Loading...
HomeMy WebLinkAbout20171316 Ver 1_Impact Information_201710184 LENOIR COUNTY REPLACE BRIDGE NO. 161 OVER STRAWBERRY BRANCH GRADING, DRAINAGE, PAVING AND CULVERT D T V = = = = = = % % MPH ADT ADT % * FUNC CLASS = DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED K 0 0 0 PROFILE (HORIZONTAL) 17BP.2.R.82 PE PROJECT LENGTH STATE STATE PROJECT REFERENCE NO. STATE PROJ. NO.F. A. PROJ. NO.DESCRIPTION NO. TOTAL SHEETS N.C. SHEET 1 DESIGN DATA SIGNATURE: SIGNATURE: P.E. P.E. GRAPHIC SCALES PLANS PROFILE (VERTICAL) HYDRAULICS ENGINEER ENGINEER ROADWAY DESIGN LOCATION: TYPE OF WORK:09/08/9917BP.2.R.82DIVISION OF HIGHWAYS STATE OF NORTH CAROLINA 0 00 10/11/2017...\17BP.2.R.82_hyd_permits_tsh.dgnHNTBCONTRACT:TIP PROJECT:17BP.2.R.82ARTMEN N ASO H DEPT O F TRA SPORTTIONTATEOFNRTCAR O LI NASee Sheet 1A For Index of Sheets RIGHT OF WAY DATE: LETTING DATE: 2012 STANDARD SPECIFICATIONS NC License No: C-1554 Raleigh, North Carolina 27609 343 E. Six Forks Road, Suite 200 HNTB NORTH CAROLINA, P.C. Prepared in the Office of: PROJECT ENGINEER PROJECT DESIGN ENGINEER MONICA J. DUVAL NCDOT CONTACT DAVID W. BASS, PE MARCH 21, 2018 SEPTEMBER 13, 2017 50 1005025 50 1005025 10 20105 2012 850 2032 1700 10 60 2. THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES. 1. CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD II. NOTES: 6 60 * TTST =2%DUAL 4% LOCAL SUB-REGIONAL TIER TOTAL LENGTH OF TIP PROJECT 17BP.2.R.82 LENGTH OF ROADWAY TIP PROJECT 17BP.2.R.82 = = VICINITY MAP OFFSITE DETOUR LIMITS PROJECT1913190419031905192919091913 1342 1900 1804 MOT T S WAMP STRAWBERRYBRANCHJ ONES COUNTY LI NE58 58 70 KINSTON -L- POC STA 12+00.00 BEGIN TIP PROJECT 17BP.2.R.82 -L- POT STA 18+50.00 END TIP PROJECT 17BP.2.R.82 SR 1913 ELIJAH LOFTIN ROAD -L- TO NC 58 TO SR 1903 0.123 MILES 0.117 MILES 1914 ON SR 1913 (ELIJAH LOFTIN ROAD) 17BP.2.R.82 ROW/UTIL. HEATHER C. LANE, PE -L- STA 15+02.62 BEGIN CULVERT -L- STA 15+35.38 END CULVERT LENGTH OF CULVERT TIP PROJECT 17BP.2.R.82 = 0.006 MILES WATER IMPACTS PERMIT WETLAND AND SURFACE SHEET 1 OF 7 PERMIT DRAWING HCNARB YRREBWARTSL ALBC 32'-9"x8'-6" C 1 @ -L- STA 15+19.00 58 58 58 Southwest Creek Br anchSt r a wberr yBr anch.65.26.29.14.33Mott Swa mp RAILROAD Bern A ve.NA 2 0 1 1NAD 8 3/ 36" WDW 9' S OIL 9' SOIL9' SOIL9' SOIL9' SOIL9' SOIL18' SOIL 1SFD B FALLOW FALLOW FALLOW FALLOW FALLOW FALLOW FALLOW N 42°53'36" E84.16'S 59°32'21" W221.65'N 56°18'49" E208.25'S 56°18'49" WN 61°11'22" E249.61'N 58°18'33" E55.46'60.00'EXISTING R/W EXISTING R/W EXISTING R/W EXISTING R/W EIP TO R/W=0.33'15" CMP 15" RCP 15" RCP 15" RCP 15" CMP 60.00'TTT8" PVC 8" PVC 8" PVC F/O MARKER DB 623 PG 584 SYRETHA