Loading...
HomeMy WebLinkAbout20170783 Ver 1_More Info Received - Email_20170929Feet Square Feet Waterbody Zone 1 Zone 2 Zone 1 Zone 2 shag005 94 0 1,348 2,356 what001e ® 4 ► South Justice whag010f r . ^ ' = na9eos IF Branch Sub 03020102 - - -> O•{ - 3,0 p1P ¢r l.aoe 900873 2403103 )OM_ScptlantlNecM Mapul_2400 mxtl REVISED: 09/13201] SGA�E: 1:2,400 vfien primed at 11x1] Access Map Dominion North Carolina Power Scotland Neck to South Justice Branch 115 kV Transmission Line Project Halifax County, NC 0 200 400 Feet 12.400 Legend o Angle Structure Tangent Structure i Project Limit ►► Proposed Access Road C� Existing Access Road 10 Wetland Data Point ® Upland Data Point Surveyed Wetland Q Surveyed Waterbody ® Riparian Buffer Zone I Riparian Buffer Zone 11 j„ HUC8 Watershed Note 1. Aer al Date, June 2016 2 Rev aad Date September 7 2017 3 Properly I f nnabon from Halifax County: June 2017 4. Approximate 50'X50' Mat Constructlon Pad will be centered Dominion Energy ERM Page 1 of 38 901 G88 2406326 900688 2407326 Access Map Dominion North Carolina Power Scotland Neck to South Justice Branch 115 kV Transmission Line Project Halifax County, NC r...`.. 0 200 400 Feet 1:2,400 Legend o Angle Structure r _ Tangent Structure j� Project Limit ►► Proposed Access Road •�•• W ►•� Existing Access Road •& § ' •• .0 40 Wetland Data Point -- �-✓ � �, ••� ♦ Upland Data Point •••� % Q Surveyed Wetland �• Q Surveyed Waterbody st, whag012f > •�•,.�'• ••` �,�, ® Riparian Buffer Zone I • .�• •� �.�• �%� Riparian Buffer Zone 11 "` .�' •�• ••�•\•.• f _ HUC8 Watershed j,• vs ,,,,,,ttt , .. jVFJ4K m03020102 •�••'�• ms's %,4K]o 0 .' . whagol3f CE 33 • l '.rri....$'_ 1 Note ��l 1. Aenal Daze: June 2016 p�P �•.• 2. Revised Date. September 7, 2017 n from Halifax County: June 2017 •�`a^• 4. Appro mate 50 X050' Met Conerucb- ad will be centered r Dominion Energy ERM �s Page 2 of 38 899868 2405326 FIU; M1CNMs1DF l,VSceWn4_NxkLAn,G151301 M9\11 Mepeet 2-nDOM_SweerMNeck Mepeer_]40O—d I REVISED: 09113201] 1 SCALE' 1:2,490 Wken piMedef 11x17 Feet Square Feet Waterbody Zone 1 Zone 2 Zone 1 Zone 2 shag003 65 45 6,808 4,700 A ,,, FILE: M.ICL 0 � k I REVISED: 2408270 899732 2409270 whag008f I ._..._..._..._..._..._..._..._..._..._..._..._..._ o�. v v��l� Vag: S1Rr1iflRri Access Map Dominion North Carolina Power Scotland Neck to South Justice Branch 115 kV Transmission Line Project Halifax County, NC 0 200 400 Feet 1:2,400 Legend o Angle Structure • Tangent Structure j„ Project Limit ►►- Proposed Access Road Existing Access Road • Wetland Data Point A Upland Data Point 0 Surveyed Wetland Q Surveyed Waterbody ® Riparian Buffer Zone I ® Riparian Buffer Zone II HUC8 Watershed Note 1. Aerial Date. June 2016 2. Revised Date: September 7, 2017 3. Property Information from Halifax Count': June 2017 4. Approximate 50'X50' Mat Construction Pad will be centered iO Dominion XEnergy N. ERM w . s Page 3 of 38 Access Map Dominion North Carolina Power Scotland Neck to South Justice Branch 115 kV Transmission Line Project Halifax County, NC 0 200 400 Feet 1:2,400 Legend o Angle Structure • Tangent Structure 1,. C Project Limit ►ice Proposed Access Road C� Existing Access Road Wetland Data Point Upland Data Point Surveyed Wetland Q Surveyed Waterbody ® Riparian Buffer Zone I ® Riparian Buffer Zone II HUC8 Watershed Rote 1. Aerial Date: June 2016 2. Revised Date: September 7, 2017 3. Property Irdormabon from Halifax County: June 2017 4. Approximate 50'X50' Mat Construct- Pad MH be centered Dominion pvwo Energy r. .Y ERM a Page 4 of 38 Access Map Dominion North Carolina Power Scotland Neck to South Justice Branch 115 kV Transmission Line Project Halifax County, NC D 200 4D0 Feet 1:2,400 Legend G Angle Structure Tangent Structure Project Limit Proposed Access Road l� Existing Access Road • Wetland Data Point Upland Data Point Q Surveyed Welland Q Surveyed Waterbody ® Riparian Buffer Zone I ® Riparian Buffer Zone II i,,, j HUCS Watershed Note 1. Aerial Date. June 2016 2. Revised Date: September 7, 2017 3. Property Information from HOW County: June 2017 4. Approximate 50'X50' Mat Construction Pad will be centered Dominion Energy ERM s Page 5 of 38 �Ir dna�otl 0309010i whac027f m _C .. _... _... _... _... _... _... _..._... _.. _..._..._... _..._... _... _... _..._... _.1 _... .. _... _..._.. ._.. 0 If all 14149144 10 41 14.4 01.4 :7 vuhac026e x v •b w F :. e Access Map Dominion North Carolina Power Scotland Neck to South Justice Branch 115 kV Transmission Line Project Halifax County, NC 0 200 400 Feet 1:2,400 Legend o Angle Structure Tangent Structure 1.. Project Limit ►► Proposed Access Road C� Existing Access Road 0 Wetland Data Point ® Upland Data Point Surveyed Wetland Q Surveyed Waterbody ® Riparian Buffer Zone 1 ® Riparian Buffer Zone 11 j� HUC8 Watershed I REVISED: D91-017 1 SCALE. 12,4—h— 111nle4 at 11.17 Note 1. Aerial Date: June 2016 2. Revised Data September 7, 2D17 3. Property Information from Halifax County: June 2017 4. Approximate 50'X50' Mat Constmctlon Rod will be centered Dominion Energy° N W ERM e S Page 6 of 38 Access Map Dominion North Carolina Power Scotland Neck to South Justice Branch 115 kV Transmission Line Project Halifax County, NC 0 200 400 Feet 1:2,400 Legend o Angle Structure Tangent Structure j Project Limit ►► Proposed Access Road Existing Access Road Wetland Data Point A Upland Data Point Surveyed Wetland 0 Surveyed Waterbody ® Riparian Buffer Zone I Riparian Buffer Zone II HUC8 Watershed 09113(1017 1 SCALE: 1:2.400 wben I—Nd at 1107 Note 1. Aerial Date: June 2016 2. Revised Date: September 7, 2017 3. Property Informa0on from Halifax County: June 2017 4. Approximate 50'X50' Mat Constmcton Pad will be centered Dominion Energy e ERM � s Page 7 of 38 o Po w� +. 4q .�... �... �... ... �...� 03010/07 _ _ _ ...� N • _ _ ~ 03020102 Access Map Dominion North Carolina Power Scotland Neck to South Justice Branch 115 kV Transmission Line Project Halifax County, NC a 200 400 Feet 1:2,400 Legend o Angle Structure Tangent Structure j,. —_' Project Limit H� Proposed Access Road C� Existing Access Road • Wetland Data Point A Upland Data Point Q Surveyed Wetland Q Surveyed Waterbody ® Riparian Buffer Zone I ® Riparian Buffer Zone II HUC8 Watershed Note 1, Aenal Date: June 2016 2. Revised Data: September 7, 2017 3. Property Information from Halifax County: June 2017 4. Approximate 50'X50' Mat Construction Pad vnll be centered 0 OM Dominion Energy *v ERM Page 8 of 38 Access Map Dominion North Carolina Power Scotland Neck to South Justice Branch 115 kV Transmission Line Project Halifax County, NC 0 200 400 Peet 1:2,400 Legend o Angle Structure • Tangent Structure Project Limit 10-111— Proposed Access Road lbw Existing Access Road 0 Welland Data Point A Upland Data Point Q Surveyed Wetland Q Surveyed Waterbody ® Riparian Buffer Zone I ® Riparian Buffer Zone II HUC8 Watershed Note 1. Aerial Date: June 2016 2. Revised Date: September 7, 2017 3. Property Information from Halifax County: June 2017 4. Approximate 50'X50' Mat Construction Pad will be centered Dominion XEnergy N W ERM S Page 9 of 38 993970 2422131 _... Access Map Dominion North Carolina Power Scotland Neck to South Justice Branch 115 kV Transmission Line Project Halifax County, NC 0 200 400 Feet 1:2,400 Legend e Angle Structure Tangent Structure j„ Project Limit ►► Proposed Access Road 0-0=- Existing Access Road 0 Wetland