Loading...
HomeMy WebLinkAbout20171316 Ver 1_SW Diffuse Flow Plan_20171018(Version 2.07; Released October 2016)17BP.2.R.82TIP No.:SF-530161County(ies):Lenoir Page 1 of 2TIP Number:Date:Phone:Phone:Email:Email:County(ies):CAMA County?NoRural, Residential, and AgricultureDesign/Future:Year:2032Existing:Year:Aquatic T&E Species?Comments:YesNoNoWetlands within Project Limits?Swamp Waters (Sw) Supplemental Classification: Nutrient Sensitive Waters (NSW)Strawberry Branch27-80-70.40.12Project DescriptionProposed ProjectNeuseac.River Basin(s): City/Town:0.5Typical Cross Section Description: Surrounding Land Use: General Project Narrative:(Description of Minimization of Water Quality Impacts)Norturnbull@esinc.ccAddress:9/20/2017LenoirRobert T. Turnbull, Environmental Services, Inc.Raleigh, NC 27610WBS Element:Bridge ReplacementWBS Element:HNTB North Carolina, P.C. / James A Byrd, PENCDOT Contact:(919) 212-1760Suite 200Raleigh, NC 27609Contractor / Designer:(919) 424-0437343 E. Six Forks RoadNorth Carolina Department of TransportationHighway Stormwater Program STORMWATER MANAGEMENT PLAN FOR NCDOT PROJECTSProject Type:4901 Trademark Dr.Address:General Project InformationSF-53016117BP.2.R.82Impairments:Other Stream Classification: Primary Classification: Project Built-Upon Area (ac.)State project 17BP.2.R.82 involves the replacement of Lenoir County Bridge #0161 on SR 1913 (Elijah Loftin Road) over Strawberry Branch. The existing bridge consists of 1 @ 31' - 0", prestressed concrete channels on PPC caps with timber piles. It is to be replaced with a 1 @ 32'-9" x 8'-6" ALBC at the same location. Ditches in all four quadrants will be 3:1 front slopes and 3:1 back slopes and tie to Strawberry Branch with rip rap at embankments, to prevent head cutting. There are no wetlands present within the project limits. NeuseBuffer Rules in Effect:8502 - 10' asphalt paved lanes with 4' to 6' paved shoulders and 2' to 3' grass shoulders. Ditches in all four quadrants are to be replaced with 3:1 front slopes and 3:1 back slopes.Waterbody Information2012NCDWR Stream Index No.:NRTR Stream ID:Annual Avg Daily Traffic (veh/hr/day):Existing SiteProject Length (lin. miles or feet): ac.Surface Water Body (1): Class CNCDWR Surface Water Classification for Water Body2 - 10' asphalt paved lanes with grass shoulders. Roadside ditches exist in all four quadrents and discharge directly into Strawberry Branch. 