See Sheet � A For I ndex of Sheets
See Sheet �B For Conventlona/ Symbols
���� � ��
� � � �
OFF SlT E DET OUR ROUT E
����� � � ��� ��������
�� ������ �� ���� ���
LOCATI01�: BRIDGE 1�0. SS O T�ER WHITELACE CREEI�
01� SR 1324 (I�E1�1�ED Y HOME R OAD)
TYPE OF WORI�: GRADII�G, DRAII�A GE, PA VI1�G, A1�D STR UCT URE
TO JOHN W. ROBERTS
ROAD
B UFFER IMPA CTS
-L-
KENNEDY HOME ROAD
(SR 1324)
BEGIN PROJECT SF-530055
BEGIN CONSTRUCTION
—L— Sta. 10 + 95.00
v
��
�z c�
r�
BRIDGE � �
NO. 55 �
BEGIN BRIDGE
—L— Sta. 13 + 35.00
END PROJECT SF-530055
END CONSTRUCTION
—L— Sta. 15 + 30.00
END BRIDGE
—L— Sta. 13 + 85.00
�.
,,
�
��
��
__ , �
__,\
'--- ��
�,
,, ��
��
TO
�5��0
CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD II
THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES.
�------------------------------------------------------------,
; PERMIT DRA WI1�lGS ;
�-------------------------------------------------------------�
�
NC GRID
NAD 8�A 2011
�I$.�Y.I�VII�TA�Y �]LA��T�
�� z��� ��� ��� ��z����u����z�
GRAPHIC S CALES DESIGI� DA TA PR OJECT LEI�GTH Ki m l e>> H o r n HYDRA ULICS E1VGII�EER
PLA1�S PREPARED FOR y
ADT 2011 = 1700 vpd THE 1VCDOT BY: °201
50 25 0 50 100 N����ENSE#F.o,oz
azi FnvErrEvi��E sraEEr, suirE soo �
ADT 2040 = 4000 vpd ��E��H.NORTH�ARo`�NAZ'so, � �F "°� � �
PHONE: (919) 6�]-2040 � ��
o LENGTH ROADWAY PROJECT 17BP.2.R.78 = 0.073 MILES 2012 STANDARD SPECIFICATIONS � ���
PLANS D = 6�o ER711t THOMPS0IV, P.E. P.E. � �
T = 6°�o LENGTH STRUCTURE PROJECT 176P.2.R.78 = 0.009 MILES PROJECT ENGINEER SIGNATURE: � �
50 25 0 50 100 V — 60 MPH RIGHT OF WAY DATE: ROADWAY DESIG11l E11tGI1�lEER � �'
� �
TOTAL LENGTH PROJ ECT 176P.2 . R. 78 = 0.082 MI LES DECEMBER 6, 201� TYLER SPRIIVG, E.r. ��� �� �������
PROFILE (HORIZONTAL) PROJECT DESIGN ENGINEER ���
10 5 0 10 2 0 LETTIIIIG DATE:
FEBRUARY 28, 2018 HEATHER C. LANE, P.E.
F U N C C LAS S= NCDOT CONTACT
PROFILE (VERTICAL) SUB REGIONAL TIER P.E.
SIGNATURE:
N
Z
�
N
i
w
�
C
�
�
N 06°40'55' �y � �
99.75'
O
SONYA HO�yELL
DB �363 PG 8 � �
O
�
O
-L- POT 10 + 95. 00
BEGIN PROJECT SF-530055
�, Z BEGIN CONSTRUCTION
��w � W
�
� - �
N� � W-L - POT Sto. l0 +00.00
� m
m
�
�
O
O
EIP
O
ELEANOR S.ROBERTS
DB 56� PG 2�2
O �
EXISTING R/�y N
— — — — -�-� — — — — '� — — — — — — — T — — — — — F VY = _ — = � — — -
6" PVC � HoMF BQ F – —
�
� —
Q
I
�
I
�
�
�
O
O
/
O�
C
.O
�
�
0
c
�
0
,�
c
w
�
�
�
�
�
i
�
U
O
�
Z�
i
�
�
N
�
.�
m
i
�
�' DATUM QESCRIPTION
�
� THE LOCALIZED COORDINATE SYSTEM DEVELOPED FOR THIS PROJECT
�
oIS BASED ON THE STATE PLANE COORDINATES ESTABLISHED BY
� NCDOT FOR MONUMENT BL-3
o y�ITH NAD 83/NA 2011 STATE PLANE GRID COORDINATES OF
