HomeMy WebLinkAbout20060794 Ver 2_More Info Received_20090108
D r) q vP =s
y ULU
.?r`AF
NCDENR
STORMWATER MANAGEMENT PERMIT APPLICATION FORM
401 CERTIFICATION APPLICATION FORM
LEVEL SPREADER, FILTER STRIP AND RESTORED RIPARIAN BUFFER SUPPLEMENT
This form must be completely filled out, printed and submitted.
DO NOT FORGET TO ATTACH THE REQUIRED ITEMS CHECKLIST AND ALL REQUIRED ITEMS (NEXT WORKSHEET) l
For Level Spreaders Receiving Flow From a BMP
Type of BMP
Drawdown flow from the BMP Cfs
For Level Spreaders Receiving Flow from the Drainage Area
Drainage area
Impervious surface area
Percent impervious
Rational C coefficient
Peak flow from the 1 inmr storm
Time of concentration
Rainfall intensity, 10-yr storm
Peak flow from the 10-yr storm
Where Does the Level Spreader Discharge?
To a grassed bioretention ceq?
To a mulched bioretention cell?
To a wetland?
To a filter strip or riparian buffer?
Other (specify)
Filter Strip or Riparian Buffer Characterization (if applicable)
Width of grass
Width of dense ground cover
Width of wooded vegetation
Total width
Elevation at downslope base of level lip
Elevation at top of bank of the receiving water
Slope (from level lip to to top of bank)
Are any draws present?
Level Spreader Design
Forebay surface area
Feet of level lip needed per cis
Answer "Y" to one of the following:
Length based on the 1 irdhr storm?
Length based on the 10-W storm?
Length based on the BMP discharge rate?
Design flow
19,166.00 ftz
7,841.00 ft'
40.91 %
0.68
0.30 cis
5:00 min
7.3 inlhr
2.18 cfs
N (Y or N)
N (Y or N)
N (Y or N)
Y (Y or N)
Please complete filter strip characterization below.
0.00 ft
20.00 It
30.00 It
50.00 it
280.50 fmsl
278.00 fmsl
5.00 %
N (Y or N)
16:00 sq ft
44 ftlcfs
Y (Y or N)
N (Y or N)
N (Y or N)
2.20 efs
OK
OK
OK
JAN hflL4NDS DNk yyr,r 'F.1'11'-LJIY
ANp STOR,dWATER BRANCH
Form SW401-Level Spreader, Filter Strip, Restored Riparian Buffer-Rev.5 Parts I. and II. Design Summary, page 1 of 4
y ? t
f ?
Is a bypass device provided?
Length of the level lip
Are level spreaders in series?
Bypass Channel Design (if applicable)
Does the bypass discharge through a wetland?
Does the channel enter the stream at an angle?
Dimensions of the channel (see diagram below):
Y (Y or N)
30.00 ft
N (Y or N)
N (Y or N)
Y (Y or N)
OK
Level spreader length OK.
Form SW401-Level Spreader, Filter Strip, Restored Riparian Buffer-Rev.5 Parts I. and II. Design Summary, page 2 of 4
r
M 2.00 ft
B 2.00 ft
w 10.00 ft
y 0.20 ft
Peak velocity in the channel during the 10-yr storm 5.08 cfs
Channel lining material GRASS
w
M
M
Form SW401-Level Spreader, Filter Strip, Restored Riparian Buffer-Rev.5 Parts I. and II. Design Summary, page 3 of 4
Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will
result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to
indicate the following design requirements have been met If the applicant has designated an agent, the agent may initial below. N a
requirement has not been met, attach justification.
Pagel Plan
Initials
A Sheet No.
2
1. Plans (1" - 50' or larger) of the entire site showing:
- Design at ultimate build-out,
- Off-site drainage (if applicable),
- Delineated drainage basins (include Rational C coefficient per basin),
- Forebay (if applicable),
- High flow bypass system,
- Maintenance access,
- Proposed drainage easement and public right of way (ROM, and
- Boundaries of drainage easement.
ATb L? 2
Plan details (1" = 30'
l
f
.
or
arger)
or the level spreader showing:
- Forebay (f applicable),
- High flow bypass system,
- One foot topo lines between the level lip and top of stream bank,
- Proposed drainage easement, and
AJ7 - Design at ultimate build-out
3. Section view of the level spreader (1" = 20' or larger) showing:
- Underdrain system (if applicable),
- Level lip,
- Upsiope channel, and
Downslope filter fabric.
