HomeMy WebLinkAboutIMP 4th Quarter 2017 FINAL_20171019Water Resources
Environmental Quality
October 19, 2017
Paul Draovitch
Senior Vice President
Environmental, Health & Safety
Duke Energy
526 South Church Street
Mail Code EC3XP
Charlotte, North Carolina 28202
Subject: Revised Interim Monitoring Plans for 14 Duke Energy Facilities
Fourth Quarter 2017
Dear Mr. Draovitch:
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
S. JAY ZIMMERMAN
Director
The North Carolina Department of Environmental Quality (DEQ) is providing the attached revised
Interim Monitoring Plans (IMPs) for the respective coal ash facilities. Per our agreement, the DEQ
will be providing Duke Energy with updated IMPs quarterly until the individual facility Corrective
Action Plans are approved. Also, per our agreement, Duke Energy will include and begin sampling
any newly installed groundwater assessment wells as part of the facility IMP and the DEQ will
formally include it in the subsequent updated quarterly IMP.
The attached IMPs only contain references to groundwater monitoring locations. Sampling at
surface water locations that were identified as part of the May 1, 2017 communication from DEQ
to Duke Energy regarding revised IMPs at the facilities is expected to continue pending further
notice. DEQ may elect to provide Duke Energy with additional surface sampling locations to
incorporate into the revised IMPs at a future time. For clarification, we have also provided the
minimum expected groundwater sampling analyte list.
The attached revised facility IMPs shall be conducted on a quarterly basis commencing the fourth
quarter of calendar year 2017 pursuant to 15A NCAC 02L .0110, until Corrective Action Plans
are accepted for the individual facilities or as directed otherwise by the DEQ. The quarterly
sampling events will be conducted in conjunction with planned compliance monitoring sampling
events for three quarters during the calendar year, supplemented with an additional sampling event
conducted at each facility in order to provide four rounds of monitoring data to evaluate seasonal
fluctuations during a year -long timeframe. If sampling an individual groundwater location is
problematic, please call the Regional Office that manages the facility to discuss issues. Any
changes to IMPs and sampling requirements must be discussed with the respective Regional
Offices and coordinated by official correspondence from the DEQ Central Office.
Since Duke Energy will submit updated Comprehensive Site Assessments in the near future, the
requirement for an annual monitoring report submitted by April 30th for each respective coal
State of North Carolina I Environmental Quality I Division of Water Resources
Water Quality Regional Operations Section
1636 Mail Service Center I Raleigh, North Carolina 27699-1636
919-707-9129
facility as set forth in the May 1, 2017 letter will be extended to a date in 2018 that will be later
defined.
In order to optimize the groundwater monitoring at each facility, DEQ will be removing the
groundwater monitoring condition from the NPDES permits as they are reissued. Duke Energy
shall continue to monitor the compliance wells separately under the individual NPDES permits
until the NPDES permits are reissued with no groundwater monitoring condition. At that time,
the compliance wells shall continue to be monitored per the attached revised IMPs under the
authority of 15A NCAC 02L .0110.
The DEQ is open to consider further optimization of the IMPS following a qualitative and
quantitative review of site -specific data. A thorough analysis of spatial and temporal trends related
to contaminant distribution that include determination of background conditions and identification
of areas impacted by coal ash residuals must be provided as a decision framework to support
improvements to long-term monitoring programs.
If you have any questions, please feel free to contact Steve Lanter at (919) 807-6444.
Sincerely,
S. Jay Zimmerman, P.G., Director
Division of Water Resources
Attachments: Revised Interim Monitoring Plans for the 14 coal ash facilities
cc: WQROS Regional Offices
WQROS Central File Copy
Revised Allen Steam Station Interim Monitoring Plan — Groundwater Only
Wells to be Sampled
Sample for
Radionuclides
(X
Regional Office Notes
AB-10D
AB-10S
AB-11D
X
AB-12D
AB-12S
AB-13D
X
AB-13S
X
AB-14BR
AB-14D
AB-1R
AB-2
AB-20D
AB-20S
AB-21BRL
X
AB-21 D
X
Sample to be analyzed for total boron and sulfate
only.
AB-21 S
X
AB-21 SL
X
AB-22BR
Lower bedrock (AB-22BRL) scheduled to be
installed by mid -October — early November for
purposes of vertical delineation.
AB-22D
AB-22S
AB-23BRU
Sample to be analyzed for total boron and sulfate
only.
AB-23S
AB-24BR
AB-24D
Sample to be analyzed for total boron and sulfate
only.
AB-24S
AB-24SL
AB-25BR
X
Sample to be analyzed for total boron and sulfate
only.
AB-25BRU
X
Sample to be analyzed for total boron and sulfate
only.
AB-25S
X
AB-25SL
X
AB-26S
AB-27BR
Allen Steam Station Page 1 of 4 October 1, 2017
AB-27D
AB-27S
AB-28D
AB-28S
AB-29D
AB-29S
AB-29SL
AB-2D
AB-30D
AB-30S
AB-31 S
AB-32D
AB-32S
AB-33D
X
AB-33S
X
AB-34D
AB-34S
AB-35BR
X
AB-35D
X
Sample to be analyzed for total boron and sulfate
only.
AB-35S
X
AB-36D
AB-36S
AB-37D
AB-37S
AB-38BR
AB-38D
AB-38S
AB-39D
AB-39S
AB-4BR
X
AB-4D
X
AB-4S
X
AB-5
AB-6A
X
AB-6R
X
AB-9D
X
AB-9S
X
BG-lDA
X
Note: BG-1D has been abandoned and thus
removed from the IMP. BG-lDA was installed as
replacement well.
BG-1 S
X
Allen Steam Station Page 2 of 4 October 1, 2017
BG-2BRA
X
Note: BG-2BR has been abandoned and thus
removed from the IMP. BG-2BRA was installed as
replacement well.