� NORTHING: 546552.881(ft) EASTING: 2385882.440(ft)
�i ELEVATION: 45.36(ftl
� THE A�ERAGE COMBINED GRID FACTOR USED ON THIS PROJECT
Y (GROUND TO GR1D) IS: 0.99987606
THE N•C. LAMBERT GRID BEARING AND
LOCALIZED HORIZONTAL GROUND DISTANCE FROM
o "BL-3" TO -L- STATION [S
N
NALL LINEAR D[MENSIONS ARE LOCALIZED HOR[ZONTAL DISTANCES
� VERTICAL DATUM USED IS NAVD 88
�
o���T24�3 �j�EDY HO�E RD �
o �78� ST p K � �
—T— — —T— — — —T— — =T�--
--- -----IN-- -----F--
36" DIP -
EXISTING R/� -
36" PVC
FENCE
�\ �
\ �
\
O
ELEANOR S.ROBERTS
DB 56� PG 2�5
==W�—
F
30.73' �
� 35' RT
+10
30.77' &
35' RT
28.8 ' LT
X/ST/NG BR/ GE
_ PK
F —� �
m EIP
ICE -o
� �
�3 -�'
�
� o
� �
N I �� I
00 ` -
� W �
� N O
� o 0
�� 4 �
�
JAMES DAUGHTY.III
C 904 PG 34�
� S 06°49'47' E
199.9 7'
z
�
w
N
N
O
0
im
hEIP
V � �
N ^
mH �H
��
7T 13+23.00 N
BEG/ BRIDGEC°
-L - POT l3+ �
FALLO�y
O
�
�
Pl Sto l5 +12.49
�= 9° 05' 25.9" �RT J
D=�38'16.2"
L = 249.89'
T = 125.2/'
R = 1,575.00'
-L -
Pl Sto 17+67.05
0= 20° l0' 34.8" IRTI
D = % 50' 55.5"
L = 257.06'
T = 129.88'
R = 730.00'
■
im e >> orn
OC 2017
421 FAYETTEVILLE STREET, SUITE 600
RALEIGH, NC 27601
RIGHT-OF-WAY REV.
CONST. REV.
OBM1 ELEVRTION * 45e9�
� 546267 E 2385716
OLLIE DELANEY SUTTON BRUNER B� STRTION 13�22°0� 131 �EFT
DB 5i0 PG 374 +13 RiR sPIKE sET IN PowER Po�E
CLASS IRIP RAP AT EMBANKMENT , x�xxx�����������������������������������
2 SEE DETAIL 2, THIS SHEET 30.32 &
a ��',' EST 5 S�Y GFDR 35 LT ��- POC 15+30.�0
�� 45' LT END PROJECT SF-530055
EN� �PROACH SLAB END CONSTRUCTION
� -L - POC 13+97.00
'K
�— —
e� Nn 36 DIP
o♦ �
�. m
� N r
m m
I �� �
O
ELEANOR S.ROBERTS
� ��� pr ��5
m
—I—
NC GRID
NAD 8�A 2011
�SPECIAL LATERAL 'V' DITCH
SEE DETAIL 1, THIS SHEET
/
N
� FALLOy� NOTE: o � i �SFQ
m � ��
BRIDGE N0.55 HAS A CONCRETE SEAT, �
i �
WOOD HEAD AND �yING �yALLS, �} � � � �
METAL GUARDRAILS. ' �HIGH WATER LEVEL DURING HURRICANE
EP�E I� � ELEyATI0NP46.65'OPERTv OWNER�
_ _ _T— � � � IQ �
— � i� �
---�-- T-- � '�i
m
— 15"
+ 46
30.43'�
� — _ _ _ — —T_ — —
� —/ I I �
�� ---_ �� � i �y
� � W � � T � I t.,'
� �
— — — — F �R� � ENNED � � � � � � �\
T�
_-- _ _�_ — _ � �
----- — ---- HO,�!_ ��=BST \�\ � �
� _ e.
� — � � \
, � � \
_ \ \
\ � � � \
c,s`� �`\\w �\
�
�
M\\ \ �/
� CLASS 'B' RIP RAP
EST 2 TONS
EST 7 SY GFD
+14
31.02' &
49' RT
�NSTALL SHOULDER BER�
GUTTER FRO ST /3+97.00
ro sra�4+4o.00 -L- RT
-L - PC Sto. 13+87.28
-L -
31.18' &
49' RT
wnnnFn
-L - PCC Sto. /6 +37./7,
O
LAURA ELLEN McDANIEL �yALKER
DETAIL 1
SPECIAL LATERAL 'V' DITCH
( Not to Scale)
Natural � 1 �� Fill
Ground ?.� ��p�'�et Slope
D
Min. D= 1 Ft.
FROM STA. 13 + 85 TO STA. 15 + 00
won„�_
Z
PROJECT REFERENCE NO.