1700jabyrd@hntb.comProject Includes Bridge Spanning Water Body? Deck Drains Discharge Over Buffer? Dissipator Pads Provided in Buffer?NoDeck Drains Discharge Over Water Body?(If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the General Project Narrative)(If yes, provide justification in the General Project Narrative) (Version 2.07; Released October 2016) 17BP.2.R.82 TIP No.:SF-530161 County(ies):Lenoir Page 2 of 2 Sheet No. Station & Coordinates (Road and Non Road Projects) Surface Water Body Base Width (ft) Front Slope (H:1) Back Slope (H:1) Drainage Area (ac) Recommended Treatm't Length (ft) Actual Length (ft) Longitudinal Slope (%) Q2 (cfs) V2 (fps) Q10 (cfs) V10 (fps) Rock Checks Used BMP Associated w/ Buffer Rules? -L- 15+03 LT 35.194714 / -77.538482 -L- 15+05 RT 35.194619 / -77.538675 -L- 15+31 LT 35.194640 / -77.538429 -L- 15+32 RT 35.194540 / -77.538627 North Carolina Department of Transportation Highway Stormwater Program STORMWATER MANAGEMENT PLAN FOR NCDOT PROJECTS Additional Comments No No No No (1)Strawberry Branch (1)Strawberry Branch (1)Strawberry Branch (1)Strawberry Branch Swales 3303.0 No1.85.7 570 1.6 1.52205.40.50% 0.0 3.0 1.40.50%4.1 0.50%7.5 12.00.0 3.0 3.0 3.0 3.0 5.8 580 0.0 3.0 200 200 4 9.2 1.5 3.340.0 4 2.0 WBS Element: 1.7 1.8 4 No300 220 No 0.50% 5.3 3.0 No1.6 9.7 7.0 4 LENOIR COUNTY REPLACE BRIDGE NO. 161 OVER STRAWBERRY BRANCH GRADING, DRAINAGE, PAVING AND CULVERT D T V = = = = = = % % MPH ADT ADT % * FUNC CLASS = DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED K 0 0 0 PROFILE (HORIZONTAL) 17BP.2.R.82 PE PROJECT LENGTH STATE STATE PROJECT REFERENCE NO. STATE PROJ. NO.F. A. PROJ. NO.DESCRIPTION NO. TOTAL SHEETS N.C. SHEET 1 DESIGN DATA SIGNATURE: SIGNATURE: P.E. P.E. GRAPHIC SCALES PLANS PROFILE (VERTICAL) HYDRAULICS ENGINEER ENGINEER ROADWAY DESIGN LOCATION: TYPE OF WORK:09/08/9917BP.2.R.82DIVISION OF HIGHWAYS STATE OF NORTH CAROLINA 0 00 9/20/2017...\17BP.2.R.82_hyd_permits_tsh.dgnHNTBCONTRACT:TIP PROJECT:17BP.2.R.82ARTMEN N ASO H DEPT O F TRA SPORTTIONTATEOFNRTCAR O LI NASee Sheet 1A For Index of Sheets RIGHT OF WAY DATE: LETTING DATE: 2012 STANDARD SPECIFICATIONS NC License No: C-1554 Raleigh, North Carolina 27609 343 E. Six Forks Road, Suite 200 HNTB NORTH CAROLINA, P.C. Prepared in the Office of: PROJECT ENGINEER PROJECT DESIGN ENGINEER MONICA J. DUVAL NCDOT CONTACT DAVID W. BASS, PE MARCH 21, 2018 SEPTEMBER 13, 2017 50 1005025 50 1005025 10 20105 2012 850 2032 1700 10 60 2. THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES. 1. CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD II. NOTES: 6 60 * TTST =2%DUAL 4% LOCAL SUB-REGIONAL TIER TOTAL LENGTH OF TIP PROJECT 17BP.2.R.82 LENGTH OF ROADWAY TIP PROJECT 17BP.2.R.82 = = VICINITY MAP OFFSITE DETOUR LIMITS PROJECT1913190419031905192919091913 1342 1900 1804 MOT T S WAMP STRAWBERRYBRANCHJ ONES COUNTY LI NE58 58 70 KINSTON -L- POC STA 12+00.00 BEGIN TIP PROJECT 17BP.2.R.82 -L- POT STA 18+50.00 END TIP PROJECT 17BP.2.R.82 SR 1913 ELIJAH LOFTIN ROAD -L- TO NC 58 TO SR 1903 0.123 MILES 0.117 MILES 1914 ON SR 1913 (ELIJAH LOFTIN ROAD) 17BP.2.R.82 ROW/UTIL. HEATHER C. LANE, PE -L- STA 15+02.62 BEGIN CULVERT -L- STA 15+35.38 END CULVERT LENGTH OF CULVERT TIP PROJECT 17BP.2.R.82 = 0.006 MILES WATER IMPACTS PERMIT WETLAND AND SURFACE SHEET 1 OF 7 PERMIT DRAWING HCNARB YRREBWARTSL ALBC 32'-9"x8'-6" C 1 @ -L- STA 15+19.00 58 58 58 Southwest Creek Br anchSt r a wberr yBr anch.65.26.29.14.33Mott Swa mp RAILROAD Bern A ve.NA 2 0 1 1NAD 8 3/ 36" WDW 9' S OIL 9' SOIL9' SOIL9' SOIL9' SOIL9' SOIL18' SOIL 1SFD B FALLOW FALLOW FALLOW FALLOW FALLOW FALLOW FALLOW N 42°53'36" E84.16'S 59°32'21" W221.65'N 56°18'49" E208.25'S 56°18'49" WN 61°11'22" E249.61'N 58°18'33" E55.46'60.00'EXISTING R/W EXISTING R/W EXISTING R/W EXISTING R/W EIP TO R/W=0.33'15" CMP 15" RCP 15" RCP 15" RCP 15" CMP 60.00'TTT8" PVC 8" PVC 8" PVC F/O MARKER DB 623 PG 584 SYRETHA L. SUTTON MB 5 PAGE 113 DB 1044 PG 197 DONALD A. LELAND, et ux DB 1193 PG 861 RICHARD M. BAKER PC 6 SLIDE 68 RICHARD M. BAKER DB 1193 PG 861 PC 6 SLIDE 68 TRACT 2 TRACT 1 TIMOTHY T. HOWARD DB 1055 PG 240 DB 1771 PG 48 PC 14 SLIDE 249 STANLEY F. ROBERSON, JR., et ex SR 1913 ELIJAH LOFTIN RD.20' BST TSB '02 .DR NITFOL HAJILE 3191 RSWEWE WEWE530161-2 NCDOT GPS BL-3 BM#11 2 3 3 4 BL-4 F F C F C C C C C C C C F F F F PI = 13+60.00 EL = 62.74' (-)1.8500%(+)0.7163% VC = 300' K = 117 V = 55 MPH ELEV. = 65.70' -L- STA 12+00.00 BEGIN GRADE ELEV. = 66.25' -L- STA 18+50.00 END GRADE BED MATERIAL: SAND & SILT 1 @ 32'-9" x 8'-6" ALBC (-) 0.5000% El = 58.83 El = 58.46 El=59.44 PI =13+00.00 LAT. 'V' DITCH (LT) BEGIN SPECIAL El=63.08 PI =12+00.00 LAT. 'V' DITCH (RT) BEGIN SPECIAL El=58.31 PI =15+05.00 LAT. 'V' DITCH (RT) END SPECIAL El=58.42 PI =15+03.00 LAT. 'V' DITCH (LT) END SPECIAL El =62.28 PI =17+50.00 LAT. 'V' DITCH (LT) BEGIN SPECIAL El=61.71 PI =17+50.00 LAT. 'V' DITCH (RT) BEGIN SPECIAL El=58.19 PI =15+31.00 LAT. 'V' DITCH (LT) END SPECIAL El=58.12 PI =15+32.00 LAT. 'V' DITCH (RT) END SPECIAL SURVEY 06-01-17 WS EL.