BG-2D
X
BG-2S
X
BG-3D
BG-3S
BG-4BR
BG-4D
BG-4S
GWA-14DA
Note: GWA-14D has been abandoned and thus
removed from the IMP. GWA-14DA was installed
as replacement well.
GWA-14S
GWA-15D
GWA-15S
GWA-16D
GWA-16S
GWA-17D
X
GWA-17S
X
GWA-18D
GWA-18S
GWA-19D
Sample to be analyzed for total boron and sulfate
only.
GWA-19S
GWA-1BR
X
GWA-ID
X
GWA-1S
X
GWA-21BR
X
GWA-21DA
X
Note: GWA-21D has been abandoned and thus
removed from the IMP. GWA-21DA was installed
as replacement well.
GWA-21S
X
GWA-22D
GWA-22S
GWA-23D
Sample to be analyzed for total boron and sulfate
only.
GWA-23S
GWA-24BR
GWA-24D
GWA-24SA
Note: GWA-24S has been abandoned and thus
removed from the IMP. GWA-24SA was installed
as replacement well.
GWA-26D
Allen Steam Station Page 3 of October 1, 2017
GWA-26S
GWA-2D
X
GWA-2S
X
GWA-3BRA
X
Note: GWA-3BR has been abandoned and thus
removed from the IMP. GWA-3BRA was installed
as replacement well.
GWA-3D
X
GWA-3S
X
GWA-4BRA
X
Note: GWA-4BR has been abandoned and thus
removed from the IMP. GWA-4BRA was installed
as replacement well.
GWA-4D
X
GWA-4S
X
GWA-SBRA
X
Note: GWA-5BR has been abandoned and thus
removed from the IMP. GWA-SBRA was installed
as replacement well.
GWA-5D
X
GWA-5S
X
GWA-6BR
X
Replacement bedrock (GWA-6BRA) scheduled to
be installed by mid -October — early November.
GWA-6DA
X
GWA-6S
X
GWA-7D
X
GWA-7S
X
GWA-8D
GWA-8S
GWA-9D
X
GWA-9S
X
GWA-9BR
X
Minimum Parameters to be Analyzed
Aluminum
Boron
Copper
Mercury
Selenium
Thallium
Alkalinity
Cadmium
Hexavalent
Molybdenum
Sodium
Total Organic
Chromium
Carbon
Total
Antimony
Calcium
Iron
Nickel
Strontium
Combined
Uranium
Total
Arsenic
Chloride
Lead
Potassium
Sulfate
Suspended
Solids
Barium
Chromium
Magnesium
Radium 226
Sulfide
Vanadium
Total
Beryllium
Cobalt
Manganese
Radium 228
Dissolved
Zinc
Solids
Allen Steam Station Page 4 of 4 October 1, 2017
Revised Asheville Steam Electric Plant Interim Monitoring Plan — Groundwater Onlv
Wells to be
Sampled
Sample for
Radionuclides
X
Regional Office Notes
ABMW-I1BR
AMW-03B
X
AMW-lB
X
AMW-2A
AMW-213
water level only
APZ-30
water level only
B-1
water level only
B-1-A
water level only
B-2
water level only
CB-1
X
CB-1BR
water level only
CB-1BRL
water level only
CB-1D
X
CB-8BR
X
CB-8D
water level only
CB-9BR
X
CB-9SL
X
GW-lBR
GW-ID
GW-2
X
GW-3
X
GW-4
X
GW-5
X
MW-3D
X
MW-5BR
MW-5D
MW-8S
X
MW-10
X
MW-11
MW-11D
MW-13BR
MW-13D
MW-14BR
MW-15A
X
MW-15BR
water level only
MW-15D
X
MW-16A
X
Asheville Steam Electric Plant Page 1 of 3 October 1, 2017
MW-16BR
X
MW-17A
X
MW-18BR
X
MW-18BRL
X
MW-18D
X
MW-19BR
water level only
MW-20A
MW-21D
X
MW-22BR
X
MW-22D
X
MW-23BR
MW-23DL
MW-23DU
MW-24S
X
MW-6BR
X
MW-6D
X
MW-6S
X
MW-7BR
water level only
MW-8BR
MW-9BR
X
MW-9D
X
MW-9S
X
P-102
water level only
P-103
PZ-16
Needs to be replaced and added to IMP.