SF -530055
ILW SHEET NO.
ROADWAY
ENGINEER
��]E]LI�I�TA�
�� ��� ��� ���
SHEET NO.
3
HYDRAU LICS
ENGINEER
�LA�T�
�U�����
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
� � \
T
6 p \\ \
o ��� \
\ \
� \ �
��
S„QA � , � �,
\
� \ <
a�y
\
�.,,-.��
\
-L - PT Sto. l8 +94.24 \
`
'\
� � \
DETAIL 2
RIP RAP AT EMBANKMENT
( Not to Scale)
10'min.
Ditch 1.0'min• � 1.5'
Grade �
GEOTEXTILE J
Type of Liner= Class I Rip-Rap
FROM STA. 13 + 75 TO STA. 13 + 95
�po�FG
\
L,-,,, �
TEMPORARY IMPACTS ZONE 1
TEMPORARY IMPACTS ZONE 2
PERMANENT IMPACTS ZONE 2
zs� o� zs� s.o�
N
Z
�
N
i
w
�
�
�
O
U
�
N 06°40'55' �y
99.75' ,
O
SONYA HO�yELL
DB �363 PG 8 �
y
O
�
O
-L- POT 10 + 95. 00
BEGIN PROJECT SF-530055
��, Z BEGIN CONSTRUCTION
�o w �o w
�
N � � W -L - POT Sto.10+00.00 �r�
� m
_\
m �
� . \
F A I I (11�1 � \ �
�
�
``� ^�
� �
� � `
O - - - - - ,. p
� EXISTING R/�y N ♦
1 _' ♦ __ _ _ _ — __=
— -- —=�-�--- —�1------- T-----F �y—
—6„PVC� HoMF � ___ � _
o ���24�3 �j�EDY HO�E RD - �'
y� o `�8� ST PK -- --� 6' 7�7 7n PK
� - — - - - - - - — —T— — =F= T�— _ _ _ _ _ — � _�.
� - — - — - i — — — — — -1N= _ —� , — — F F � —
� 36" DIP � EiP
Q EXISTING R/� — � � m
I 36" PVC � E CE -o
� FENCE +93 0 � �
�' \ � 30.73' � �B� / AP
aj �} � �1 35' RT I {�'-� POT
� � I ��
M \ i �o
� _ � + 10 �3 � �, BE
� 30J7' & I '- -L-
� ' 35' RT I � �, �Z
OO �^ � �3
O�
C
•o
Q
�
0
c
�
0
,�
c
w
�
�
�
�
�
i
�
U
O
�
Z�
i
�
�
N
�
.�
m
i
�
�' DATUM QESCRIPTION
�
� THE LOCALIZED COORDINATE SYSTEM DEVELOPED FOR THIS PROJECT
�
o[S BASED ON THE STATE PLANE COORDINATES ESTABLISHED BY
� NCDOT FOR MONUMENT BL-3
o y�ITH NAD 83/NA 2011 STATE PLANE GRID COORDINATES OF
� NORTHING: 546552.881(ft) EASTING: 2385882.440(ft)
�i ELEVATION: 45.36(ftl
� THE A�ERAGE COMBINED GRID FACTOR USED ON THIS PROJECT
Y (GROUND TO GR1D) IS: 0.99987606
THE N•C. LAMBERT GRID BEARING AND
LOCALIZED HORIZONTAL GROUND DISTANCE FROM
o "BL-3" TO -L- STATION [S
N
NALL LINEAR D[MENSIONS ARE LOCALIZED HOR[ZONTAL DISTANCES
� VERTICAL DATUM USED IS NAVD 88
�
O
ELEANOR S.ROBERTS
DB 56� PG 2�2
O
ELEANOR S.ROBERTS
DB 56� PG 2�5
� �
_� `"' o
O N
� p O
�� 4 �
O
JAMES DAUGHTY.III
C 904 PG 34�
L S 06°49'47' E
199.9 7'
�
w
N
N
0
0
im
h
28.8k' LT
X/ST/NG BR
� � /
N ^
mH �H
� \ _
��
PROACH S AB
13+23.00 N
G/ BRIDGEC°
POT l3+ .00
FALLO�y
'K
O
ELEANOR S.ROBERTS
, ��� R� - -
O
�
�
Pl Sto l5 +12.49
�= 9° 05' 25.9" �RT J
D=�38'16.2"
L = 249.89'
T = 125.2/'
R = 1,575.00'
-L -
Pl Sto 17+67.05
0= 20° l0' 34.8" IRTI
D = % 50' 55.5"
L = 257.06'
T = 129.88'
R = 730.00'
■
im e >> orn
OC 2017
421 FAYETTEVILLE STREET, SUITE 600
RALEIGH, NC 27601
RIGHT-OF-WAY REV.
