Loading...
HomeMy WebLinkAbout20171317 Ver 1_SW Plan_20171018(Version 2.07; Released October 2016)17BP.12.R.20TIP No.:County(ies):Catawba Page 1 of 3TIP Number:Date:Phone:Phone:Email:Email:County(ies):CAMA County?NoDesign/Future:Year:2033Existing:Year:Aquatic T&E Species?Comments:NoNoNoWetlands within Project Limits?NoneSupplemental Classification: Agriculture / RuralHop Creek11-129-2-140.20.08Project DescriptionProposed ProjectCatawbaRiver Basin(s): City/Town:0.3Typical Cross Section Description: Surrounding Land Use: General Project Narrative:(Description of Minimization of Water Quality Impacts)Nopdbeam@ncdot.govShelby, NC 28151Address:10/10/2017CatawbaHickoryTrish Beam - Division Environmental SupervisorPO Box 47WBS Element:RCBCWBS Element:HNTB North Carolina, P.C. / James A. Byrd, PENCDOT Contact:(704) 480-9044Suite 200Raleigh, NC 27609Contractor / Designer:(919) 424-0437343 E. Six Forks RoadNorth Carolina Department of TransportationHighway Stormwater Program STORMWATER MANAGEMENT PLAN FOR NCDOT PROJECTSProject Type:1710 E. Marion St. (US 74 Business)Address:General Project Information17BP.12.R.20Impairments:Other Stream Classification: Primary Classification: Project Built-Upon Area (ac.)State project 17BP.12.R.20 involves the replacement of Catawba Bridge #45 on Pittstown Rd. (SR 1131) over Hop Creek in Catawba County, NC. The existing bridge consists of 1 @ 30'-4" span with timber deck on I-beams on timber caps and piles. It is to be replaced with a 2 @ 12' - 0" x 8' - 6" RCBC at the same location. Proposed ditches in the southwest quadrants will utilize 2:1 or flatter front slopes and 2:1 back slopes to replicate existing conditions. Class ‘B’ Rip Rap is added through the length of both proposed ditches to lower the velocity and minimize erosion. To protect these new ditches from “head cutting”, Class ‘II’ Rip Rap will be placed at the ties to Hop Creek.Grass shoulders and flattened roadway embankments are utilized throughout the project to the extent practicable to provide passive stormwater treatment for roadway runoff. Since no wetlands were located within the project corridor, the proposed project does not impact any wetlands. The alignment of the proposed RCBC was set parallel to the existing stream centerline and minimizes upstream and downstream impacts. The proposed RCBC will be constructed utilizing impervious dikes and a “pump and pipe” operation. Dewatering of the construction area will be into Special Stilling Basins at location specified by NCDOT Representatives. All disturbed areas will be seeded with the appropriate seed mixtures. Proposed upstream and downstream channel improvements will be stabilized with a combination of Class ‘II’ Rip Rap and Coir Fiber Matting. While permanent site vegetation is being established, erosion control matting will be utilized to minimize erosion. Also, erosion control matting will be utilized on 2:1 slopes.N/ABuffer Rules in Effect:9602 -10' asphalt paved lanes with 2' paved shoulders. 