PZ-17D
X
PZ-17S
X
PZ-19
X
PZ-22
X
Asheville Steam Electric Plant Page 2 of 3 October 1, 2017
Minimum Parameters to be Analyzed
Aluminum
Boron
Copper
Mercury
Selenium
Thallium
Alkalinity
Cadmium
Hexavalent
Molybdenum
Sodium
Total Organic
Chromium
Carbon
Total
Antimony
Calcium
Iron
Nickel
Strontium
Combined
Uranium
Total
Arsenic
Chloride
Lead
Potassium
Sulfate
Suspended
Solids
Barium
Chromium
Magnesium
Radium 226
Sulfide
Vanadium
Total
Beryllium
Cobalt
Manganese
Radium 228
Dissolved
Zinc
Solids
Asheville Steam Electric Plant Page 3 of 3 October 1, 2017
Revised Belews Creek Steam Station Interim Monitoring Plan — Groundwater Onlv
Wells to be
Sampled
Sample for
Radionuclides
(X)
Regional Office Notes
AB-1BR
AB -ID
AB -IS
AB-2D
AB-2S
AB-3D
AB-3S
AB-4BR
Measure pH, if still high, do not sample
AB-4BRD
AB-4D
AB-4S
AB4SL
Measure pH, if still high, do not sample
AB-5D
AB-5S
AB-5SL
AB-6D
AB-6S
AB-6SL
AB-7D
AB-7S
AB-8D
AB-8S
AB-8SL
AB-9BR
AB-9BRD
AB-9D
AB-9S
BG-ID
BG-1 S
X
Dry 7/19/17; continue monitoring
BG-2BR
BG-2D
X
BG-2S
X
BG-3D
BG-3S
GWA-10DA
GWA-10S
GWA-11D
Belews Creek Steam Station Page 1 of 4 October 1, 2017
GWA-11S
GWA-12BR
GWA-12D
GWA-12S
GWA-16BR
GWA-16DA
GWA-16S
GWA-17D
GWA-17S
GWA-18D
GWA-18SA
GWA-19BR
GWA-19D
GWA-19SA
GWA-1BR
X
GWA-1D
X
GWA-lS
X
GWA-20BR
GWA-20D
GWA-20SA
GWA-21 D
GWA-21S
GWA-22D
GWA-22S
GWA-23D
GWA-23S
GWA-24BR
GWA-24D
X
GWA-24S
X
Insufficient Volume 7/21/17; continue monitoring
GWA-25BR
X
GWA-26BR
X
GWA-26D
X
GWA-26S
X
GWA-27BR
GWA-27D
GWA-27S
GWA-2D
GWA-2S
GWA-30D
X
GWA-30S
X
GWA-31D
Belews Creek Steam Station Page 2 of 4 October 1, 2017
GWA-31S
GWA-32D
GWA-32S
GWA-3D
GWA-3S
Insufficient Volume 7/21/17; continue monitoring
GWA-6D
X
GWA-6S
X
GWA-7D
X
GWA-7SA
X
GWA-8D
X
GWA-8S
X
GWA-9BR
GWA-9D
GWA-9S
MW-104BR
MW-104D
MW-104S
MW-200BR
X
MW-200D
X
MW-200S
X
MW-201BR
MW-201D
MW-202BR
MW-202D
MW-202S
MW-203BR
MW-203D
MW-203S
MW-204D
MW-204S
MW-3
X
Belews Creek Steam Station Page 3 of 4 October 1, 2017
Minimum Parameters to be Analyzed
Aluminum
Boron
Copper
Mercury
Selenium
Thallium
Alkalinity
Cadmium
Hexava lent
Molybdenum
Sodium
Total Organic
Chromium
Carbon
Total
Antimony
Calcium
Iron
Nickel
Strontium
Combined
Uranium
Total
Arsenic
Chloride
Lead
Potassium
Sulfate
Suspended
Solids
Barium
Chromium
Magnesium
Radium 226
Sulfide
Vanadium
Total
Beryllium
Cobalt
Manganese
Radium 228
Dissolved
Zinc
Solids
Belews Creek Steam Station Page 4 of 4 October 1, 2017
Revised Buck Combined Cycle Station Interim Monitoring Plan — Groundwater Only
Wells to be
Sampled
Sample for
Radionuclides
X
Regional Office Notes
AB-1D
AB-1 OBR
Lower bedrock (AB-1 OBRL) scheduled to be installed
by early November — early December for purposes of
vertical delineation.
AB-1 OD
AB-1 OS
AB-2BR
X
Sample to be analyzed for total boron and sulfate
only.
AB-2D
X
AB-2S
X
AB-2SL
X
AB-3D
AB-3S
AB-4BR
Discontinue sampling AB-4BR. Based on review of
analytical (submitted on 2/13/2017), water quality at
AB-4BRL is acceptable (pending background).
AB-4BRL
AB-4BRU
AB-4S
AB-4SL
AB-SBRU
X
AB-5S
X
AB-5SL
X
AB-6BRU
AB-7BRU
AB-7S
AB-8BRU
AB-8S
AB-9BRA
X
Note: AB-9BR has been abandoned and thus removed
from the IMP. AB-9BRA was installed as
re lacement well.
AB-9BRUA
X
Note: AB-9BRU has been abandoned and thus
removed from the IMP. AB-9BRUA was installed as
replacement well.
AB-9S
X
AS-1D
AS-1 S
AS-2D
AS-3D
Buck Combined Cycle Station Page I of 4 October 1, 2017
AS-3S
BG-1BRA
Note: BG-lBR has been abandoned and thus removed
from the IMP. BG-1BRA was installed as
replacement well.
BG-1DA
Note: BG-lD has been abandoned and thus removed
from the IMP. BG-1DA was installed as replacement
well.
BG-1 S
BG-2D
X
BG-2S
X
BG-3BRU
X
BG-3S
X
GWA-10D
GWA-10S
GWA-11D
GWA-11S
GWA-12BRU
X
GWA-12S
X
GWA-13D
GWA-13SR
GWA-14BR
X
GWA-14D
X
Sample to be analyzed for total boron and sulfate
only.
GWA-14S
X
GWA-15D
X
GWA-15BR scheduled to be installed early
November — early December for purposes of vertical
delineation.
GWA-15S
X
GWA-16BR
X
GWA-16D
X
GWA-16S
X
GWA-17S
GWA-18DA
X
Note: GWA-18D has been abandoned and thus
removed from the IMP. GWA-18DA was installed as
replacement well.
GWA-18S
X
GWA-19D
X
GWA-19S
X
GWA-1D
X
GWA-1 S
X
GWA-20D
X
GWA-20S
X
GWA-22D
X
Buck Combined Cycle Station Page 2 of 4 October 1, 2017
GWA-2BRA
X
Note: GWA-2BR has been abandoned and thus
removed from the IMP. GWA-2BRA was installed as
replacement well.
GWA-2BRU
X
GWA-2S
X
GWA-3BR
X
GWA-3BRU
X
GWA-3S
X
GWA-4D
X
GWA-4S
X
GWA-SBRU
X
GWA-5S
X
GWA-6BR
X
Lower bedrock (GWA-6BRL) scheduled to be
installed by early November — early December for
oses of vertical delineation.
GWA-6BRU
X
GWA-6S
X
GWA-7D
X
GWA-7S
X
GWA-8D
GWA-9BRA
X
Note: GWA-9BR has been abandoned and thus
removed from the IMP. GWA-9BRA was installed as
replacement well.