CONST. REV.
OBM1 ELEVRTION * 45e9�
� 546267 E 2385716
OLLIE DELANEY SUTTON BRUNER B� STRTION 13�22°0� 131 �EFT
DB 5i0 PG 374 +13 RiR sPIKE sET IN PowER Po�E
CLASS IRIP RAP AT EMBANKMENT , x�xxx�����������������������������������
2 SEE DETAIL 2, THIS SHEET 30.32 &
a ��',' EST 5 S�Y GFDR 35 LT ��- POC 15+30.�0
�� 45' LT END PROJECT SF-530055
E D APPROACH SLAB END CONSTRUCTION
� -L - POC 13+97.00 _
�/ SPECIAL LATERAL 'V' DITCH
SEE DETAIL 1, THIS SHEET
m
�
—I—
NC GRID
NAD 8�A 2011
/
N o �} ISFp
N FALLOy� NOTE: �
C1 � m � l' �
BRIDGE N0. 55 HAS A CONCRETE SEAT, i i � i� �3�� �,
^ WOOD HEAD AND �yING �yALLS, � � � �� `, \- _ --�
METAL GUARDRAILS. � i � i �� - �1 ' �
E—ppE � � � 1 �ATT„EW PEREPROPER�TvNO�yNERR,r1ANE
— F � �.L � �LEyAT10N=46.65' t;r
�'-' — - _� =— l� � i � i4 � � i
i� — I
- - - T— � — � �� 1� � /
�
„ --_. — � . � �-� �
- - - - - - � _ — —__ _ — 7 — _ — � i � , �
„ - -_- �
_�_ , � , �
15 -- _ �� �
RCPJV_----- ��� '-`-=�� ' � � Fq
- ---- - ___ � � --: , G
_ �
�R" i3�'4- _ �c�, � =, � �� � \'
\ ry
— � F � � � � �
— —F—� _ _ _ � �€� _,���_ , � � , ; \ .
� �
T �
'�� 'i� — � � � _ � =QST \ \
_ - - - —` \ � kiST�HC qi
- - -� � � �
�� � ` �
m
PROJECT REFERENCE NO.
SF -530055
ILW SHEET NO.
ROADWAY
ENGINEER
��]E]LI�I�TA�
�� ��� ��� ���
SHEET NO.
4
HYDRAU LICS
ENGINEER
�LA�T�
�U�����
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
T5 . - - �
- � �, � �
- - - ' � �� \ �r
— � �
. . . � � � , 6,, p \�
+ 46 � . �"� \\ � o � �C �\
30.43' ��� � w � � o \ �
R � \ "� �
� ��� �
. `' FkiSr� 3c� � �
CLASS 'B' RIP RAP `� �:,,��R� �/p �
EST 2 TONS wnnnFn � � ,
EST 7 SY GFD ` � � \
+ 14 � 4"� � � \
�
\
31.02' & � p \
49' RT w�OpEb � � �
�NSTALL SHOULDER BER� ' \ �
GUTTER FRO ST /3+97.00 �
ro sra �4+40.00 -L - RT —L —', PT Sto. l8 +94.24
-L - PC Sto. 13+87.28
-L -
31.18' &
49' RT
-L - PCC Sto. /6 +37./7,
O
LAURA ELLEN McDANIEL �yALKER
DETAIL 1
SPECIAL LATERAL 'V' DITCH
( Not to Scale)
Natural � 1 �� Fill
Ground ?.� ��p�'�et Slope
D
Min. D= 1 Ft.
FROM STA. 13 + 85 TO STA. 15 + 00
DETAIL 2
RIP RAP AT EMBANKMENT
( Not to Scale)
10'min.