Data Point A Upland Data Point Q Surveyed Wetland Q Surveyed Waterbody ® Riparian Buffer Zone I ® Riparian Buffer Zone 11 i„ _: HUC8 Watershed Note 1. Aerial Date: June 2016 2, Revised Date: September 7, 2017 3. Property IMarmation from Halifax County: June 2017 4. Approximate 50'x50' Mat Construction Pad will be centered ORft Dominion pvwo Energy ERM Page 10 of Access Map Dominion North Carolina Power Scotland Neck to South Justice Branch 115 kV Transmission Line Project Halifax County, NC 0 200 400 Feet 1:2,400 Legend o Angle Structure Tangent Structure Project Limit ►► Proposed Access Road 110=1lb— Existing Access Road • Wetland Data Point A Upland Data Point Q Surveyed Wetland Q Surveyed Waterbody ® Riparian Buffer Zone I Riparian Buffer Zone II HUCB Watershed I REVISE0:09I132017 I Note I. Aerial Date: June 2016 2. Revised Date: September7, 2017 3. Property Information from Halifax County: June 2017 4. Approximate 50'X50' Mat Construction Pad will be centered OVZ Dominion PIP Energy ERM Page 11 of 381 890676 2425371 889676 2426371 Access Map Feet Square Feet Dominion North Carolina Power Watcrbody Zone 1 Zone 2 Zone 1 Zone 2 =k li Sha1005 78 55 7,139 4,946 V Scotland Neck to South Justice sha1006 70 46 7,593 546 4 Branch 115 W Transmission Line o, Project a Halifax County, NC 0 200 400 All — Feet Legend o Angle Structure e Tangent Structure Project Limit ►►• Proposed Access Road . Existing Access Road 0 Wetland Data Point - ♦ Upland Data Point ok 0 Surveyed Wetland Surveyed Waterbody ` :n 1006 ® Riparian Buffer Zone I ri+1'r' ` �'"y •� — ••�••._..._ ®Riparian Buffer Zone II �• dnalooi' HUC8 Watershed alOOS •� " �•_••—•"— 03020102 .e CE 2 �„•l•�„-- CE 2511 Not. .a 1. Aenal Date: June 2016 2. Revised Date: September 7, 2017 3. Property Information from Halifax County. June 2017 a°. :w 4. Approximate 50'X50' Met Construction Pad will be centered a Dominion - . pW Energy Al ERM 889676 ee867s 4241�l Page 12 of 38 FILE: M:zC m.1DF MZ,.ftnd_N.c _Art ISUp1T09\11_Map.et 240 MM ScofbndN..k M.p..1 2.00.m.d I REVISED: 09/13x1017 I—1E:1:2,--n pi.d.11-7 am Feet Square Feet IWaterbody Zone 1 Zone 2 Zone 1 Zone 2 sha1004 116 86 12,236 8,387 shaI005 78 55 7,139 4,946 as a� �a 03020102 �v l�V i - ___•••rrr-•' shaID04 I =1.. -..� sha1003 I REVISED:091-017 I SCALE'. 12.400 xM.n.rim.d at 11x17 Access Map Dominion North Carolina Power Scotland Neck to South Justice Branch 115 kV Transmission Line Project Halifax County, NC 0 200 400 Feet 1:2,4D0 Legend o Angle Structure • Tangent Structure Project Limit 111-10— Proposed Access Road G� Existing Access Road 0 Wetland Data Point A Upland Data Point Q Surveyed Welland Q Surveyed Waterbody ® Riparian Buffer Zone I ® Riparian Buffer Zone II i,,,1 HUC8 Watershed Not. 1. Aerial Dae: Jura 2016 2. Revised Date: Septemb.r 7, 2017 3. Property Information from Halifax County: June 2017 4. Approximate 50'X50' Mat Construction Pad will be centered Dominion Energy N w� ERM s Page 13 of Access Map Dominion North Carolina Power Scotland Neck to South Justice Branch 115 kV Transmission Line Project Halifax County, NC 0 200 400 Feet 1:2,400 Legend o Angle Structure Tangent Structure .r Project Limit t►► Proposed Access Road Existing Access Road Wetland Data Point Upland -Data Point Q Surveyed Wetland Q Surveyed Waterbody ® Riparian Buffer Zone I '(Z2 Riparian Buffer Zone II i,,, j HUC8 Watershed Note 1. Aerial Date: June 2016 2. Revised Data September 7, 2017 3. Property Information from Halifax County: June 2017 4. Approximate 50'X50' Mat Construction Pad vAD be centered ft Dominion Energy FILEM\C1eMa\DFl 014-4-4 Nack\ ArcOIS201 ]Y19\il Mapsa1 2400'WM SwtlaMNecF_MaP t_2400 xJ I REVISED Da/1-7 1 —F t I—w....... �..—.. 11.11 Page 14 of whac028s tj • •'cif• whac028 .y'`.r. 03020102 ei"••..,,» V m�• o wha1002f''= L , I; I REVISED: Access Map Dominion North Carolina Power Scotland Neck to South Justice Branch 115 kV Transmission Line Project Halifax County, NC 0 200 400 Feet 1:2,400 Legend o Angle Structure Tangent Structure j Project Limit ►► Proposed Access Road C Existing Access Road • Wetland Data Point A Upland Data Point Q Surveyed Wetland Q Surveyed Waterbody ® Riparian Buffer Zone I ® Riparian Buffer Zone II i„ _: HUC8 Watershed Note 1 Aenal Date: June 2016 2 Revised Date. September 7, 2017 3 Property Information from Halifax County: June 2017 4. Approximate 50'X50' Mat Construction Pad will be centered Dominion pwwo Energy ERM a Page 15 of 38 FILE: 114:1Cb. ""' 1433145 886411 2434145 ILK 111111111111111k, awl 'tjT > 7tlfz5Ro h, as y js ?, `•••a.,• 03020102 _ ••�• n Me vvhac02 4 14spaaa,,,,,,y�����+ t ,^A ✓• lam... .. ?�... J � a • �'•�• � f �� �•. � !: %�r{�/ �r %/,ems I. !i ,, ki % jay,_ �y. �. ��.. '1�.•?Dj i� � s �� � � ✓ .. whac028s GPS✓/�14'.r.�. _ 885411 2432145 2633145 06/1-17 1 SCALE'. 1'.2,4W wren Access Map Dominion North Carolina Power Scotland Neck to South Justice Branch 115 W Transmission Line Project Halifax County, NC 0 200 400 Feet 1:2,400 Legend o Angle Structure • Tangent Structure j„ Project Limit 11-► Proposed Access Road [ Existing Access Road Wetland Data Point ® Upland Data Point 0 Surveyed Wetland Q Surveyed Waterbody ® Riparian Buffer Zone t Y� Riparian Buffer Zone II HUCB Watershed Note 1. Aerial Date: June 2016 2. Revised Date: September 7, 2017 3. Property Information from Halifax County: June 2017 4. Approximate 50'X50' Mat Construction Pad VAN be centered Dominion Energy ERM Page 16 of 38 Access Map Dominion North Carolina Power Scotland Neck to South Justice Branch 115 kV Transmission Line Project Halifax County, NC 0 200 400 Feet 1:2,400 Legend o Angle Structure Tangent Structure Project Limit 0i Proposed Access Road C=am Existing Access Road 11111 Wetland Data Point ® Upland Data Point Surveyed Wetland Q Surveyed Waterbody ® Riparian Buffer Zone I ® Riparian Buffer Zone II j„ HUC8 Watershed Note 1. Aerial Data June 2016 2. Revised Date. September7, 2017 3. Property Information from Halifax County. June 2017 4. Approximate 50'X50' Mat Construction Pad will be centered OWZ Dominion Energy, I REVISED09113/10171 SCALE'. 1'.].400 wM1en nrintetl at itv'I] Page 17 of Square Feet Zone Zone: 9,499 6,578 7,993 5,485 4,%8 3,791 2437209 0 shac031 020102 tI h-021f it 883287 2438209 I7VI9\i1 M.pset 240 —M_ S.".dNecx_M.peer_2400.mxd I RINnsED:0en9r2017 I BCAIXA:2,4 eten oHned.111.17 ash aa002i z Mik—. . /A I shac030 rhac020f m Access Map Dominion North Carolina Power Scotland Neck to South Justice Branch 115 kV Transmission Line Project Halifax County, NC 0 200 400 Feet 1:2,400 Legend o Angle Structure • Tangent Structure Project Limit ►► Proposed Access Road t� Existing Access Road 0 Wetland Data Point A Upland Data Point 0 Surveyed Wetland 0 Surveyed Waterbody ® Riparian Buffer Zone I 'ZJ Riparian Buffer Zone II j,,, j HUC8 Watershed Note 1. Aenal Date: June 2016 2. Revised Date: September 7, 2017 3. Property Information from Halifax County: June 2017 4. Approximate 50'X50' Mat Construction Pad will be centered 00.19 Pftl Dominion pEnergy, ERM f Page 18 of 38 er 11.1 Feet Waterbody Zone 1 Zone 2 shac030 91 63 shac031 71 43 shaa002 104 80 Square Feet Zone Zone: 9,499 6,578 7,993 5,485 4,%8 3,791 2437209 0 shac031 020102 tI h-021f it 883287 2438209 I7VI9\i1 M.pset 240 —M_ S.".dNecx_M.peer_2400.mxd I RINnsED:0en9r2017 I BCAIXA:2,4 eten oHned.111.17 ash aa002i z Mik—. . /A I shac030 rhac020f