HomeMy WebLinkAbout20170783 Ver 1_More Info Received_20170929Environmental
Resources
Management
Suite 2320
121 West Trade Street
Charlotte, NC 28202.
Se tember 29, 2017: (980) 297-7270 main
p _ (704) 973-9376 fax
:..
North Carolina Erivironrnental-Quality .
Division of Water Resources
Attn:, Ms. Stephanie Goss
1617 Mail'Service Center .
Raleigh, NC' 27699-1617
Re:':Scotland Neck to South Justice Branch 115kV Transmission Line Project, Halifax
Courtt3' DWR#17-0783
- Dear Ms. Goss: .
Environmental Resources Management (ERM) has received your letter dated August 31, 2017
'V
requesting additional information,for the'above referenced ,project. Per 15A NCAC 02B;.0259(6)
Table, of, Uses, overhead electric utility lines with perpendicular crossings that disturb less than,
or equal"to 150linear ,feet of riparian buffer'are exempt. Additionally, overhead electric utility
lines with perpendicular crossings that disturb greater than 150,liinear feet of riparian buffer are
allowed. All crossings for the Projectineet one of the categories. Responses to the requested
information are found below:
N= 1. Please provide the most recent version of the 1:24,000 USGS Topographic Map. Please
cleanly drawing or delineate the -site boundaries�on.the topographic,map. [15A NCAC 02H
�p< .0502(b)]
Please see attached, Figure 1. _
2, Please, provide a most recent bound and published county soil survey. Please cleanly draw,
or delineate the site boundaries on the soil survey. [15A NCAC'.02H .0502(b)], ,
Please see attached Figure 2.,
Environmental
Resources
Management
3. The Division recognizes that Overhead Electric Utility Lines impacts other that
perpendicular crossings in, Zone 1 and. Zone 2 are considered exempt, impacts [15A NC
AC
02H .0502(b)].. Please"explain m' your'response how your project meets .the. BMP following
requirements for exemption:
Response:
® A miri;mum.of 10 feet wide immediately adjacent to the, waterbody will be maintained
such that'only vegetation,that poses a hazard or has the potentiallo grow tall enough to '
interfere with the line is removed.
® The Project will require' a 100 -foot wide right-of-way (ROW) that will be cleared of tall
growing vegetation di ..ring construction and will be maintained to preveli tall growing
vegetation. Clearing of vegetation.on the right-of=way area will be performed by shear
cutting with: a shear dozer off construction mats and by hand cutting iwith saws. The:
right-of-way will not grubbed or graded and construction in will be removed once
construction is complete. Trees and shrubs located within 100, feet of 'a stream or
jurisdictional ditches with running water, will be cleared by hand. All.materia'l three
inches in diameter and abovewill be cut and removed from the buffer. Material less ;.
than three inches in diameter will be left undisturbed and careshall be taken to •prevent "
-the disturbance of ,soil `within the 100 -foot -buffer zone around streams and ditches: • .
The right-of-way is,not,grubbed, thus leaving the root mass intact and the soil`,
undisturbed.
• The proposed transmission line will be constructed. usirig a combination of steel H-
-frame,
-frame, 2 -pole tangent structures and 3 -pole: su ort structures'at an le oints.; All,H F'.''�'''
p g p support g p
frames structures will consist of two legs. These structures will! be directly embedded;; .
into the ground, dependent on soil type, tension,arid angle:' Pipe pile foundations iat�;
angle structures" will have a maximur i diameter width of 5 feet 6 inches; whereas the;
direct embed foundation will have a'maximum diameter of 2.5 feet each foundaiioi:iw'' ill
be the minimum size necessary.to provide adequate support. There is no rip, rap need"edl
to stabilize the towers. '
• During restoration, fertilizer and lime will be used in a'one-time application before
seeding to re -:establish vegetation.