= 55.2' PI =16+00.00 PI =14+00.00(-) 4 .0000% (-) 1.5000%(-) 0.5000% El = 61.08 PI =12+50.00 (+) 0.5000%(+) 3.5000% El =58.78 PI =16+50.00 (+) 0.5000%(+) 1.5000%(+) 2.5000% El = 59.21 PI =16+50.001015 20-L- P C St a. 1 1 + 2 4. 1 2 -L- PCC Sta. 14+25.12-L- PT Sta. 17+33.14-L- P OT St a. 1 0 + 0 0. 0 0 TAPER RT/LT50' EOT TAPER RT/LT 50' EOT EXI ST.20'4' FDPS4' FDPSTAPER 8:1 GREU, TL-3 TAPER8:1 GREU, TL-3 10'10'0807060504030250201000102025EXIST.20'4' FDPS4' FDPSTAPER 8:1 TAPER 8:1 GREU, TL-3 GREU, TL-3 10'10'INC 24'+00.0050 60 70 80 50 60 70 80 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 -L- RR SPIKE IN 30" PINE ELEV. = 66.23 -L- STA 17+55.40, 82.31' LT BM#1NAD 8 3/ NA 2 0 1 1 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED SHEET NO.PROJECT REFERENCE NO. HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER 417BP.2.R.82 R/W SHEET NO.8/17/999/21/2017...\17BP.2.R.82_hyd_permits_psh4.dgnHNTBNC License No: C-1554 Raleigh, North Carolina 27609 343 E. Six Forks Road, Suite 200 HNTB NORTH CAROLINA, P.C. NOTE: ALL DRIVEWAY RADII ARE 10' UNLESS OTHERWISE NOTED ON THE PLANS. -L- STA 12+00.00 BEGIN PROJECT 17BP.2.R.82 -L- STA 18+50.00 END PROJECT 17BP.2.R.82 -L- LEFT DITCH RIGHT DITCH S S SURFACE WATER DENOTES IMPACTS IN LEGEND TS TS IMPACTS IN SURFACE WATER DENOTES TEMPORARY WETLAND & STREAM IMPACTS SHEET 2 OF 7 PERMIT DRAWING DESIGN DISCHARGE DESIGN FREQUENCY BASE DISCHARGE CFS YRS YRS BASE FREQUENCY OVERTOPPING ELEVATION OVERTOPPING FREQUENCY OVERTOPPING DISCHARGE CFS CFS YRS FT FT FT DESIGN HW ELEVATION BASE HW ELEVATION CULVERT HYDRAULIC DATA = 310 = 25 = 60.3 = 480 = 100 = 60.9 = >700(+) = >500(+) = 64.10TOBTOBTOBTOBHCNARB YRREBWARTSQ2 TEMPORARY IMPACTS IN SURFACE WATER = 13 LF PERMANENT IMPACTS IN SURFACE WATER = 64 LF Q3 TEMPORARY IMPACTS IN SURFACE WATER = 14 LF PERMANENT IMPACTS IN SURFACE WATER = 41 LF Q4 Q1 TEMPORARY IMPACTS IN SURFACE WATER = 0 LF PERMANENT IMPACTS IN SURFACE WATER = 0 LF TEMPORARY IMPACTS IN SURFACE WATER = 0 LF PERMANENT IMPACTS IN SURFACE WATER = 0 LF WATTLE BARRIER COIR FIBER WATTLE BARRIER COIR FIBER -L- STA. 18+50 (LT/RT) BEGIN / END SAFETY FENCE -L- STA. 12+00 (LT) BEGIN / END SAFETY FENCE -L- STA. 17+90 (RT) BEGIN / END SAFETY FENCE L ALBC 32'-9"x8'-6" C 1 @ -L- STA 15+19.00 ( Not to Scale) SPECIAL LATERAL 'V' DITCH D DETAIL 1 Ground Natural Slope Fill3:1 3:1Min. D= 1.5 Ft. FROM -L- STA. 13+00 TO STA. 15+03 LT FROM -L- STA. 12+00 TO STA. 15+05 RT FROM -L- STA. 15+31 