m Access Map Dominion North Carolina Power Scotland Neck to South Justice Branch 115 kV Transmission Line Project Halifax County, NC 0 200 400 Feet 1:2,400 Legend o Angle Structure • Tangent Structure Project Limit ►► Proposed Access Road t� Existing Access Road 0 Wetland Data Point A Upland Data Point 0 Surveyed Wetland 0 Surveyed Waterbody ® Riparian Buffer Zone I 'ZJ Riparian Buffer Zone II j,,, j HUC8 Watershed Note 1. Aenal Date: June 2016 2. Revised Date: September 7, 2017 3. Property Information from Halifax County: June 2017 4. Approximate 50'X50' Mat Construction Pad will be centered 00.19 Pftl Dominion pEnergy, ERM f Page 18 of 38 er 11.1 Access Map Dominion North Carolina Power Scotland Neck to South Justice Branch 115 kV Transmission Line Project Halifax County, NC 0 200 400 Feet 1:2,400 Legend o Angle Structure • Tangent Structure i', —j Project Limit N- Proposed Access Road ►P Existing Access Road 0 Wetland Data Point A Upland Data Point Q Surveyed Wetland 0 Surveyed Waterbody ® Riparian Buffer Zone I ® Riparian Buffer Zone 11 i::— -'F HUCa Watershed Note 1. Aerial Date: June 2016 2. Ra0aed Date: September 7, 2017 3. Property Information from Halifax County: June 2017 4, Approximate 50'X50' Mat Construction Pad a1tl be centered ie`af' Dominion Energy Page 19 of I REVISED'. 09113!1011 1 SCALE. 1:3,400 when Orinfetl at 11x1 ] Access Map Dominion North Carolina Power Scotland Neck to South Justice Branch 115 kV Transmission Line Project Halifax County, NC 0 200 400 Feet 1:2,400 Legend o Angle Structure Tangent Structure j„ Project Limit ►► Proposed Access Road Gr Existing Access Road 49 Wetland Data Point ® Upland Data Point Surveyed Wetland Q Surveyed Waterbody ®� Riparian Buffer Zone I i i n Riparian Buffer Zone II j„ HUC8 Watershed Note 1. Aerial Date: June 2016 2. Revised Data September 7, 2017 3. Property Information from Halifax County. June 2017 4. Approximate 50'X50' Mat Construction Pad will be centered Dominion Energy° �J N ERM w . S Page 20 of Access Map Dominion North Carolina Power Scotland Neck to South Justice Branch 115 kV Transmission Line Project Halifax County, NC 0 200 400 Feet 1:2,400 Legend o Angle Structure e Tangent Structure j,: Project Limit ►Ob-- Proposed Access Road Existing Access Road • Wetland Data Point A Upland Data Point Q Surveyed Wetland Q Surveyed Waterbody ® Riparian Buffer Zone I ® Riparian Buffer Zone II HUC8 Watershed FILE: M:1CNnhV]FDOM�Scotlxnd_Neck\ ArcD1512017108111 Mapaet_24 MR4 S.0 MNeck_Mapaet 2400mxd I REVISED. 09/132017 I SCALE.1.2.400 when ednied x111.17 Note 1. Aerial Date: June 2016 2. Revised Date: September 7, 2017 3. Property Information from Halifax County: June 2017 4. Approximate 50'X50' Mat Construction Pad will be centered Ovz Dominion Energy e. ERM a Page 21 of Access Map Dominion North Carolina Power Scotland Neck to South Justice Branch 115 W Transmission Line Project Halifax County, NC 0 200 400 Feet 1:2,400 Legend o Angle Structure e Tangent Structure Project Limit ►► Proposed Access Road P=ls- Existing Access Road 0 Wetland Data Point Upland Data Point Q Surveyed Wetland Q Surveyed Waterbody ® Riparian Buffer Zone I Riparian Buffer Zone 11 HUC8 Watershed I REVISED: W/13r1e17 1 SCALE: Note 1. Aerial Date: June 2016 2. Revised Data: Septefter 7, 2017 3. Property Imormabon from Halifax County: June 2017 4. Approximate 50'X50' Mat Construction Pad vnll be centered e Dominion Energy Page 22 of 381 Access Map Dominion North Carolina Power Scotland Neck to South Justice Branch 115 kV Transmission Line Project Halifax County, NC 0 200 400 Feet 1:2,400 Legend o Angle Structure • Tangent Structure j„ Project Limit 0-1— Proposed Access Road Existing Access Road Wetland Data Point A Upland Data Point Q Surveyed Wetland 0 Surveyed Waterbody ® Riparian Buffer Zone I ® Riparian Buffer Zone II HUC8 Watershed when prin.d.111.11 Note 1. Aerial Date: June 2016 2. Revised Date: September 7, 2017 3. Property Information from Halifax County: June 2017 4. Approximate 50'X50' Mat Construction Pad will be centered Dominion Energy — N ERM E Page 23 of Access Map Dominion North Carolina Power Scotland Neck to South Justice Branch 115 W Transmission Line Project Halifax County, NC 0 200 400 Feet 1:2,400 Legend o Angle Structure • Tangent Structure j„ Project Limit 1110-110— Proposed Access Road C� Existing Access Road A Wetland Data Point A Upland Data Point Surveyed Wetland Surveyed Waterbody ® Riparian Buffer Zone I Riparian Buffer Zone it HUC8 Watershed nLE:M1CNMaVlf1DOM�5cotl+ntl Neck\_A1cGISVplT ll1 Mapaer 2A Mk' SW&MNeck_Mep><at_ QOO .d I REVISED. 00113Q017 SCALE. 12- aban niMed at 11.17 Note 1. Aerial Data June 2016 2. Revised Date: September 7, 2017 3. Property Information from Halifax County: June 2017 4. Approximate 50'X50' Mat Construction Pad will be centered Dominion Energy° yyN((((��� ERM CC77��11YYNN��// 5 Page 24 of MU: MA&U. I SCALE:1 2 Ctln when orlmed at 11.1 0 1% Access Map Dominion North Carolina Power Scotland Neck to South Justice Branch 115 kV Transmission Line Project Halifax County, NC 0 200 400 Feet 1:2,400 Legend o Angle Structure • Tangent Structure Project Limit ►► Proposed Access Road 11104ba- Existing Access Road • Wetland Data Point Upland Data Point 0 Surveyed Wetland Q Surveyed Waterbody ® Riparian Buffer Zone I ® Riparian Buffer Zone II HUC8 Watershed Note 1. Aerial Date: June 2016 2. Revised Date: September 7, 2017 3. Property Information from Halifax County June 2017 4. Approximate 50'X50' Met Construction Pad MR be centered ftsO Dominion WOO Energy N wF ERM s Page 25 of 38 Access Map Dominion North Carolina Power Scotland Neck to South Justice Branch 115 kV Transmission Line Project Halifax County, NC 0 200 400 Feet 1:2,400 Legend o Angle Structure • Tangent Structure i„ Project Limit ►► Proposed Access Road 110-0— Existing Access Road 0 Wetland Data Point Upland Data Point Surveyed Welland Q Surveyed Waterbody ® Riparian Buffer Zone ® Riparian Buffer Zone 11 HUC8 Watershed I SCALE: Note 1. Aerial Date: June 2018 2. Revised Date: September 7, 2017 3. Property Information from Halifax County: June 2017 4. Approximate 50'X50' Mat Construction Pad will be centered Dominion Energy ERM Page 26 of 38 874710 2452682 873710 2453682 ad sa°a Feet Square Feet f: ;\; Dominion North Carolina Power Waterbody Zone 1 Zone 2 Zone 1 Zone 2 �♦, dhac005 64 43 6,473 4,353! ♦ ♦ Scotland Neck to South Justice 99 dhac004 62 42 8,182 5 5 ! . Branch 115 kV Transmission Line dhac007 157 112 4,102 2,449 �' ``♦ Project dhaw007 424 381 8,480 7,620 ♦ Halifax County, NC dhaw008 68 47 1,360 940 .♦ ¢ 0 200 400 ' l♦ N Peet 1:2,400 i' dhaw008] Legend !'• .\;.., o Angle Structure �♦ • Tangent Structure /ahaw007 a✓,. 1.. �C Project Limit ✓ •�. ►•►• Proposed Access Road whac012f C=t�— Existing Access Road •,�''�, �•„`�-"' ��, a Wetland Data Point ��` �Ya • ' I`z • 0 Upland Data Point . •e Surveyed Wetland r t '•� ��•••,•• _ ^'�� t., liir � � Surveyed Waterbody �`•'�• • •�, 03020102 ••� ' G llm"' ® Riparian Buffer Zone �'••� ggr7. r_ f—�--`' Riparian Buffer Zone II •�' .