L. SUTTON MB 5 PAGE 113 DB 1044 PG 197 DONALD A. LELAND, et ux DB 1193 PG 861 RICHARD M. BAKER PC 6 SLIDE 68 RICHARD M. BAKER DB 1193 PG 861 PC 6 SLIDE 68 TRACT 2 TRACT 1 TIMOTHY T. HOWARD DB 1055 PG 240 DB 1771 PG 48 PC 14 SLIDE 249 STANLEY F. ROBERSON, JR., et ex SR 1913 ELIJAH LOFTIN RD.20' BST TSB '02 .DR NITFOL HAJILE 3191 RSWEWE WEWE530161-2 NCDOT GPS BL-3 BM#11 2 3 3 4 BL-4 F F C F C C C C C C C C F F F F PI = 13+60.00 EL = 62.74' (-)1.8500%(+)0.7163% VC = 300' K = 117 V = 55 MPH ELEV. = 65.70' -L- STA 12+00.00 BEGIN GRADE ELEV. = 66.25' -L- STA 18+50.00 END GRADE BED MATERIAL: SAND & SILT 1 @ 32'-9" x 8'-6" ALBC (-) 0.5000% El = 58.83 El = 58.46 El=59.44 PI =13+00.00 LAT. 'V' DITCH (LT) BEGIN SPECIAL El=63.08 PI =12+00.00 LAT. 'V' DITCH (RT) BEGIN SPECIAL El=58.31 PI =15+05.00 LAT. 'V' DITCH (RT) END SPECIAL El=58.42 PI =15+03.00 LAT. 'V' DITCH (LT) END SPECIAL El =62.28 PI =17+50.00 LAT. 'V' DITCH (LT) BEGIN SPECIAL El=61.71 PI =17+50.00 LAT. 'V' DITCH (RT) BEGIN SPECIAL El=58.19 PI =15+31.00 LAT. 'V' DITCH (LT) END SPECIAL El=58.12 PI =15+32.00 LAT. 'V' DITCH (RT) END SPECIAL SURVEY 06-01-17 WS EL.= 55.2' PI =16+00.00 PI =14+00.00(-) 4 .0000% (-) 1.5000%(-) 0.5000% El = 61.08 PI =12+50.00 (+) 0.5000%(+) 3.5000% El =58.78 PI =16+50.00 (+) 0.5000%(+) 1.5000%(+) 2.5000% El = 59.21 PI =16+50.001015 20-L- P C St a. 1 1 + 2 4. 1 2 -L- PCC Sta. 14+25.12-L- PT Sta. 17+33.14-L- P OT St a. 1 0 + 0 0. 0 0 TAPER RT/LT50' EOT TAPER RT/LT 50' EOT EXI ST.20'4' FDPS4' FDPSTAPER 8:1 GREU, TL-3 TAPER8:1 GREU, TL-3 10'10'0807060504030250201000102025EXIST.20'4' FDPS4' FDPSTAPER 8:1 TAPER 8:1 GREU, TL-3 GREU, TL-3 10'10'INC 24'+00.0050 60 70 80 50 60 70 80 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 -L- RR SPIKE IN 30" PINE ELEV. = 66.23 -L- STA 17+55.40, 82.31' LT BM#1NAD 8 3/ NA 2 0 1 1 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED SHEET NO.PROJECT REFERENCE NO. HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER 417BP.2.R.82 R/W SHEET NO.8/17/9910/12/2017...\17BP.2.R.82_hyd_permits_psh4.dgnHNTBNC License No: C-1554 Raleigh, North Carolina 27609 343 E. Six Forks Road, Suite 200 HNTB NORTH CAROLINA, P.C. NOTE: ALL DRIVEWAY RADII ARE 10' UNLESS OTHERWISE NOTED ON THE PLANS. -L- STA 12+00.00 BEGIN PROJECT 17BP.2.R.82 -L- STA 18+50.00 END PROJECT 17BP.2.R.82 -L- LEFT DITCH RIGHT DITCH S S SURFACE WATER DENOTES IMPACTS IN LEGEND TS TS IMPACTS IN SURFACE WATER DENOTES TEMPORARY WETLAND & STREAM IMPACTS SHEET 2 OF 7 PERMIT DRAWING DESIGN DISCHARGE DESIGN FREQUENCY BASE DISCHARGE CFS YRS YRS BASE FREQUENCY OVERTOPPING ELEVATION OVERTOPPING FREQUENCY OVERTOPPING DISCHARGE CFS CFS YRS FT FT FT DESIGN