GWA-9D
X
GWA-9S
X
MW-lOD
MW-1 l BR
X
Lower bedrock (MW-11BRL) scheduled to be
installed by early November — early December for
purposes of vertical delineation.
MW-11D
X
MW-llS
X
MW-12D
MW-12S
MW-13D
MW-ID
MW-1 S
MW-2S
MW-2D
MW-3D
X
MW-3S
X
MW-4D
MW-4S
MW-5D
Buck Combined Cycle Station Page 3 of 4 October 1, 2017
MW-5S
MW-6BR
X
MW-6D
X
MW-6S
X
MW-7D
MW-7S
MW-8BR
X
Note: MW-8BR has been abandoned and thus
removed from the IMP. MW-8BRA was installed as
replacement well.
MW-8D
X
MW-8S
X
MW-9D
X
MW-9S
X
Minimum Parameters to be Analyzed
Aluminum
Boron
Copper
Mercury
Selenium
Thallium
Alkalinity
Cadmium
Hexavalent
Molybdenum
Sodium
Total Organic
Chromium
Carbon
Total
Antimony
Calcium
Iron
Nickel
Strontium
Combined
Uranium
Total
Arsenic
Chloride
Lead
Potassium
Sulfate
Suspended
Solids
Barium
Chromium
Magnesium
Radium 226
Sulfide
Vanadium
Total
Beryllium
Cobalt
Manganese
Radium 228
Dissolved
Zinc
Solids
Buck Combined Cycle Station Page 4 of 4 October 1, 2017
Revised Cane Fear Steam Electric Plant Interim Monitoring Plan — Groundwater Only
Wells to be
Sampled
Sample for
Radionuclides
(X
Regional Office Notes
ABMW-1
X
ABMW-1BR
X
ABMW-IS
X
ABMW-2SL
ABMW-2SU
ABMW-3
X
ABMW-3BR
ABMW-3SR
X
ABMW-4
X
ABMW-4S
X
ABMW-5BR
ABMW-5S
BGMW-4
X
BGTMW-4
X
CMW-Ol
X
CMW-02
CMW-03
X
CMW-5R
Installed 7/19/17
CMW-06
X
CMW-07
X
CMW-08
X
CTMW-01
X
CTMW-02
CTMW-07
CTMW-08
X
MW-10
X
MW-lOBR
X
MW-1 OBRL
MW-101)
MW-11
X
MW-12
X
MW-12BR
MW-13
MW-15BR
X
MW-15SL
X
MW-15SU
X
MW-16BR
X
Cape Fear Steam Electric Plant Page 1 of 3 October 1, 2017
MW-16S
X
MW-17BR
MW-17SL
X
MW-17SU
X
MW-18S
X
MW-19S
MW-20BR
MW-20S
MW-21BR
MW-21 SL
X
MW-21SU
X
MW-22BR
MW-22S
MW-23BR
MW-23D
X
MW-23S
X
MW-24BR
X
Duke indicated in email sent 9-18-17 this well
location is designated MW-24BR
MW-24S
X
MW-5BRR
MW-6BR
X
MW-9
X
MW-9BR
X
PZ-1
PZ-10
PZ-2
PZ-3D
PZ-3S
PZ-4
PZ-5
X
PZ-6
PZ-7
PZ-8
Cape Fear Steam Electric Plant Page 2 of 3 October 1, 2017
Minimum Parameters to be Analyzed
Aluminum
Boron
Copper
Mercury
Selenium
Thallium
Alkalinity
Cadmium
Hexavalent
Molybdenum
Sodium
Total Organic
Chromium
Carbon
Total
Antimony
Calcium
Iron
Nickel
Strontium
Combined
Uranium
Total
Arsenic
Chloride
Lead
Potassium
Sulfate
Suspended
Solids
Barium
Chromium
Magnesium
Radium 226
Sulfide
Vanadium
Total
Beryllium
Cobalt
Manganese
Radium 228
Dissolved
Zinc
Solids
Cape Fear Steam Electric Plant Page 3 of 3 October 1, 2017
Revised James E. Rogers Energy Complex Interim Monitoring Plan — Groundwater Only
Wells to be
Sampled
Sample for
Radionuclides
M
Regional Office Notes
AB -ID
AB-lS
AB-2D
AB-2S
AB-3BR
A13-3I
AB-3S
X
AB-3SL
X
AB-4BR
AB-4D
AB-4S
X
AB-4SL
X
AB-5BR
AB-5BRU
AB-5 S
X
AB-6BR
AB-6D
AB-6S
X
AS -ID
AS-1 SB
AS-2BR
AS-2D
X
AS-2S
X
AS-3BRU
AS-4D
AS-4S
AS-5BRU
AS-5S
AS-6D
AS-6S
AS-7D
AS-7S
X
BG-lD
X
BG-1 S
X
BG-2D
X
CCPMW-lD
X
CCPMW-lS
X
James E. Rogers Energy Complex Page 1 of 5 October 1, 2017
CLMW-1
X
CLMW-2
CLMW-3D
X
CLMW-3S
X
CLMW-5D
CLMW-5S
CLMW-6
CLP-1
water level only
CLP-2
water level only
GWA-10D
GWA-10S
GWA-11BRU
X
GWA-11S
X
GWA-12BRU
GWA-12S
GWA-13BR
GWA-14BR
GWA-14D
GWA-14S
GWA-1BRU
GWA-20BR
X
GWA-20D
X
GWA-20S
X
GWA-21BR
X
GWA-21BRU
X
GWA-21D
GWA-21S
X
GWA-22D
GWA-22S
X
GWA-23D
GWA-24BR
GWA-24D
GWA-24S
GWA-25S
GWA-25D
water level only
GWA-26S