• Construction activities will minimize the removal of woody vegetation, the extent otthe
disturbed area; and the I time in which the areas remain in a disturbed state. Sedimen , i
barriers, 7§uch as silt fences; straw bales, or other approved barriers will be installed
during' clearing limiting the operation of construction .equipment within wetland"s to
only equipment essential'for clearing, excavation; installation; backfilling, and
restoration. Once the project is initiated, it will be completed as expeditiously as i
possible.
2
Environmental
Resources
Management
• The Tar -Pamlico River Basin is adjacent to a protected riparian buffer identified within
one of the NC Riparian Buffer Protection Rules. There are no new direct stormwater
conveyances to the stream; therefore a diffuse flow plan is not required. If needed .
measures will be implemented after construction and during routine maintenance to
ensure diffuse flow of stormwater through the buffer.
• In wetland areas, construction mats will be used to minimize soil disturbance. They will
be removed upon completion.
• All towers'associated with the project will be located at a -minimum of 10 feet away from ;
" anywaterbody. It is Dominion s standard practice to cross all waterbody's
'perpendicularly.
4'. In the Tar- Pamlico River Basin and Neuse River Basin, intermittent streams, perennial
streams, lakes, ponds and estuaries depicted on USGS maps and NRCS soil survey maps are
-subject to the Riparian Buffer Rules. Impacts to the riparian.buffers must,be identified on
your plans [15A NCAC 02B. 0259 (8)( b)( iv)]. If a stream is depicted on either map it is
subject to the riparian buffers: [Note: if the permittee believes the maps inaccurately depict
surface waters he or she must consult the Division to secure a formal on site determination.
DWR' s'file, review revealed that the riparian buffers have NOT received formal verification
by the Division.]
Please see attached Figure 3.
5. The wetland, stream and "riparian buffer impacts requested in this application need to be
clearly shown and enumerated on the site plan. These impacts need to correspond to the
impacts requested in the application. The labels' on the site -plan must be clear and must
match the labels of the impacts listed in the application. The Division recommends
highlighting by hatching or shading all impacts areas for temporary impact areas and
permanent, impact areas. [ 15A NCAC 02B. 0259(8)(b)(iv)] Wetlands, streams, open
waters, and Riparian buffers impacts mustbe differentiated by permeant versus temporary
impacts. With respect to riparian buffers, these impacted' areas must be further separated by
Zone I and Zone II impacts as well.
Please see attached Figure 3.
X
3
Environmental
Resources
Management
We appreciate the opportunity to provide additional information. Should you have any further
questions, please feel free to contact me at Laura.Clark@erm.com or 980-297-7282.
Sincerely,
Laura Clark
Project Scientist
ERM
Enclosures
Cc: Amanda Mayhew, Dominion Energy
98970 2400970 2402970 2404970 2406970 2408970 2410970 2412970 2414970 2416970 2418970 2420970 2422970
A
.. • 30
' •r
" r *a-
r South
s, Justice""',7
�1,Branch Sub
a
s-
• � '� a �'i
✓ .` lli
.F
rJU
.� 1 s«.
i
ail
�
1 t.
�� k
w
m
•_ �*}n, � �V t ��-_: "e �, 1 �r^`> ,n ..�, '� o ��.�� .'ibis -
-
x
_
« i
_ 4 _
So
OIN
m -
t - = '
mss+
34
-
«
f _ t
y
yy
f
98970 2400970 2402970 2404970 2406970 2408970 2410970 2412970 2414970 2416970 2418970 2420970 2422970
FILE: M:1ClamslD+IDOMG..4 4_N.,k\_A,G1S12a1n0S0I_M,,,eM 24XV]OM S.ft.d Neck_Mapsat Overview 24c0o.mse 1 REVISED: 091112017 1 SCALE: 1:24,000 wM1en o.bin4.t 11.17 m
Topography Map
Dominion North Carolina Power
Scotland Neck to South Justice
Branch 115 kV Transmission Line
Project
Halifax County, NC
0 2,000 4,000
Feet
,:24,000
Legend
j, Project Limd
Note
1 Aerial Date June 2016
2. Revised Date: September 7 2017
3 Property Informabon from Halifax County:
June 2017
4 Approximate 50'X50' Mat Construction
Pad will be centered
Dominion
Energy
N
WE
ERM
S
Page 1 of 3
2423026 2425026
r
2429026 2431026 2433026 2435026 2437026 2439026
r ,
• ,u
1+
I
•ts
ri e
l , _00
A.