HW ELEVATION BASE HW ELEVATION CULVERT HYDRAULIC DATA = 310 = 25 = 60.3 = 480 = 100 = 60.9 = >700(+) = >500(+) = 64.10TOBTOBTOBTOBHCNARB YRREBWARTSQ2 TEMPORARY IMPACTS IN SURFACE WATER = 13 LF PERMANENT IMPACTS IN SURFACE WATER = 64 LF Q3 TEMPORARY IMPACTS IN SURFACE WATER = 12 LF PERMANENT IMPACTS IN SURFACE WATER = 41 LF Q4 Q1 TEMPORARY IMPACTS IN SURFACE WATER = 0 LF PERMANENT IMPACTS IN SURFACE WATER = 0 LF TEMPORARY IMPACTS IN SURFACE WATER = 0 LF PERMANENT IMPACTS IN SURFACE WATER = 0 LF WATTLE BARRIER COIR FIBER WATTLE BARRIER COIR FIBER -L- STA. 18+50 (LT/RT) BEGIN / END SAFETY FENCE -L- STA. 12+00 (LT) BEGIN / END SAFETY FENCE -L- STA. 17+90 (RT) BEGIN / END SAFETY FENCE L ALBC 32'-9"x8'-6" C 1 @ -L- STA 15+19.00 ( Not to Scale) SPECIAL LATERAL 'V' DITCH D DETAIL 1 Ground Natural Slope Fill3:1 3:1Min. D= 1.5 Ft. FROM -L- STA. 13+00 TO STA. 15+03 LT FROM -L- STA. 12+00 TO STA. 15+05 RT FROM -L- STA. 15+31 TO STA. 17+50 LT FROM -L- STA. 15+32 TO STA. 17+50 RT ( Not to Scale) RIP RAP AT EMBANKMENT DETAIL 2 Grade Ditch ? GEOTEXTILE Type of Liner= Class 'I' Rip-Rap 10'min. 1.0'min. -L- 15+03 LT -L- 15+05 RT -L- 15+31 LT -L- 15+32 RT EST. 9 TONS EST. 15 SYGF SEE DETAIL 2 RIP RAP AT EMBANKMENT EST. 11 TONS EST. 18 SYGF SEE DETAIL 2 RIP RAP AT EMBANKMENT EST. 10 TONS EST. 17 SYGF SEE DETAIL 2 RIP RAP AT EMBANKMENT EST. 11 TONS EST. 18 SYGF SEE DETAIL 2 RIP RAP AT EMBANKMENT SEE DETAIL 3 IMPROVEMENTS CULVERT CHANNEL SEE DETAIL 4 IMPROVEMENTS CULVERT CHANNEL SEE DETAIL 1 SPECIAL LAT. 'V' DITCH SEE DETAIL 1 SPECIAL LAT. 'V' DITCH SEE DETAIL 1 SPECIAL LAT. 'V' DITCH SEE DETAIL 1 SPECIAL LAT. 'V' DITCH SILL DETAIL 12' 1'2.0' O45 9'9' FOR CULVERT BOTTOM BACKFILL EST. 135 TONS CLASS 'I' RIP-RAP DETAIL 3 D= Varies (To Top of Bank) (UPSTREAM) CULVERT CHANNEL IMPROVEMENTS EST. 30 TONS CLASS 'I' RIP-RAP EST. 40 SY MATTING EST. 30 CY EXCAVATION Natural Ground Natural Ground D 2:1 Ma x.2:1 Max. Bed 1' Above Floodplain Bench Class 'I' Rip-Rap Rip-Rap Class 'I' Class 'I' Rip-Rap -L- STA. 15+19 RT (Not to Scale) Channel Bed 12' Class 'I' Rip-Rap w/ Seed Mix Coir Fiber Matting w/ Seed Mix Coir Fiber Matting DETAIL 4 D= Varies (To Top of Bank) (DOWNSTREAM) CULVERT CHANNEL IMPROVEMENTS EST. 70 TONS CLASS 'I' RIP-RAP EST. 60 SY MATTING EST. 100 CY EXCAVATION Natural Ground Natural Ground D 2:1 Ma x.2:1 Max. Bed 1' Above Floodplain Bench Class 'I' Rip-Rap Rip-Rap Class 'I' Class 'I' Rip-Rap -L- STA. 15+19 LT (Not to Scale) Channel Bed 12' Class 'I' Rip-Rap w/ Seed Mix Coir Fiber Matting w/ Seed Mix Coir Fiber Matting 15" RCP-III REMOVE RETAIN RETAIN RETAIN 15" RCP-III REMOVE 53545454545454545454545555555555555555555 6 