�• '�. t, •, j HUCB Watershed •`• •`' •`• `• '�. dhac008 dhac004• — .,•••,•• , D' ey, Note 1. Aerial Date: June 2016 2. Revised Date: September 7, 2017 3. Property Information from Halifax County: June 2017 4 4. Approximate 50'X50' Mat Construction Pad will be centered Dominion Energy ERM 872716 245166 2452682 27 of 38 452682 FILE: M:CkM1VO4 MZ,,11en4_Neck\ Art IS12OI7 k11M.peel_240Mk ScoaaMN..M.p.et2MO-11 REVISED:%/1M017I6CALE:1:2,400 wM1en prlMr4at 11817 Access Map Dominion North Carolina Power Scotland Neck to South Justice Branch 115 kV Transmission Line Project Halifax County, NC 0 200 400 Feet 1:2,400 Legend o Angle Structure Tangent Structure Project Limit ►► Proposed Access Road 0-0— Existing Access Road • Wetland Data Point Upland Data Point Surveyed Wetland Q Surveyed Waterbody ® Riparian Buffer Zone I ® Riparian Buffer Zone II HUC8 Watershed I SCALE: 1:].Gmm—.1--.111.11 Note 1. Aerial Date: June 2016 2. Revised Date: September 7, 2017 3. Property Information from Halifax County: June 2017 4. Approximate 50'X50' Mat Construction Pad vnll be centered Dominion Energy ERM 5 Page 28 of Access Map Dominion North Carolina Power Scotland Neck to South Justice Branch 115 kV Transmission Line Project Halifax County, NC 0 200 400 Feet 1:2,400 Legend o Angle Structure Tangent Structure Project Limit 1111-0— Proposed Access Road W-11— Existing Access Road 40 Wetland Data Point A Upland Data Point Q Surveyed Wetland 0 Surveyed Waterbody ® Riparian Buffer Zone I Riparian Buffer Zone II HUCa Watershed FILE: M1CNrus�DilWMIScaWnd Necklfrtplb1201 ]108\1t_Mapset 2400`COM_SweaMNeck_Map t 24ap.mxd I REVISED. -1 17I SCALE:l:2,40b—;xlnledatfix17 Note 1. Aerial Dale: June 2016 2. Revised Date: September 7, 2017 3. Property Information from Halifax County: June 2017 4. Approximate 50'X50' Mat Construction Pad will be centered Dominion Ener9Y � w ERM �S Page 29 of 8]1195 458518 870195 2458518 ' Access Map 1 Dominion North Carolina Power 'dhaa006. Scotland Neck to South Justice Branch 115 kV Transmission Line Project Halifax County, NC 0 200 400 Feet a�cK•a��rr .,:EXT •\ 12,400 �rr.� Legend \ o Angle Structure • �\ •\ _ • Tangent Structure \ 1,• 7Project Limit •' • 1►4111 Proposed Access Road �� • ';\ %` � Existing Access Road 0 Wetland Data Point ••:. 1 1 ♦ Upland Data Point •i ( , �\ 0 Surveyed Wetland •; \•�` _ Q Surveyed Waterbody 1tTl�i1 r 1 dhac003 ------� 03020102OW, , ® Riparian Buffer Zone I Riparian Buffer Zone 11 .._ �_.. _ .�... _... �. _ _..._\.._..._..._..._.............._..._......_..._......_......_...�...�..._...�...�...�...�... �...�... i...1 HUC8 Watershed �.. .�.. _..._ i' Feet Square Feet Waterbody Zone 1 Zone 2 Zone 1 Zone 2 dbac003 64 43 6,360 4,339 "anal Dade jNne 2016 2. Revised Date: September 7, 2017 3. Property Information from Halifax County: June 2017 d. Approximate 50'X50' Met Constm u.n Pad will be centered Dominion pEnergy„ ERMr �..... 869195 2457518 Page 30 of 38 FILE: M'1C4ms.DilWMxScaWnd_Ned\ A.c(iIS1201 ]108\11 M.qk ]4W`IIOM SweandNack Mepasr_2400.mxd I R"ISEO:Oa/13CO17 I SCALE: 12.400wM1en ed-dat 11x17 2458518 DRAM BY JPB 868791 2461393 .r �. + 1 y 1N" 4 y t '•• Iag014f 867791 FILE: M:tClei4s�Dst➢OMl6cotlan4_Neck\ ArtDl6\201T09\11 MepsM 2400YJOM 6weaMNeck Mapser_]i00mxJ I REVISED: 08/132017 1 SCALE: 1:2.400w liftdet11117 N . Feet Square Feet Waterbody Zone 1 Zone 2 Zone 1 Zone 2 shag006 64 44 6,830 4,374 shac019 71 49 6,965 4,825 shac018 292 189 29,200 14,175 dhaa008 715 680 31,353 24,047 868791 2461393 .r �. + 1 y 1N" 4 y t '•• Iag014f 867791 FILE: M:tClei4s�Dst➢OMl6cotlan4_Neck\ ArtDl6\201T09\11 MepsM 2400YJOM 6weaMNeck Mapser_]i00mxJ I REVISED: 08/132017 1 SCALE: 1:2.400w liftdet11117 N . w Access Map Dominion North Carolina Power Scotland Neck to South Justice Branch 115 kV Transmission Line Project Halifax County, NC 0 200 400 Feet 1:2,400 Legend o Angle Structure • Tangent Structure i„ Project Limit ►► Proposed Access Road C=� Existing Access Road • Wetland Data Point A Upland Data Point Surveyed Wetland Q Surveyed Waterbody ® Riparian Buffer Zone ® Riparian Buffer Zone II i,,,1 HUC8 Watershed Note 1. Aenal Date: June 2016 2. Revised Date: September 7, 2017 3. Property Information from Halifax County: June 2017 4. ApProdmate 50'X50' Mat Constmebon Pad will be centered Dominion ppWoo Energy ki + ti ERM aS Page 31 of 38 es4 2462834 i, Access Map Dominion North Carolina Power Scotland Neck to South Justice Branch 115 kV Transmission Line Project Halifax County, NC •,•`� ` 0 200 400 r' Feet 1:2,400 Irj� Legend li` - o Angle Structure - �- Tangent Structure "'1•••� Project Limit anaaooe ��. A � .�- ` � � ' �4 %• lit10— Proposed Access Road snao018 j I►► Existing Access Road • Wetland Data Point Upland Data Point Surveyed Wetland % Q Surveyed Waterbody on�<oo1 }.. ,2• ® 03020102 Riparian Buffer Zone I � ®Riparian Buffer Zone 11 w\., �• _ _ _ _ _ _ ,7 -. �... _... _... _... _... _..._ HUC8 Watershed � tri 1 :�•'1�%� 'y,������ 1.�. � t:•: 4t,� �'f�`rJy��` °�' ,. -00 f - - - Nob: 1. Aerial Date: June 2016 x -•s. 1� 3 ��# 2. ReVlsed Date: September 7, 2017 3. Property Information from Halifax County: June 2017 3 " 4. Approximate 50'X50' Mat Construction Pad vnll be centered Dominion f Energy. a 5 ERM a . esss3s •: Page 32 of 38 665839 2460834 FILE:M:\CNMa�DF�llOMlScptl•ntl_Neck�,A NGISp01710a\11 Mapaat_2400'DOM SwbrMN•ck M•p••t_2400.rvtl I REVISED: ou1M017 I I—LE: I:2,OO —n priniad•t 11x17 MAM BY Access Map Dominion North Carolina Power Scotland Neck to South Justice Branch 115 kV Transmission Line Project Halifax County, NC 0 200 a00 Feet 12,400 o Angle Structure • Tangent Structure i„ Project Limit ►� Proposed Access Road la� Existing Access Road 0 Wetland Data Point A Upland Data Point Surveyed Wetland 0 Surveyed Waterbody ® Riparian Buffer Zone I ® Riparian Buffer Zone II HUC8 Watershed Note 1. Aenal Date: June 2016 2. Revised Date: September 7, 2017 3. Properly Informabon from Halifax County: June 2017 0. Approximate 50'X50' Mat Construc5on Pad will be centered gem Dominion Energy FILE: M'1Cr.M.Ulflt]OMVSc.W14Nock\Arc IS201710a\11 M.px.t 2d MRy SMIIMN.ck-Maput_ QO.mad I REVISED. poli12,7 I SCALE.13.400—w1Med 11.17 Page 33 of Feet Zone 1 Zone 2 66 46 30 60 i Square Feet Zone Zone 2 6,717 4,683 8,394 6,003 FILE: M:1CNr 24 cell=017 1 SCALE:1 246 Y,35 whaw001e n aarsn 1635 Access Map Dominion North Carolina Power Scotland Neck to South Justice Branch 115 kV Transmission Line Project Halifax County, NC 0 200 400 Feet 1:2,400 Legend o Angle Structure e Tangent Structure j:: Project Limit 0-0— Proposed Access Road D=O— Existing Access Road 0 Wetland Data Point Upland Data Point 0 Surveyed Wetland Q Surveyed Waterbody ® Riparian Buffer Zone I ® Riparian Buffer Zone II i,,,1 HUC8 Watershed Note 1*A Hal Date: June 2016 2. Revised Date: September 7, 2017 3. Property Information from Halifax County: June 2017 4. Approximate 50'X50' Mat Construction Pad will be centered Dominion XEnergy ERM 'N' Page 34 of 38 D -N BY JPR Access Map Dominion North Carolina Power Scotland Neck to South Justice Branch 115 kV Transmission Line Project Halifax County, NC 0 200 400 Feet 1:2,400 Legend o Angle Structure Tangent Structure Project Limit M� Proposed Access Road [ Existing Access Road 0 Wetland Data Point A Upland Data Point Surveyed Wetland Q Surveyed Walerbody ® Riparian Buffer Zone I �2!�J Riparian Buffer Zone 11 j„ HUC8 Watershed 16CA1E.12—w-di.r11.17 Note 1. Aerial Date: June 2016 2. Revised Data: September 7, 2017 3. Property Information from Halifax County: June 2017 4. Approximate 50'X50' Mat Construction Pad will be centered OM IPW Dominion OpRIVO Energy, N ERM w s Page 35 of 38 Feet Square Feet Zone 1 Zone 2 Zone 1 Zone 2 52 41 2,786 301 75 52 7,536 5,215 56 0 5,217 0 70 49 3,501 2,440 863401 CE 3 �\ lop •� •\ 03020102 ,i' •��• •\•• •\ CE 4 ,.