.r
y z
<
1
• 1
^_ -
I�" 74z1e
t � 1
-
Crossroad
�-� Deli er*Plln Y• „•'
ft
`I t�;` ; � � � • 4: , i ,•'�
l r
x
,
y. -
4_
. J
1
! 2423026 2425026 2427026 2429026 2431026 2433026 2435026 2437026 2439026 2441026 2443026 2445026
4\Oleniz�Ofi',DOM�Scptlzntl_Neck\_ArtG151201-11 Me.. 2—VJOM. Sc UMNeck_Mepzet_Ov M. 2400 —d I REVISED: 0a IM017 I S—E1:29.000wM1enminbd.1-17 m
Topography Map
Dominion North Carolina Power
Scotland Neck to South Justice
Branch 115 W Transmission Line
Project
Halifax County, NC
0 2,000 4,000
Feet
1:24,000
Legend
Project Limit
Note
1 Aerial Date June 2016
2. Revised Date September? 2017
3. Property Informationfrom Hal /ax County: June
2017
4 Approwmate 50'X50'
0 X50 Mat Construction Pad
will be centered
Dominion
Energy
ERM N
Page 2 of 3
DRgW�l 6YJPB
_447002 2449002
2451002 2453002
2455002 2457002
2459002 2461002
2463002 2465002 2467002 2469002
•
M Dominion
Energy
Jo ` w
WP
ERM
S
}
s l
06
1
4.
a
-
CD
Scotland
iientlnrd Neck Sub
4
A %
is
1
/ _
4
� \ � y .. � • .' {tale te.rA •
o '
m
t
5002 2447002 2449002 2451002 2453002 2455002 2457002 2459002 2461002 42463002 2465002 2467002 2469002
FILE: M:\Cke�rtz\OF\➢OMKeptlan4 Nack\ ArcGI61301 T09\11 Mapset_2d00V30M 6wtlan4Neck Mapsel_Overview_3d000.mstl I REVISED: 09/1312017 1 SCALE: 1:24,000—pnrw.11x17
Topography Map
Dominion North Carolina Power
Scotland Neck to South Justice
Branch 115 W Transmission Line
Project
Halifax County, NC
0 2,000 4.000
Feet
1:24,000
Legend
Protect Limit
Note
1 Aerial
Date- June 2016
2Revised Data: September 7 2017
3 Property IMormabon from Halifax County. June
2017
4 Approximate 50 X50 Mat Construction Pad
will be centered
M Dominion
Energy
WP
ERM
S
Page 3 of 3
2404333 903748 2405333 zdJG 3 2407333 901748 2408333 2409333
Solis 1r y a' Dominion North Carolina Power
YAScotland Neck to South Justice
v Branch 115 kV Transmission Line
Project
0 yez�, Halifax County, NC
0 500 1,000
Feet
1:6,000
Legend
_ QQ 1� A
C\ o Angle Structure ff' ,,
a • Tangent Structure
Construction Entrance
-Substation
47- Project Limits
►►•Proposed Access Road
Fig Existing Access Road
South
Juice
Erra
nchtSub
1 A ran
m
1 RaA
�(� • _, 1. Aerial Date: June 2016
VV 2. Revised Date: September 7, 2017
9
O ` 3. Property Infoate 5nabon from Construction
County. June 2017
ce
A yG 4. Approximate 50X50' Mat Consirucbon Pad will be centered
• Q�r
v
GYB2%aDominion
a �'
� � Energy
o,.