Ditch 1.0'min• � 1.5'
Grade �
GEOTEXTILE J
Type of Liner= Class I Rip-Rap
FROM STA. 13 + 75 TO STA. 13 + 95
� °�
`
\
\
�,-,,, �
TEMPORARY IMPACTS ZONE 1
TEMPORARY IMPACTS ZONE 2
PERMANENT IMPACTS ZONE 2
zs� o� zs� s.o�
BUFFER IMPACTS SUMMARY
IMPACT BUFFER
TYPE PERMANENT TEMPORARY REPLACEM ENT
STRUCTURE SIZE / STATION ROAD PARALLEL ZONE 1 ZONE 2 TOTAL ZONE 1 ZONE 2 TOTAL ZONE 1 ZONE 2
SITE NO. TYPE (FROM/TO) CROSSING BRIDGE IMPACT (ftZ) (ft2) (ft2) (ft2) (ft2) (ft2) (ft2) (ftZ)
1 BRIDGE 55 -L- 13+35 TO 13+85 X 1642 1212 2854 1635 1156 2791
TOTAL: � sa2 1212 2854 1635 1156 2791
rn
�
�
�
0
0
�
0
�
0
�
�
Q
�
�
0
�
N
�
• �
See Sheet � A For I ndex of Sheets
See Sheet �B For Conventlona/ Symbols
���� � ��
� � � �
OFF SlT E DET OUR ROUT E
����� � � ��� ��������
�� ������ �� ���� ���
LOCATI01�: BRIDGE 1�0. SS O T�ER WHITELACE CREEI�
01� SR 1324 (I�E1�1�ED Y HOME R OAD)
TYPE OF WORI�: GRADII�G, DRAII�A GE, PA VI1�G, A1�D STR UCT URE
TO JOHN W. ROBERTS
ROAD
S TREAM IMPA C TS
-L-
KENNEDY HOME ROAD
(SR 1324)
BEGIN PROJECT SF-530055
BEGIN CONSTRUCTION
—L— Sta. 10 + 95.00
v
��
�z c�
r�
BRIDGE � �
NO. 55 �
BEGIN BRIDGE
—L— Sta. 13 + 35.00
END PROJECT SF-530055
END CONSTRUCTION
—L— Sta. 15 + 30.00
END BRIDGE
—L— Sta. 13 + 85.00
�.
,,
�
��
��
__ , �
__,\
'--- ��
�,
,, ��
��
TO
�5��0
CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD II
THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES.
�------------------------------------------------------------,
; PERMIT DRA WI1�lGS ;
�-------------------------------------------------------------�
�
NC GRID
NAD 8�A 2011
�I$.�Y.I�VII�TA�Y �]LA��T�
�� z��� ��� ��� ��z����u����z�
GRAPHIC S CALES DESIGI� DA TA PR OJECT LEI�GTH Ki m l e>> H o r n HYDRA ULICS E1VGII�EER
PLA1�S PREPARED FOR y
ADT 2011 = 1700 vpd THE 1VCDOT BY: °201
50 25 0 50 100 N����ENSE#F.o,oz
azi FnvErrEvi��E sraEEr, suirE soo �
ADT 2040 = 4000 vpd ��E��H.NORTH�ARo`�NAZ'so, � �F "°� � �
PHONE: (919) 6�]-2040 � ��
o LENGTH ROADWAY PROJECT 17BP.2.R.78 = 0.073 MILES 2012 STANDARD SPECIFICATIONS � ���
PLANS D = 6�o ER711t THOMPS0IV, P.E. P.E. � �
T = 6°�o LENGTH STRUCTURE PROJECT 176P.2.R.78 = 0.009 MILES PROJECT ENGINEER SIGNATURE: � �
50 25 0 50 100 V — 60 MPH RIGHT OF WAY DATE: ROADWAY DESIG11l E11tGI1�lEER � �'
� �
TOTAL LENGTH PROJ ECT 176P.2 . R. 78 = 0.082 MI LES DECEMBER 6, 201� TYLER SPRIIVG, E.r. ��� �� �������
PROFILE (HORIZONTAL) PROJECT DESIGN ENGINEER ���
10 5 0 10 2 0 LETTIIIIG DATE:
FEBRUARY 28, 2018 HEATHER C. LANE, P.E.
F U N C C LAS S= NCDOT CONTACT
PROFILE (VERTICAL) SUB REGIONAL TIER P.E.