4' grass shoulders. Roadside ditches are replaced in both the southwest and northeast quadrents. Both ditches are proposed as tying into hop creek within the US and DS culvert channel improvements, which retains the existing drainage pattern. Waterbody Information2013NCDWR Stream Index No.:NRTR Stream ID:Annual Avg Daily Traffic (veh/hr/day):Existing SiteProject Length (lin. miles or feet): ac.Surface Water Body (1): Water Supply III (WS-III)NCDWR Surface Water Classification for Water Bodyac.2 -9' asphalt paved lanes with grassed shoulders. Roadside ditches exist in southwest and northeast quadrants. Both ditches tie to Hop Creek. 1920jabyrd@hntb.comProject Includes Bridge Spanning Water Body? Deck Drains Discharge Over Buffer? Dissipator Pads Provided in Buffer?N/ADeck Drains Discharge Over Water Body?(If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the General Project Narrative)(If yes, provide justification in the General Project Narrative) (Version 2.07; Released October 2016)17BP.12.R.20TIP No.: County(ies):Catawba Page 2 of 3Sheet No.Station & Coordinates (Road and Non Road Projects)Surface Water BodyBase Width(ft)Front Slope(H:1)Back Slope(H:1)Drainage Area(ac)Recommended Treatm't Length(ft)Actual Length(ft)Longitudinal Slope(%)Q2(cfs)V2(fps)Q10(cfs)V10(fps)Rock Checks UsedBMP Associated w/ Buffer Rules?12+50 LT35.666389 / -81.36458013+55 LT35.666641 / -81.36458513+40 RT35.666631 / -81.36441316.0Note: All ditch designs replicate existing conditions and ties to the proposed culvert channel improvements (US & DS).WBS Element:4.25.44No3585No7.50%11.0 3.845.62.011056049.0 11.00.0 3.0 2.02.0 2.0 10.2 10200.00.02.03.65.25% 9.09.50% 12.0No4.45.6 5605.1Swales(1)Hop Creek(1)Hop Creek(1)Hop CreekNoNoNoNorth Carolina Department of TransportationHighway Stormwater ProgramSTORMWATER MANAGEMENT PLANFOR NCDOT PROJECTSAdditional Comments (Version 2.07; Released October 2016)17BP.12.R.20TIP No.:County(ies):Catawba Page 3of 3Sheet No.:PSH 4Station:-L- 13+51.42Barrel Height (ft):Culvert Length (ft)%%North Carolina Department of TransportationHighway Stormwater ProgramSTORMWATER MANAGEMENT PLANFOR NCDOT PROJECTSWBS Element:Bridge to Culvert Avoidance and MinimizationProposed Structure SummarySheet No. & StationDrainage Area (ac or sq mi):1.2 sq milesNumber of Barrels:2Barrel Width/Diameter (ft):12Surface Water Body:(1)Hop Creek65Culvert Type:Reinforced Concrete Box Culvert8.5Avoidance and Minimization Efforts:(Bridge to Culvert)Stream SlopeFish and/or Aquatic Life PassageExisting Average Stream Slope (%):1.80Existing Low Flow Channel Dimensions in the Stream:The existing channel averages 12' in width.Proposed Culvert Slope (%):1.50Culvert BurialProposed Culvert Burial Depth (ft):1.0 ftExisting Streambed Material:Sand and GravelProposed Low Flow Dimensions Through the Culvert:12' x 8.5' Low Flow CellProposed Sills/Baffles:Proposed 1.0' Sills are shown in the Highflow (LT) Cell of the culvert.Existing Low