Loading...
HomeMy WebLinkAbout20120412 Ver 3_Modifications_201710161r Charta[ta-Mecklenburg STORM WATER Services 600 E. Fourth Street Charlotte, NC 28202 VV Fax 704.353.0473 October 5, 2017 Ms. Crystal Amschler U.S. Army Corps En � of Engineers 151 Patton Avenue, Room 208 Asheville, North Carolina 28801 Subject: Wiseman Capital Improvement Project (CIP) permit modification (SAW #: 2012-0669/ DWR #: 12-0412) Dear Ms. Amschler, I am hereby requesting a modification to the approved 401/404 permits for the Wiseman CIP, originally authorized by the USACE on July 27, 2012 (DWR on May 1, 2012) and re -authorized by the USACE on August 30, 2016 (DWR on August 19, 2016). All project impacts were constructed in accordance with the approved construction plans, with the exception of impact area S3 (as denoted in the Pre -Construction notification package). Impact S3 was originally proposed as a rock sill and riffle grade control on the upstream side of a pipe replacement. Upon excavation for installation of these features, it was discovered that there was shallow bedrock present in the stream channel. As a result of this discovery, it was determined that the rock sill would be difficult to try and install properly on top of bedrock. The constructed riffle was installed between the bedrock and the culvert invert. Over the course of several weeks, multiple large flow events scoured out the riffle material each time it was re -installed. The engineer determined that some larger material would need to be installed such that the stream could not scour out around the inlet of the culvert. The engineer determined that class 1 rip rap would be the appropriate measure. A 25 linear foot rip rap apron was installed in this location. The voids in the rip rap were filled in and water was flowing over the rock. After several storm events, this area remains stable. The installation of rip rap in an area that was previously permitted as a temporary impact increases the total permanent (loss) impacts of the project to 165 linear feet; we are requesting a permit modification to account for this change. As this change was the result of unforeseen circumstances and is justified to maintain the stability of the stream channel, we are requesting that mitigation be required for this impact only; resulting in the purchase of 25 SMUs from the City's Umbrella Stream and Wetland Mitigation Bank (Robinhood-Dooley Stream Restoration Project). Enclosed you will find an updated impacts summary table, a marked up construction plan sheet for the impact area described above and photos of the area (before and after repair/revised impact). If you have any questions or concerns regarding this project, feel free to contact me at (704)562-2691, or erin.shanaberger(a,charlottenc.gov to discuss in more detail. • A'Y1w To report pollution or drainage problems, call: 311 a� http://stormwater.charmeck.org Sincerely, c;.mroa.a7.v, Digitally signed by Erin ,. WATER Shanaberger YijiTER Date: 2017.10.05 15:50:42 =sem.ee-z=1'=: -04'00' Erin Shanaberger Water Quality Program Specialist City of Charlotte, Storm Water Services cc: Alan Johnson, NCDWR Table 1. Stream impacts associated with the Wiseman CIP. Photos 1-2. Impact area S3 after a storm event; constructed riffle was scoured out. Wiseman CIP Revised Impacts mary Stream Impact # Stream Name Originally Impact Type Revised Impact Type Original Impact Length Revised Impact Length SI Reach 7 Temporary Temporary 85 85 S2 Reach 6 Permanent Permanent 140 140 S3 Reach 5 Temporary Permanent 20 25 S4 Reach 4 Temporary Temporary 80 80 S5 Reach 5 Temporary Temporary 378 378 S6 Reach 4 Temporary Temporary 278 278 S7 Reach 3 Temporary Temporary 55 55 Photos 1-2. Impact area S3 after a storm event; constructed riffle was scoured out. Charlotte -Mecklenburg TCR -,,WATER Services " 600 E. Fourth Street Charlotte, NC 28202 Fax 704.353.0473 Photo 3. Impact area S3 immediately after rip rap installation. Rip rap was keyed in and flush with the channel bottom. (6 • To report pollution or drainage problems, call: 311 �/� http://stormwater.charmeck.org Photo 4. Impact area S3 after a storm event and rip rap apron installation remains stable. 