Loading...
HomeMy WebLinkAbout20170904 Ver 1_Email Revised Approval Letter_20171025Strickland, Bev From: Scarbraugh, Anthony Sent: Wednesday, October 25, 2017 9:23 AM To: 'Kelly Hoyt' Cc: Kyle Barnes; Dumpor, Samir; Matt Ingalls Subject: Jamesville Road Solar, LLC Re -Issued 401 Authorization (DWR 2017-0904) Attachments: Jamesville Road Solar, LLC_Reissued_401_Authorization.pdf, GC4088.pdf Mr. Hoyt, Please find attached the reissued 401 certification authorization for the redesigned culvert plan received by this Office on October 3, 2017 addressing concerns raised by Kyle Barnes of US Army Corps of Engineers. If you have any questions, please feel free to contact me. Regards, Anthony Scarbraugh Environmental Senior Specialist Division of Water Resources — Water Quality Regional Operations Department of Environmental Quality 252 948 3924 office anthony.scarbraugh@ncdenr.gov 943 Washington Square Mall Washington, NC 27889 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Water Resources w Environmental Quality October 25, 2017 SunEnergy 1, LLC Attn: Mr. Kelly Hoyt 192 Raceway Drive Mooresville, NC 28117 ROY COOPER Governor MICHAEL S. REGAN Secretary S. JAY ZIMMERMAN Director DWR # 2017-0904 MARTIN County Subject: APPROVAL OF 401 WATER QUALITY CERTIFICATION WITH ADDITIONAL CONDITIONS JAMESVILLE ROAD SOLAR, LLC Dear Mr. Hoyt: You have our approval for the impacts listed below for the purpose described in your application dated July 7, 2017 and received by the Division of Water Resources (Division) on July 24, 2017 with subsequent information received on October 3, 2017. These impacts are covered by the attached Water Quality General Certification Number 4088 and the conditions listed below. This certification is associated with the use of Nationwide Permit Number 14 once it is issued to you by the U.S. Army Corps of Engineers. This approval supersedes the previous approval issued on August 10 2017 under DWR Project No. 2017- 0904. Please note that you should get any other federal, state or local permits before proceeding with your project, including those required by (but not limited to) Sediment and Erosion Control, Non - Discharge, and Water Supply Watershed regulations. This approval requires you to follow the conditions listed in the enclosed certification(s) or general permit and the following additional conditions: 1. The following impacts are hereby approved provided that all of the other specific and general conditions of the Certification are met. No other impacts are approved, including incidental impacts. [15A NCAC 02B .0506(b)(c)j) Type of Impact Amount Amount Approved Plan location/ Approved (units) (units) Reference Permanent Temporary Attached Stream S1 (Culvert and Rip -Rap 105 (Linear Feet) 0 (Linear Feet) Sheet No. EX1.0 Scour Pad) 2. This approval is for the purpose and design described in your application. The plans and specifications for this project are incorporated by reference as part of the Certification. If you change your project, you must notify the Division and you may be required to submit a new application package with the appropriate fee. If the property is sold, the new owner State of North Carolina I Environmental Quality I Water Resources -Water Quality Regional Operations Section -Washington Regional Office 943 Washington Square Mall, Washington, North Carolina 27889 252-946-6481 JAMESVILLE ROAD SOLAR, LLC DWR# 2017-0904 401 APPROVAL Page 2 of 3 must be given a copy of this approval,letter and General Certification and is responsible for complying with all conditions. (15A NCAC 02B .0507(d)(2)] 3. Water Quality Certification The proposed project must comply with all the conditions of the General Water Quality Certification(s) 4088. [15A NCAC 02B .0507(c)] 4. Within 60 days of completion of construction, as -built drawings (which can be shown on an aerial or done as a survey) shall be submitted to both the Division of Water Quality, 401 & Buffer Permitting Unit, 1617 Mail Service Center, Raleigh