Loading...
HomeMy WebLinkAbout20171361 Ver 1_Build Maps_20171025/+� :\ I�Il�;hw�ly North Carolina Department of Transportation /" 'cltf'r' Highway Stormwater Program ��) Stormw .. STORMWATER MANAGEMENT PLAN �—�^"�' (Version 2.06; Released June 2016) FOR NCDOT PROJECTS WBS Element: 17BP.9.C.6 TIP No.: SF-840128 County(ies): Stokes Page 1 of 1 General Project Information WBS Element: 17BP.9.C.6 TIP Number: SF-840128 Project Type: Other Date: 10/10/2017 NCDOT Contact: Galen Cail Contractor / Designer: Same Address: 1020 Birch Ridge Rd. Address: Raleigh, NC 27610 Phone: 919 707-6711 Phone: Email: cail ncdot. ov Email: Cit ITown: Count ies : Stokes River Basin(s): Roanoke CAMA County? No Wetlands within Project Limits? No Pro'ect Description Project Length (lin. miles or feet): 0.10 Surrounding Land Use: Rural Proposed Pro'ect Existin Site Pro'ect Built-Upon Area ac. 0.2 ac. 0.2 ac. Typical Cross Section Description: 10' travel lanes; 3' shoulders/6' w/ guardrail; 2:1 side slopes 9' travel lanes, No paved shoulders, Shoulder width varies 2' to 15' w/ no guardrail; Side slopes vary 1:1 to 2:1 Annual Avg Daily Traffic (veh/hr/day): Design/Future: N/A Year: N/A Existin : 400 Year: 2018 General Project Narrative: Replacement of culvert 128 over Elk Creek on SR 1433 (Pucket Road) - The existing structure is a 23'-2" x 14'-0" Oval Metal Pipe with mitered inleUoutlet. The recommended (Description of Minimization of Water replacement for these structures is a single Corrugated Aluminum Structural Plate Pipe Arch 24'-3" x 15'-10" with headwall and endwall. The existing channel varies in width Quality Impacts) from 15' to 30' through the project site and stream banks are steep and deep. The existing culvert is perched. The recommended culvert will be buried and fitted with sills at the inlet and outlet. No low flow notch will be provided since sill width is similar to stream width. The banks of the floodplain bench will be laid back at 1.5:1 and lined with class II rip rap. The existing drainage patterns will be maintained through the existing ditches. All existing outfalls are stable except in the NW quad. The NW quad ditch will be stabilized with rip rap to the stream. Waterbody Information Surface Water Body (1): Elk Creek NCDWR Stream Index No.: 22-5 NCDWR Surface Water Classification for Water Body Primary Classification: Class C Supplemental Classification: Trout Waters (Tr) Other Stream Classification: None Impairments: None Aquatic T&E Species? No Comments: NRTR Stream ID: Buffer Rules in Effect: N/A Project Includes Bridge Spanning Water Body? No Deck Drains Discharge Over Buffer? N/A Dissipator Pads Provided in Buffer? N/A Deck Drains Discharge Over Water Body? N/A (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the (If yes, provide justification in the General Project Narrative) General Project Narrative) •� � V � V See Sheet � l� For Con�enti onal Plan Sheet Symbols � � � � � �� ��� ��� � � �� ���� ��� ���� ��i �����i � \�\ �� J�J�JI��� � J� � LOCATI01�: C UL VERT 128 O VER ELI� CREEI� 01� SR1433 (P UCI�ETT RD) TYPE OF WORI�: GRADII�G, PA VI1�G, DRAII�AGE, A1�D STR UCTURE TO COLLI11lST0LV11t RD S 73° 06' 40.6" E� THIS PROJECT IS NOT WITHIN A MUNICIPAL BOUNDARY DESIGN EXCEPTION REQUIRED FOR VERTICAL CURVE K. CLEARING METHOD ON THIS PROJECT SHALL BE IN ACCORDANCE WITH METHOD III � PUCKETT ROAD — SR �� � � TO AAR0IVS CORII�ER L_ — CHURCH RD ���������� ��,��� II9� N�7[° U�]E F�YB Id % i� .�C��TI�d'Il`I�N OCUMENT NOT CONSIDERED FINAL Gcc n� � c�r_NnT��vGc rnnno� GTG• P�REPAR FD kN THE OFF/�' oOR aeZ h xc 27606 HYDRAULICS E11lGI1VEER GRAPHIC SCALES DESIG11t DATA PROJECT LEI�GTH � Stantec STAIVTEC C0IVSULTING � i i g, ADT 2018 = 400 Tel. (919) 851-6866 � Fax. (919) 851-7024 � www.st¢ntec.com License No. F-0672 --` 5O 2 5 � 5 O 1 O V = �J �J M P H FOR THE NO�PTH CAROL/N,4 DEPA�PTMENT OF TRANSPORTAT/ON �� �� � 0��� �� 2012 STANDARD SPECIFICATIONS �°t 0 PLANS � �� LENGTH OF ROADWAY TIP PROJECT 176P.9.C.6 = 0.078 MI PE � � SIGNATURE: � � 50 25 0 50 1 0 RIGHT OF WAY DATE: MIKE LINDGREN, PE � � LENGTH OF STRUCTURE TIP PROJECT 17BP.9.C.6 = O.00�J MI PROJECT ENGINEER ROADWAY DESIGIV � � PROFILE HORIZONTAL Aprill5 2017 �'�� ��, ' E111GI11tEER � Q �� TOTAL LENGTH OF PROJECT 17BP.9.C.6 = 0.083 MI � FUNC CLASS = LETTI11lG DATE: MICHAEL LITTLEFIELD, PE ��_—��-��/ 2 5 0 10 RURAL LOCAL FEBRUARY 28� ZO�H I'ROJECT DESIGN ENGINEER PROFILE (VERTICAL) SUB REGIONAL TIER P.E. SIGIIIATURE: WETLAND PERMIT IMPACT SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fillln Fillln in Clearing in SW SW Impacts Impacts Stream No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft) 1 13+22.5 -L- LT & RT Bank Stabilization 0.01 0.02 35 40 TOTALS*: 0.01 0.02 35 40 0 *Rounded totals are sum of actual impacts NOTES: 35 ft of temporary impacts are within footprint of permanent impacts and are not included in total. Revised 2013 10 24