Flow Velocities in the Stream (ft/s):4.3 ft/sec Q10Proposed Low Flow Velocities Through the Culvert (ft/s):3.6 ft/sec Q10Alternating Low Flow Sills/Baffles:Proposed 1.0' Sills are shown in the Highflow (LT) Cell of the culvert at the inlet and outlet of the culvert.Culvert/Stream AlignmentStream Patterns Upstream and Downstream of the Culvert that Could Affect Fish Passage and Bank Stability:No stream realignment is required.Bed Forms Impacted by Culvert (riffles, pools, glides, etc.):Pools and riffles will beimpacted within the footprint of the culvertLow Flow Floodplain Bench Required? (provide justification)Yes Low Flow Floodplain Bench is required to maintain existing channel width.Bank Stabilization:Upstream and downstream channel improvements are required to transition the proposed improvements to the existing channel widths.Natural Stream Channel 2-yr Velocity (ft/s):3.9Outlet VelocitiesBends at Inlet/Outlet?(describe culvert alignment with stream)NoStream Realignment Necessary? (provide justification)NoEvaluate/Describe Roadway Geometric Constraints:Proposed Culvert 2-yr Outlet Velocity (ft/s):3.4Natural Stream Channel 10-yr Velocity (ft/s):4.3Proposed Culvert 10-yr Outlet Velocity (ft/s):3.6Roadway Geometric Considerations 4 -L- -D RV1- ** ** CATAWBA COUNTY REPLACE BRIDGE NO. 45 OVER HOP CREEK ON SR 1131 (PITTSTOWN ROAD) GRADING, DRAINAGE, PAVING AND CULVERT 25 50 10050 25 50 10050 5 10 2010 D T V = = = = = = 960 1920 10 60 6 50 % % MPH ADT ADT 2013 2033 % * DUAL 4% * TTST =2% FUNC CLASS = LOCAL SUBREGIONAL TIER DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED K 0 0 0 PROFILE (HORIZONTAL) 17BP.12.R.20 PE PROJECT LENGTH RIGHT OF WAY DATE: LETTING DATE: STATE STATE PROJECT REFERENCE NO. STATE PROJ. NO.F. A. PROJ. NO.DESCRIPTION NO. TOTAL SHEETS N.C. SHEET 1 DESIGN DATA SIGNATURE: SIGNATURE: P.E. P.E. 2012 STANDARD SPECIFICATIONS GRAPHIC SCALES PLANS PROFILE (VERTICAL) HYDRAULICS ENGINEER ENGINEER ROADWAY DESIGN LOCATION: TYPE OF WORK:09/08/9917BP.12.R.20DIVISION OF HIGHWAYS STATE OF NORTH CAROLINA 0 00 See Sheet 1-A For Index of Sheets 10/11/2017...\17BP.12.R.20_HYD_tsh.dgnHNTBCONTRACT:ARTMEN N ASO H DEPT O F TRA SPORTTIONTATEOFNRTCAR O LI NAPrepared in the Office of: NC License No: C-1554 Raleigh, North Carolina 27609 343 E. Six Forks Road, Suite 200 HNTB NORTH CAROLINA, P.C. PROJECT ENGINEER PROJECT DESIGN ENGINEER MONICA J. DUVAL NCDOT CONTACT DAVID W. BASS, PE STEVE RACKLEY, PE JUNE 6, 2017 DECEMBER 12, 201717BP.12.R.20VICINITY MAP OFFSITE DETOUR1132 1131 1176129925591130 1129 2 9 5 229 1411772942 HOP CREEK 1258 1131127 127 SR 1131 (PITTSTOWN ROAD) TO SR 1132 TO SR 1176 LIMITS PROJECT -L- POT STA 11+50.00 BEGIN PROJECT 17BP.12.R.20 PROJECT:-L- POT STA 13+36.75 BEGIN CULVERT -L- POT STA 13+67.08 END CULVERT TOTAL LENGTH OF PROJECT 17BP.12.R.20 LENGTH OF STRUCTURE PROJECT 17BP.12.R.20 LENGTH OF ROADWAY PROJECT 17BP.12.R.20 = = = 0.080 MILES 0.006 MILES 0.074 MILESR/W SUBMITTAL-L- POT STA 11+35.00 PROJECT 