SIGNATURE:
N
Z
�
N
i
w
�
Oi
�
�
N 06°40'55' �y � �
99.75'
O
SONYA HO�yELL
DB �363 PG 8 � �
O
�
O
-L- POT 10 + 95. 00
BEGIN PROJECT SF-530055
�, Z BEGIN CONSTRUCTION
��w � W
�
� - �
N� � W-L - POT Sto. l0 +00.00
� m
m
�
�
O
Q
—1. _ �
O
ELEANOR S.ROBERTS
DB 56� PG 2�2
O �
EXISTING R/�y N
— — — — -�-� — — — — '� — — — — — — — T — — — — — F VY = _ — = � — — -
6" PVC � HoMF BQ F – —
�
a. -
I
�
i
�
" J
O
O
/
O�
C
•o
�
i
0
c
�
0
,�
c
w
�
�
�
�
�
i
�
U
O
�
Z�
i
�
�
N
�
.�
m
i
�
�' DATUM QESCRIPTION
�
� THE LOCALIZED COORDINATE SYSTEM DEVELOPED FOR THIS PROJECT
�
oIS BASED ON THE STATE PLANE COORDINATES ESTABLISHED BY
� NCDOT FOR MONUMENT BL-3
a y�ITH NAD 83/NA 2011 STATE PLANE GRID COORDINATES OF
� NORTHING: 546552.881(ft) EASTING: 2385882.440(ft)
�i ELEVATION: 45.36(ftl
� THE A�ERAGE COMBINED GRID FACTOR USED ON THIS PROJECT
Y (GROUND TO GR1D) IS: 0.99987606
THE N•C. LAMBERT GRID BEARING AND
LOCALIZED HORIZONTAL GROUND DISTANCE FROM
o "BL-3" TO -L- STATION [S
N
NALL LINEAR D[MENSIONS ARE LOCALIZED HOR[ZONTAL DISTANCES
� VERTICAL DATUM USED IS NAVD 88
�
o���T24�3 �j�EDY HO�E RD �
o �78� ST p K � �
_ — —T— — =T�--
---r-- --F---
--- -----v�-- ---
36" DIP -
EXISTING R/� -
36" PVC
FENCE
�\ �
\ �
\
O
ELEANOR S.ROBERTS
DB 56� PG 2�5
==w�—
F
30.73' �
� 35' RT
+10
30.77' &
35' RT
E�
_ PK
F —� �
m EIP
ICE -o
� �
�3 -�'
�
� o
� �
N I �� I
00 ` -
� W �
� N O
� o 0
�� 4 �
�
JAMES DAUGHTY.III
C 904 PG 34�
� S 06°49'47' E
199.9 7'
z
�
w
N
N
0
0
im
hEIP
28.8 ' LT
BR/ GE
O
�
�
Pl Sto l5 +12.49
�= 9° 05' 25.9" �RT J
D=�38'16.2"
L = 249.89'
T = 125.2/'
R = 1,575.00'
-L -
Pl Sto 17+67.05
0= 20° l0' 34.8" IRTI
D = % 50' 55.5"
L = 257.06'
T = 129.88'
R = 730.00'
■
im e >> orn
OC 2017
421 FAYETTEVILLE STREET, SUITE 600
RALEIGH, NC 27601
RIGHT-OF-WAY REV.
CONST. REV.
OBM1 ELEVRTION * 45e9�
� 546267 E 2385716
OLLIE DELANEY SUTTON BRUNER B� STRTION 13�22°0� 131 �EFT
DB 5i0 PG 374 +13 RiR sPIKE sET IN PowER Po�E
CLASS IRIP RAP AT EMBANKMENT , x�xxx�����������������������������������
2 SEE DETAIL 2, THIS SHEET 30.32 &
a ��',' EST 5 S�Y GFDR 35 LT ��- POC 15+30.�0
�� 45' LT END PROJECT SF-530055
E D APPROACH SLAB END CONSTRUCTION
-L - POC 13+97.00
m SPECIAL LATERAL 'V' DITCH
� SEE DETAIL 1, THIS SHEET
m
m /
� � N �
V � /
N ^
mH �H
�E Es r�
7T 13+23.00 N
BEG/ BRIDGEC°
-L - POT l3+ �
FALLO�y
�r� T�
TS ;5 TS
TS `^TS T`
TS TS
� � �6 DIP
m
r
�
I
�
��
u, �"' .
��
��
0 0
.�
�
O
ELEANOR S.ROBERTS
� ��� pr ��5
—I—
NC GRID
NAD 8�A 2011
� FALLOy� NOTE: o � � SFp
m � ��
BRIDGE N0.55 HAS A CONCRETE SEAT, �
^ � i
WOOD HEAD AND �yING �yALLS, �} � � � �
P E METAL GUARDRAILS. � �HIGH WATER LEVEL DURING HURRICANE
_— PDE I� � ELEyATI0NP46.65'OPERTv OWNER�
--1 � �T� `� � � �Q �
— � i� �
,,, ---�-- T-- � '�i
\ --__ --r-- —
_ �, ; , �
� � � � � � — _ I �y
� � W � � T � I t.,'
� �
— � F �R� � ENNED � � � � � � �\
T�
— __�-- � � ,
---- — ---- Ho,dl= ��`esr \�� � �
� — � � \
, � � \
_ \ \
�` ��� \
� \� w \ \
�
,
M\\ \ �/
� CLASS 'B' RIP RAP
EST 2 TONS
EST 7 SY GFD
+14
31.02' &
49' RT
�NSTALL SHOULDER BER�
GUTTER FRO ST /3+97.00
ro sra�4+4o.00 -L- RT
-L - PC Sto. 13+87.28
-L -
31.18' &
49' RT
wnnnFn
-L - PCC Sto. /6 +37./7,
O
LAURA ELLEN McDANIEL �yALKER
DETAIL 1
SPECIAL LATERAL 'V' DITCH
( Not to Scale)
Natural � 1 �� Fill
Ground ?.� ��p�'�et Slope
D
Min. D= 1 Ft.