4. A date-stamped photograph of the filter ship that clearly shows the type of vegetation that is present.
?cJ
5
A
.
construction sequence that shows how the level spreader will be protected from sediment until the
_ entire drainage area is stabilized.
6. The supporting calculations.
7. A copy of the signed and notarized operation and maintenance (0&M) agreement.
copy of the deed restrictions (if required).
&J /h-A?
Form SW401-Level Spreader, Filter Strip, Restored Riparian Buffer-Rev.5 Part III, page 4 of 4
HYDRAULIC RESULTS
Discharge
cfs Peak Fbw
Period s elocia UPS Area (soft) Hydraulic
Radu Namal
D It
2.2 24.0 5.08 0.43 0.17 0.20
DESIGN FREQUENCY:, 10 YEAR
1 wanOT00 ft 1
Not to Scale
Reach Mattig Type
tabftAnalya' Vegetation Chiwacte#Wcs
PennisvNe
Calculated
SaletyFactor
Remarks
Staple Pattern Phate Class Type Density Shear Stress
(W Sheer Sbess
(Psn
Straight Unreiforced Vegetation D Sod 75.95% 3.33 0.61 5.42 STABLE
Sol Clay (1070 0049 1.44 STABLE
Back to InputScreen
A264
6.0
tl '= a3v
IA-? a9
Page 1 of 1
r
:-
http://www.axcessmypics.com/photos/photo02/fe/3e/de49b727e37c.jpg 1/7/2009
G
WDENR
STORMWATER MANAGEMENT PERMIT APPLICATION FORM
401 CERTIFICATION APPLICATION FORM
LEVEL SPREADER, FILTER STRIP AND RESTORED RIPARIAN BUFFER SUPPLEMENT
This form must be completely Nied out, printed and submitted.
DO NOT FORGET TO ATTACH THE REQUIRED ITEMS CHECKLIST AND ALL REQUIRED ITEMS (NEXT WORKSHEET))
......... ..__......... __._..........
For Level Spreaders Receiving Flow From a BMP
Type of BMP
Drawdown flow from the BMP cfs
For Level Spreaders Receiving Flow from the Drainage Area
Drainage area
Impervious surface area
Percent impervious
Rational C coefficient
Peak flow from the 1 in/hr storm
Time of concentration
Rainfall intensity, 10-yr storm
Peak flow from the 10-yr storm
Where Does the Level Spreader Discharge?
To a grassed bioretention ce6?
To a mulched bioretention cell?
To a wetland?
To a filter strip or riparian buffer?
Other (specify)
Filter Strip or Riparian Buffer Characterization (f applicable)
Width of grass
Width of dense ground cover
Width of wooded vegetation
Total width
Elevation at downslope base of level lip
Elevation at top of bank of the receiving water
Slope (from level lip to to top of bank)
Are any draws present?
Level Spreader Design
Forebay surface area
Feet of level lip needed per cis
Answer "Y" to one of the following:
Length based on the 1 inftx storm?
Length based on the 10-yr storm?
Length based on the BMP discharge rate?
Design flow
15,682.00 ft'
6,098.00 ft'
38.89 %
0.67
0.24 sfs
5.00 min
7.3 inlhr
1.76 efs
N (Y or N)
N (Y or N)
N (Y or N)
Y (Y or N) Please complete filter strip characterization below.
0.00 ft
20.00 ft
10.00 ft
30.00 ft
282.20 fmsl
280.50 fmsl
5.67 %
N (Y or N)
13.00 sq ft
30 ft/cfs
Y (Y or N)
N (Y or N)
N (Y or N)
1.80 cfs
OK
OK
OK
*0 01
Form SW401-Level Spreader, Filter Strip, Restored Riparian Buffer-Rev.5 Parts I. and II. Design Summary, page 1 of 4
Is a bypass device provided? Y (Y or N) OK
Length of the level lip 24.00 It Level spreader length OK.
Are level spreaders in series? N {Y or N)
Bypass Channel design (if applicable)
Does the bypass discharge through a wetland?
Does the channel enter the stream at an angle?
Dimensions of the channel (see diagram below):
N (Y or N)
Y (Y or N)
Form SW401-Level Spreader, Filter Strip, Restored Riparian Buffer-Rev.5 Parts I. and II. Design Summary, page 2 of 4
M
B
W
Y
Peak velocity in the channel during the 10-yr storm
Channel lining material
M
2.00 ft
2.00 ft
10.00 ft
0.17 ft
5.03 Cfs
GRASS
W
Y
B
M
1
Form SW401-Level Spreader, Filter Strip, Restored Riparian Buffer-Rev.5 Parts I. and 11. Design Summary, page 3 of 4
..: . ;
.??j?1r.?!Y '.