84� LF OF 4' CHAIN FENCE / FOUNDATION PROTECTION SEE NOTE 1 AND CONTRACTA\ DOCUMENTS FOR DETAILS ROP 144 LF OF 11'X7' RCBC ® 2.09% 1701, LY DECK BOTTOM GRATE =N3 .11 \\ \TOP GRATE _ = 6$7.4 (A)CMP 72" INV. IN �62Q.60 i% CW 2 2" ORN ENDO\ PROP SEWER G �� \ REPLACEMENT SEE SHEET U4�/��������� m COP 6 ORS 5 TD 6 Iso 1� Ar �5 6 6 6 6 6 6 6 Montalvp, Sheri A From: Johnson, Alan Sent: Monday, October 16, 2017 3:51 PM To: Montalvo, Sheri A Subject: FW: [External] FW: Wiseman Attachments: 2017-10-05 Wiseman permit mod.pdf, Red lined Plan sheet 5.pdf Can you handle as a modification? DWR 12-0412. Not sure what version. Just let me know when you have added to bims and the new version. Then I will issue from here. Procedural thing. -----Original Message ----- From: Shanaberger, Erin [ma iIto: Erin. Shanaberger@ci.charlotte. nc. us] Sent: Friday, October 13, 2017 7:06 AM To: Johnson, Alan <alan.johnson@ncdenr.gov> Subject: RE: [External] FW: Wiseman CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you verify that the attachment and content are safe. Send all suspicious email as an attachment to report.spam@nc.gov. Alan, Must be something about sending a ZIP file. Hopefully this one comes through. Thanks, Erin -----Original Message ----- From: Johnson, Alan [mailto:alan.johnson@ncdenr.gov] Sent: Thursday, October 12, 2017 4:06 PM To: Shanaberger, Erin Subject: RE: [External] FW: Wiseman Ok, it doesn't recognize the file... Send as something else. thanks -----Original Message----- From: Shanaberger, Erin [mailto: Erin. Shanaberger@ci.charlotte.nc. us] Sent: Thursday, October 12, 2017 2:45 PM To: Johnson, Alan <alan.johnson@ncdenr.gov> Cc: Amschler, Crystal C SAW <Crystal.C.Amschler@usace.army. mil> Subject: RE: [External] FW: Wiseman CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you verify that the attachment and content are safe. Send all suspicious email as an attachment to report.spam@nc.gov. -----Original Message ----- From: Johnson, Alan[mailto:alan.johnson@ncdenr.gov] Sent: Thursday, October 12, 2017 2:44 PM To: Shanaberger, Erin Subject: RE: [External] FW: Wiseman Nothing was attached. -----Original Message ----- From: Shanaberger, Erin [mailto: Erin. Shanaberger@ci.charlotte. nc. us] Sent: Thursday, October 12, 2017 9:27 AM To: Johnson, Alan <alan.johnson@ncdenr.gov> Cc: Amschler, Crystal C SAW <Crystal.C.Amschler@usace.army. mil> Subject: RE: [External] FW: Wiseman CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you verify that the attachment and content are safe. Send all suspicious email as an attachment to report.spam@nc.gov. Alan, See attached. Thanks, Erin -----Original Message ----- From: Johnson, Alan [mailto:alan.johnson@ncdenr.gov] Sent: Thursday, October 05, 2017 2:30 PM To: Shanaberger, Erin Subject: RE: [External] FW: Wiseman z Sounds good. As long as the stream is stable. Email me an "additional information" letter/diagram. Showing what was and what is can then just copy to the data file for future reference Include the DWR# -----Original Message ----- From: Shanaberger, Erin [mai Ito: Erin.Shanaberger@ci.charlotte.nc.us] Sent: Thursday, October 05, 2017 7:56 AM To: Amschler, Crystal C SAW <Crystal.C.Amschler@usace.army. miI>; Johnson, Alan <alan. johnson@ncdenr.gov> Subject: [External] FW: Wiseman CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you verify that the attachment and content are safe. Send all suspicious email as an attachment to report.spam@nc.gov. 0 Just to follow up on this email, The remainder of the project was inspected yesterday and everything looks good from a compliance point of view. Let me know what documents you would like me to submit to address the change below. I know Crystal will likely have to issue a modification because of the mitigation. Thanks, Erin Erin Shanaberger Water Quality Program Specialist City of Charlotte I Engineering & Property Management I Storm Water Services mobile: 704-562-2691 1 erin.shanaberger@charlottenc.gov -----Original Message ----- From: Shanaberger, Erin Sent: Friday, September 15, 2017 9:57 AM To: 'Amschler, Crystal C CIV USARMY CESAW (US)' Cc: Alan Johnson (alan.johnson@ncdenr.gov); Simonson, Helen Subject: RE: Wiseman Crystal, C The final resolution they implemented was a change in the constructed riffle/rock sill combo to a rip rap apron and then live stakes on the bank upstream. Since there was bedrock where the rock sill was supposed to be installed, they originally decided to leave out the sill. The result was a scour hole developing at the inlet because the riffle grade control wasn't holding (see attached photos 0184, 0186). Rip rap was installed in lieu of the riffle below the bedrock to the inlet (see attached photos 1116, 0843) and seems to be holding up. This results in a permanent loss impact of 25 linear feet as opposed to a temporary impact of 25 feet to install the riffle and sill. The re - authorizations you and Alan issued last year for the project were for 140LF of permanent loss impacts. Looks like we will now owe 15 feet of mitigation, or 30 SMUs. If you concur with this assessment, please reply and I will submit the required documentation. Thanks, Erin Shanaberger