Loading...
HomeMy WebLinkAbout20171100 Ver 1_Approval Letter_20171023Environrnentu( Qualrry ROY COOPER Gorun,or MICHAEL S. REGAN �Sr�.r�an� S. JAY ZIMMERMAN vu�r� mr October?3.?017 Tyrrell Counry NCDWR Project No. 20171100 SR I209 Culvert replacement WBS rt 44436 APPROVAL of 401 WATER QUALITY CERTIFICATION N'ith ADDITIONAL CONDITIONS Mr. Paul Williams NCDOT. Division I I 13 Airport Drive, Suite 100 Edenton, NC 27932 DearMr. Williams: You have our approval, in accordance with the conditions listed below, for the following impacts for the purpose of installing a culvert on SR I209 (N Road St) in Columbia in Tyrrell Coun[y: O en Water Im acts in the Pas uotank River Basin Site O en Water(ac) SR 1209 0.02 The project shall be constructed in accordance with your application dated received August 31, 2017 and addi[ional information received via e-mail October I8, 2017. Atter reviewing your application, we have decided [ha[ these impacts are covered by Water Quality General Certification Numbers 4086 and 4088. These certifica[ions correspond to the Na[ionwide Permit Numbers I2 and 14 issued by the Corps of Engineers. In addition, you should acquire any other federal, state or local permits before you proceed with your project including (but not limited to) Sediment and Erosion Control. Non-Dischar�e and Water Supply Wa[ershed regulations. This approval will expire wi[h the accompanyin� 404 permit. This approval is valid solely for Ihe purpose and desi�n described in your application (unless modified below). Should your project change, you mus[ notify [he NCDWR and submit a new application. Ifthe property is sold, the new owner must be ;iven a copy of Ihis Certitica[ion and approval letter, and is thereby responsible for complying with all the conditions. If total wetland fil Is for this project (now or in the future) exceed one acre, or of total impacts to streams (now or in the future) exceed I50 linear feet, compensa[ory mi[iga[ion may be reyuired as described in I SA NCAC 2H .0�06 (h) (6) and (7). Additional buffer impacts may require compensatory mi[iga[ion as described in I5A NCAC 26.0259. For this approval to remain valid, you must adhere [o [he conditions listed in the attached certifica[ion(s) and any additional condi[ions listed below. Condition(s) af Certification: The issuance of this certification does not exempt the Permittee from complying with any and all statutes, rules, regulations, or ordinances that may be imposed by other government aeencies (i.e. local, state, and federal) having jurisdiction, including but not limited to applicable buffer rules, stormwatzr management rules, soil erosion and sedimentation control requirements, etc. 2. The Pemiittee shall ensure that the tinal design drawings adhere ro the permit and to the pennit drawings submitted for approval. [15A NCAC 02H .OS07(c) and I SA NCAC 02H .0506 (b)(2) and (c)(2)] Smtz of North Cnroline I Envvonmen[al Qualiry I617 Mail Senire Centar I Raleigh. North Carnlina 2 7699-1 6 1 7 3. If concrete is used during construction, a dry work area shall be maintained to prevent direct contact between curing concrete and stream water. Water that inadvertently contacts uncured concrete' shall not be discharged to surface waters due to the potential for elevated pH and possible aquatic life and fish kills. [15A NCAC 02B.0200] 4. Unless otherwise approved in this certification, placement of culverts and other structures in open waters and streams shall be placed below the elevation of the streambed by one foot for all culverts with a diameter greater than 48 inches, and 20 percent of the culvert diameter for culverts having a diameter less than 48 inches, to allow low flow passage of water and aquatic life. Design and placement of culverts and other structures including temporary erosion control measures shall not be conducted in a manner that may result in dis- equilibrium of wetlands or streambeds or banks, adjacent to or upstream and downstream of the above structures. The applicant is required to provide evidence that the equilibrium is being maintained if requested in writing by NCDWR. If this condition is unable to be met due to bedrock or other limiting features encountered during construction, please contact NCDWR for guidance on how to proceed and to determine whether or not a permit modification will be required. [15A NCAC 02H.0506(b)(2)] 5. All work in or adjacent to stream waters shall be conducted in a dry work area. Approved BMP measures from the most current version of NCDOT Construction and Maintenance Activities manual such as sandbags, rock berms, cofferdams and other diversion structures shall be used to prevent excavation in flowing water. [15A NCAC 02H.0506(b)(3) and (c)(3)] 6. The outside buffer, wetland or water boundary located within the construction corridor approved by this authorization shall be clearly marked by highly visible fencing prior to any land disturbing activities. Impacts to areas within the fencing are prohibited unless otherwise authorized by this certification. [15A NCAC 02H.0501 and .0502] 7. During the construction of the project, no staging of equipment of any kind is permitted in waters of the U.S., or protected riparian buffers. [15A NCAC 02H.0506(b)(2)] 8. No rock, sand or other materials shall be dredged from the stream channel except where authorized by this certification. [15A NCAC 02H.0506(b)(3)] � 9. Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards [15A NCAC 02H.0506(b)(3) and (c)(3]): a. The erosion and sediment control measures for the project must be� designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. c. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual. d. The reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act. 10. Sediment and erosion control measures shall not be placed in wetlands or waters unless otherwise approved by this Certification. [15A NCAC 02H.0506(b)(3) and (c)(3)] 11. Erosion control matting in riparian areas shall not contain a nylon mesh grid which can impinge and entrap small animals. Matting should be secured in place by staples, stakes, or wherever possible live stakes of native trees. Riparian areas are defined as a distance 25 feet from top of stream bank. [15A NCAC 02B.0224, .0225] 12. There shall be no excavation from, or waste disposal into, jurisdictional wetlands or waters associated with this permit without appropriate modification. Should waste or borrow sites, or access roads to waste or borrow sites, be located in wetlands or streams, compensatory mitigation will be required since that is a direct impact from road construction activities.