5656565657575757575758585858585858585959595959595959595959595959595960606060 60 606060 60606060606 060 606060606060 6060 60 606060 60616161 6161 61616161 616161 6161616161 6161 6161 6 1 61 616162 62 6262 626262 62626262 626262626263636363 6363 6 36363636363 63 63 6363646464 646 4 646464646464 646464646565 6565 65656565656565656565 656565656565 656565656565 666666666666 66666666666667676767676767 6 7 6767 67 676868 6868 68686 8 6868 686869696 9 696969 696969696969 7070707070 70 70707070 70707070 70 707070707070707171 717171 7171717171 7171 7171717171727272 7272727272727 27 2 7272727373737373 73747474747474 747475757575757575 75 75757576 767676767777 777777 787836" WDW 9' S OIL 9' SOIL9' SOIL9' SOIL9' SOIL9' SOIL18' SOIL 1SFD B FALLOW FALLOW FALLOW FALLOW FALLOW FALLOW FALLOW N 42°53'36" E84.16'S 59°32'21" W221.65'N 56°18'49" E208.25'S 56°18'49" WN 61°11'22" E249.61'N 58°18'33" E55.46'60.00'EXISTING R/W EXISTING R/W EXISTING R/W EXISTING R/W EIP TO R/W=0.33'15" CMP 15" RCP 15" RCP 15" RCP 15" CMP 60.00'TTT8" PVC 8" PVC 8" PVC F/O MARKER DB 623 PG 584 SYRETHA L. SUTTON MB 5 PAGE 113 DB 1044 PG 197 DONALD A. LELAND, et ux DB 1193 PG 861 RICHARD M. BAKER PC 6 SLIDE 68 RICHARD M. BAKER DB 1193 PG 861 PC 6 SLIDE 68 TRACT 2 TRACT 1 TIMOTHY T. HOWARD DB 1055 PG 240 DB 1771 PG 48 PC 14 SLIDE 249 STANLEY F. ROBERSON, JR., et ex SR 1913 ELIJAH LOFTIN RD.20' BST TSB '02 .DR NITFOL HAJILE 3191 RSWEWE WEWE530161-2 NCDOT GPS BL-3 BM#11 2 3 3 4 BL-4 F F C F C C C C C C C C F F F F PI = 13+60.00 EL = 62.74' (-)1.8500%(+)0.7163% VC = 300' K = 117 V = 55 MPH ELEV. = 65.70' -L- STA 12+00.00 BEGIN GRADE ELEV. = 66.25' -L- STA 18+50.00 END GRADE BED MATERIAL: SAND & SILT 1 @ 32'-9" x 8'-6" ALBC (-) 0.5000% El = 58.83 El = 58.46 El=59.44 PI =13+00.00 LAT. 'V' DITCH (LT) BEGIN SPECIAL El=63.08 PI =12+00.00 LAT. 'V' DITCH (RT) BEGIN SPECIAL El=58.31 PI =15+05.00 LAT. 'V' DITCH (RT) END SPECIAL El=58.42 PI =15+03.00 LAT. 'V' DITCH (LT) END SPECIAL El =62.28 PI =17+50.00 LAT. 'V' DITCH (LT) BEGIN SPECIAL El=61.71 PI =17+50.00 LAT. 'V' DITCH (RT) BEGIN SPECIAL El=58.19 PI =15+31.00 LAT. 'V' DITCH (LT) END SPECIAL El=58.12 PI =15+32.00 LAT. 'V' DITCH (RT) END SPECIAL SURVEY 06-01-17 WS EL.= 55.2' PI =16+00.00 PI =14+00.00(-) 4 .0000% (-) 1.5000%(-) 0.5000% El = 61.08 PI =12+50.00 (+) 0.5000%(+) 3.5000% El =58.78 PI =16+50.00 (+) 0.5000%(+) 1.5000%(+) 2.5000% El = 59.21 PI =16+50.001015 20-L- P C St a. 1 1 + 2 4. 1 2 -L- PCC Sta. 14+25.12-L- PT Sta. 17+33.14-L- P OT St a. 1 0 + 0 0. 