GWA-26D
water level only
GWA-27BR
X
GWA-27D-A
X
GWA-28BR
GWA-28BRU
James E. Rogers Energy Complex Page 2 of 5 October 1, 2017
GWA-28S
GWA-29D
X
GWA-2BR
X
GWA-2BRU
X
GWA-2S
X
GWA-30BR
GWA-30BRU
water level only
GWA-30S
GWA-31BR-A
GWA-31D
GWA-32D
GWA-32BR
water level only
GWA-33BR
GWA-33D
GWA-33S
GWA-34S
GWA-35D
GWA-35S
GWA-36D
X
GWA-36S
X
GWA-37D
GWA-37S
GWA-38D
GWA-38S
GWA-39S
water level only
GWA-3D
X
GWA-40S
water level only
GWA-42S
water level only
GWA-43D
GWA-43S
GWA-44BR
GWA-44D
GWA-44S
GWA-45D
GWA-45S
GWA-46D
GWA-47D
GWA-48BR
GWA-48S
GWA-4D
X
GWA-4S
X
James E. Rogers Energy Complex Page 3 of 5 October 1, 2017
GWA-SBRU
GWA-5S
GWA-6S
GWA-6D
water level only
1B-3D
IB-3S
X
MW-10D
MW-10S
MW-11D
MW-11S
X
MW-20D
MW-20DR
MW-21BR
MW-21D
MW-22BR
MW-22DR
MW-23D
MW-23DR
MW-23S
MW-24D
X
MW-24DR
X
MW-25DR
MW-2D-A
MW-30D
X
MW-30S
X
MW-32BR
X
MW-32D
X
MW-32S
X
MW-34S
MW-34BRU
MW-36BRU
MW-36S
MW-38BR
X
MW-38D
X
MW-38S
X
MW-40BRU
MW-40S
MW-42D
MW-42S
MW-8D
MW-8S
X
James E. Rogers Energy Complex Page 4 of 5 October 1, 2017
U5-lD
U5-1 S
U5-2BR
U5-2D
X
U5-2S-SL-A
X
U5-3D
U5-4D
U5-4S
U5-5BR
U5-5D
X
U5-6D
U5-6S
U5-8BR
U5-8D
U5-8S
Minimum Parameters to be Analyzed
Aluminum
Boron
Cop er
Mercury
Selenium
Thallium
Alkalinity
Cadmium
Hexavalent
Molybdenum
Sodium
Total Organic
Chromium
Carbon
Total
Antimony
Calcium
Iron
Nickel
Strontium
Combined
Uranium
Total
Arsenic
Chloride
Lead
Potassium
Sulfate
Suspended
Solids
Barium
Chromium
Magnesium
Radium226
Sulfide
Vanadium
Total
Beryllium
Cobalt
Manganese
Radium 228
Dissolved
Zinc
Solids
James E. Rogers Energy Complex Page 5 of 5 October 1, 2017
Revised Dan River Combined Cycle Station Interim Monitoring Plan — Groundwater Only
Wells to be Sampled
Sample for
Radionuclides
X
Regional Office Notes
AB-30BR
AB-30D
AB-30S
AB-35BR
AB-5D
AB-5S
AS-12S
AS-8BR
AS-8D
BG-1DA
X
Insufficient volume 8/24/17; continue motoring
BG-1 OD
X
BG-10S
X
BG-1 OBR
X
BG-5D
BG-5S
GWA-10D
GWA-12D
GWA-12S
GWA-14D
GWA-14S
GWA-15D
GWA-16D
GWA-16S
GWA-17D
GWA-18D
X
GWA-20D
GWA-20S
GWA-4D
GWA-4S
GWA-5BR
GWA-5BRD
GWA-6D
X
GWA-6S
X
GWA-7D
GWA-7S
GWA-8BR
GWA-8D
Dan River Combined Cycle Station Page 1 of 2 October 1, 2017
GWA-8S
GWA-9D
X
GWA-9S
X
MW-10
X
Dry 8/24/17; continue monitoring
MW-10D
X
MW-11
X
Dry 8/24/17; continue monitoring
MW-11D
X
MW-12
X
MW-12D
X
MW-21D
MW-21S
MW-22BR
X
MW-22D
X
MW-22S
X
MW-23BR
MW-23D
MW-317BR
MW-317BRL
MW-9
Dry 8/24/17; continue monitoring
MW-9D
Minimum Parameters to be Analyzed
Aluminum
Boron
Copper
Mercury
Selenium
Thallium
Alkalinity
Cadmium
Hexavalent
Molybdenum
Sodium
Total Organic
Chromium
Carbon
Total
Antimony
Calcium
Iron
Nickel
Strontium
Combined
Uranium
Total
Arsenic
Chloride
Lead
Potassium
Sulfate
Suspended
Solids
Barium
Chromium
Magnesium
Radium 226
Sulfide
Vanadium
Total
Beryllium
Cobalt
Manganese
Radium 228
Dissolved
Zinc
Solids
Dan River Combined Cycle Station Page 2 of 2 October 1, 2017
Revised H. F. Lee Energy Complex Interim Monitoring Plan — Groundwater Onlv
Wells to be
Sampled
Sample for
Radionuclides
X
Regional Office Notes
ABMW-1
ABMW-IS
X
AMW-11BC
AMW-11S
X
AMW-12BC
AMW-12S
AMW-13BC
AMW-13S
AMW-14BC
AMW-14S
AMW-15BC
AMW-15S
AMW-16BC
AMw-17BC
AMW-17S
AMW-18S
X
AMW-6RBC
AMW-9BC
AMW-19S
Well pairs AMW-19-23 S/BC were added to the list.