TO STA. 17+50 LT FROM -L- STA. 15+32 TO STA. 17+50 RT ( Not to Scale) RIP RAP AT EMBANKMENT DETAIL 2 Grade Ditch ? GEOTEXTILE Type of Liner= Class 'I' Rip-Rap 10'min. 1.0'min. -L- 15+03 LT -L- 15+05 RT -L- 15+31 LT -L- 15+32 RT EST. 9 TONS EST. 15 SYGF SEE DETAIL 2 RIP RAP AT EMBANKMENT EST. 11 TONS EST. 18 SYGF SEE DETAIL 2 RIP RAP AT EMBANKMENT EST. 10 TONS EST. 17 SYGF SEE DETAIL 2 RIP RAP AT EMBANKMENT EST. 11 TONS EST. 18 SYGF SEE DETAIL 2 RIP RAP AT EMBANKMENT SEE DETAIL 3 IMPROVEMENTS CULVERT CHANNEL SEE DETAIL 4 IMPROVEMENTS CULVERT CHANNEL SEE DETAIL 1 SPECIAL LAT. 'V' DITCH SEE DETAIL 1 SPECIAL LAT. 'V' DITCH SEE DETAIL 1 SPECIAL LAT. 'V' DITCH SEE DETAIL 1 SPECIAL LAT. 'V' DITCH SILL DETAIL 12' 1'2.0' O45 9'9' FOR CULVERT BOTTOM BACKFILL EST. 135 TONS CLASS 'I' RIP-RAP DETAIL 3 D= Varies (To Top of Bank) (UPSTREAM) CULVERT CHANNEL IMPROVEMENTS EST. 30 TONS CLASS 'I' RIP-RAP EST. 40 SY MATTING EST. 30 CY EXCAVATION Natural Ground Natural Ground D 2:1 Ma x.2:1 Max. Bed 1' Above Floodplain Bench Class 'I' Rip-Rap Rip-Rap Class 'I' Class 'I' Rip-Rap -L- STA. 15+19 RT (Not to Scale) Channel Bed 12' Class 'I' Rip-Rap w/ Seed Mix Coir Fiber Matting w/ Seed Mix Coir Fiber Matting DETAIL 4 D= Varies (To Top of Bank) (DOWNSTREAM) CULVERT CHANNEL IMPROVEMENTS EST. 70 TONS CLASS 'I' RIP-RAP EST. 60 SY MATTING EST. 100 CY EXCAVATION Natural Ground Natural Ground D 2:1 Ma x.2:1 Max. Bed 1' Above Floodplain Bench Class 'I' Rip-Rap Rip-Rap Class 'I' Class 'I' Rip-Rap -L- STA. 15+19 LT (Not to Scale) Channel Bed 12' Class 'I' Rip-Rap w/ Seed Mix Coir Fiber Matting w/ Seed Mix Coir Fiber Matting 15" RCP-III REMOVE RETAIN RETAIN RETAIN 15" RCP-III REMOVE 53545454545454545454545555555555555555555 6 56565656575757575757575858585858585858595959595959595959595959595959595960606060 60 606060 6060606060606 060 606060606060 6060 60 60606060 60616161 6161 61616161 616161 6161616161 6161 616 1 61 6162 62 6262 626262 6262 62626262626263636363 6363 6363 63636363 63 6363646464 646 4 646464646464 646464646565 6565 656565656565656565 656565656565 656565656565 666666666666 66666666666667676767676767 6 7 6767 67 676868 6868 68686 8 6868 686869696 9 696969 696969696969 7070707070 70 70707070 70707070 70 707070707070707171 717171 7171717171 7171 71717171727272 727272727272727 27 2 7272727272737373737373 73747474747474 7475757575757575 75 75757576 767676767777 777777 787836" WDW 9' S OIL 9' SOIL9' SOIL9' SOIL9' SOIL9' SOIL18' SOIL 1SFD B FALLOW FALLOW