Loading...
HomeMy WebLinkAbout20171293 Ver 1_Meeting Note_20171017Meeting Notes Date: October 17, 2017 Type of Site: Bank Stream Site Prepared By: Mac Haupt Sponsor/Provider: Resource Environmental Solutions Meeting Type: Preliminary Site Review County: Yadkin Action ID: SAW -2017-01466 Basin and HUC: Yadkin - 03040101 Project Name: Green Mesa- RES Yadkin 01 Coordinates: 36.2132 1 °N -80.7182 °W Attendees: USACE-Kim Browning NCDWR-Mac Haupt NCWRC- Andrea Leslie, Olivia RES -Brad, Cara, David Notes, Sketch, etc.: Kim's Office Review: *Concern regarding break in buffer along reach FF1-D and FF4; The way the easement is drawn the buffer won't be wide enough in some areas. *FF1-B and FF3-B appear to flow into a pond, question regarding benefit of project. *Difference in Ell, EIII, and P?? Proposed: R 1:1, E1 1.5:1, Ell 2.5:1, EIII 5:1, P 10:1 My Field Review: FF1-A: Ell- my map had 2.5:1 here FF1-B: EIII- did not have a note on my map, go with 5:1 with justification FF1-C: Ell -bottom part either no credit or move channel, constraints of road and power line, moving better for system FF1-D: R- powerline constraint, restoration ok, they will try and have more of a perpendicular crossing. The channel is incised with a single tree buffer with plenty of floodplain to work with. FF2: P- DWR could go with 7.5:1 here but would rather see the upper portion (above crossing at top) to be fenced out. RES should try to get this reach if possible. FF3-A: Ell- should be combined with FF3B, 7.5:1, planting on right bank, a lot of privet at bottom FF3-B: EIII- combine with FF3A- make it all 7.5:1 FF4: R- not too bad to rock outcrop, Kim commented on buffer width given current alignment with power line FFS: EIII- planting edge of right buffer, 7.5-8:1 at least, exotic removal Action Items: Page 1 Notes, Sketch, etc.: Page 2