s �
�` �•�P ERM a
Page 1 of 16
899748 2402333 2403333 898748 2404333 ,.:i `;33' 2406333
FILENack—c.15\301-0a Seic_Map_Figures\DOM_8.t1onENeck_6oi1—p—.d I REVMED:06811tr'L017 16GtLE:1:6.000—ornta4M11x17
241027
900600
899600
2412227 098600
2413227
897600 2414227
�.`
Soils Map
Dominion North Carolina Power
-J
Scotland Neck to South Justice
Branch 115 kV Transmission Line
Project
Halifax County, NC
�}
0 500 1,000
V
Feet
PLegend
o
t�tiN
o Angle Structure
• Tangent Structure
I Al
Construction Entrance
Project Limits
1-
►•► Proposed Access Road
C � Existing Access Road
N
y
a,
w
H
a
V
y
Note
`
*
1. Aerial Date: June 2016
2 Revised Date: September 7 2017
3 Property Information from Halifax County June 2017
L'CJ
4
4 Approximate 50'X50 Mat Construction Pad will be centered
01
Dominion
� Energy.
yV•a
�'
2
s
ERM
897600
2407227
89860D
2408227
BB5600 2409227
894600
2410227
Page 2 of 16
FILE:
M:\CYnta\DFDOMZcotlantl Nack\ ArtG15\t41 T09108_Soia Mep Figures\DOM ScotMntlNack_SoiY_Mapaetmxd I REVISED:
Oal0YL01] I SUlE: 1:B,DDO wYrn gwYdM 11x1]
2413620 2414620 898046 2415620 2416620 2417620 x97046 2418620
A Solis Map
Dominion North Carolina Power
Scotland Neck to South Justice
Branch 115 kV Transmission Line
- Project
CE 2 S Halifax County, NC
o 600 1000
', 4•
Feet
8o CE 30 - 1:6,000
^`A Q Legend
Vj o Angle Structure
�.. # ^' • Tangent Structure
a y
• ': Construction Entrance
•�L—:'! Project Limits
►► Proposed Access Road
V=C�— Existing Access Road
� � u
s u+
e x <
Note
dv�t1 Aenal Date: June 2016
2 Revised Date September 7, 2017
�O1 D 3. Property Information from Halifax County: June 2017
,� •' ',y�+� 4 Approximate 50X50' Mat Construction Pad will be centered
S
Dominion
Energy„
r
g
ERM 5
k Page 3 of 16
894046 2412620 2413620 2414620 2415620 2416620 2417620
N BY: JPB
FILE: M'\Cfenis\DF\DOMIScotlen0 Neck\ NrtGl6\3017109\VB_Sols_Map_Figurea\DOM_S<eHantlNack Soils MepsaLmxtl REVISED: oaloell017 16GLE: 1:6,OOD wMn pinYA a111x1)
Soils Map
Dominion North Carolina Power
Scotland Neck to South Justice
Branch 115 kV Transmission Line
Project
Halifax County, NC
0 Soo 1,000
Feet
1:6,000
Legend
o Angle Structure
e Tangent Structure
® Construction Entrance
-tet Project Limits
►► Proposed Access Road
G=C:— Existing Access Road
s
FIDOMIScoeand Neck\_A-1...I glee_Sois_Map_Figures\OOM_SwIMn4Neck_Soila_Mapaet d
E
Note
1. Aerial Data: June 2016
2. Revised Date: September 7, 2017
3. Property Information from Halifax County:
June 2017
4. Approximate 50'X50' Met Construction Pad will be centered
Dominion
Energy,
r
�a
ERM
S
Page 4 of 16
"Ill49
54
61
F
��, �• ���
�� •� .