• .�. •�� shac072 •,,, ,�•' o 60 03010107 '\ikAlrS�dilIt.�p. a mw t 2466902 862401 Aaaeni I SCALE. 12.400 -Wird at II.17 Access Map Dominion North Carolina Power Scotland Neck to South Justice Branch 115 kV Transmission Line Project Halifax County, NC 0 200 400 Feet 1:2,400 Legend o Angle Structure Tangent Structure i,: Project Limit Ili Proposed Access Road V�20— Existing Access Road • Wetland Data Point Upland Data Point Q Surveyed Wetland Q Surveyed Waterbody ® Riparian Buffer Zone I ® Riparian Buffer Zone 11 i,,,1 HUCB Watershed Note I. Aerial Date June 2016 2. Revised Date: September 7, 2017 3 Property Information from Halifax County: June 2017 4. Approximate 50'X50' Met Construction Pad will be centered Dominion 0100 Energy" E ERM z Page 36 of 38 CRAWN BY -J 865671 'Ac 125 1 t Jf x Laurel Road Feet Square Feet Waterbody Zone 1 Zone 2 Zone 1 Zone 2 shac005 54 46 6,729 4,652 shac006 59 0 3,485 0 shac008 52 41 2,786 300 a '' shac009 59 0 1,180 Il Vi � unAAoar _•?�•••• ..�...� . snacooa -. � whac001 s_a ® ,•U •.. �.._ J • .. .... .� .� O what OOte b® I •, � N �' �.. .�. \ 10 Access Map Dominion North Carolina Power Scotland Neck to South Justice Branch 115 kV Transmission Line Project Halifax County, NC 0 200 400 Feet 12,400 Legend o Angle Structure • Tangent Structure is Project Limit ►t► Proposed Access Road C--.:�= Existing Access Road Wetland Data Point A Upland Data Point Q Surveyed Wetland Q Surveyed Waterbody ® Riparian Buffer Zone I ® Riparian Buffer Zone II j„ HUC8 Watershed Note 1. Aerial Date: June 2016 2. Reosed Date: September 7, 2017 3. Property Informatian from Halifax County June 2017 4. Approximate 50'X50' Mat Construction Pad will be centered Dominion WEnergy° F ERM �z Page 37 of •�I= Me_a `j� p Railroad SGeet • _ ��' '� • what 001f b, sha�005 � �... At AM W^* _ t + 10 Access Map Dominion North Carolina Power Scotland Neck to South Justice Branch 115 kV Transmission Line Project Halifax County, NC 0 200 400 Feet 12,400 Legend o Angle Structure • Tangent Structure is Project Limit ►t► Proposed Access Road C--.:�= Existing Access Road Wetland Data Point A Upland Data Point Q Surveyed Wetland Q Surveyed Waterbody ® Riparian Buffer Zone I ® Riparian Buffer Zone II j„ HUC8 Watershed Note 1. Aerial Date: June 2016 2. Reosed Date: September 7, 2017 3. Property Informatian from Halifax County June 2017 4. Approximate 50'X50' Mat Construction Pad will be centered Dominion WEnergy° F ERM �z Page 37 of 867922 Ya ROa�t°Te ,. d C 1., CPP Srre et i f Scotland Neck Sub a o �...�.- ...�...�...........1 1 c -a: 03020102 � c Mit T„ O•EJ 1- G „� yd III, .,Railroad Street. ro 41* f*4%ws G ace 41 �e Ch .:. estn4t Sheer 866922 367922 Access Map Dominion North Carolina Power Scotland Neck to South Justice Branch 115 kV Transmission Line Project Halifax County, NC 0 200 400 Feet 1:2,400 Legend o Angle Structure • Tangent Structure j, Project Limit ►► Proposed Access Road L � Existing Access Road 40 Wetland Data Point A Upland Data Point Q Surveyed Wetland Q Surveyed Waterbody ® Riparian Buffer Zone I l� Riparian Buffer Zone 11 HUC8 Watershed Note 1 Aerial Date June 2016 2 Revised Date: September 7 2017 3 Property Information from Held- county'. June 2017 4 Approi mate 50'X50 Mat Const—bon Pad will be centered Qit Dominion En,OWergy° y F ERM z h Page 38 of Goss, Stephanie From: Laura Clark <Laura.Clark@erm.com> Sent: Friday, September 15, 2017 10:09 AM To: Goss, Stephanie Subject: ' ' FW: 2017-01401 incomplete application Hi Stephanie, I' Below'is'the'email we received from the COE authorizing - use of NW.P 12 and deeming the PCN application unnecessary. Also;what does the department consider permanent and temporgry,impa'cts? There, is information in the PCN application (page 11 of the supplemental information) that we submitted to you that wouldive you a better idea of construction activities near waterb'odies' g , Thanks, Laura Clark Project Scientist' ERM 121 West Trade Street LSuite 2320 1 Charlotte I NC 128202 Office 980-297-72821 M 724-544-2310 laura:clark@erm.com ='Original Message ----- From: Alexander, Tasha L CIV USARMY CESAW.(US) [ma'ilto:Tasha.L.Alexander@usace.army.mil] Sent: Thursday, September 14, 2017 1:30 PM To Laura Clark Amanda M Mayhew; Tanitra Seibles Subject: RE: 2017-01401 incomplete application i, Lau ra, I appreciate the additional information. After further review, we -determined the notification via Pre -Construction' Notification (PCN) on June 26, 2017 was unnecessary. ''This notification proposes permanent impacts to 0.08 acre of wetlands to construct a - new overhead 115k trans`m'ission line within entirel,y;new right -of -Way. The existing substations at either terminus are proposed to be expanded',to,'accommodate the new bine. This project will convert forested wetlands'to maintained herbaceous/scrub shrub. Wetlands however no discharge of.fill'is associated with the'conversion (stumping and grubbing will not occur)-. Based on the, information you provide; your workis authorized by Nationwide Permit (NWP) 12 for Utility Line;Activities proyi,d'edit is accomplished in accordance'with the NWP's along with'the corresponding permit conditions. See the link bel'o;W: " http://saw-reg:usace.arm_y..mil/.NWP2017/2017NWP12.pdf Any violation of the a ttache'd'conditions or deviation from your proposed work scope may subject the permittee,to'!a stop work order, a restoration order and/or appropriate legal action. The expiration date for the, permit authorization is March 18, 2022,unless'the nationwide authorizatio''wis modified, suspended or revoked. If the nationwide permit authorization expires or is suspended, revoked, or is modified, such that the activity would no longer comply, With the terms and conditions of the nationwide permit, activities which have commenced (i.e., are under construction) or are under contract to commence in reliance upon the nationwide permit, will remain authorized provided the activity is completed within twelve months of the date of the nationwide permit's expiration, modification or revocation, unless discretionary authority has been exercised on a case-by-case basis to modify, suspend or revoke the authorization. Activities subject to Section 404 may also require an individual Section 401 Water Quality Certification. You should contact the NC Division of Water Resources to determine Section 401 requirements. This response does not relieve the permittee of the responsibility to obtain any other required Federal, State or local approvals/permits. Please let me know if you have any questions regarding this permit or the conditions. Again, I apologize for the confusion with this project and the discrepancies between offices Thank you, Tasha Alexander Regulatory Specialist Raleigh Regulatory Field Office U.S. Army Corps of Engineers -Wilmington District 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Phone: 919-554-4884, extension 35 email: tasha.l.alexander@usace.army.mil The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at our website at http://www.saw.usace.army.mil/missions/RegulatoryPermitProgram.aspx to complete the survey online. -----Original Message ----- From: Laura Clark [mailto:Laura.Clark@erm.com] Sent: Friday, September 08, 2017 4:02 PM