17BP.12.R.20 BEGIN CONSTRUCTION -L- POC STA 15+75.00 END PROJECT 17BP.12.R.20 END CONSTRUCTION 17BP.12.R.20 ROW/UTIL 3. DESIGN EXCEPTION NEEDED FOR HORIZONTAL CURVE, HORIZONTAL SSD, VERTICAL SAG AND VERTICAL SSD. 2. THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES. 1. CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD III. NOTES: WATER IMPACTS PERMIT WETLAND AND SURFACE SHEET 1 OF 6 PERMIT DRAWING HOP CREEKNSRS 2007NAD 83/ 9' GRPITTSTOWN RD SR 1131 VAR GRBODY SHOP FRAMED ONE STORY 9' BST15"CMP 15"CMP 60.00' EXISTING R/W EXISTING R/W EXISTING R/W EXISTING R/W DB 1261 PG 573 60' PRIVATE R/W RIP RAP 15"RCP 18' BST 9' GR WELL C F C F F F PI = 13+75.00 EL = 935.70'(-)5.5200% (+)5.2750% VC = 360' K = 33 V = 28 MPH ELEV. = 948.12 -L- STA 11+50.00 BEGIN GRADE ELEV. = 946.25 -L- STA 15+75.00 END GRADE (-) 5.2500% (- ) 7.5000%(-) 5.2500% El=947.10 PI =11+35.00 LAT. 'V' DITCH (LT) BEGIN SPECIAL El=943.68 PI =12+00.00 El=939.93 PI =12+50.00 El=934.42 PI =13+55.00 LAT. 'V' DITCH (LT) END SPECIAL BED MATERIAL: SAND & GRAVEL 2 @ 12'-0" x 8'-6" RCBC (+) 9.5000% El=939.18 PI =14+20.00 BEGIN LAT. 'V' DITCH (RT) El=931.58 PI =13+40.00 END LAT. 'V' DITCH (RT) PI = 10+30.00 EL = 941.62' (+)2.0000% PI = 10+70.00 EL = 938.20' (-)8.5503%(-)3 .2485% K = 3 VC = 35 K = 6 VC = 35 ELEV. = 937.55 -DRV1- STA 10+90.00 END GRADE ELEV. = 941.26 -DRV1- STA 10+12.01 BEGIN GRADE CHORD HOP CREEK-L- STA. 15+75 (LT) BEGIN / END SAFETY FENCE -L- STA. 11+50 (RT) BEGIN / END SAFETY FENCE -L- STA. 14+11 (RT) BEGIN / END SAFETY FENCE WATTLE BARRIER COIR FIBER WATTLE BARRIER COIR FIBER 18" 24" DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED SHEET NO.PROJECT REFERENCE NO. HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO.8/17/9910/11/2017...\17BP.12.R.20_HYD_psh4.dgnHNTB930 940 950 960 920 930 940 950 960 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 920 930 940 950 940 950 930 920 920 -L- -DRV1- ELEV. = 946.77 RR SPIKE IN NE ROOT OF 10" OAK -L- STA 12+27.61, 31.48' LT BM#1 NAD 83/ NSRS 2007 17BP.12.R.20 4 -L- -L- POT STA 11+50.00 BEGIN PROJECT 17BP.12.R.20 -L- POC STA 15+75.00 END PROJECT 17BP.12.R.20 010001020304050607GREU, TL-3 AT-1 TAPER 8:1 -L- POT STA 13+67.08 END CULVERT -L- POT STA 13+36.75 BEGIN CULVERT CULVERT LOCATION DETAIL NTS ** ** -L- STA 11+35.00 PROJECT 17BP.12.R.20 BEGIN CONSTRUCTION NC License No: C-1554 Raleigh, North Carolina 27609 343 E. Six Forks Road, Suite 200 HNTB NORTH CAROLINA, P.C.NOTE: ALL RADII ARE 20' UNLESS NOTED ON PLANS WETLAND & STREAM IMPACTSSSSURFACE WATER DENOTES IMPACTS IN TS TS IMPACTS IN SURFACE WATER DENOTES TEMPORARY LEGEND VERTICAL SSD CURVE, VERTICAL SAG AND NEEDED OR HORIZONTAL NOTE: DESIGN EXCEPTION DESIGN DISCHARGE DESIGN FREQUENCY BASE DISCHARGE CFS YRS YRS BASE FREQUENCY OVERTOPPING ELEVATION OVERTOPPING FREQUENCY OVERTOPPING DISCHARGE CFS CFS YRS FT FT FT DESIGN HW ELEVATION BASE HW ELEVATION CULVERT HYDRAULIC DATA = 700 = 25 = 935.9 = 950 = 100 = 936.90 = 1500+ = 500+ = 939.9 SHEET 2 OF 6 PERMIT DRAWING W.S. EL. = 930.1' F F F LEFT DITCH RIGHT DITCH L 2@12'-0" x 8'-6" RCBC C -L- STA 13+51.42 REMOVE REMOVE RETAIN SEE DETAIL 3 LATERAL 'V' DITCH SEE DETAIL 2 SPECIAL LAT. 