Water Quality Program Specialist City of Charlotte I Engineering & Property Management I Storm Water Services mobile: 704-562-2691 1 erin.shanaberger@charlottenc.gov -----Original Message ----- From: Amschler, Crystal C CIV USARMY CESAW (US) [mai Ito: Crystal. C.Amschler@usace.army. mil] Sent: Thursday, September 14, 2017 3:34 PM To: Shanaberger, Erin Subject: RE: Wiseman Ok. just wanted to make sure it didn't fall of the radar. Crystal C. Amschler Project Manager Asheville Regulatory Field Office 151 Patton Avenue, Room 208 Asheville, NC 28403 (828)-271-7980 Ext 4231 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at: http://corpsmapu. usace. army. mil/cm_apex/f?p= 136:4: 0 -----Original Message ----- 4 From: Shanaberger, Erin [mailto: Erin. Shanaberger@ci.charlotte. nc. us] Sent: Thursday, September 14, 2017 2:55 PM To: Amschler, Crystal C CIV USARMY CESAW (US) <Crystal.C.Amschler@usace.army. mil> Subject: [EXTERNAL] RE: Wiseman Crystal, I have asked both the project manager and construction supervisor to follow up with me and am waiting for a response. Thanks, Erin -----Original Message ----- From: Amschler, Crystal C CIV USARMY CESAW (US) [mai Ito: Crystal. C.Amschler@usace. army. mi l] Sent: Thursday, September 14, 2017 2:54 PM To: Simonson, Helen; Shanaberger, Erin Cc: Johnson, Alan; Keene, John Subject: RE: Wiseman Just wanted to follow up on the below email and find out if you guys ever got clarification on this project? Crystal C. Amschler Project Manager Asheville Regulatory Field Office 151 Patton Avenue, Room 208 Asheville, NC 28403 (828)-271-7980 Ext 4231 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at: Blockedhttp://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0 -----Original Message ----- From: Simonson, Helen [mai Ito: Helen. Simonson@ci.charlotte. nc. us] Sent: Tuesday, September 05, 2017 8:11 AM To: Shanaberger, Erin < Erin. Shanaberger@ci.charlotte. nc. us>; Amschler, Crystal C CIV USARMY CESAW (US) <Crystal.C.Amschler@usace. army. mi I> E Cc: Johnson, Alan <alan.johnson@ncdenr.gov>; Keene, John <jkeene@ci.charlotte. nc. us> Subject: [EXTERNAL] RE: Wiseman Erin, The email attachment Crystal sent didn't come through on my end. Following the information provided here though, this portion of the project was long last completed before I came on board. I was involved with reducing the impacts downstream on page 10 from 45 to 35LF at the riffle. I would check with John Keene, as the project manager he would have more information regarding this specific location. The project is almost completed, final paving is being done now. We can stop by there and take photos/ check on location this Thursday if necessary. Sorry I don't know more about this project. Helen. -----Original Message ----- From: Shanaberger, Erin Sent: Tuesday, September 05, 2017 7:25 AM To: Amschler, Crystal C CIV USARMY CESAW (US) Cc: Johnson, Alan; Simonson, Helen Subject: RE: Wiseman Crystal, The design engineer and the City project team were going back and forth for some time about exactly how to address the issue in this location. I believe discussions were still ongoing earlier this year, around the time when Helen got involved with this project; so I am unsure exactly where they landed as an appropriate solution. I checked the redlined plans for this area, and didn't see any additional impacts. I have copied Helen on this email to provide additional feedback on any additional impacts that may have occurred at this location. Helen, the area in question is immediately upstream of the culvert inlet on plan sheet 5. Back in October, the design consultant was proposing a rock toe; however, I know earlier this year, they still had not settled on this solution, and were reconsidering alternatives (or whether or not to do any additional work at all). Do you know if there have been any plan changes in this location? Thanks, Erin 6 Erin T. Shanaberger Water Quality Program Specialist City of Charlotte I Engineering & Property Management I Storm Water Services mobile: 704-562-2691 1 erin.shanaberger@charlottenc.gov -----Original Message ----- From: Amschler, Crystal C CIV USARMY CESAW (US) [mailto:Crystal.C.Amschler@usace.army.mil] Sent: Friday, September 01, 2017 12:38 PM To: Shanaberger, Erin Cc: Johnson, Alan Subject: Wiseman Hey Erin, Just wanted to follow up on Wiseman. The attached email is the last correspondence I have on it. Crystal C. Amschler Project Manager Asheville Regulatory Field Office 151 Patton Avenue, Room 208 Asheville, NC 28403 (828)-271-7980 Ext 4231 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at: BIockedBlocked http://corpsmapu. usace. army. mil/cm_apex/f?p=136:4:0