NC 27699-1617 and to the Washington Regional Office. [15A NCACO2H .0507 (c) and 15A NCAC 02H .0506 (b)(2) and (c)(2)] 5. This approval and their conditions are final and binding unless contested. [G.S. 143-215.51 6. This approval is for the purpose and design described in your application. The plans and specifications for this project are incorporated by reference as part of the Certification. If you change your project, you must notify the Division and you may be required to submit a new application package with the appropriate fee. If the property is sold, the new owner must be given a copy of this approval letter and General Certification and is responsible for complying with all conditions. [15A NCAC 02B .0507(d)(2)] These Certifications can be contested as provided in Articles 3 and 4 of General Statute 1508 by filing a written petition for an administrative hearing to the Office of Administrative Hearings (hereby known as OAH). A petition form may be obtained from the OAH at htto://www.ncoah.com/ or by calling the OAH Clerk's Office at (919) 431-3000 for information. Within sixty (60) calendar days of receipt of this notice, a petition must be filed with the OAH. A petition is considered filed when the original and one (1) copy along with any applicable OAH filing fee is received in the OAH during normal office hours (Monday through Friday between 8:OOam and S:OOpm, excluding official state holidays). The petition may be faxed to the OAH at (919) 431-3100, provided the original and one copy of the petition along with any applicable OAH filing fee is received by the OAH within five (5) business days following the faxed transmission. Mailing address for the OAH: If sending via US Postal Service: Office of Administrative Hearings 6714 Mail Service Center Raleigh, NC 27699-6714 If sending via delivery service (UPS, FedEx, etc.): Office of Administrative Hearings 1711 New Hope Church Road Raleigh, NC 27609-6285 One (1) copy of the petition must also be served to DEQ: JAMESVILLE ROAD SOLAR, LLC DWR# 2017-0904 401 APPROVAL Page 3 of 3 William F. Lane, General Counsel Department of Environmental Quality 1601 Mail Service Center Raleigh, NC 27699-1601 This letter completes the review of the Division under section 401 of the Clean Water Rules. Please contact Anthony Scarbraugh at 252-948-3924 or anthonv.scarbraugh@ncdenr.gov if you have any questions or concerns. Sincerely, Robert Tankard, Assistant Regional Supervisor Water Quality Regional Operations Section Division of Water Resources, NCDEQ Enclosures: GC 4088 Certification of Completion cc: Kyle Barnes, USACE Washington Regulatory Field Office (via email) Samir Dumpor, DEMLR WaRO DWR WaRO401 File Laserfiche Matt Ingalls, Hart and Hickman, PC (via email: mingalls@harthickman.com) ° NOTE: THIS ROAD CROSSING IS RESULTING IN E A 105 LF INTERMITTENT STREAM DISTURBANCE. PROPOSED SOLAR a a PANEL RACK =m wooM ado 0 PROPOSED SILT FENCE (TYP) e P APPROVEDw= h + + North Carolina Environmental h� Management Commission PROPOSED 12'W X 40'L X 32"D h + li Division of Water Resources o 0 CLASS 2 RIP RAP OUTLET PROTECTION +1 Date 12ti X20 11 i Permit # X17 -(D oo o o� , + I++ I I PROPOSED CAST IN PLACE I Dew"D. CONCRETE ENDWALL � �`�' V' � 3. DOOLEY °ESIcrvED BV EXISTING LIMITS OF DISTURBANCE I ' �� .DOOLEY R. BAKER TO BE RELOCATED FES #2 PROPOSED 56 LF OF 48" RCPp • • su,e 20' UPHILL INVERT: 12.50' Pp 1 0 �• DOWNHILL INVERT: 11.50' 1 ' MINIMUM V OF COVER 13� Q- - x-14 ^n 15 1g 16 3:1 SLOPE i 17 17 PROPOSED RO/�D CROSSING PROPOS1 1 u --- X17.8' 1 _—_—_— ��_"'•--�_� 101 -� ED _—yam' _ ��_�_�_��_�_ • l 110' u N # ~ • `17.8 'PROPOSED ROAD CROSSING `C5 0 co 17 17— �16 • • 6 i �z 2 < r Q z w • 15 � z I 0 • (� z �zzn W ♦ FES #1 I ° r/o LLJ 8 O I STABILIZE BOTH THE NORTHERN a J a u • PROPOSED CAST IN PLACE AND SOUTHERN SLOPES OF THE ZU' £ o CONCRETE END LL I ROAD WIDENING WITH NORTH � U) 0 i I AMERICAN GREEN S75 MATTING ° W o� I I •` J` I � • ,I + 1 • I • SCALE 1"=20' o � J3�;56220' P 40'