AMW-19BC
AMW-20S
AMW-20BC
AMW-21 S
AMW-21BC
AMW-22S
AMW-22BC
AMW-23S
AMW-23BC
BGMW-10
BGMW-9
BW-1
CCR-100S
X
CMW-10
CMW-5
CMW-6R
CMW-7
CMW-8
H. F. Lee Energy Complex Page 1 of 3 October 1, 2017
CTMW-1
CW-1
CW-2
CW-3
CW-4
DMW-1
DMW-2
DMW-3
IABMW-1
IABMW-IS
X
IABMW-2S
IA13MW-3
IABMW-3S
X
IMW-04BC
IMW-05BC
IMW-lBC
IMW-is
X
RAW-2BC
IMW-3BC
IMW-3S
X
IMW-4S
X
IMW-5S
X
LLMW-1
LLM W-1 S
LLMW-2
LLMW-2S
MW-1
MW-2
MW-3
X
SMW-3
SMW-4
SMW-5
H. F. Lee Energy Complex Page 2 of 3 October 1, 2017
Minimum Parameters to be Analyzed
Aluminum
Boron
Copper
Mercury
Selenium
Thallium
Alkalinity
Cadmium
Hexavalent
Molybdenum
Sodium
Total Organic
Chromium
Carbon
Total
Antimony
Calcium
Iron
Nickel
Strontium
Combined
Uranium
Total
Arsenic
Chloride
Lead
Potassium
Sulfate
Suspended
Solids
Barium
Chromium
Magnesium
Radium 226
Sulfide
Vanadium
Total
Beryllium
Cobalt
Manganese
Radium 228
Dissolved
Zinc
Solids
H. F. Lee Energy Complex Page 3 of 3 October 1, 2017
Revised Marshall Steam Station Interim Monitoring Plan — Groundwater Only
Wells to be Sampled
Sample for
Radionuclides
X
Regional Office Notes
AB-10BR
AB-1O1)
AB-10S
AB-1 OSL
AB-11D
AB-11 S
AB-12BR
X
AB-12D
X
AB-12S
X
AB-12SL
X
AB-13D
AB-13S
AB-14D
AB-14S
AB-15BR
AB-15D
AB-15S
AB-15SL
AB-16D
AB-16S
AB-17D
AB-17S
AB-18D
AB-18S
AB-1BR
X
Lower bedrock (AB-1BRL) scheduled to be
installed by mid -October for purposes of vertical
delineation.
AB-1D
X
AB -IS
X
AB-20D
AB-20S
AB-21D
AB-21 S
AB-2D
X
AB-2S
X
AB-3D
AB-3S
AB-4D
Marshall Steam Station Page I of 5 October 1, 2017
AB-4S
AB-4SL
AB-5BR
X
AB-5D
X
AB-5S
X
AB-6BRA
Lower bedrock (AB-6BRL) scheduled to be
installed by mid -October for purposes of vertical
delineation.
Note: AB-6BR has been abandoned and thus
removed from the IMP. AB-6BRA was installed
as replacement well.
AB-6D
AB-6S
AB-7D
AB-7S
AB-8D
AB-8S
AB-9BR
AB-9D
AB-9S
AL-1BR
X
AL -ID
X
AL -IS
X
AL-2BR
AL-2BRL
Lower bedrock (AL-2BRLL) scheduled to be
installed by mid -October for purposes of vertical
delineation.
AL-2D
AL-2S
AL-3BR
AL-3D
AL-3S
AL-4BR
Lower bedrock (AL-4BRL) scheduled to be
installed by mid -October for purposes of vertical
delineation.
AL-4D
BG-1BRA
X
Note: BG-lBR has been abandoned and thus
removed from the IMP. BG-1BRA was installed
as replacement well.
BG-ID
X
BG-1 S
X
BG-2BR
X
BG-2S
X
Marshall Steam Station Page 2 of 5 October 1, 2017
BG-3BR
X
BG-3D
X
BG-3S
X
GWA-lBR
X
GWA-lD
X
GWA-1S
X
GWA-2DA
Note: GWA-2D has been abandoned and thus
removed from the IMP. GWA-2DA was
installed as replacement well.
GWA-2S
GWA-3D
GWA-3S
GWA-4D
GWA-4S
GWA-5D
GWA-5S
GWA-6D
X
GWA-6S
X
GWA-7D
GWA-7S
GWA-8D
GWA-8S
GWA-9BR
GWA-10D
GWA-10S
GWA-11BR
X
GWA-11D
X
GWA-11 S
X
GWA-12BR
X
GWA-12D
Sample to be analyzed for total boron and sulfate
only.
GWA-12S
X
GWA-13DA
Sample to be analyzed for total boron and sulfate
only.
GWA-13S
GWA-14D
GWA-14S
GWA-15S
X
MS-8
MS-10
X
MS-11
MS-13
Marshall Steam Station Page 3 of 5 October 1, 2017
MW-1
MW-lOD
X
MW-lOS
X
MW-11D
MW-llS
MW-12D
MW-12S
MW-13D
MW-13S
MW-14BR
X
MW-14D
X
MW-14S
X
MW-2
MW-3
MW-4
X
MW-4D
X
MW-5
MW-6D
X
MW-6S
X
MW-7
Water level only
MW-7D
X
MW-7S
X
MW-8D
X
MW-8S
X
MW-9D
X
MW-9S
X
OB-1 (Dry Ash Basin)
OB-1 (Dry Ash Landfill)
Water level only
Marshall Steam Station Page 4 of 5 October 1, 2017
Minimum Parameters to be Analyzed
Aluminum
Boron
Copper
Mercury
Selenium
Thallium
Alkalinity
Cadmium
Hexavalent
Molybdenum
Sodium
Total Organic
Chromium
Carbon
Total
Antimony
Calcium
Iron
Nickel
Strontium
Combined
Uranium
Total
Arsenic
Chloride
Lead
Potassium
Sulfate
Suspended
Solids
Barium
Chromium
Magnesium.