FALLOW FALLOW FALLOW FALLOW FALLOW N 42°53'36" E84.16'S 59°32'21" W221.65'N 56°18'49" E208.25'S 56°18'49" WN 61°11'22" E249.61'N 58°18'33" E55.46'60.00'EXISTING R/W EXISTING R/W EXISTING R/W EXISTING R/W EIP TO R/W=0.33'15" CMP 15" RCP 15" RCP 15" RCP 15" CMP 60.00'TTT8" PVC 8" PVC 8" PVC F/O MARKER DB 623 PG 584 SYRETHA L. SUTTON MB 5 PAGE 113 DB 1044 PG 197 DONALD A. LELAND, et ux DB 1193 PG 861 RICHARD M. BAKER PC 6 SLIDE 68 RICHARD M. BAKER DB 1193 PG 861 PC 6 SLIDE 68 TRACT 2 TRACT 1 TIMOTHY T. HOWARD DB 1055 PG 240 DB 1771 PG 48 PC 14 SLIDE 249 STANLEY F. ROBERSON, JR., et ex SR 1913 ELIJAH LOFTIN RD.20' BST TSB '02 .DR NITFOL HAJILE 3191 RSWEWE WEWE530161-2 NCDOT GPS BL-3 BM#11 2 3 3 4 BL-4 F F C F C C C C C C C C F F F F PI = 13+60.00 EL = 62.74' (-)1.8500%(+)0.7163% VC = 300' K = 117 V = 55 MPH ELEV. = 65.70' -L- STA 12+00.00 BEGIN GRADE ELEV. = 66.25' -L- STA 18+50.00 END GRADE BED MATERIAL: SAND & SILT 1 @ 32'-9" x 8'-6" ALBC (-) 0.5000% El = 58.83 El = 58.46 El=59.44 PI =13+00.00 LAT. 'V' DITCH (LT) BEGIN SPECIAL El=63.08 PI =12+00.00 LAT. 'V' DITCH (RT) BEGIN SPECIAL El=58.31 PI =15+05.00 LAT. 'V' DITCH (RT) END SPECIAL El=58.42 PI =15+03.00 LAT. 'V' DITCH (LT) END SPECIAL El =62.28 PI =17+50.00 LAT. 'V' DITCH (LT) BEGIN SPECIAL El=61.71 PI =17+50.00 LAT. 'V' DITCH (RT) BEGIN SPECIAL El=58.19 PI =15+31.00 LAT. 'V' DITCH (LT) END SPECIAL El=58.12 PI =15+32.00 LAT. 'V' DITCH (RT) END SPECIAL SURVEY 06-01-17 WS EL.= 55.2' PI =16+00.00 PI =14+00.00(-) 4 .0000% (-) 1.5000%(-) 0.5000% El = 61.08 PI =12+50.00 (+) 0.5000%(+) 3.5000% El =58.78 PI =16+50.00 (+) 0.5000%(+) 1.5000%(+) 2.5000% El = 59.21 PI =16+50.001015 20-L- P C St a. 1 1 + 2 4. 1 2 -L- PCC Sta. 14+25.12-L- PT Sta. 17+33.14-L- P OT St a. 1 0 + 0 0. 0 0 TAPER RT/LT50' EOT TAPER RT/LT 50' EOT EXI ST.20'4' FDPS4' FDPSTAPER 8:1 GREU, TL-3 TAPER8:1 GREU, TL-3 10'10'0807060504030250201000102025EXIST.20'4' FDPS4' FDPSTAPER 8:1 TAPER 8:1 GREU, TL-3 GREU, TL-3 10'10'INC 24'+00.0050 60 70 80 50 60 70 80 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 -L- RR SPIKE IN 30" PINE ELEV. = 66.23 -L- STA 17+55.40, 82.31' LT BM#1NAD 8 3/ NA 2 0 1 1 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED SHEET NO.PROJECT REFERENCE NO. HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER 417BP.2.R.82 R/W SHEET NO.8/17/999/21/2017...