To: Alexander, Tasha L CIV USARMY CESAW (US) <Tasha.L.Alexander@usace.army.mil> Cc: Amanda M Mayhew <Amanda.M.Mayhew@dominionenergy.com>; Tanitra Seibles <Tanitra.Seibles@erm.com> Subject: [EXTERNAL] RE: 2017-01401 incomplete application Hi Tasha, Attached is a letter in response to the incomplete application items. Also attached is the requested ORM Table, and SHPO correspondence. Let me know if you have any questions or need me to revise the ORM Table. Have a nice Weekend! Thanks, Laura Clark Project Scientist ERM 121 West Trade Street I Suite 2320 1 Charlotte I NC 128202 Office 980-297-7282 1 M 724-544-2310 laura.clark@erm.com ---=-Origirial Message ----- From: Alexander, Tasha L CIV USARMY CESAW (US) [mailto:Tasha.L.Alexander@usace.ariny.mil] Sent: Thursday, August 31, 2017 1:50'PM To: Ta nitra Seibles Cc: Amanda, M Mayhew; Laura Clark Subject: RE: -2017-01401 incomplete application Ta n itra, I ,have left a message for Amanda but we have not been able to catch up. I want to'ensure you know we will not,be requiring mitigation for this project. Our scope for this project 'is limited to the waters of the. United States (wetlands) that will be directly, affected by,the proposed structures and uplands directly affected as &result of authorizing the structures.] would still like to'see the,additional;correspondence from the S'HPO. I apologize for any confusion or additional, work: Thank you, Tasha Alexander Regulatory, Specialist 'Raleigh Regulatory Field Office U.S. Army Corps of Engineers -Wilmington District . 3331 Heritage Trade Drive; Suite 105 Wake Forest; North Carolina 27587 Phone': 919-554-4884, extension 35 email:'itasha.l.al'exander@usace.army.mil The Wilmington District is committed to providing the highest level of support t'o the, public. To help us ensure we continue to do.so; please complete the Customer Satisfaction Survey located at our website at Blockedhttp://www.saw.usac'e.army.mil/missions/ReguI atoryPermitProgram.aspx to complete the survey online: ----Original Message ----- From: Tanitra.Seibles [mailto:Tanitra.:Seibles@erm.corri] Sent:.Thursday, August 24, 2017 1:34 PM ' To: Alexander, Tasha L CIV USARMY CESAW (US) 4Tasha.L.Alexander@usace.army.mil> Cc: Amand`a'M Mayhew <Amanda.M.Mayhew@dominionenergy.com>; Laura Clark <Laura.Cl'ark@erm.com> Subject: [Non-DoD Source] RE: 2017-01401'incomplete application' Hi Tasha, . We are still putting together the requested items for the PCN and would,formally like to request and. extension. We hope to have information'to you in the coming days.' Thanks -----Original Message ---- From: Alexander, Tasha.L CIV USARMY'CESAW (.US) [mailto:Tasha.L.Alexander@usace.army.mil] Sent: Tuesday, July 25, 2017 11:06 AM To: Tanitra-•Seibles Subject: 2017-01401 incomplete application I have reviewed the JD package and the PCN and I have several questions and I will need.additional information. Has Dominion acquired all easements at this time? If not, do you have agent authorization forms,granting access for the field review? 3 I have included a link to the NWP 12 with general and regional conditions for your reference. Blocked Blockedhttp://saw-reg.usace.army.miI/NWP2017/2017NWP12.pdf Missing information in the JD package: Please complete the aquatic resource excel sheet (provided in previous email). For a PJD request you should select delineate for waters type. I noticed you have several ditches listed. Please note, with a PJD we are assuming these are jurisdictional. Perhaps we should review some of these features during our field visit. Please complete our JD request form, see link. Blocked Blockedhttp://saw-reg.usace.army.miI/JD/FINALSAW-JD-REQUEST-FORM-20170508.pdf Missing information for PCN: You did not provide a mitigation plan. Please see Regional Condition 4.1.10 "Any permanently maintained corridor along the utility right of way within forested wetlands shall be considered a permanent impact. A compensatory mitigation plan will be required for all such impacts associated with the requested activity if the activity requires PCN and the cumulative total of permanent forested wetland impacts exceeds 1/10 -acre, unless the District Engineer determines in writing that either some other form of mitigation would be more environmentally appropriate or the adverse effects of the proposed activity are minimal. For permanent forested wetland impacts of 1/10 -acre or less, the District Engineer may determine, on a case-by-case basis, that compensatory mitigation is required to ensure that the activity results in minimal adverse effects on the aquatic environment." Additionally, I did not see a restoration plan for cleared areas. See Regional Condition 4.1.9 "A plan to restore and re -vegetate wetland areas cleared for construction must be submitted with the required PCN. Cleared wetland areas shall be re -vegetated to the maximum extent practicable with native species of canopy, shrub, and herbaceous species. Fescue grass shall not be used." Please provide impact maps and typical details for access roads, replanting, etc. Please provide justification for 100 ft permanent maintained corridor. The PCN includes a letter to SHPO which references previous correspondence. Please provide all correspondence with the SHPO. At this time the application is incomplete. Please provide the additional information within 30 days or we may withdraw your application. We are a scheduled to conduct the field review on August 9-10. 1 will email you prior to our meeting to select a meeting location. I suggest we meet around 9:00 if that works for you and your team? Thank you, Tasha Alexander Regulatory Specialist Raleigh Regulatory Field Office U.S. Army Corps of Engineers -Wilmington District 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Phone: 919-554-4884, extension 35 email: tasha.l.alexander@usace.army.mil The Wilmington District is committed to providing the highest level of support to ,the public.. To help us ensure we continue to do so,, please, complete the Customer Satisfaction-Survey.located at our website,at BlockedBlockedhttp://www.saw.usace.army.mil%missions/RegulatoryPermitProgram.aspx to complete the survey online., This'electronic mail message may contain information which is (a) LEGALLY PRIVILEGED, PROPRIETARY IN NATURE, OR OTHERWISE PROTECTED BY LAW FROM DISCLOSURE, and (b) intended only for the use of the Addressee (s) names herein. If you are not the Addressee(s), or the person responsible for delivering this to the'Addressee,'(s), you are'hereby notified that reading, copying, or.distributingthis message is prohibited:1f you have received this electronic,mail message in error, please contact us immediately at (612) 347-6789 acid take the steps necessary,.'to delete the message completely from your computer system. Thank you, Please visit: ERM's web site: BlockedBlockedhttp://www.erm.com _ This electronic mail message may contain information which is (a) LEGALLY. PRIVILEGED, PROPRIETARY IN' NATURE, OR OTHERWISE PROTECTED BY LAW FROM DISCLOSURE, and (b) intended only for the use of the Addressee (s) names herein. If you are not the Addressee(s), or the person responsible'lor delivering this to the Addressee (s), you are hereby notified that reading, copying, or. distributing thm.message is prohibited. If you,have received this electronic mail message, in error, please contact