}}//..??((;jj-- ?:i? ?:?M?` ...- ? ?.,....?'::::i ?::::iv ::::::::::::::::::::i?:?:is:.:::iii;?:,::::::::::?:::::::::i:::L::::F::::'?::::: ?:?i:?t?:::::i::::::i::::i::iii:??i::i::::ii::•'}:?::?:.:'•,:•'.?:i::?{:5:.:.i:.i:.iii:.ii:.i:.iii:'::.:'::.r:iL.ii:.i:.ii:.i:.ii:'i:.i::.:::ii:.:.:':i.i: i::.:
R.:::..........
Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package VIII
result in a request for addi4onal information. This VIN delay final review and approval of the project Initial in the space provided to
indicate the following design requirements have been met If the applicant has designated an agent the agent may initial below. fl a
requirement has not been met, attach justification.
Pagel Plan
Initials Sheet No.
A T6 t° 1. Plans (1" - 50' or larger) of the entire site showing:
- Design at ultimate build-out,
- Off-site drainage (if applicable),
- Delineated drainage basins (include Rational C coefficient per basin),
Forebay (if applicable),
- High flow bypass system,
- Maintenance access,
- Proposed drainage easement and public right of way (ROW), and
- Boundaries of drainage easement.
`r L 2. Plan details (1" = 30' or larger) for the level spreader showing:
- Forebay (f applicable),
- High flow bypass system,
- One foot topo lines between the level lip and by of stream bank,
- Proposed drainage easement, and
- Design at ultimate build-out.
Al 3. Section view of the level spreader (1" = 20' or larger) showing:
- Underdrain system (if applicable),
- Level lip,
- Upslope channel, and
- Downslope filter fabric.
'A I IL- 4. A date-stamped of the filterstn ' that clearly shows the
photograph p type of vegetation that is present.
ILJ- L L_ 5. A oonstruchon sequence that shows how the level spreader will be protected from sediment until the
entire drainage area is stabilized.
AI 6. The supporting calculations.
7. A copy of the signed and notarized operation and maintenance (0&M) agreement.
A copy of the deed restrictions (if required).
Form SW401-Level Spreader, Filter Strip, Restored Riparian Butter-Rev.5 Part III, page 4 of 4
Version
AOM STATIONJREADi: 70 ST
HYDRAULIC RESULTS
Discharge
ds Peak Flow
Period Ns) elocity (fps Area (sq.ft) Hydraubc
Radius R Namal
Depth N
1.8 24.0 5.03 0.36 0.15 0.17
...................................................
IEL SPREADER 6
0.36ACRES 'FESIGN FREgUENLY;'IOYW
10 Widh-200 ft 10
Not to Scale
Reach Mattip Type
taWAn Vegetation Chatactoristics
Pecristble
CabJated
Safety Factor
Remarks
Staple Patten Phase less Type Density Shear Stress
(133f) Shear Skett
(1330
Shaight Unrenforced Vegetation D Sod 75.95X 3.33 0.62 5.38 STABLE
Soo 1]4 0.070 0.049 1.43 STABLE
/? /? C2 F
M-P?,??f?Gf
o,o9
0.a9
FV9Prr
1
NCDENR
STORMWATER MANAGEMENT PERMIT APPLICATION FORM
401 CERTIFICATION APPLICATION FORM
LEVEL SPREADER, FILTER STRIP AND RESTORED RIPARIAN BUFFER SUPPLEMENT
This fora must be completely filMed out prated and submitted.
DO NOT FORGET TO ATTACH THE REQUIRED ITEMS CHECKLIST AND ALL REQUIRED ITEMS (NEXT WORKSHEET)I
For Level Spreaders Receiving Flow From a BMP
Type of BMP
Drawdown flow from the BMP
For Level Spreaders Receiving Flow from the Drainage Area
Drainage area
Impervious surface area
Percent impervious
Rational C coefficient
Peak flow from the 1 in/hr storm
Time of concentration
Rainfall intensityr,10-yr storm
Peak flow from the 10-yr storm
Where Does the Level Spreader Discharge?
To a grassed bioretention cell?
To a mulched bioretention cell?
To a wetland?
To a filter strip or riparian buffer?
Other (speedy)
Filter Strip or Riparian Buffer Characterization (if applicable)
Width of grass
Width of dense ground cover
Width of wooded vegetation
Total width
Elevation at downslope base of level lip
Elevation at top of bank of the receiving water
Slope (from level lip to to top of bank)
Are any draws present?
