Loading...
HomeMy WebLinkAbout20171100 Ver 1_More Info Received_20171018 (2)Carpenter,Kristi From: Sent: To: Subject: Attachments: � Williams, Paul C Wednesday, October 18, 2017 3:02 PM Barnes, Kyle W SAW; Ward, Garcy FW: [External] Re: Columbia Pipe 171018 llxl7 Permit Drawings.pdf Pl�as� s�� th� r�spons� from th� consultant b�low in r�gards to th� impacts to th� canal banks. Also, h�°s r�vis�d th� p�rmit dravvings to includ� th� gas lin� r�location as vv� discuss�d on th� phon�. . • Division On� NC D�partm�nt of Transportation (252) 482-1861 office (252) 333-9812 mobile (252) 482-8722 fax ��willi�m����u��dr�t.� 113 Airport Dr. Suite 100 Edenton, NC 27932 a������ �������,��s���������� �� ����� ������ ��`��,� ��������,�,� �,� ,��.������ �� ��`�� �'J����`� �°��������� ��.����� �������:�,� ��W�r ����� ���.� �� ���,����,���� �� �������� �:s�����,�. I rr�7all �:urrc,��u � � � � � � � � y I�c rli��;lu�e,rl �u �C�h•ih�rl I i� ci��;e, Cu ai� rur°r7 �mii;, ;;e,i� cr i;, ;;u� ��;� �u Cmie, ,..,u� i�; ta�:ur�: ;, ..,aw ai� ir7a, I�arti��, From: Dan Withers [mailto:dwithers@riversandassociates.com] Sent: Tuesday, October 17, 2017 4:12 PM To: Williams, Paul C <pcwilliams2@ncdot.gov> Cc: Abel, John S<jabel@ncdot.gov>; Willis, Thomas C<tcwillis@ncdot.gov> Subject: [External] Re: Columbia Pipe �A�JTI��'; This email originated from outside of the organization. Do not click links or open attachments unless you verify that the attachment and content are safe. Send all suspicious email as an attachment to report.spam@nc.gov. Paul, The canal currently is bulkheaded on the downstream side of the culvert, while the upstream side is vegetated. The banks should be returned to pre-construction conditions before the cofferdams are removed and the canal is returned to full use. There is currently no riprap shown on the stream banks. The power lines are being moved as a result of this project. There is one pole that is being abandoned as part of the project (it is the one located closest to the proposed culvert. The remainder of poles shifting are to allow the sidewalk to be fully passable after the project is complete. I've attached the plans I received from the electric utility for your records. Dan Withers, P.E. Project Manager Rivers & Associates, Inc. O: (252) 752-4135 ext. 260 C: (252) 646-2257 From: Williams, Paul C <pcwilliams2@ncdot.�ov> Sent: Tuesday, October 17, 2017 11:09 AM To: Dan Withers Cc: Abel, John S; Willis, Thomas C Subject: Columbia Pipe The USACE rep. called this morning about the project in Columbia. He was concerned with the streambank impacts from the installation of the culvert and the headwalls. The culvert width takes up the entire width of the canal, but the width of the headwalls will go beyond that. How far upstream and downstream will the streambanks be peeled back for the project? How far down the stream will riprap be placed to stabilize the disturbed streambanks? Also, will the OH powerlines be temporarily or permanently moved on the upstream side? If the alignment is moved, that will need to be authorized under the CAMA permit. Thanks, Paul C. Williams, Jr. Environmental Specialist Division One NC Department of Transportation (252) 482-1861 office (252) 333-9812 mobile (252) 482-8722 fax ��willi�m����u��dr�t.� 113 Airport Dr. Suite 100 Edenton, NC 27932 a������ �������,��s���������� �� ����� ������ ��`��,� ��������,�,� �,� ,��.������ �� ��`�� �'J����`� �°��������� ��.����� �������:�,� ��W�r ����� ���.� �� ���,����,���� �� �������� �:s�����,�. I rr�7all �:urrc,��u � � � � � � � � y I�c rli��;lu�e,rl �u �C�h•ih�rl I i� ci��;e, Cu ai� rur°r7 �mii;, ;;e,i� cr i;, ;;u� ��;� �u Cmie, ,..,u� i�; ta�:ur�: ;, ..,aw ai� ir7a, I�arti��, I rr�7all �:urrc,��u � � � � � � � � y I�c rli��;lu�e,rl �u �C�h•ih�rl I i� ci��;e, Cu ai� rur°r7 �mii;, ;;e,i� cr i;, ;;u� ��;� �u Cmie, ,..,u� i�; ta�:ur�: ;, ..,aw ai� ir7a, I�arti��,