sNarl byRiOC w� xmav,¢2. WWROFF'��N�v� 1�jIFY�� F�bIC) 4 FM. kw®h. . :M� 1 3 . MIL H ttTON, INC. 5102 C aF'PER DRNE CNNO ;TTE. N.C.25214 VA4)5 t-it700 XM 1,) ALPLATOF THEY a EYARDS ON LAKE *ME PNASI MAP 1S APOF '!ON OF Gd8 PARM ll3Mt8 ®FANG 15.477 ORES TOTAL CRY CHARLOTTE (E.TJ. ) BEIM' -,ILL TOWNSHIP h&GKi:WLRG& NTY IH I M ;41 1'=100' 0527:12 Mftw.�— MEQ Rw11m 1tl1 1 Google Maps Man Baia X32017 Gooale United States 1000 ft httr)s://www.googt,e.com/niapst@35.22282K-&0.9997791,15z Page 1 or 1 9/25/201.7 L i0Z/SZ/6 &dl'8966i/arid/wvj vuv;nsu 110 1 aft'd Shoreline Stabilization for 6230 Jepson Court 1. Existing Pathway from Lower Lawn to Shore 2. Pathway Continuing down hill to Dods 3. Pathway Continuing down hill to Dock 4. Shoreline North of the Dock Shoreline Stabilization for 6230 Jepson Court PAGE 3 G rincpsan of crahili2ation Area North of Dock f Shoreline Stabilization for 6230 Jepson Court PAGE 4 6. Closeup of Stabilization Area South of Dock