Radium 226
Sulfide
Vanadium
Total
Beryllium
Cobalt
Manganese
Radium 228
Dissolved
Zinc
Solids
Marshall Steam Station Page 5 of 5 October 1, 2017
Revised Mayo Steam Electric Plant Interim Monitoring Plan — Groundwater Only
Wells to be Sampled
Sample for
Radionuclides
Regional Office Notes
ABMW-1
X
ABMW-2
ABMW-2BR
ABMW-2BRL
ABMW-3
ABMW-3S
ABMW-4
X
ABMW-4BR
ABMW-4D
BG-I
X
BG-2
X
CW-1
CW-1D
CW-2
X
CW-2D
X
CW-3
CW-4
CW-5
CW-6
X
MW-1 OBR
X
MW-11BR
water level only
MW-12D
X
MW-12S
X
MW-13BR
MW-14BR
MW-15BR
water level only
MW-16BR
X
MW-16D
X
MW-16S
MW-18D
New installation
MW-18BR
New installation
MW-19D
New installation
MW-19BR
New installation
MW-2
MW-3
X
MW-3BR
MW-4
Mayo Steam Electric Plant Pagel of 2 October 1, 2017
MW-5BR
MW-8BR
MW-9BR water level only
MW-9BRL
Minimum Parameters to be Analyzed
Aluminum
Boron
Copper
Mercury
Selenium
Thallium
Alkalinity
Cadmium
Hexavalent
Molybdenum
Sodium
Total Organic
Chromium
Carbon
Total
Antimony
Calcium
Iron
Nickel
Strontium
Combined
Uranium
Total
Arsenic
Chloride
Lead
Potassium
Sulfate
Suspended
Solids
Barium
Chromium
Magnesium
Radium 226
Sulfide
Vanadium
Total
Beryllium
Cobalt
Manganese
Radium 228
Dissolved
Zinc
Solids
Mayo Steam Electric Plant Page 2 of 2 October 1, 2017
Revised Riverbend Steam Station Interim Monitoring Plan — Groundwater Only
Wells to be
Sampled
Sample for
Radionuclides
X
Regional Office Notes
AB -ID
Measure pH, if still >10, not sample.
AB -IS
AB-2D
AB-2S
AB-8D
AB-8S
BG-1DA
BG-1 S
BG-2BR
BG-2D
BG-2S
BG-3D
BG-3S
BG-4BR
X
BG-4D
X
BG-4S
X
BG-5BR
BG-5D
C-1BRUA
C-1 S
C-2D
C-2S
GWA-10BRU
Measure pH, if still >10, not sample.
GWA-10S
GWA-11D
GWA-11 S
GWA-12D
X
GWA-12S
X
GWA-13D
GWA-13S
GWA-14D
GWA-14S
GWA-15D
GWA-15S
X
GWA-1BRU
GWA-1 S
GWA-20BR
Measure pH, if still >10, not sample.
Riverbend Steam Station Page I of 3 October 1, 2017
GWA-20DA
GWA-20S
GWA-21BR
GWA-21D
GWA-21 S
GWA-22BR-A
X
GWA-22D
X
GWA-22S
X
GWA-23BR
Measure pH, if still >10, not sample.
GWA-23DA
GWA-23S
GWA-2BR
X
GWA-2BRU
X
Measure pH, if still >10, not sample.
GWA-2S
X
GWA-3BR
GWA-3D
GWA-3S-A
GWA-4BR
Measure pH, if still >10, not sample.
GWA-4D
X
GWA-4S
X
GWA-5D
GWA-5S
GWA-6D
X
Measure pH, if still >10, not sample.
GWA-6S
X
GWA-7BR
GWA-7D
GWA-7S
GWA-8D
X
GWA-8S
X
GWA-9BR
X
GWA-9D
X
GWA-9S
X
MW-10
X
MW-11DR
MW-11 SR
MW-13
MW-14
X
MW-15
MW-15BR
MW-15DA
MW-lD
Riverbend Steam Station Page 2 of 3 October 1, 2017
MW-lS
MW-2D
MW-2S-A
MW-3D
MW-3S
MW-4D
MW-4S
MW-5D
MW-5S
MW-6D
MW-6S
MW-7BRA
X
MW-7D
X
MW-7SR
X
MW-8D
MW-8I
MW-8S
MW-9
X
MW-9BRA
X
MW-9DA
X
Minimum Parameters to be Analyzed
Aluminum
Boron
Copper
Mercury
Selenium
Thallium
Alkalinity
Cadmium
Hexavalent
Molybdenum
Sodium
Total Organic
Chromium
Carbon
Total
Antimony
Calcium
Iron
Nickel
Strontium
Combined
Uranium
Total
Arsenic
Chloride
Lead
Potassium
Sulfate
Suspended
Solids
Barium
Chromium
Magnesium
Radium 226
Sulfide
Vanadium
Total
Beryllium
Cobalt
Manganese
Radium 228
Dissolved
Zinc
Solids
Riverbend Steam Station Page 3 of 3 October 1, 2017
Revised Roxboro Steam Electric Plant Interim Monitoring Plan — Groundwater Only
Wells to be
Sampled
Sample for
Radionuclides
X
Regional Office Notes
ABMW-1
X
water level only
ABMW-1BR
X
ABMW-2
X
water level only
ABMW-2BR
X
ABMW-3
ABMW-3BR
ABMW-3BRL
ABMW-4
X
ABMW-4BR
X
ABMW-5
X
ABMW-5D
X
ABMW-6
ABMW-6BR
A13MW-7
water level only
ABMW-7BR
ABMW-7BRL
BG-1
X
BG-lBR
X
BG-1BRL
water level only
BG-1BRLR
X
New installation
BG-2
X
New installation
CW-1
CW-2
X
CW-2D
X
CW-3
CW-3D
C W-4
CW-5
X
GMW-10
GMW-11
GMW-6
X
GMW-7
GMW-8
GMW-9
MW-1BR
MW-2BR
MW-3BR
X
Roxboro Steam Electric Plant Page 1 of 3 October 1, 2017
MW-4BR
MW-4BRL