[15A NCAC 02H.0506(b)(3) and (c)(3)] 13. All mechanized equipment operated near surface waters must be regularly inspected and maintained to prevent contamination of stream waters from fuels, lubricants, hydraulic fluids, or other toxic materials. [15A NCAC 02H.0506(b)(3)] 14. Native riparian vegetation must be reestablished in the riparian areas within the construction limits of the project by the end of the growing season following completion of construction. [15A NCAC 02B.0506(b)(2)] 15. Discharging hydroseed mixtures and washing out hydroseeders and other equipment in or adjacent to surface waters is prohibited. [15A NCAC 02H.0506(b)(3)] 16. The permittee and its authorized agents shall conduct its activities in a manner consistent with State water quality standards (including any requirements resulting from compliance with §303(d) of the Clean Water Act) and any other appropriate requirements of State and Federal law. If the NCDWR determines that such standards or laws are not being met (including the failure to sustain a designated or achieved use) or that State or federal law is being violated, or that further conditions are necessary to assure compliance, the NGDWR may reevaluate and modify this certification. [15A NCAC 02B.0200] 17. The Permittee shall report any violations of this certification to the Division of Water Resources within 24 hours of discovery. [15A NCAC 02B.0506(b)(2)] 18. Upon completion of the project (including any impacts at associated borrow or waste sites), the NCDOT Division Engineer shall complete and return the enclosed "Certification of Completion Form" to notify the NCDWR when all work included in the 401 Certification has been completed. [15A NCAC 02H.0502(fl] 19. A copy of this Water Quality Certification shall be maintained on the construction site at all times. In addition, the Water Quality Certification and all subsequent modifications, if any, shall be maintained with the Division Engineer and the on-site project manager. [15A NCAC 02H .0507(c) and 15A NCAC 02H .0506 (b)(2) and (c)(2)] If you wish to contest any statement in the attached Certification you must file a petition for an administrative hearing. You may obtain the petition form from the office of Administrative hearings. You must file the petition with the office of Administrative Hearings within sixty (60) days of receipt of this notice. A petition is considered filed when it is received in the office of Administrative Hearings during normal office hours. The Office of Administrative Hearings accepts filings Monday through Friday between the hours of 8:OOam and S:OOpm, except for official state holidays. The original and one (1) copy of the petition must be filed with the Office of ' Administrative Hearings. The petition may be faxed-provided the original and one copy of the document is received by the Office of Administrative Hearings within five (5) business days following the faxed transmission. The mailing address for the Office of Administrative Hearings is: Offce of Administrative Hearings 6714 Mail Service Center Raleigh, NC 27699-6714 Telephone: (919) 431-3000, Facsimile: (919) 431-3100 A copy of the petition must also be served on DEQ as follows: Mr. Bill F. Lane, General Counsel Department of Environmental Quality 1601 Mail Service Center � This letter completes the review of the Division of Water Resources under Section 401 of the Clean Water Act. If you have any questions, please contact Garcy Ward at (252)946-6481 or garcy.ward@ncdenr.gov. �SincG�, �� �� : S. Jay Zimmerman, Director Division of Water Resources Electronic copy only distribution: Kyle Bames, US Army Corps of Engineers, Washington Field Office Clay Willis, Division 1 Environmental Officer Greg Daisey, NC Division of Coastal Management Cathy Brittingham, NC Division of Coastal Management Garcy Wazd, NC Division of Water Resources Washington Regional Office File Copy En vironmen t ul Quality NCDWR Project No.: Applicant Project Namc: Date of Issuance of 401 Water Quality Certifica[ion: County: ROY COOPER Gotcr„or MICHAEL S. REGAN Sec'r�r�rn�r S. JAY ZIMMERMAN nra-�,,,,� Certificate of Completion Upon completion of all work approved within the 401 Water Qualiry Certification ar applicable Buffer Rules, and any subsequent moditica[ions, the applicant is required to remm [his certificate to Ihe 401 Transporta[ion Permitting Uni[, North Carolina Division of Water Resources, 1617 Mail Service Cen[er, Ralei�h. NC, 27699-16I7. This form may be retumed to NCDWR by Ihe applicant, the applicant's authorized agent, or [he project en,ineer. It is not necessary to send certificates from all of these. .Applica��t's Certificnlioi� I, , hereby s[ate that, to [he bes[ of my abili[ies, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Sianature: Date: Agenl's Certificalioii I, , hereby state that, to the 6es[ of my abilities, due care and diligence was used in [he observation of the construction such diat the construction was observed ro be built within substan[ial compliance and intent of [he 40I Water Quali[y Certification and Buffer Rules, [he approved plans and specifications, and other supportin� materials. Signature: Eagineer's Cerlificution Partial Final �, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically, weekly, fidl time) the construction of die project for the Permittee hereby state tha[, to Ihe bes[ of my abilities, due care and dili�ence was used in the observation ofthe construction such [ha[ [he construction was observed to be built within subs[an[ial compliance and intent of [he 401 Wa[er Quality Certification and Buffer Rules, [he approved plans and specifications, and other supportine materials. Signa[ure Date Registration No. Statz ofNorth Carolina I Environmental Quahty 1617 Mail Service Centzr I Raleigh. North Caroliw 27699-1617