\17BP.2.R.82_hyd_permits_psh4.dgnHNTBNC License No: C-1554 Raleigh, North Carolina 27609 343 E. Six Forks Road, Suite 200 HNTB NORTH CAROLINA, P.C. NOTE: ALL DRIVEWAY RADII ARE 10' UNLESS OTHERWISE NOTED ON THE PLANS. -L- STA 12+00.00 BEGIN PROJECT 17BP.2.R.82 -L- STA 18+50.00 END PROJECT 17BP.2.R.82 -L- LEFT DITCH RIGHT DITCH S S SURFACE WATER DENOTES IMPACTS IN LEGEND TS TS IMPACTS IN SURFACE WATER DENOTES TEMPORARY WETLAND & STREAM IMPACTS SHEET 3 OF 7 PERMIT DRAWING DESIGN DISCHARGE DESIGN FREQUENCY BASE DISCHARGE CFS YRS YRS BASE FREQUENCY OVERTOPPING ELEVATION OVERTOPPING FREQUENCY OVERTOPPING DISCHARGE CFS CFS YRS FT FT FT DESIGN HW ELEVATION BASE HW ELEVATION CULVERT HYDRAULIC DATA = 310 = 25 = 60.3 = 480 = 100 = 60.9 = >700(+) = >500(+) = 64.10TOBTOBTOBTOBHCNARB YRREBWARTSQ2 TEMPORARY IMPACTS IN SURFACE WATER = 13 LF PERMANENT IMPACTS IN SURFACE WATER = 64 LF Q3 TEMPORARY IMPACTS IN SURFACE WATER = 14 LF PERMANENT IMPACTS IN SURFACE WATER = 41 LF Q4 Q1 TEMPORARY IMPACTS IN SURFACE WATER = 0 LF PERMANENT IMPACTS IN SURFACE WATER = 0 LF TEMPORARY IMPACTS IN SURFACE WATER = 0 LF PERMANENT IMPACTS IN SURFACE WATER = 0 LF WATTLE BARRIER COIR FIBER WATTLE BARRIER COIR FIBER -L- STA. 18+50 (LT/RT) BEGIN / END SAFETY FENCE -L- STA. 12+00 (LT) BEGIN / END SAFETY FENCE -L- STA. 17+90 (RT) BEGIN / END SAFETY FENCE L ALBC 32'-9"x8'-6" C 1 @ -L- STA 15+19.00 ( Not to Scale) SPECIAL LATERAL 'V' DITCH D DETAIL 1 Ground Natural Slope Fill3:1 3:1Min. D= 1.5 Ft. FROM -L- STA. 13+00 TO STA. 15+03 LT FROM -L- STA. 12+00 TO STA. 15+05 RT FROM -L- STA. 15+31 TO STA. 17+50 LT FROM -L- STA. 15+32 TO STA. 17+50 RT ( Not to Scale) RIP RAP AT EMBANKMENT DETAIL 2 Grade Ditch ? GEOTEXTILE Type of Liner= Class 'I' Rip-Rap 10'min. 1.0'min. -L- 15+03 LT -L- 15+05 RT -L- 15+31 LT -L- 15+32 RT EST. 9 TONS EST. 15 SYGF SEE DETAIL 2 RIP RAP AT EMBANKMENT EST. 11 TONS EST. 18 SYGF SEE DETAIL 2 RIP RAP AT EMBANKMENT EST. 10 TONS EST. 17 SYGF SEE DETAIL 2 RIP RAP AT EMBANKMENT EST. 11 TONS EST. 18 SYGF SEE DETAIL 2 RIP RAP AT EMBANKMENT SEE DETAIL 3 IMPROVEMENTS CULVERT CHANNEL SEE DETAIL 4 IMPROVEMENTS CULVERT CHANNEL SEE DETAIL 1 SPECIAL LAT. 'V' DITCH SEE DETAIL 1 SPECIAL LAT. 'V' DITCH SEE DETAIL 1 SPECIAL LAT. 'V' DITCH SEE DETAIL 1 SPECIAL LAT. 