October 13, 2017
SUBJECT: Action ID SAW- 2014-02205
Mr. Blake Mills
Town of Morrisville
414 Aviation Pazkway
Morrisville, North Carolina 27560
Dear Mr. Mills:
Reference the Department of the Army (DA) nationwida permit verification (Action
ID SAW-2002-21120) issued to the Town of Morrisville (Town) on July 22, 2002, authorizing
the dischazge of fill material into unnamed tributaries to Crabtree Creek, associated with the
construction of the Momsville Community Pazk Stream & Riparian Buffer Mitigation Site (MCP
Site).
By e-mail dated April 18, 2017, Kimley-Horn, on behalf of the Town, submitted a memo
assessing the stability of the MCP Site, and requesting use of the MCP Site for additional
compensatory mitiga$on for future Town projects. The Corps and the NC Division of Water
Resources reviewed the MCP Site with Kimley-Hom on Apri121, 2017, and observed that the site
had stabilized considerably, compazed to observations from the site visit on October 27, 2016, but
still had several areas of instability related to specific meander bends in the lower half of the main
reach. By e-mail dated September 26, 2017, Kimley-Horn, on behalf of the Town, stated that
they had determined that approximately 219 LF of stream in the Morrisville Community Pazk
restoration site has had its buffer encroached upon by mowing associated with the park facilities.
Mowing has only encroached into Zone 2 on one side of the stream, and the buffer encroachment
areas are limited to the four meander bends approaching the soccer fields and the two meander
bends closest to the baseball fields.
Based on the April 18 memo, the observations of discrete azeas of instability at the
mitigation site on Apri121, and evaluation of the buffer encroactunents, the Corps has
determined the appropriate amount of credit reduction for this mitigation site. The stream credit
will be reduced by 2191f of credit, deducted from the as-built based total credit available of
3,2341f.
��c�r�adc�D
OCT 1 8 2017
7pp�gNPORTATION RPERMfTTIN��T
The Corps has updated the credit ledger that was submitted by Kimley-Hom, and the
updated ledger is attached. The 2,4241f of remaining stream credits will available for use for
impacts by future town of Morrisville projects, as determined case-by-case.
Should you have any questions, please call Mr. Eric Alsmeyer at (919) 554-4884, Ext. 23.
Sincerely,
O� `.-- ` --�
Jean B. Gibby
Chief, Raleigh Regulatory
Field Office
Attachment
Copies Furnished w/attachment:
�f � i�lf.'�.Tif: FS� iL�Ti �1
421 Fayetteville Street, Suite 600
Raleigh, NC 27601
Mr. Mac Haupt
Division of Water Resources
North Cazolina Department of Environmental Quality
1617 Mail Service Center
Raleigh, NC 27699-1617
Ms. Katie Merritt
Division of Water Resources
North Cazolina Department of Environmental Quality
1617 Mail Service Center
Raleigh, NC 2'1699-1617
Mr: Rob Ridings
Division of Water Resources
North Cazolina Department of Environmental Quality
1617 Mail Service Center
Raleigh, NC 27699-1617
•Credits shown below are only for mitigation credits approved by the UMBI, BPDP, and As-Built.
Town of Morrisville - Morrisville Community Park Stream and Neuse Riparian
Buffer Restoration ProjeM Parcel Id #: 0745625020; HUC #: 03020201
Date Last Updated: October 13, 2017
DWR Bank Parcel Project #: 02-0820
Total Credits Released To Date: 3,O15LF (Original As-built credits: 3,234)
Stream Credit Ledger - Adjusted for 219 If of total encroachment into Buffer Zone 2
Current
Sale/ Purchaser or %Credit Credits Available to Credits Sald From Gov't
Release Date Release Project w/ HUC q gank Bank Credit Requiring
Balance
Linear Feet Linear Feet Linear Feet
10/29/2012 100%-219 If 3,234219 = 3,015
Town af Morrisville �rps AID
30/4/2016 NC 54 Bypass (McCrimmon 5'°`W'2014-02205 36 2,979 USACE
Parkway) - Phase 1 DWRp 2016-0212 (HUC
03020201
Corps AID
Town af Morrisville S,qy�_201402205
5/31/2017 NC 54 Bypass (McCrimmon 752 2,227 USACE
Parkway) - Phase 2 DWRN 2016-0212 ver 3
(HUC03020201)
Updated 10/13/2017