'V' DITCH SEE DETAIL 1 SPECIAL LAT. 'V' DITCH SEE DETAIL 5 IMPROVEMENTS CULVERT CHANNEL SEE DETAIL 4 IMPROVEMENTS CULVERT CHANNEL ( Not to Scale) SPECIAL LATERAL 'V' DITCH D d 2:1DETAIL 2 Type of Liner= Class 'B' Rip-Rap Ground Natural Fill Slope Variable2:1 FROM -L- STA. 13+00 LT TO -L- STA. 13+55 LT Max. d= 1.2 Ft. Min. D= 1.2 Ft. EST. 40 SYGF EST. 15 TONS Geotextile ( Not to Scale) SPECIAL LATERAL 'V' DITCH D d 2:1DETAIL 1 Max. d= 1.2 Ft. Min. D= 1.2 Ft. Type of Liner= Class 'B' Rip-Rap Slope Fill3:1 Ground Natural Geotextile FROM -L- STA. 11+35 LT TO -L- STA. 13+00 LT EST. 100 SYGF EST. 30 TONS LATERAL 'V' DITCH ( Not to Scale) 2:1 2:1 D b d 1"/Ft. FROM -L- STA. 13+40 RT TO -L- STA. 14+20 RT Slope Fill Type of Liner= Class 'B' Rip-Rap DETAIL 3 Ground Natural Geotextile b= 0' to 7.5' Max. d= 1.4 Ft. Min. D= 1.4 Ft. EST. 35 SYGF EST. 10 TONS DETAIL 4 D= Varies (To Top of Bank) (UPSTREAM) CULVERT CHANNEL IMPROVEMENTS Natural Ground Natural Ground D 2:1 Ma x. Floodplain Bench -L- STA. 13+72 LT ( Not to Scale) w/ Seed Mix Coir Fiber Matting Channel Bed 12' Bed 1' Above 2:1 Max. 1.5' DETAIL 5 D= Varies (To Top of Bank) Natural Ground Natural Ground D2: 1 Ma x.2:1 Max. Floodplain Bench -L- STA. 13+30 RT ( Not to Scale) w/ Seed Mix Coir Fiber Matting Channel Bed 12' (DOWNSTREAM) CULVERT CHANNEL IMPROVEMENTS Bed 1' Above 1.5' SEE DETAIL 3 LATERAL 'V' DITCH Rip-Rap Class 'II' Class 'II' Rip-Rap EST. 40 TONS CLASS 'II' RIP-RAP EST. 20 SY MATTING EST. 15 CY EXCAVATION EST. 20 TONS CLASS 'II' RIP-RAP EST. 10 SY MATTING EST. 15 CY EXCAVATION Class 'II' Rip-Rap Rip-Rap Class 'II' 929 929929930930 930930930930930930931931 931931931931931931931932932932932 932932 932932932932 932933933933933933933 933 933933933934934934934 934 934 934935935935935935935935 935935 935 935935 935935935935936936 936936 936936 9 3 6 936936937937937937 937 937 937 937 937937937937937938938938938938938 938938938 938 938 9389389399399399 3 9 9399 3 9 939939 939 939939939 939 940940940 940940940940940 940940 940940940 940940940 940940 940 940 940940940940941941941 9419419 4 1 941941 941 941941 942942942942942 942942 942 942942 943943943943943943 943 943 944944944944944944944 944 945945945 945945945945945945945945945 945 945945 945 945 945946946 946946946946946946946 946946947947 947947947 947947 947 947 947 948948948948948948948 948 948948 949949949949949949 949 950950950950950950950950950950950950 950 950 950 950 950 951951 951951951951 951 9 5 1 951952952952952952 952 952 952952953953953953953 953 9 5 3954954954954954 954 954955955955955955955955955 955955 955 955955 956956956956956956 956 957957957957957957 957 957 957958958958958958 958 958 958 959959959959959 959 959 960960960960960960 960960 960 960 960 960 961961961961 961 962962962962962962 962 963963963963963 963 963 