water level only
MW-5BR
X
MW-5D
X
MW-6BR
X
MW-6D
X
MW-7BR
MW-8BR
MW-9BR
X
MW-l0BR
X
MW-1lBR
X
MW-11D
X
New installation
MW-12BR
MW-13BR
X
MW-14BR
X
MW-15,BR
X
MW-15D
X
MW-16BR
X
MW-17BR
X
MW-18BR
X
MW-18D
X
MW-19BRL
X
MW-2
X
MW-20BRL
MW-21BRL
water level only
MW-22BR
MW-22D
MW-23BR
water level only
MW-23BRR
New installation
MW-24BR
MW-25BR
MW-26BR
MW-27BR
New installation
MW-28BR
New installation
MW-29BR
New installation
MW-30BR
New installation
MW-31BR
New installation
MW-32BR
New installation
MW-33BR
New installation
GPMW-1 S
New installation
GPMW-lD
New installation
Roxboro Steam Electric Plant Page 2 of 3 October 1, 2017
GPMW-lBR
New installation
GPMW-2D
New installation
GPMW-2BR
New installation
GPMW-3D
New installation
GPMW-3BR
New installation
Minimum Parameters to be Analyzed
Aluminum
Boron
Copper
Mercury
Selenium
Thallium
Alkalinity
Cadmium
Hexavalent
Molybdenum
Sodium
Total Organic
Chromium
Carbon
Total
Antimony
Calcium
Iron
Nickel
Strontium
Combined
Uranium
Total
Arsenic
Chloride
Lead
Potassium
Sulfate
Suspended
Solids
Barium
Chromium
Magnesium
Radium 226
Sulfide
Vanadium
Total
Beryllium
Cobalt
Manganese
Radium 228
Dissolved
Zinc
Solids
Roxboro Steam Electric Plant Page 3 of 3 October 1, 2017
Revised L.V. Sutton Energy Complex Interim Monitoring Plan— Groundwater Only
Wells to be Sampled
Sample for
Radionuclides
M
Regional Office Notes
AW-IC
AW-2C
AW-2D
AW-3C
X
AW-4C
X
AW-5C
AW-5D
AW-6R-D
Installed in 1st Qtr. 2017 to replace AW-6
AW-6R-E
Installed in 1st Qtr. 2017 to replace AW-6E
AW-7R-D
Installed in 1 st Qtr. 2017 to replace AW-7D
AW-08C
AW-09C
AW-09D
MW-05C
X
MW-05CD
X
MW-05D
X
MW-05R-E
Replaced MW-5E
MW-7C
MW-8
X
MW-11
MW-12R
Installed in 1st Qtr. 2017 to replace MW-12
MW-16D
MW-19
MW-20
MW-20D
MW-21C
MW-22B
MW-22
MW-23B
MW-23C
MW-23D
X
MW-23E
X
MW-24R-B
MW-24R-C
MW-27B
MW-27C
X
MW-28B
MW-28C
MW-31R-C
X
Installed in 1st Qtr. 2017 to replace NM-31C
L.V. Sutton Energy Complex Page 1 of 2 October 1, 2017
MW-32C
X
MW-33C
X
MW-36C
X
MW-37B
X
MW-37C
X
MW-37CD
X
MW-37D
X
MW-37E
X
MW-38B
MW-38C
X
MW-38D
X
MW-39B
MW-39C
X
MW-39D
X
MW-40B
MW-40C
MW-40D
MW-41E
SMW-01C
SMW-02C
SMW-03C
SMW-04C
SMW-5C
SMW-06C
SMW-06D
Minimum Parameters to be Analyzed
Aluminum
Boron
Copper
Mercury
Selenium
Thallium
Alkalinity
Cadmium
Hexava lent
Molybdenum
Sodium
Total Organic
Chromium
Carbon
Total
Antimony
Calcium
Iron
Nickel
Strontium
Combined
Uranium
Total
Arsenic
Chloride
Lead
Potassium
Sulfate
Suspended
Solids
Barium
Chromium
Magnesium
Radium 226
Sulfide
Vanadium
Total
Beryllium
Cobalt
Manganese
Radium 228
Dissolved
Zinc
Solids
L.V. Sutton Energy Complex Page 2 of 2 October 1, 2017
Revised W. H. Weathersnoon Power Plant Interim Monitorine Plan — Groundwater Onlv
Wells to be
Sampled
Sample for Radionuclides
M
Regional Office Notes
AW-01D
AW-01I
AW-01 S
AW-02D
AW-02S
AW-03D
AW-03I
AW-03S
BW-01
BW-02D
BW-02I
BW-02S
X
BW-03D
X
BW-03I
X
BW-03S
X
CCR-101-BG
CAMA
X
CW-01
CW-02
CW-03
X
MW-01
X
MW-02
X
MW-03
X
MW-04
X
MW-05
X
MW-06
X
MW-07
X
MW-33D
MW-33I
MW-33S
MW-41D
MW-41I
MW-52
X
MW-53D
MW-53I
MW-54D
MW-55D
X
MW-55I
X
W. H. Weatherspoon Power Plant Page 1 of 2 October 1, 2017
PW-1 (DEP 2)
Minimum Parameters to be Analyzed
Aluminum
Boron
Copper
Mercury
Selenium
Thallium
Alkalinity
Cadmium
Hexavalent
Molybdenum
Sodium
Total Organic
Chromium
Carbon
Total
Antimony
Calcium
Iron
Nickel
Strontium
Combined
Uranium
Total
Arsenic
Chloride
Lead
Potassium
Sulfate
Suspended
Solids
Barium
Chromium
Magnesium
Radium 226
Sulfide
Vanadium
Total
Beryllium
Cobalt
Manganese
Radium 228
Dissolved
Zinc
Solids
W. H. Weatherspoon Power Plant Page 2 of 2 October 1, 2017