58r
52 45 •�
50
♦ 16 f
a
•♦47 4g
♦ 54 57,
� 43 '
r
FILE M:1Cfents\Ds\DOMZS .I.nd_Neck\ ,r GISQ01 Toa\ OB_Sois_Map_Flaures100M_S-Erd— Soila_M—t— I REVISED. OiVotx 17 1 SCALE:16000--onnr.d ar tt.II
Soils Map
Dominion North Carolina Power
Scotland Neck to South Justice
Branch 115 kV Transmission Line
Project
Halifax County, NC
0 500 1,000
Feet
1:6,000
Legend
o Angle Structure
• Tangent Structure
® Construction Entrance
._� Project Limits
0-0• Proposed Access Road
Note
1. Aerial Date: June
2016
2. Revised Date: September 7, 2017
3. property Information from Halifax County:
June 2017
4. Approximate 50'x50' Mat Construction Pad will be centered
Dominion
Energy,
I lit$
ERM
s
Page 5 of 16
2428571
2429511 2430571 2431571
2432571
889095
2433571
Soils Map
f
P •;
Dominion North Carolina Power
„
•
is
f
a
Scotland Neck to South Justice
Branch 115 kV Transmission Line
Project
Halifax my, NC
Ha Cou Soo 1 o00
Y'114
0 A A 0- O
;91rte'
-*Ue
-cc
Feet
�s,000
Legend
w
(`
,/{�
t01 1-
o Angle Structure
• Tangent structure
In Construction Entrance
Project Limits
11111i Proposed Access Road
�qj
✓`
o
r
P
y
C�oR
•fP
V
IA
'
0
not Date: June 2016
2. Revised Date: September 7, 2017
3. Property Information from Halifax County: June 2017
4. Approximate 50'X50' Met Construction Pad will be cratered
m
a
m
Dominion
EnergyN
ERM s
r,
2427571
2426571
2429571 685095
2430571
2431571
Page 6 of 16
FILE'.
M'\Cianis�➢F1I]OM�Scotland Neck\ ArtGIS001 T0910e_Sois MaP_Fiaurea\DOM ScotlantlNeck_Soils Mapsetmktl I REVISED: -2017 1 SCALE: 1:e,000wMn gn-11x1]
AM BY JP81
243443?
Y
W �
A�
V�
e �
A dD
lv
` lop s� .
♦ P a
2432432 243343224344:12
2436432
FILE: M:\CNMe\D41DOMt..Untl Neck\_Ar 1S2017V Oe_SOea Mp_Fi9arsa\DOM ScolYntlNeck Solla Mepaetmxtl I REVISED: 0910612017 1 SCALE: 1 6,000 when P—d at 11x17
Solis Map
Dominion North Carolina Power
Scotland Neck to South Justice
Branch 115 W Transmission Line
Project
Halifax County, NC
0 500 1,000
Feet
1:6,000
Legend
o Angle Structure
• Tangent Structure
Construction Entrance
Project Limits
10-111— Proposed Access Road
Note
1. Aenal Date June 2016
2 Re. -d Data Sephmbef 7, 2017
3 Property Il f—Mon from Halifax County'. June 2017
4. Approsi t 50'X50' Mat Construction Pad wig be centered
M Dominion
Energy
A),
.
ERM
Page 7 of 16
Soils Map
Dominion North Carolina Power
Scotland Neck to South Justice
Branch 115 W Transmission Line
Project
Halifax County, NC
0 500 1,00C
Feet
1:6,000
Legend
o Angle Structure
• Tangent Structure
Construction Entrance
L. Project Limits
►►- Proposed Access Road
1040-- Existing Access Road
FILE: M:\CaenlslDfl0OMl5 Und Neck\_A-IS�61T —d Spia Map. F — —V Scolland—k Sails -,-—d I REVISED6910813011 1 SG LE: 1x6.606 --led a111a17
Note
1. Aerial Date: June 2016
2. Revised Date: September 7, 2017
3. Property Information from Halifax County: June 2017
4. Approximate 50'X50' Mat Construction Pad will be centered
Dominion
Energy
4.
