HomeMy WebLinkAbout20171355 Ver 1_Shoreline Stabilization_20171024State of North Carolina
Department of Environment and Natural Resources
DWR Division of Water Resources
Division of Water Resources 15A NCAC 02H .0500 —Water Quality Certification, Shoreline Stabilization
FORM: SSGP 10-2013
Shoreline Stabilization Application Form 2 0 1 7 1 3 5 5
Three copies of the application (including attachments) and the application. fee should be sent
to:
Division of Water Resources,
A�1 _T�1; ,/_ „�
1
401 & Buffer Permitting Unit
�%j
v
1617 Mail Service Center
Raleigh, NC 27699-1617
OCT 2.4:217
Applicant Information [15A NCAC 02H .0502(a)]
S
1. Owner Info matlOn
Name: E -k- ek e' Ke'&Anon
01 BBUFFER ERMITTI
Mailing Address: y�g
(oa�f"lJirYt'C: c
Nom,
LJC_ a 8?co l
Telephone Number: Fax Number:
E-mail Address:eJ( Mad4nnon@Vakcro.Cp/✓l
2. Agent/ Contact Person Information
A signed and dated copy of the Agent Authorization letter (a form can be downloaded here:
http•//www saw usace army mil/Portals/59/docs/regulatory/`regdocs/Permits/SAMPLE AGENT AUTH
ORIZATION FORM.pdf) must be attached if the Agent has signed this application form.
Name: 0W mCS - 460ye-
Company Affiliation:
Mailing Address:
Telephone Number: Fax Number:
E-mail Address: ' f
Person to receive.the Certification Approval:. CO2W t Ucj"01n
Project Information [15A NCAC 02H .0502(a) & (b)]
1. Attach a vicinity map (i.e. street map) clearly showing the location of the property with
respect to local landmarks such as towns, rivers, and roads.
2. Provide a detailed site plan showing property boundaries and proposed locations of
vegetation clearing, structures (buildings, retaining walls, docks, impervious surfaces,
FORM: SSGP 10-2013 Page 1 of 3
etc.), rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations,
and construction access corridors. You may use the diagram provided at the end of this
application form.
3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale
of some sort- a yard stick, shovel handle, etc.)
4. Location of the property (where work is to be conducted)
County: tke-Do W iLk\ Nearest Town: Q� C� O�C1011
Subdivision name or site address (include phase/lot number):
Directions to site - please include road names and numbers, landmarks, etc.:
qO cx;� 90 A10 ,nu -OA
Q.
�.
Latitude (in decimal degrees) Longitude (decimal degrees) �� �•
5. Describe the existing land use or condition of the site at the time of this application
(residential, undeveloped, etc.): (Z45t �i0.� �i'f1�MJprm 9
6. Property size (acres): 10,13
7. Lake/ river/ ocean adjacent to property: ate- - Game's
8. Describe proposed work (include &CAmr-'560f.,
*cussion as to how hardening of shoreline has been
a oided, or why it is necessary): f► r
�►,� n . ,
9. Will work be conducted from land? LA" From water? ❑
10. Total amount of disturbance (including all excavation, backfill, rip rap, retaining walls, etc.)
below the normal po/o�l lake level/ Noi m /
mal Water Level in square feet or acres:
a -h17-
11. Total amount of disturbance (including all clearing, back fill, excavation, rip rap, retaining
walls, etc.) above the normal pool lake level/ Normal Water Level and 50 feet land -ward in
I
square feet or acres: 5� Sfn �3 XbO tor- Ote •00Y07 x 100 Shorn! ene &4r-,
12. Please describe the vegetation above the normal pool lake level/ Normal Water Level and
500feet landward to be impacted (number of trees, f1or instance):
&JVA (N
Own lwa&Is Si�afure* [15A NCAC.02H .0502(f)j Date
'Agent's signature is valid only if an authorization letter from the owner is provided.
FORM: SSGP 10-2013 Page 2 of 3
Full Pond/
Normal Water Level
M3 =a om Ism
Shoreline
4'S
La ke
(At Full Pond/ Normal Water Level)
Fes'_ a,•
C
AM..
I WN WA
Please approximately sketch the following information on this plan (provide dimensions for each
item, such as 10 ft x 100 ft)*:
1. All proposed vegetation clearing
2. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation
3. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation
4. Location of any proposed structures such as buildings, retaining walls, docks, etc.
5. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation
6. Location of construction access corridors
FORM: SSGP 10-2013 Page 3 of 3
Yi 11 F
• �'4, 1 � y' ..�r .l �J 1 n
October 10, 2017
Corey & Elizabeth McKinnon
478 Par Three Drive
Ncbo, NC 28761
Re: The Arbor Lot # 49
Mr. & Mrs. McKinnon:
1+11 F:as1 Coon Street - Marion. North Curntina 28752
Telephone: !8281 652-7121 ram 18281 &r9 -.%4W
ti''chsltc: w++w.mcdowellgov.cnm
The letter selves both as notification of the issuance of a McDowell County Shoreline
Protection Permit and authorization for the commencement of work on the property. A
survey of the existing condition of your property has been completed as required by the
Lake James Shoreline Protection Ordinance. This process allows for the documentation
of the existing condition of the property prior to development. The relevant figures
specific to your lot are as follows:
Primary structures will need to be setback (65) ft from the shoreline
(35) protected (%6+' diameter) trees exist within the 0-50 foot buffer
Prior to any land disturbing activity within 50 feet of the shoreline, any trees that
are to be removed will need to be marked. At that time i will need to be contacted to
make a site visit to'record all the necessary measurements before any trees are cut.
Trees can removed within the 50 foot buffer to clear winding foot paths and allow access
to -boat docks, but they must be replaced with trees totaling an equivalent diameter
somewhere within the 50 foot buffer.
Please be advised that these and all other requirements of the Lake James Shoreline
Protection Ordinance will need to be strictly adhered to. If you have any questions or
concerns please bio not hesitate to contact me at 828.652.7121.
Ronald l�a�mtn t
McDowell County Planning Department
CC: Ashley Wooten, County Manager
McDowell County Building Inspections
a0;-I"g
I jo I a2vj
Co��A- s6ee-
a' Gftn-�f MtAf-
3�T
a '
4A. „OM1
'C�G�i^��� ', F I�l�,. I � � Mrs • °.„iy. •4
� M
f -4 t , +” +J y�F' � �• t� , ;.', a .� : � ,