0 0 TAPER RT/LT50' EOT TAPER RT/LT 50' EOT EXI ST.20'4' FDPS4' FDPSTAPER 8:1 GREU, TL-3 TAPER8:1 GREU, TL-3 10'10'0807060504030250201000102025EXIST.20'4' FDPS4' FDPSTAPER 8:1 TAPER 8:1 GREU, TL-3 GREU, TL-3 10'10'INC 24'+00.0050 60 70 80 50 60 70 80 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 -L- RR SPIKE IN 30" PINE ELEV. = 66.23 -L- STA 17+55.40, 82.31' LT BM#1NAD 8 3/ NA 2 0 1 1 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED SHEET NO.PROJECT REFERENCE NO. HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER 417BP.2.R.82 R/W SHEET NO.8/17/9910/12/2017...\17BP.2.R.82_hyd_permits_psh4.dgnHNTBNC License No: C-1554 Raleigh, North Carolina 27609 343 E. Six Forks Road, Suite 200 HNTB NORTH CAROLINA, P.C. NOTE: ALL DRIVEWAY RADII ARE 10' UNLESS OTHERWISE NOTED ON THE PLANS. -L- STA 12+00.00 BEGIN PROJECT 17BP.2.R.82 -L- STA 18+50.00 END PROJECT 17BP.2.R.82 -L- LEFT DITCH RIGHT DITCH S S SURFACE WATER DENOTES IMPACTS IN LEGEND TS TS IMPACTS IN SURFACE WATER DENOTES TEMPORARY WETLAND & STREAM IMPACTS SHEET 3 OF 7 PERMIT DRAWING DESIGN DISCHARGE DESIGN FREQUENCY BASE DISCHARGE CFS YRS YRS BASE FREQUENCY OVERTOPPING ELEVATION OVERTOPPING FREQUENCY OVERTOPPING DISCHARGE CFS CFS YRS FT FT FT DESIGN HW ELEVATION BASE HW ELEVATION CULVERT HYDRAULIC DATA = 310 = 25 = 60.3 = 480 = 100 = 60.9 = >700(+) = >500(+) = 64.10TOBTOBTOBTOBHCNARB YRREBWARTSQ2 TEMPORARY IMPACTS IN SURFACE WATER = 13 LF PERMANENT IMPACTS IN SURFACE WATER = 64 LF Q3 TEMPORARY IMPACTS IN SURFACE WATER = 12 LF PERMANENT IMPACTS IN SURFACE WATER = 41 LF Q4 Q1 TEMPORARY IMPACTS IN SURFACE WATER = 0 LF PERMANENT IMPACTS IN SURFACE WATER = 0 LF TEMPORARY IMPACTS IN SURFACE WATER = 0 LF PERMANENT IMPACTS IN SURFACE WATER = 0 LF WATTLE BARRIER COIR FIBER WATTLE BARRIER COIR FIBER -L- STA. 18+50 (LT/RT) BEGIN / END SAFETY FENCE -L- STA. 12+00 (LT) BEGIN / END SAFETY FENCE -L- STA. 17+90 (RT) BEGIN / END SAFETY FENCE L ALBC 32'-9"x8'-6" C 1 @ -L- STA 15+19.00 ( Not to Scale) SPECIAL LATERAL 'V' DITCH D DETAIL 1 Ground Natural Slope Fill3:1 3:1Min. D= 1.5 Ft. FROM -L- STA. 13+00 TO STA. 15+03 LT FROM -L- STA. 12+00 TO STA. 15+05 RT FROM -L- STA. 15+31 TO STA. 17+50 LT FROM -L- STA. 15+32 TO STA. 17+50 RT ( Not to Scale) RIP RAP AT EMBANKMENT DETAIL 2 Grade Ditch ? GEOTEXTILE Type of Liner= Class 'I' Rip-Rap 10'min. 1.0'min. -L- 15+03 LT -L- 15+05 RT -L- 15+31 LT -L- 15+32 RT EST. 9 TONS EST. 15 SYGF SEE DETAIL 2 RIP RAP AT EMBANKMENT EST. 11 TONS EST. 18 SYGF SEE DETAIL 2 RIP RAP AT EMBANKMENT EST. 10 TONS EST. 17 SYGF SEE DETAIL 2 RIP RAP AT EMBANKMENT EST. 11 TONS EST. 18 SYGF SEE DETAIL 2 RIP RAP AT EMBANKMENT SEE DETAIL 3 IMPROVEMENTS CULVERT CHANNEL SEE DETAIL 4 IMPROVEMENTS CULVERT CHANNEL SEE DETAIL 1 SPECIAL LAT. 'V' DITCH SEE DETAIL 1 SPECIAL LAT. 'V' DITCH SEE DETAIL 1 SPECIAL LAT. 