FROM STA. 13 + 85 TO STA. 15 + 00
won„�_
Z
PROJECT REFERENCE NO.
SF -530055
ILW SHEET NO.
ROADWAY
ENGINEER
��]E]LI�I�TA�
�� ��� ��� ���
SHEET NO.
3
HYDRAU LICS
ENGINEER
�LA�T�
�U�����
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
� � �
T
6 p \\ \
o ��� \
\ \
� \ �
��
S„QA � , � �,
\
� \ <
\ a�y
�.,,-.��
\
-L - PT Sto. l8 +94.24 \
`
'\
� � \
DETAIL 2
RIP RAP AT EMBANKMENT
( Not to Scale)
10'min.
Ditch 1.0'min• � 1.5'
Grade �
GEOTEXTILE J
Type of Liner= Class I Rip-Rap
FROM STA. 13 + 75 TO STA. 13 + 95
�po�FG
�
\
L,-,,, �
�PERMANENT IMPACTS IN
$ SURFACE WATERS
TEMPORARY IMPACTS IN
TS�T� T� SURFACE WATERS
zs� o� zs� s.o�
N
Z
�
N
i
w
�
N 06°40'55' �y
99.75' ,
O
SONYA HO�yELL
DB �363 PG 8 �
y
O
�
O
-L- POT 10 + 95. 00
BEGIN PROJECT SF-530055
��, Z BEGIN CONSTRUCTION
�o w �o w
�
N � � W -L - POT Sto.10+00.00 �r�
� m
_\
m �
� . \
F A I I (11�1 � \ �
�
�`
� � �`�
� � `
O - - - - - ,. p
� EXISTING R/�y - - N ♦
1 _' ♦ __ _ _ _ — __=
— -- —=�-�--- —�1------- T=----F �y—
—6„ Pvc KE L-�0�� � _ { — —
o ���T24�3�j�EDY HO�E RD - �'
o �78� ST pK � G" 7�7 7n
V PK
-�
� - — - - - - - - — —T— — =F= T�— _ _ _ _ _ — � _�.
� - — - — - i — — — — — -1N= _ —� , — — F F � —
� 36" DIP � EiP
Q EXISTING R/� — � � m
I 36" PVC � E CE -o
� FENCE +93 0 � �
�' \ � 30.73' � �B� / AP
aj �} � �1 35' RT I {�'-� POT
� � I ��
M \ i �o
� _ � + 10 � � �, BE
� 30J7' & I '- -L-
� ' 35' RT I � �, �Z
O �^ � �3
i
O�
C
•o
Q
�
0
c
�
0
,�
c
w
�
�
�
�
�
i
�
U
O
�
Z�
i
�
�
N
�
.�
m
i
�
�' DATUM QESCRIPTION
�
� THE LOCALIZED COORDINATE SYSTEM DEVELOPED FOR THIS PROJECT
�
o[S BASED ON THE STATE PLANE COORDINATES ESTABLISHED BY
� NCDOT FOR MONUMENT BL-3
o y�ITH NAD 83/NA 2011 STATE PLANE GRID COORDINATES OF
� NORTHING: 546552.881(ft) EASTING: 2385882.440(ft)
�i ELEVATION: 45.36(ftl
� THE A�ERAGE COMBINED GRID FACTOR USED ON THIS PROJECT
Y (GROUND TO GR1D) IS: 0.99987606
THE N•C. LAMBERT GRID BEARING AND
LOCALIZED HORIZONTAL GROUND DISTANCE FROM
o "BL-3" TO -L- STATION [S
N
NALL LINEAR D[MENSIONS ARE LOCALIZED HOR[ZONTAL DISTANCES
� VERTICAL DATUM USED IS NAVD 88
�
O
ELEANOR S.ROBERTS
DB 56� PG 2�2
O
ELEANOR S.ROBERTS
DB 56� PG 2�5
� �
_� `"' o
O N
� p O
�� 4 �
O
JAMES DAUGHTY.III
C 904 PG 34�
L S 06°49'47' E
199.9 7'
�
w
N
N
0
0
im
h
28.8 ' LT
- EX/ST/ G BR/ GE
TURE /TE J
V �
mH �H
E
E
E �hm
_ � I -
BS1=�'
BS4=� ,
� \ F
�\
PROACH S AB
13+23.00 N
G/ BRIDGEC°
POT l3+ .00
FALLO�y
rs TS
O
�
�
Pl Sto l5 +12.49
�= 9° 05' 25.9" �RT J
D=�38'16.2"
L = 249.89'
T = 125.2/'
R = 1,575.00'
-L -
Pl Sto 17+67.05
0= 20° l0' 34.8" IRTI
D = % 50' 55.5"
L = 257.06'
T = 129.88'
R = 730.00'
OBM1 ELEVRTION * 45e9�
� 546267 E 2385716
OLLIE DELANEY SUTTON BRUNER B� STRTION 13�22°0� 131 �EFT
DB 5i0 PG 374 RiR sPIKE sET IN PowER Po�E
CLASS I RIP RAP AT EMBANKMENT +13 x* x x x
,
2 SEE DETAIL 2, THIS SHEET 30.32 &
a ��',' EST 5 S�Y GFDR 35 LT ��- POC 15+30.�0
�� 45' LT END PROJECT SF-530055
E D APPROACH SLAB END CONSTRUCTION
� -L - POC 13+97.00 _
m / SPECIAL LATERAL 'V' DITCH
,'� SEE DETAIL 1, THIS SHEET
�m
m � /
/ /N �o �3 /SFQ
� � FALLOy� NOTE: , a, � � �� \
�
O
ELEANOR S.ROBERTS
, ��� R� - -
■
im e >> orn
OC 2017
421 FAYETTEVILLE STREET, SUITE 600
RALEIGH, NC 27601
RIGHT-OF-WAY REV.