963964964964964 964 964 965965965965965965965 965 965 965965 965 966966966966966 96 6967967967967 967 967 967967 968968968968968968 968 968 968 969969969969 969 969 969 970970970970970970970 970970 970 971971971 971 971 972972972972972 972 973973973973973 973 973974974974 975975975975975975975975975 975 975975 975 976976976976 976977977977 978978 978 978979979979 979 980980980980980980 980 980980 981981981981981 981982982982982982 982983983983 983984 984 985985985985985 985 985 985 985986986 986 987987987987 988988988988988988988 989989 989 989 990990990990990990 990 990 990 990991 99 1 992992992 993993 993 993 994994 995995995995 99699699799799899899999910001000100010001001100110021002100510051006100710081009100910101010101010111011101310131014101410151017102010201021102410251026102710291030103010311032 1035103510401042104310499' GRPITTSTOWN RD SR 1131 VAR GRBODY SHOP FRAMED ONE STORY 9' BST15"CMP 15"CMP 60.00' EXISTING R/W EXISTING R/W EXISTING R/W EXISTING R/W DB 1261 PG 573 60' PRIVATE R/W RIP RAP 15"RCP 18' BST 9' GR WELL C F C F F F PI = 13+75.00 EL = 935.70'(-)5.5200% (+)5.2750% VC = 360' K = 33 V = 28 MPH ELEV. = 948.12 -L- STA 11+50.00 BEGIN GRADE ELEV. = 946.25 -L- STA 15+75.00 END GRADE (-) 5.2500% (- ) 7.5000%(-) 5.2500% El=947.10 PI =11+35.00 LAT. 'V' DITCH (LT) BEGIN SPECIAL El=943.68 PI =12+00.00 El=939.93 PI =12+50.00 El=934.42 PI =13+55.00 LAT. 'V' DITCH (LT) END SPECIAL BED MATERIAL: SAND & GRAVEL 2 @ 12'-0" x 8'-6" RCBC (+) 9.5000% El=939.18 PI =14+20.00 BEGIN LAT. 'V' DITCH (RT) El=931.58 PI =13+40.00 END LAT. 'V' DITCH (RT) PI = 10+30.00 EL = 941.62' (+)2.0000% PI = 10+70.00 EL = 938.20' (-)8.5503%(-)3 .2485% K = 3 VC = 35 K = 6 VC = 35 ELEV. = 937.55 -DRV1- STA 10+90.00 END GRADE ELEV. = 941.26 -DRV1- STA 10+12.01 BEGIN GRADE CHORD HOP CREEK-L- STA. 15+75 (LT) BEGIN / END SAFETY FENCE -L- STA. 11+50 (RT) BEGIN / END SAFETY FENCE -L- STA. 14+11 (RT) BEGIN / END SAFETY FENCE WATTLE BARRIER COIR FIBER WATTLE BARRIER COIR FIBER 18" 24" DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED SHEET NO.PROJECT REFERENCE NO. HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO.8/17/9910/11/2017...\17BP.12.R.20_HYD_psh4.dgnHNTB930 940 950 960 920 930 940 950 960 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 920 930 940 950 940 950 930 920 920 -L- -DRV1- ELEV. = 946.77 RR SPIKE IN NE ROOT OF 10" OAK -L- STA 12+27.61, 31.48' LT BM#1 NAD 83/ NSRS 2007 17BP.12.R.20 4 -L- -L- POT STA 11+50.00 BEGIN PROJECT 17BP.12.R.20 -L- POC STA 15+75.00 END PROJECT 17BP.12.R.20 010001020304050607GREU, TL-3 AT-1 TAPER 8:1 -L- POT STA 13+67.08 END CULVERT -L- POT STA 13+36.75 BEGIN CULVERT CULVERT LOCATION DETAIL NTS ** ** -L- STA 11+35.00 PROJECT 17BP.12.R.20 BEGIN CONSTRUCTION NC License No: C-1554 Raleigh, North Carolina 27609 343 E. Six Forks Road, Suite 200 HNTB NORTH CAROLINA, P.C.NOTE: ALL RADII ARE 20' UNLESS NOTED ON PLANS WETLAND & STREAM IMPACTSSSSURFACE WATER DENOTES IMPACTS IN TS TS IMPACTS IN SURFACE