'V' DITCH SEE DETAIL 1 SPECIAL LAT. 'V' DITCH SILL DETAIL 12' 1'2.0' O45 9'9' FOR CULVERT BOTTOM BACKFILL EST. 135 TONS CLASS 'I' RIP-RAP DETAIL 3 D= Varies (To Top of Bank) (UPSTREAM) CULVERT CHANNEL IMPROVEMENTS EST. 30 TONS CLASS 'I' RIP-RAP EST. 40 SY MATTING EST. 30 CY EXCAVATION Natural Ground Natural Ground D 2:1 Ma x.2:1 Max. Bed 1' Above Floodplain Bench Class 'I' Rip-Rap Rip-Rap Class 'I' Class 'I' Rip-Rap -L- STA. 15+19 RT (Not to Scale) Channel Bed 12' Class 'I' Rip-Rap w/ Seed Mix Coir Fiber Matting w/ Seed Mix Coir Fiber Matting DETAIL 4 D= Varies (To Top of Bank) (DOWNSTREAM) CULVERT CHANNEL IMPROVEMENTS EST. 70 TONS CLASS 'I' RIP-RAP EST. 60 SY MATTING EST. 100 CY EXCAVATION Natural Ground Natural Ground D 2:1 Ma x.2:1 Max. Bed 1' Above Floodplain Bench Class 'I' Rip-Rap Rip-Rap Class 'I' Class 'I' Rip-Rap -L- STA. 15+19 LT (Not to Scale) Channel Bed 12' Class 'I' Rip-Rap w/ Seed Mix Coir Fiber Matting w/ Seed Mix Coir Fiber Matting 15" RCP-III REMOVE RETAIN RETAIN RETAIN 15" RCP-III REMOVE 36" WDW 9' S OIL 9' SOIL9' SOIL9' SOIL9' SOIL9' SOIL18' SOIL 1SFD B FALLOW FALLOW FALLOW FALLOW FALLOW FALLOW FALLOW N 42°53'36" E84.16'S 59°32'21" W221.65'N 56°18'49" E208.25'S 56°18'49" WN 61°11'22" E249.61'N 58°18'33" E55.46'60.00'EXISTING R/W EXISTING R/W EXISTING R/W EXISTING R/W EIP TO R/W=0.33'15" CMP 15" RCP 15" RCP 15" RCP 15" CMP 60.00'TTT8" PVC 8" PVC 8" PVC F/O MARKER DB 623 PG 584 SYRETHA L. SUTTON MB 5 PAGE 113 DB 1044 PG 197 DONALD A. LELAND, et ux DB 1193 PG 861 RICHARD M. BAKER PC 6 SLIDE 68 RICHARD M. BAKER DB 1193 PG 861 PC 6 SLIDE 68 TRACT 2 TRACT 1 TIMOTHY T. HOWARD DB 1055 PG 240 DB 1771 PG 48 PC 14 SLIDE 249 STANLEY F. ROBERSON, JR., et ex SR 1913 ELIJAH LOFTIN RD.20' BST TSB '02 .DR NITFOL HAJILE 3191 RSWEWE WEWE530161-2 NCDOT GPS BL-3 BM#11 2 3 3 4 BL-4 F F C F C C C C C C C C F F F F PI = 13+60.00 EL = 62.74' (-)1.8500%(+)0.7163% VC = 300' K = 117 V = 55 MPH ELEV. = 65.70' -L- STA 12+00.00 BEGIN GRADE ELEV. = 66.25' -L- STA 18+50.00 END GRADE BED MATERIAL: SAND & SILT 1 @ 32'-9" x 8'-6" ALBC (-) 0.5000% El = 58.83 El = 58.46 El=59.44 PI =13+00.00 LAT. 'V' DITCH (LT) BEGIN SPECIAL El=63.08 PI =12+00.00 LAT. 'V' DITCH (RT) BEGIN SPECIAL El=58.31 PI =15+05.00 LAT. 'V' DITCH (RT) END SPECIAL El=58.42 PI =15+03.00 LAT. 'V' DITCH (LT) END SPECIAL El =62.28 PI =17+50.00 LAT. 'V' DITCH (LT) BEGIN SPECIAL El=61.71 PI =17+50.00 LAT. 'V' DITCH (RT) BEGIN SPECIAL El=58.19 PI =15+31.00 LAT. 'V' DITCH (LT) END SPECIAL El=58.12 PI =15+32.00 LAT. 'V' DITCH (RT) END SPECIAL SURVEY 06-01-17 WS EL.