Loading...
HomeMy WebLinkAbout20171291 Ver 1_Meeting Notes MAC Final 2_20171016Meeting Notes Date: October 16, 2017 Type of Site: Bank Stream Site Prepared By: Mac Haupt Sponsor/Provider: Resource Environmental Solutions Meeting Type: Preliminary Site Review County: Surry Action ID: SAW -2017-01462 Basin and HUC: Yadkin - 03040101 Project Name: Gideon- RES Yadkin 01 Coordinates: 36.3967 °N -80.8584 °W Attendees: USACE-Kim Browning NCDWR-Mac Haupt NCWRC- Andrea Leslie, Olivia RES-cara, brad, David godley Notes, Sketch, etc.: Office Review: Kim's notes: Initial concern regarding the transition from Ell to R at MC3-A bend. Map appears to have a wooded buffer on all Ell areas, and some woods along the R. MC3-A connects with DMS ILF site on the west and MC3-B connects with DMS ILF site on the east. Field Review: My notes- JN6-B: Ell, E3 5:1 at best JN6-A: Preservation- 10:1 ok MC3-A: Restoration -cattle access, little buffer, lateral movement JN6-C: Restoration, Olivia noticed slough that connects trib, bottom reach wetland or stream? This reach shows the risk of being more of a wetland than a stream, RES should consider the alternate path identified by Olivia JN4: Ell -crossing work, some grade work below crossing, discussed possible E1 towards bottom of JN4&5, above crossing more E3 JNS: Ell- there was some discussion of this reach being E1 giving the work needed at the confluence MC3-B: Ell, calling it more E3 @ 5:1 Action Items: Page 1 Notes, Sketch, etc.: Page 2