ERM
Page 8 of 16
Soils Map
Dominion North Carolina Power
Scotland Neck to South Justice
Branch 115 W Transmission Line
Project
Halifax County, NC
0 50o 1,000
Feet
1:6,000
Legend
0 Construction Entrance
C� Existing Access Road
_...
ILE: M:\OfaMa\OFDOM�S<atland Ne<kLArtG15\201 T09\OB_Sols Map Figurez�DOM 9cotWnENeck Soils Mapzetmvtl I REVISED: 0910&]01] 1 —LE '1'6,000 wMn ginkM at 11v17
Note
1. Aerial Date: June 2016
2. Rehsed Date: September 7, 2017
3. Property Informat-from Halifax County: June 2017
4. Approximate 50'X50' Mat Constructlon Pad will be centered
Dominion
Energy
a.
ERM S
Page 9 of 16
Soils Map
Dominion North Carolina Power
Scotland Neck to South Justice
Branch 115 W Transmission Line
Project
Halifax County, NC
0 500 1,000
Feet
1:6,000
Legend
o Angle Structure
• Tangent Structure
Construction Entrance
Project Limits
►► Proposed Access Road
V=t: Existing Access Road
FILE: M'kDl-1DF OhnScptlend_Neck\_A-IW01 A0S%W Seiz_Map_Figul-DOM_6pptlandNeck_Spils_Map.—d I REVISED. 09/08/2017 1 SCALE: 1.6 000 when ornYd et 11.17
Note
1. Aerial Date: June 2016
2. Revised Date: September 7, 2017
3. Property Information from Halifax County: June 2017
4. Approximate 50'X50' Mat Construction Pad will be centered
P OM
Dominion
Energy°
� w
BRM s
Page 10 of
2449021 2450021 2451021 877649 2452021 876649 2453021 2454021
t1J Soils Map
Dominion North Carolina Power
Scotland Neck to South Justice
Branch 115 W Transmission Line
V [ Z 9� Project
�i Halifax County, NC
0 500 1,000
Feet
� f
1:6,000
Legend
1
V o Angle Structure
` ( t0 • Tangent Structure
-4 Construction Entrance
ki' �Project Limits
. ►► Proposed Access Road
r u G=am Existing Access Road
71
�� VO
kTY
a
N
pp
Note
1 Aerial Date, June S2016
eptember
2. Revised Date September 7 2017
3. Property I to 50ation from Halifax County: June a centered 4. Approx mato 50X50 Met Construction Pad vnN be centered
4 1
Dominion
� - >. 0 Energy`.,
d
.. ERM s
ao �,
Page 11 of 16
2447021 2448021 873649 2449021 2450021 2451021
FILE: M:\Cfenh�Df\DOM�Scotland Neck\ ArtGIS�I01T09\05_Sois Mep Fi9uras\DOM_ScolbntlNack
.- —d I REVISED: WIM2017 1 SCALE: 1:5,000 when W—d al 11x17 DRAM BY
Soils Map
Dominion North Carolina Power
Scotland Neck to South Justice
Branch 115 kV Transmission Line
Project
Halifax County, NC
0 500 1,000
Feet
1:6,000
Legend
o Angle Structure
• Tangent Structure
Construction Entrance
Project Limits
►► Proposed Access Road
I—=L:— Existing Access Road
I REVISED'. 09109/2017 1 S—E. 1:6,000 ween DnnW et
Note
1. Aerial Date: June 2016
2. Revised Date: September 7, 2017
3. Property Information from Halifax County: June 2017
4. Approximate 50'X50' Mat Construction Pad will be centered
Dominion
Energy°
a e
FRM s
Page 12 of
1�60302 87 09�9 2461302
>s
2456302 867%9 2457302 866969
'10910e_sois Meg Figures\DOM SwlkndNeck_Soils Mapsetmxtl i REVISED. Oel0a12017 1 $GlE: 1:6,000—n prinbd at 11.17
k)i
a
a,
371
Soils Map
Dominion North Carolina Power
Scotland Neck to South Justice
Branch 115 W Transmission Line
Project
Halifax County, NC
0 500 1 000
Feet
1:6,000
Legend
o Angle Structure
•Tangent Structure
i Project Limits
;z Proposed Access Road
Note
1. Aerial June
Date: 2016
2. Revised Date: September 7, 2017
3. Property Information from Halifax County:
June 2017
4. Approximate 50'X50' Mat Construction Pad will be centered
Ofth Dominion
pwwoo Energy
-1� w
d
ERM
5
Page 13 of 16
DFAM By B
2461688 _.,_ 2463688 872749 2464688 2465688
f Soils Map
Dominion North Carolina Power
Nx i
m
a
Scotland Neck to South Justice
Branch 115 W Transmission Line
�.4 Project
Sts Halifax County, NC
3
" T
0 500 1,000
nn 1�
Feet
•r A .o I 16.000
Rs 1 Legend
ConsWction Entrance
ti► Proposed Access Road
AW
r. 4� e.