= 55.2' PI =16+00.00 PI =14+00.00(-) 4 .0000% (-) 1.5000%(-) 0.5000% El = 61.08 PI =12+50.00 (+) 0.5000%(+) 3.5000% El =58.78 PI =16+50.00 (+) 0.5000%(+) 1.5000%(+) 2.5000% El = 59.21 PI =16+50.001015 20-L- P C St a. 1 1 + 2 4. 1 2 -L- PCC Sta. 14+25.12-L- PT Sta. 17+33.14-L- P OT St a. 1 0 + 0 0. 0 0 TAPER RT/LT50' EOT TAPER RT/LT 50' EOT EXI ST.20'4' FDPS4' FDPSTAPER 8:1 GREU, TL-3 TAPER8:1 GREU, TL-3 10'10'0807060504030250201000102025EXIST.20'4' FDPS4' FDPSTAPER 8:1 TAPER 8:1 GREU, TL-3 GREU, TL-3 10'10'INC 24'+00.0050 60 70 80 50 60 70 80 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 -L- RR SPIKE IN 30" PINE ELEV. = 66.23 -L- STA 17+55.40, 82.31' LT BM#1NAD 8 3/ NA 2 0 1 1 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED SHEET NO.PROJECT REFERENCE NO. HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER 417BP.2.R.82 R/W SHEET NO.8/17/9910/12/2017...\17BP.2.R.82_hyd_buffers_psh4.dgnHNTBNC License No: C-1554 Raleigh, North Carolina 27609 343 E. Six Forks Road, Suite 200 HNTB NORTH CAROLINA, P.C. NOTE: ALL DRIVEWAY RADII ARE 10' UNLESS OTHERWISE NOTED ON THE PLANS. -L- STA 12+00.00 BEGIN PROJECT 17BP.2.R.82 -L- STA 18+50.00 END PROJECT 17BP.2.R.82 -L- LEFT DITCH RIGHT DITCH SHEET 4 OF 7 PERMIT DRAWING DESIGN DISCHARGE DESIGN FREQUENCY BASE DISCHARGE CFS YRS YRS BASE FREQUENCY OVERTOPPING ELEVATION OVERTOPPING FREQUENCY OVERTOPPING DISCHARGE CFS CFS YRS FT FT FT DESIGN HW ELEVATION BASE HW ELEVATION CULVERT HYDRAULIC DATA = 310 = 25 = 60.3 = 480 = 100 = 60.9 = >700(+) = >500(+) = 64.10 BUFFER IMPACTS ALLOWABLE IMPACTS ZONE 1 ALLOWABLE IMPACTS ZONE 2 LEGEND TOBTOBTOBTOBHCNARB YRREBWARTSQ2 Q1 Q3 Q4 ZONE 2 BUFFER IMPACTS = 491 SF ZONE 1 BUFFER IMPACTS = 778 SF ZONE 2 BUFFER IMPACTS = 962 SF ZONE 1 BUFFER IMPACTS = 1370 SF ZONE 2 BUFFER IMPACTS = 979 SF ZONE 1 BUFFER IMPACTS = 1465 SF ZONE 2 BUFFER IMPACTS = 385 SF ZONE 1 BUFFER IMPACTS = 744 SF WATTLE BARRIER COIR FIBER WATTLE BARRIER COIR FIBER -L- STA. 18+50 (LT/RT) BEGIN / END SAFETY FENCE -L- STA. 12+00 (LT) BEGIN / END SAFETY FENCE -L- STA. 17+90 (RT) BEGIN / END SAFETY FENCE L ALBC 32'-9"x8'-6" C 1 @ -L- STA 15+19.00 ( Not to Scale) SPECIAL LATERAL 'V' DITCH D DETAIL 1 Ground Natural Slope Fill3:1 3:1Min. D= 1.5 Ft. FROM -L- STA. 13+00 TO STA. 15+03 LT FROM -L- STA. 12+00 TO STA. 15+05 RT FROM -L- STA. 15+31 TO STA. 17+50 LT FROM -L- STA. 15+32 TO STA. 17+50 RT ( Not to Scale) RIP RAP AT EMBANKMENT DETAIL 2 Grade Ditch ? GEOTEXTILE Type of Liner= Class 'I' Rip-Rap 10'min. 1.0'min. -L- 15+03 LT -L- 15+05 RT -L- 15+31 LT -L- 15+32 RT EST. 9 TONS EST. 15 SYGF SEE DETAIL 2 RIP RAP AT EMBANKMENT EST. 11 TONS EST. 18 SYGF SEE DETAIL 2 RIP RAP AT EMBANKMENT EST. 10 TONS EST. 17 SYGF SEE DETAIL 2 RIP RAP AT EMBANKMENT EST. 11 TONS EST. 18 SYGF SEE DETAIL 2 RIP RAP AT EMBANKMENT SEE DETAIL 3 IMPROVEMENTS CULVERT CHANNEL SEE DETAIL 4 IMPROVEMENTS CULVERT CHANNEL SEE DETAIL 1 SPECIAL LAT. 