CONST. REV.
—I—
NC GRID
NAD 8�A 2011
BRIDGE N0. 55 HAS A CONCRETE SEAT, i i � i� �3�� �,
^ WOOD HEAD AND �yING �yALLS, � � � �� `, \- _ --�
METAL GUARDRAILS. � � � i��i � `1 ' � �
P E—ppE � �� 1�ATT„EW PEREPROPER�TvNO�yNERR,r1ANE
— F � �.L � �LEyAT10N=46.65' t;r
� __ _=— � �%� ��4� � �
� � � � � �� i i
- - - - T— � — � �� 1� � /
�
'- - - - -� — � . — � - � �
- - - - - - - _ — � �7_
_ ... � _ _ _ _� � - - - .. ..� — � 1 � � � � �
15" - -�' - �
� --�—�_L �� i; i �
RCP JV � � � �W --� __� � ,' � � F
---------- �� � � --- ��G
— ��" i3t'4- _ �c�, � = �� � �' �
\ ry
_ _ � F � /6 � ,
F� - - - �� '�j�E, ` �� � � �•
_ _ _ _ �� T
— — — — — —
�
� --�� !� — -_ � _ _ _ � � =�T \ \ � \ FkiST�HC R
�8�
- - - - - —_ _ \ � •
�, - - - — _ � \ � �
m
PROJECT REFERENCE NO.
SF -530055
ILW SHEET NO.
ROADWAY
ENGINEER
��]E]LI�I�TA�
�� ��� ��� ���
SHEET NO.
4
HYDRAU LICS
ENGINEER
�LA�T�
�U�����
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
T5 . - - �
� �, � �
- - ' � �� \ �r
— � �
. . . � � � , 6,, p \�
+ 46 � . �"� \\ � o � �C �\
30.43' ��� � w � � o \ �
R � \ "� �
� ��� �
. `' FkiSr� 3c� � �
CLASS 'B' RIP RAP `� �:,,��R� �/p �
EST 2 TONS wnnnFn � � ,
EST 7 SY GFD ` � � \
+ 14 � 4"� � � \
�
\
31.02' & � p \
49' RT w�OpEb � � �
�NSTALL SHOULDER BER� ' \ �
GUTTER FRO ST /3+97.00 �
ro sra �4+40.00 -L - RT —L —', PT Sto. l8 +94.24
-L - PC Sto. 13+87.28
-L -
31.18' &
49' RT
-L - PCC Sto. /6 +37./7,
O
LAURA ELLEN McDANIEL �yALKER
DETAIL 1
SPECIAL LATERAL 'V' DITCH
( Not to Scale)
Natural � 1 �� Fill
Ground ?.� ��p�'�et Slope
D
Min. D= 1 Ft.
FROM STA. 13 + 85 TO STA. 15 + 00
DETAIL 2
RIP RAP AT EMBANKMENT
( Not to Scale)
10'min.
Ditch 1.0'min• � 1.5'
Grade �
GEOTEXTILE J
Type of Liner= Class I Rip-Rap
FROM STA. 13 + 75 TO STA. 13 + 95
�
� °�
`
\
\
�,-,,, �
�PERMANENT IMPACTS IN
$ SURFACE WATERS
TEMPORARY IMPACTS IN
TS�T� T� SURFACE WATERS
zs� o� zs� s.o