w
lk� o
Note
O 1. Aerial Dale: June 2016
2. Revised Date. September 7, 2017
4 3. Property Information from Halifax County: June 2017
4. Approximate 50'x50' Mat Conatmcton Pad VAN be centered
Dominion
` Energy,
i
Cj ERM 11
Page 14 of 16
2458688 870749 2459688 869749 2460688 8h8i49 ,DRAM 8 JPS
. .,.._
Fa. M\DfeMs\DF\DOM,4Ce4an4_Neck\ Art IS\201 A091o9_Sois Map Figurez\DOM_ScptlandNecN_Soils Mapsatmxd i REVISED. OWM2017 i —LE.1 6,000—n p,inbd at 11.17 ^'
860495 2463092
067495 2464092
566495 2465092
865495
2466092 864495
/Y
j1r
t
Soils Map
Dominion North Carolina Power
\
r
Scotland Neck to South Justice
A
bj�
Branch 115 kV Transmission Line
Project
Y1b
V
Halifax County, NC
-
o Soo 1,000
Feet
$
_
1:6,000
Legend
s
e
o Angle Structure
e Tangent Structure
Construction Entrance
j�
,_s Project Limits
►r► Proposed Access Road
m
�7
V N7
_
n
a-4
noe-
-.
4.
C.
v.,...
�
m
..
s
14 +
i
T
�
�
�
�
m
• ,itYYs
Note
1. Aerial Date: June 2016
2 ReMsed Date: September 7, 2017
3. Property lidonnabon fmm Halifax county: June 2017
4. Approximate 50'X50 Mat Construction Pad will be centered
Ate.
Dominion
Energy,,
Al
a
ERMZIP
a
984495 2480092
863495 2461092
,,. ,...
2462092
861495
2463092
Page15 of16
FILE: M:\CI.n1s�D�FtDOMtScoeantl NecNLA nG15�301
T09108_Soic Mep Fipurea\DOM Sm1YntlNack Soil Mapaetmxtl I REVISED: 09/ 0&'2017 1 .-UE: 6,00D Wron "W.111x17
Soils Map
Dominion North Carolina Power
Scotland Neck to South Justice
Branch 115 W Transmission Line
Project
Halifax County, NC
0 500 1,000
Feet
1:6,000
Legend
o Angle Structure
• Tangent Structure
Construction Entrance
- Substation
:'! Project Limits
►► Proposed Access Road
FILE: M:1CferrtzlDF1DOML5cotlentl Neck1 ArtG151201 T0910d_Sois Ma p_Flgures�DOM_S-Wnd—k So,is_Map—anal I REVISED: o9/OIM1017 1 —I -E, 1:6000 ---at 11.17
Note
1. Aerial Date: June 2016
2. Revised Date: September 7, 2017
3. Property Information from Halifax county: June 2017
/. Approximate 50'X50' Mat construction Pad will be centered
Dominion
pEnergy"
ERM z
Page 16 of