'V' DITCH SEE DETAIL 1 SPECIAL LAT. 'V' DITCH SEE DETAIL 1 SPECIAL LAT. 'V' DITCH SEE DETAIL 1 SPECIAL LAT. 'V' DITCH SILL DETAIL 12' 1'2.0' O45 9'9' FOR CULVERT BOTTOM BACKFILL EST. 135 TONS CLASS 'I' RIP-RAP DETAIL 3 D= Varies (To Top of Bank) (UPSTREAM) CULVERT CHANNEL IMPROVEMENTS EST. 30 TONS CLASS 'I' RIP-RAP EST. 40 SY MATTING EST. 30 CY EXCAVATION Natural Ground Natural Ground D 2:1 Ma x.2:1 Max. Bed 1' Above Floodplain Bench Class 'I' Rip-Rap Rip-Rap Class 'I' Class 'I' Rip-Rap -L- STA. 15+19 RT (Not to Scale) Channel Bed 12' Class 'I' Rip-Rap w/ Seed Mix Coir Fiber Matting w/ Seed Mix Coir Fiber Matting DETAIL 4 D= Varies (To Top of Bank) (DOWNSTREAM) CULVERT CHANNEL IMPROVEMENTS EST. 70 TONS CLASS 'I' RIP-RAP EST. 60 SY MATTING EST. 100 CY EXCAVATION Natural Ground Natural Ground D 2:1 Ma x.2:1 Max. Bed 1' Above Floodplain Bench Class 'I' Rip-Rap Rip-Rap Class 'I' Class 'I' Rip-Rap -L- STA. 15+19 LT (Not to Scale) Channel Bed 12' Class 'I' Rip-Rap w/ Seed Mix Coir Fiber Matting w/ Seed Mix Coir Fiber Matting 15" RCP-III REMOVE RETAIN RETAIN RETAIN 15" RCP-III REMOVE HandExisting Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts StreamNo. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft)1 -L- 15+04 TO 15+33 RCBC 0.03 48 1 -L- 15+04 TO 15+33 US Channel Improvements 0.01 18 1 -L- 15+01 TO 15+31 DS Channel Improvements 0.02 39 1 -L- 15+02 TO 15+32 RCBC Phasing 0.02 25 TOTALS*: 0.07 0.02 105 25 0*Rounded totals are sum of actual impactsNOTES:Revised 2016 09 09SHEET 5OF 7Existing channel impacts are measured along the centerline of the stream.Permanent SW impacts: 2839 SFTemporary SW impacts: 654 SF WETLAND AND SURFACE WATER IMPACTS SUMMARYWETLAND IMPACTSSURFACE WATER IMPACTSLenoir County17BP.2.R.82 NC DEPARTMENT OF TRANSPORTATIONDIVISION OF HIGHWAYS10/11/2017 ROAD CROSSING CULVERTPARALLEL IMPACTZONE 1 (ft2)ZONE 2 (ft2)TOTAL (ft2)ZONE 1 (ft2)ZONE 2 (ft2)TOTAL (ft2)ZONE 1 (ft2)ZONE 2 (ft2)1 RCBC -L- 14+52 TO 15+83 X4357 2817 7174TOTAL:4357 2817 7174 0 0 0 0 0Rev. SEP 2016IMPACTRIPARIAN BUFFER IMPACTS SUMMARYTYPESITE NO.STRUCTURE SIZE / TYPESTATION (FROM/TO)ALLOWABLE MITIGABLEBUFFER REPLACEMENT SHEET 6 OF 7 17BP.2.R.82 10/10/2017N.C. DEPT. OF TRANSPORTATIONDIVISION OF HIGHWAYS LENOIR COUNTY BRIDGE NO. 161Rev. May 2006 ZONE 1 (ft2)ZONE 2 (ft2)1 N/A0 0TOTAL:0 0WETLANDS IN BUFFER IMPACTS SUMMARY SHEET 7 OF 717BP.2.R.82 10/10/2017N.C. DEPT. OF TRANSPORTATIONDIVISION OF HIGHWAYS LENOIR COUNTY BRIDGE NO. 161WETLANDS IN BUFFERSSITE NO.STATION (FROM/TO)Rev. Jan 2009