us'immediately'at (612) 347-6789 and take the steps. necessary to delete the message completely,from your computer system. Thank you, Please visit: ERM's web site: Blockedhttp://www.erm.com This electronic mail message may contain information which is (a) LEGALLY PRIVILEG ED,.PROPRIETARY IN NATURE, OR OTHERWISE PROTECTED BY LAW, FROM DISCLOSURE, and (b), intended only for the use of'the Addressee (s) names herein. If you are. not the Addressee(s), or the person responsible for delivering this to the Addressee (s), you are hereby notified that reading, copy,ing;, or distributing this message is prohibited. If you have received this electronic mail message in error; please contact us immediately at (612) 347=6789 and take the steps necessary to delete.the message completely from your computer system: Thank you, Please visit: ERM's web site:, http://www.erm.com 5 .Goss; Stephanie From: Burdette, Jennifer a . ! Sent: Wednesday, September 20, 2017 8:23 AM To: Goss, Stephanie Subject: RE: 20170783 incomplete application Stephanie, Because the area will still function as a wetland it is still considered a temporary impact. We do not require mitigation for permanent.conversion of.forested wetland to an herbaceous, wetland. The USACE'doe's require mitigation for this type'of impact. Jennifer Jennifer Burdette 401/Buffer Coordinator Division ofWater Resources - 401 & Buffer Permitting Branch Department, of Environmental Quality 919 807'6364 office jennifer.burdette@ncdenr.gov 1617 Mail Service Center Raleigh, NC 27699-1617 (PhysicaliAddress: 512 N. Salisbury St, Raleigh,,,NC 27604.- 9th. FIr:Archdale Bldg = Room 942F) Emailicorrespondence to and -from this address. is subject,to the North.Carolina Public Records Law and may be disclosed to third parties. -----Original Message ---- From: Goss, Stephanie Sent: Wednesday, September -20, .2017 8:16 'AM To: Burdette, Jennifer a <Jennifer.Burdette@4ncdenr.gov> Subject: 20170783 incomplete application Jennifer, am still Working on the project Scotland Neck to South Justice Branch Transmission Line. Anyway, the consultant had a question regarding temporary vs permanent impacts regarding_the power easement. The easement will allow scrub to grow back, but they will not allow trees to grow up. Is.this'considered temporary or permanent activity? In my, opinion; I believe it is permanent; but wanted to check'with you. Stephanie Z: Goss Environmental Senior Specialist Division of Water. Resources ' Raleigh Regional Office 3800. Barrett Drive Raleigh; NC 27609 919-791=4256 V E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties -----Original Message ----- From: Laura Clark [mailto:Laura.Clark@erm.com] Sent: Friday, September 15, 2017 10:09 AM To: Goss, Stephanie <stephanie.goss@ncdenr.gov> Subject: FW: 2017-01401 incomplete application Hi Stephanie, Below is the email we received from the COE authorizing use of NWP 12 and deeming the PCN application unnecessary. Also, what does the department consider permanent and temporary impacts? There is information in the PCN application (page 11 of the supplemental information) that we submitted to you that would give you a better idea of construction activities near waterbodies. Thanks, Laura Clark Project Scientist ERM 121 West Trade Street I Suite 2320 1 Charlotte I NC 128202 Office 980-297-7282 1 M 724-544-2310 laura.clark@erm.com -----Original Message ----- From: Alexander, Tasha L CIV USARMY CESAW (US) [mailto:Tasha.L.Alexander@usace.army.mil] Sent: Thursday, September 14, 2017 1:30 PM To: Laura Clark Cc: Amanda M Mayhew; Tanitra Seibles Subject: RE: 2017-01401 incomplete application La u ra, I appreciate the additional information. After further review we determined the notification via Pre -Construction Notification (PCN) on June 26, 2017 was unnecessary. This notification proposes permanent impacts to 0.08 acre of wetlands to construct a new overhead 115k transmission line within entirely new right-of-way. The existing substations at either terminus are proposed to be expanded to accommodate the new line. This project will convert forested wetlands to maintained herbaceous/scrub shrub wetlands however no discharge of fill is associated with the conversion (stumping and grubbing will not occur). Based on the information you provide, your work is authorized by Nationwide Permit (NWP) 12 for Utility Line Activities provided it is accomplished in accordance with the NWP's along with the corresponding permit conditions. See the link below. http://saw-reg.usace.army.mil/NWP2017/2017NWP12.pdf Any violation of the attached conditions or deviation from your proposed work scope may subject the permittee to a stop work order, a restoration order and/or appropriate legal action. The expiration date for the permit authorization is March 18, 2022 unless the nationwide authorization is modified, suspended or revoked. If the nationwide permit authorization expires or is suspended, revoked, or is modified, such that the activity would no longer comply with the terms and conditions of the: nationwide permit, activities which have commenced (i.e., are, under construction) or are under contract to commence-Jri reliance upon the nationwide permit,.will remain authorized provided the activity is completed within twelve months of the date of the nationwide permit's expiration- modification or 'revocation, unless discretionary authority has been exercised on a case-by-case basis to modify, suspend or revoke the authorization. Activities subject to Section 404 may also require an individual Section 401 Water Quality Certification: You should contact the. NC Division of Water Resources to, determine.Section 401 requirements. This response does not relieve the permittee -,of the responsibility to obtain any other required Federal, State or local approvals/permits. Please let me know ifyou�have.any questions, regarding this permit or the conditions.. Again, I apologize forthe confusion with this project"and the discrepancies between, offices. Thank you;, Tasha Alexander Regulatory Specialist Raleigh Regulatory Field Office U.S. Army Corps of Engineers -Wilmington District 3331 Heritage Trade Drive, Suite 105 Wake Forest,, North Carolina 27587 'Phone: 919-554-4884, extension 35 email: tasha.l.alexander@usace.army.rimil TheAdVilmington District is committed to providing the highest level of support,' to the public. To help_ us ensure we continue to do so; please complete the Customer Satisfaction Survey, located at our website at http://www.saw.usace.army.mil/missions/RegulatoryP,ermitProgram:aspx to complete the survey online. ------ Message ----- From:.,Laura Clark [mailto:Laura.Clark@erm.com] Sent: Friday, September 08, 20174:02 PM To: Alexander, Tasha L CIV USARMY CESAW (.US) <Tasha.L.Alexander@usace.army:m'il> Cc:.Amanda M Mayhew <Amanda.M.Mayhew@dominionenergy.com>; Tanitra Seibles <Tanitra.Seibles@erm.com> Subject:'[EXTERNAL].RE: 2017-01401 incompletelapplication Hi Tasha, Attached is a letter in response to the incomplete application items: Also attached is the requested ORM Table,' and SHPO correspondence. Let me know,if you have any questions.or need me to revise the ORM Table., Have a nice Weekend! :. Thanks, Laura Clark Project Scientist ERM 121 West Trade Street I Suite 2320 1 Charlotte I NC 129202 Office 980-297-7282 1 M 724-544-2310, Iaura.clark@erm.com 3 -----Original Message ----- From: Alexander, Tasha L CIV USARMY CESAW (US) [mailto:Tasha.L.Alexander@usace.army.mil] Sent: Thursday, August 31, 2017 1:50 PM To: Tanitra Seibles Cc: Amanda M Mayhew; Laura Clark Subject: RE: 2017-01401 incomplete application Tanitra, I have left a message for Amanda but we have not been able to catch up. I want to ensure you know we will not be requiring mitigation for this project. Our scope for this project is limited to the waters of the United States (wetlands) that will be directly affected by the proposed structures and uplands directly affected as a result of authorizing the structures. I would still like to see the additional correspondence from the SHPO. I apologize for any confusion or additional work. Thank you, Tasha Alexander Regulatory Specialist Raleigh Regulatory Field Office U.S. Army Corps of Engineers -Wilmington District 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Phone: 919-554-4884, extension 35 email: tasha.l.alexander@usace.army.mil The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at our website at Blockedhttp://www.saw.usace.army.miI/missions/RegulatoryPermitProgram.aspx to complete the survey online. -----Original Message ----- From: Tanitra Seibles [mailto:Tanitra.Seibles@erm.com] Sent: Thursday, August 24, 2017 1:34 PM To: Alexander, Tasha L CIV USARMY CESAW (US) <Tasha.L.Alexander@usace.army.mil> Cc: Amanda M Mayhew <Amanda.M.Mayhew@dominionenergy.com>; Laura Clark <Laura.Clark@erm.com> Subject: [Non-DoD Source] RE: 2017-01401 incomplete application Hi Tasha, We are still putting together the requested items for the PCN and would formally like to request and extension. We hope to have information to you in the coming days. Thanks -----Original Message ----- From: Alexander, Tasha L CIV USARMY CESAW (US) [mailto:Tasha.L.Alexander@usace.army.mil] Sent: Tuesday, July 25, 2017 11:06 AM To: Tanitra Seibles Subject: 2017-01401 incomplete application I have reviewed the JD package andthe PCN and I have several questions and I will need additional information. Has. Dominion acquired all easements at this time? If not; do you have agent authorization forms granting access'for the .field review? 1 have included a link to the NWP 12 with general and 'regional conditions for your reference. Blocked Blocked http://saw-reg.usace.arMy.Mil/NWP2017/2017NWP12.pdf Missing information in the JD package: Please complete the aquatic resource excel sheet (provided in previous,email). For a PJD request you should,select delineate for waters type, I noticed you have several ditches listed'. Please note, with a PJD we.are assumin&these are jurisdictional. Perhaps we should review some:" f these features during our field .visit. Please complete our JD request form, see link. Blocked Blocked http://saw-reg.`usace.a'rmy.m i l/JD/FI NALSAW-J D-REQU EST -FOR M -2017d508. pdf i . Missing information for PCN: You did not provide a mitigation plan. Pleaselse;e Regional Condition 4.1.10 "Any permanently maintained corridor along th,e utilityright of way within forested wetlands shall be considered a permanent impact. A compensatory mitigationlplan will be required for all such impacts associated with the requested activity if the activity requires PCN and the cumulative total of permanent forested wetland impacts exceeds 1/10 -acre, unless the District Engineer determines in writing that either some other form of mitigation would be more . environmentally appropriate or the adverse effects of the proposed activity are minimal. i For permanent forested wetland impacts of 1/10 -acre or less, the District Engineer.may determine; on a case -by -,case basis, that compensatory mitigation is required to ensure that the activity results in minimal adverse effects on the aquatic environment." l Additionally, I did not see a restoration plan for cleared areas. See Regional, Condition 4.1.9, "A plan'to restore and re -vegetate wetland areas cleared for construction must be submitted with the required PCN. ' Cleared wetland areas shall be re-vegetated"to the maximum extent practicable with 'native species.of canopy, shrub," and herbaceous species. Fescue grass shall not'be used." ' I i Please provide impact maps and typical detailslfor access roads, replanting, etc. Please provide justification for. 100 ft - permanent maintained corridor. The PCN includes a letter to SHPO which references previous correspondence. Please provide all correspondence with the SHPO. At"this time the application is incomplete. Please provide the additional information'within-30 days or we may'withdraw your,'application. ,We "are a scheduled to,conduct the field review on.Augdst 9-10. I will email you prior to, our meeting to select a meeting location. I suggest we meet around 9:00 if that'works for'you and,y'o&team? Thank you, Tasha Alexander Regulatory Specialist Raleigh Regulatory Field Office U.S. Army Corps of Engineers -Wilmington District 3331 Heritage Trade Drive, Suite 105 5 Wake Forest, North Carolina 27587 Phone: 919-554-4884, extension 35 email: tasha.l.alexander@usace.army.mil The Wilmington District is committed to providing.the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at our website at Blocked Blockedhttp://www.saw.usace.army.miI/missions/RegulatoryPermitProgram.aspx to complete the survey online. This electronic mail message may contain information which is (a) LEGALLY PRIVILEGED, PROPRIETARY IN NATURE, OR OTHERWISE PROTECTED BY LAW FROM DISCLOSURE, and (b) intended only for the use of the Addressee (s) names herein. If you are not the Addressee(s), or the person responsible for delivering this to the Addressee (s), you are hereby notified that reading, copying, or distributing this message is prohibited. If you have received this electronic mail message in error, please contact us immediately at (612) 347-6789 and take the steps necessary to delete the message completely from your computer system. Thank you, Please visit: ERM's web site: BlockedBlockedhttp://www.erm.com This electronic mail message may contain information which is (a) LEGALLY PRIVILEGED, PROPRIETARY IN NATURE, OR OTHERWISE PROTECTED BY LAW FROM DISCLOSURE, and (b) intended only for the use of the Addressee (s) names herein. If you are not the Addressee(s), or the person responsible for delivering this to the Addressee (s), you are hereby notified that reading, copying, or distributing this message is prohibited. If you have received this electronic mail message in error, please contact us immediately at (612) 347-6789 and take the steps necessary to delete the message completely from your computer system. Thank you, Please visit: ERM's web site: Blockedhttp://www.erm.com This electronic mail message may contain information which is (a) LEGALLY PRIVILEGED, PROPRIETARY IN NATURE, OR OTHERWISE PROTECTED BY LAW FROM DISCLOSURE, and (b) intended only for the use of the Addressee (s) names herein. If you are not the Addressee(s), or the person responsible for delivering this to the Addressee (s), you are hereby notified that reading, copying, or distributing this message is prohibited. If you have received this electronic mail message in error, please contact us immediately at (612) 347-6789 and take the steps necessary to delete the message completely from your computer system. Thank you, Please visit: ERM's web site: http://www.erm.com