WATER DENOTES TEMPORARY LEGEND VERTICAL SSD CURVE, VERTICAL SAG AND NEEDED OR HORIZONTAL NOTE: DESIGN EXCEPTION DESIGN DISCHARGE DESIGN FREQUENCY BASE DISCHARGE CFS YRS YRS BASE FREQUENCY OVERTOPPING ELEVATION OVERTOPPING FREQUENCY OVERTOPPING DISCHARGE CFS CFS YRS FT FT FT DESIGN HW ELEVATION BASE HW ELEVATION CULVERT HYDRAULIC DATA = 700 = 25 = 935.9 = 950 = 100 = 936.90 = 1500+ = 500+ = 939.9 SHEET 3 OF 6 PERMIT DRAWING W.S. EL. = 930.1' F F F LEFT DITCH RIGHT DITCH L 2@12'-0" x 8'-6" RCBC C -L- STA 13+51.42 REMOVE REMOVE RETAIN SEE DETAIL 3 LATERAL 'V' DITCH SEE DETAIL 2 SPECIAL LAT. 'V' DITCH SEE DETAIL 1 SPECIAL LAT. 'V' DITCH SEE DETAIL 5 IMPROVEMENTS CULVERT CHANNEL SEE DETAIL 4 IMPROVEMENTS CULVERT CHANNEL ( Not to Scale) SPECIAL LATERAL 'V' DITCH D d 2:1DETAIL 2 Type of Liner= Class 'B' Rip-Rap Ground Natural Fill Slope Variable2:1 FROM -L- STA. 13+00 LT TO -L- STA. 13+55 LT Max. d= 1.2 Ft. Min. D= 1.2 Ft. EST. 40 SYGF EST. 15 TONS Geotextile ( Not to Scale) SPECIAL LATERAL 'V' DITCH D d 2:1DETAIL 1 Max. d= 1.2 Ft. Min. D= 1.2 Ft. Type of Liner= Class 'B' Rip-Rap Slope Fill3:1 Ground Natural Geotextile FROM -L- STA. 11+35 LT TO -L- STA. 13+00 LT EST. 100 SYGF EST. 30 TONS LATERAL 'V' DITCH ( Not to Scale) 2:1 2:1 D b d 1"/Ft. FROM -L- STA. 13+40 RT TO -L- STA. 14+20 RT Slope Fill Type of Liner= Class 'B' Rip-Rap DETAIL 3 Ground Natural Geotextile b= 0' to 7.5' Max. d= 1.4 Ft. Min. D= 1.4 Ft. EST. 35 SYGF EST. 10 TONS DETAIL 4 D= Varies (To Top of Bank) (UPSTREAM) CULVERT CHANNEL IMPROVEMENTS Natural Ground Natural Ground D 2:1 Ma x. Floodplain Bench -L- STA. 13+72 LT ( Not to Scale) w/ Seed Mix Coir Fiber Matting Channel Bed 12' Bed 1' Above 2:1 Max. 1.5' DETAIL 5 D= Varies (To Top of Bank) Natural Ground Natural Ground D2: 1 Ma x.2:1 Max. Floodplain Bench -L- STA. 13+30 RT ( Not to Scale) w/ Seed Mix Coir Fiber Matting Channel Bed 12' (DOWNSTREAM) CULVERT CHANNEL IMPROVEMENTS Bed 1' Above 1.5' SEE DETAIL 3 LATERAL 'V' DITCH Rip-Rap Class 'II' Class 'II' Rip-Rap EST. 40 TONS CLASS 'II' RIP-RAP EST. 20 SY MATTING EST. 15 CY EXCAVATION EST. 20 TONS CLASS 'II' RIP-RAP EST. 10 SY MATTING EST. 15 CY EXCAVATION Class 'II' Rip-Rap Rip-Rap Class 'II' 9' GRVAR GRBODY SHOP FRAMED ONE STORY 9' BST15"CMP 15"CMP EXISTING R/W EXISTING R/W EXISTING R/W EXISTING R/W RIP RAP 15"RCP 9' GR WELL C F C F F F PI = 13+75.00 EL = 935.70'(-)5.5200% (+)5.2750% VC = 360' K = 33 V = 28 MPH ELEV. = 948.12 -L- STA 11+50.00 BEGIN GRADE ELEV. = 946.25 -L- STA 15+75.00 END GRADE (-) 5.2500% (- ) 7.5000%(-) 5.2500% El=947.10 PI =11+35.00 LAT. 'V' DITCH (LT) BEGIN SPECIAL El=943.68 PI =12+00.00 El=939.93 PI =12+50.00 El=934.42 PI =13+55.00 LAT. 'V' DITCH (LT) END SPECIAL BED MATERIAL: SAND & GRAVEL 2 @ 12'-0" x 8'-6" RCBC (+) 9.5000% El=939.18 PI =14+20.00 BEGIN LAT. 'V' DITCH (RT) El=931.58 PI =13+40.00 END LAT. 