HomeMy WebLinkAbout20171291 Ver 1_Meeting Notes MAC Final 2_20171016Meeting Notes
Date: October 16, 2017
Type of Site: Bank Stream Site
Prepared By: Mac Haupt
Sponsor/Provider: Resource Environmental Solutions
Meeting Type: Preliminary Site Review
County: Surry
Action ID: SAW -2017-01462
Basin and HUC: Yadkin - 03040101
Project Name: Gideon- RES Yadkin 01
Coordinates: 36.3967 °N -80.8584 °W
Attendees:
USACE-Kim Browning
NCDWR-Mac Haupt
NCWRC- Andrea Leslie, Olivia
RES-cara, brad, David godley
Notes, Sketch, etc.:
Office Review: Kim's notes: Initial concern regarding the transition from Ell to R at MC3-A bend.
Map appears to have a wooded buffer on all Ell areas, and some woods along the R. MC3-A connects with DMS ILF
site on the west and MC3-B connects with DMS ILF site on the east.
Field Review: My notes-
JN6-B: Ell, E3 5:1 at best
JN6-A: Preservation- 10:1 ok
MC3-A: Restoration -cattle access, little buffer, lateral movement
JN6-C: Restoration, Olivia noticed slough that connects trib, bottom reach wetland or stream? This reach shows the
risk of being more of a wetland than a stream, RES should consider the alternate path identified by Olivia
JN4: Ell -crossing work, some grade work below crossing, discussed possible E1 towards bottom of JN4&5, above
crossing more E3
JNS: Ell- there was some discussion of this reach being E1 giving the work needed at the confluence
MC3-B: Ell, calling it more E3 @ 5:1
Action Items:
Page 1
Notes, Sketch, etc.:
Page 2