HomeMy WebLinkAbout20060677 Ver 1_Certification of Completion_20090108OF WATER
?O? pG
? r
p <
Michael F. Easley, Governor
William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
Coleen H. Sullins, Director
Division of Water Quality
DWQ Project No.: Oho - Oo I I County: 70hYV5i-O -X. W Q lk,
Applicant: t,,?oYAA-\ Clay-n \MO, \\YD CO nCU?6m>
Project Name: Q i. b tra l NG sid I kA
Date of Issuance of 401 Water Quality Certification: bew- 9, 2MG.1ZTu 11 I 1 2006
Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer
Rules, and any subsequent modifications, the applicant is required to return this certificate to the
401/Wetlands Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC,
27699-1650. This form may be returned to DWQ by the applicant, the applicant's authorized agent, or
the project engineer. It is not necessary to send certificates from all of these.
Applicant's Certification
1, Nord-h Ccmhra Ta'%lg)o 1. Cbrnganr, hereby state that, to the best of my abilities, due care
and diligence was used in the observation of the construction such that the construction was observed to
be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer
Rules, the approved p ans ands ecif tions, and other supporting materials.
Signature: ate: JQnQJnO4
T
Agent's Certification
I, , hereby state that, to the best of my abilities, due care
and diligence was used in the observation of the construction such that the construction was observed to
be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer
Rules, the approved plans and specifications, and other supporting materials.
Signature: Date:
If this project was designed by a Certified Professional
I, , as a duly registered Professional (i.e.,
Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized
to observe (periodically, weekly, full time) the construction of the project, for the Permitee hereby state
that, to the best of my abilities, due care and diligence was used in the observation of the construction
such that the construction was observed to be built within substantial compliance and intent of the 401
Water Quality Certification and Buffer Rules, the approved plans and specifications, and other
supporting materials.
Signature Registration No.
Date
" Fill0W14
JAN 8 -- 2009
aEl?p;, .,PATER, QUAU7Y
dAJETLANDS AND STOR`,WAvTER BRANCH
NA
North Carolina Division of Water Quality, 401 Wetlands Certification Unit,
1650 Mail Service Center, Raleigh, NC 27699-1650 (Mailing Address)
2321 Crabtree Blvd., Raleigh, NC 27604-2260 (Location)
919-733-1786 (phone), 919-733-6893 (fax), http://h2o.enr.state.nc.us/ncwettands/
Auburn
Wetland Site 1, Stream 1
Looking Upstream
40
;,mod
Looking Downstream
Auburn
Wetland Site 2, Stream 1
L? yd YYY
? ? Tr ? k b
a
- y' 4?' s ? dti x ^ +e
p t1?.? S t r? h{ t A 9:
? 4, ? fh'ti aPL ??~ ? Pro
Jf4
p : « t *4 ti ?} a
t? ? w?: a ?.f , r j tb• k s rt,.. ?? A, .. ., •r
.11Yy}I ?s. 51'?
?., t \? a t s •1
'?ttY y1 +'s '??,+?r,? ;c x? ti S'! + yea /1,1?s+ 4x ,
1? `M? ?yy sit ik tA?r 1 s '. Ir r, " ?r ?y p'Q'ty . y.. .? h
. ?? ? ti •w yy ,? t?11h ? o1t ? . '??y??f ,r,a 1 r ? s? ^+"'
ads, r3 ?+ $ ?, a '!'. 'r4 a r +xt S)J .?' i e?F,_- a k b 4{
+'!+ +
.t ,y, .-q k !tr e p µ`s ?avz')?p 3 ,?q liy ,? r a >? „? t y q??..
Looking Upstream
Looking Downstream
Auburn
Wetland Site 3, Stream 2
(q
-1 ?7'fv
Looking Upstream
Looking Downstream
Auburn
Wetland Site 4, Stream 3
Looking Upstream
Looking Downstream
Auburn
Wetland Site 5, Stream 4
Looking Upstream
Looking Downstream
Auburn
Wetland Site 6
s 8` i ^^ {,a • `t" lit,
4
"???
t "T? x y? ?
??
?? o r. ??'1+? 'Tw {
`?. ? " ?" ? Cyr ?! - s ? , •,'tj1s? ?. \ M t:
4 rY ?
Looking Upstream
Looking Downstream
Auburn
Wetland Site 8, Stream 5
A.
O r. x
Looking Upstream
.t,
?. tws `'1 `gib
Af) ,, s-
Looking Downstream
Auburn
Wetland Site 9
v
ii 4? ~ t..y Rte' w
.1 LI
Looking Upstream
Looking Downstream
Auburn
Wetland Site 10
{ t ?' f? ? Y y.. yf t t
1??+'
t
;
r
?•
?. ?.i. ti. `:E?I?s ,
?1? !'???+rd"'{.. .emu ..? ?'_+21,?1C'.?_?i'a:'.?1Y._'w °Yl. ? ..
Looking Downstream
Looking Upstream
Auburn
Wetland Site 11
Looking Upstream
Looking Downstream
Auburn
Wetland Site 12
Looking Upstream
Looking Downstream