'V' DITCH (RT) PI = 10+30.00 EL = 941.62' (+)2.0000% PI = 10+70.00 EL = 938.20' (-)8.5503%(-)3 .2485% K = 3 VC = 35 K = 6 VC = 35 ELEV. = 937.55 -DRV1- STA 10+90.00 END GRADE ELEV. = 941.26 -DRV1- STA 10+12.01 BEGIN GRADE CHORD HOP CREEKDOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED SHEET NO.PROJECT REFERENCE NO. HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO.8/17/9910/11/2017...\17BP.12.R.20_HYD_psh4_xsc.dgnHNTB930 940 950 960 920 930 940 950 960 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 920 930 940 950 940 950 930 920 920 -L- -DRV1- ELEV. = 946.77 RR SPIKE IN NE ROOT OF 10" OAK -L- STA 12+27.61, 31.48' LT BM#1 NAD 83/ NSRS 2007 17BP.12.R.20 4 -L- -L- POT STA 11+50.00 BEGIN PROJECT 17BP.12.R.20 -L- POC STA 15+75.00 END PROJECT 17BP.12.R.20 ** -L- STA 11+35.00 PROJECT 17BP.12.R.20 BEGIN CONSTRUCTION NC License No: C-1554 Raleigh, North Carolina 27609 343 E. Six Forks Road, Suite 200 HNTB NORTH CAROLINA, P.C. DESIGN DISCHARGE DESIGN FREQUENCY BASE DISCHARGE CFS YRS YRS BASE FREQUENCY OVERTOPPING ELEVATION OVERTOPPING FREQUENCY OVERTOPPING DISCHARGE CFS CFS YRS FT FT FT DESIGN HW ELEVATION BASE HW ELEVATION CULVERT HYDRAULIC DATA = 700 = 25 = 935.9 = 950 = 100 = 936.90 = 1500+ = 500+ = 939.9 SHEET 4 OF 6 PERMIT DRAWING CROSS-SECTION LOCATIONS WETLAND & STREAM IMPACTS W.S. EL. = 930.1' 18" 24" F F F DIKE IMPERVIOUS DIKE IMPERVIOUS DIKE IMPERVIOUS PUMP 2 PUMP 1 TEMPORARY PIPE 1 TEMPORARY PIPE 2 LEFT DITCH RIGHT DITCH L 2@12'-0" x 8'-6" RCBC C -L- STA 13+51.42 REMOVE REMOVE RETAIN SEE DETAIL 3 LATERAL 'V' DITCH SEE DETAIL 2 SPECIAL LAT. 'V' DITCH SEE DETAIL 1 SPECIAL LAT. 'V' DITCH SEE DETAIL 5 IMPROVEMENTS CULVERT CHANNEL SEE DETAIL 4 IMPROVEMENTS CULVERT CHANNEL SEE DETAIL 3 LATERAL 'V' DITCH XSC 1 XSC 2 XSC 3 XSC 4 00 00 1010 1010 2020 2020 3030 3030 4040 4040 5050 5050 6060 6060 7070 7070 8080 8080 9090 9090 100100 100100 110110 110110 120120 120120 130130 130 140140 140 150150 150 10/11/2017...\17BP.12.R.20_HYD_permit_xpl.dgnHNTBPROJ. REFERENCE NO.SHEET NO.0 6/23/16940 940 950 950 930 930 940 940 930 930 930 930 940 940 920 920 930 930 940 940 920 920 5 10 17BP.12.R.20 XSC 1 XSC 2 XSC 3 XSC 4 HOPS CREEK SHEET 5 OF 6 PERMIT DRAWING HandExisting Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts StreamNo. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design(ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft)1 -L- STA.13+22 TO STA. 13+72 RCBC 0.00 0.00 0.00 0.00 0.00 0.01 0.00 67 0 01 -L- STA. 13+67 TO STA. 13+97 US Channel Improvements 0.00 0.00 0.00 0.00 0.00 <0.01 0.00 26 0 01 -L- STA. 13+10 TO STA. 13+32 DS Channel Improvements 0.00 0.00 0.00 0.00 0.00 <0.01 0.00 21 0 01 '-L- STA. 13+05 TO STA. 14+24 RCBC Phasing 0.00 0.00 0.00 0.00 0.00 0.00 0.02 0 68 0TOTALS:0.00 0.00 0.00 0.00 0.00 0.02 0.02 114 68 0NOTES:Existing channel impacts are measured along the centerline of the stream.Permanent SW impacts: 860 SFTemporary SW impacts: 662 SFSHEET 6 OF 610/10/2017CATAWBA COUNTY BRIDGE NO. 45NC DEPARTMENT OF TRANSPORTATIONDIVISION OF HIGHWAYS17BP.12.R.20 WETLAND PERMIT IMPACT SUMMARYSURFACE WATER IMPACTSWETLAND IMPACTS