Level Spreader Design
Forebay surface area
Feet of level lip needed per ds
Answer °Y" to one of the folkyMng:
Length based on the 1 inily storm?
Length based on the 10-yr storm?
Length based on the BMP discharge rate?
Design flow
cfs
28,750.00 ft2
11,761.00 ft'
40.91 %
0.70
0.46 cis
5.00 min
7.3 inthr
3.37 cfs
N (Y or N)
N (Y or N)
N (Y or N)
Y (Y or N)
0.00 ft
20.00 ft
30.00 ft
50.00 It
278.50 fmsl
276.50 fmsl
4.00 %
N (Y or N)
24.00 sq ft
44 ftfcfs
Y (Y or N)
N (Y or N)
N (Y or N)
0.46 cfs
Please complete filter strip characterization below.
OK ?' ry
OK JAN 8 2009
L`EiJi? - WAFER QUALITY
OK WETLANDS AND STORMWATER BRANCH
Form SW401-Level Spreader, Fitter Strip, Restored Riparian Buffer-Rev.5 Parts I. and II. Design Summary, page 1 of 4
Is a bypass device provided?
Length of the level 10
Are level spreaders in series?
Bypass Channel Design (if applicable)
Does the bypass discharge through a wettttt?
Does the channel enter the stream at an angle?
Dimensions of the channel (see diagram below):
Y (Y or N) OK
24.00 ft Level spreader length OK.
N (Y or N)
N (Y or N)
Y (Y or N)
Form SW401-Level Spreader, Filter Strip, Restored Riparian Buffer-Rev.5 Parts I. and 11. Design Summary, page 2 of 4
M
B
W
Y
Peak velocity in the channel during the 10-yr storm
Channel lining material
M
2.00 ft
2.00 ft
10.00 ft
0.27 ft
5.03 cfs
GRASS
w
M
Form SW401-Level Spreader, Finer Strip, Restored Riparian Buffer-Rev 5 Parts I and II Design Summary, page 3 of 4
Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will
result in a request for additional information. This will delay final review and approval of the project Initial in the space provided to
indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a
requirement has not been met, attach justification.
Paget Plan
Initials Sheet No.
A7 ? 4-43 1. Plans (1" - 60' or larger) of the entire site showing.-
- Design at ultimate build-out,.
- Off-site drainage (f applicable),
- Delineated drainage basins (include Rational C coefficient per basin),
- Forebay (if applicable),
- High flow bypass system,
- Maintenance access,
- Proposed drainage easement and public right of way (ROW), and
- Boundaries of drainage easement.
415-
2. Plan details (1" = 30' or larger) for the level spreader showing:
- - Forebay (if applicable),
- High flow bypass system,
- One foot topo lines between the level lip and top of stream bank,
- Proposed drainage easement, and
- Design at ultimate build-out
3. Section view of the level spreader (1" = 20' or larger) showing:
- Underdrain system (if applicable),
- Level lip,
- Upslope channel, and
/ - D ownslope filter fabric.
A 6 4. A date-stamped photograph of the filter strip that c learty shows the type of vegetation that is present.
n j L r 5. A oonstruction sequence that shows how the level spreader will be protected from sediment until the
entire drainage area is stabilized.
AP. 6. The supporting calculations.
7. A copy of the signed and notarized operation and maintenance (0&M) agreement.
Td ? r 4-6t o r 0,612 8. A copy of the deed restrictions (if required).
0r- F,
0" r?/\ r
Form SW401-Level Spreader, Filter Strip, Restored Riparian Buffer-Rev.S Part III, page 4 of 4
-
HYDRAULIC RESULTS
Discharge
cfs Peak Flow
Period threl Velocity (fps Area (sq R) Hydraufc
Radi R Normal
De h R
0.4 24.0 548 0.62 0.22 0.27
L- Bottom
1.0 WKM•200R
Not to Scale
Reach Mattig Type
tahityAnalys' Vegetation CharacterieUcs
Pemusbb
Calculated
Safety Factor
Remarks
Staple Pattern Phete Class; Type ensiy
[ Shear Sliest
( Sheer Slim
?f)
Straight Unreilorced Vegetation D Sod ;5-95% 3.33 0.68 4.89 STABLE
Soi Clay 0070 0.054 1.30 STABLE
Back to Input Screen i
P v
?l U 3? . ? U, 22 p, i?
-----------
------------
- a y?
-
-------------
-------------
-----------
Page 1 of 1
-? ' 4
a
k. yak