'V' DITCH SILL DETAIL 12' 1'2.0' O45 9'9' FOR CULVERT BOTTOM BACKFILL EST. 135 TONS CLASS 'I' RIP-RAP DETAIL 3 D= Varies (To Top of Bank) (UPSTREAM) CULVERT CHANNEL IMPROVEMENTS EST. 30 TONS CLASS 'I' RIP-RAP EST. 40 SY MATTING EST. 30 CY EXCAVATION Natural Ground Natural Ground D 2:1 Ma x.2:1 Max. Bed 1' Above Floodplain Bench Class 'I' Rip-Rap Rip-Rap Class 'I' Class 'I' Rip-Rap -L- STA. 15+19 RT (Not to Scale) Channel Bed 12' Class 'I' Rip-Rap w/ Seed Mix Coir Fiber Matting w/ Seed Mix Coir Fiber Matting DETAIL 4 D= Varies (To Top of Bank) (DOWNSTREAM) CULVERT CHANNEL IMPROVEMENTS EST. 70 TONS CLASS 'I' RIP-RAP EST. 60 SY MATTING EST. 100 CY EXCAVATION Natural Ground Natural Ground D 2:1 Ma x.2:1 Max. Bed 1' Above Floodplain Bench Class 'I' Rip-Rap Rip-Rap Class 'I' Class 'I' Rip-Rap -L- STA. 15+19 LT (Not to Scale) Channel Bed 12' Class 'I' Rip-Rap w/ Seed Mix Coir Fiber Matting w/ Seed Mix Coir Fiber Matting 15" RCP-III REMOVE RETAIN RETAIN RETAIN 15" RCP-III REMOVE 36" WDW 9' S OIL 9' SOIL9' SOIL9' SOIL9' SOIL9' SOIL18' SOIL 1SFD B FALLOW FALLOW FALLOW FALLOW FALLOW FALLOW FALLOW N 42°53'36" E84.16'S 59°32'21" W221.65'N 56°18'49" E208.25'S 56°18'49" WN 61°11'22" E249.61'N 58°18'33" E55.46'60.00'EXISTING R/W EXISTING R/W EXISTING R/W EXISTING R/W EIP TO R/W=0.33'15" CMP 15" RCP 15" RCP 15" RCP 15" CMP 60.00'TTT8" PVC 8" PVC 8" PVC F/O MARKER DB 623 PG 584 SYRETHA L. SUTTON MB 5 PAGE 113 DB 1044 PG 197 DONALD A. LELAND, et ux DB 1193 PG 861 RICHARD M. BAKER PC 6 SLIDE 68 RICHARD M. BAKER DB 1193 PG 861 PC 6 SLIDE 68 TRACT 2 TRACT 1 TIMOTHY T. HOWARD DB 1055 PG 240 DB 1771 PG 48 PC 14 SLIDE 249 STANLEY F. ROBERSON, JR., et ex SR 1913 ELIJAH LOFTIN RD.20' BST TSB '02 .DR NITFOL HAJILE 3191 RSWEWE WEWE530161-2 NCDOT GPS BL-3 BM#11 2 3 3 4 BL-4 F F C F C C C C C C C C F F F F PI = 13+60.00 EL = 62.74' (-)1.8500%(+)0.7163% VC = 300' K = 117 V = 55 MPH ELEV. = 65.70' -L- STA 12+00.00 BEGIN GRADE ELEV. = 66.25' -L- STA 18+50.00 END GRADE BED MATERIAL: SAND & SILT 1 @ 32'-9" x 8'-6" ALBC (-) 0.5000% El = 58.83 El = 58.46 El=59.44 PI =13+00.00 LAT. 'V' DITCH (LT) BEGIN SPECIAL El=63.08 PI =12+00.00 LAT. 'V' DITCH (RT) BEGIN SPECIAL El=58.31 PI =15+05.00 LAT. 'V' DITCH (RT) END SPECIAL El=58.42 PI =15+03.00 LAT. 'V' DITCH (LT) END SPECIAL El =62.28 PI =17+50.00 LAT. 'V' DITCH (LT) BEGIN SPECIAL El=61.71 PI =17+50.00 LAT. 'V' DITCH (RT) BEGIN SPECIAL El=58.19 PI =15+31.00 LAT. 'V' DITCH (LT) END SPECIAL El=58.12 PI =15+32.00 LAT. 'V' DITCH (RT) END SPECIAL SURVEY 06-01-17 WS EL.= 55.2' PI =16+00.00 PI =14+00.00(-) 4 .0000% (-) 1.5000%(-) 0.5000% El = 61.08 PI =12+50.00 (+) 0.5000%(+) 3.5000% El =58.78 PI =16+50.00 (+) 0.5000%(+) 1.5000%(+) 2.5000% El = 59.21 PI =16+50.001015 20-L- P C St a. 1 1 + 2 4. 1 2 -L- PCC Sta. 14+25.12-L- PT Sta. 17+33.14-L- P OT St a. 1 0 + 0 0. 0 0 TAPER RT/LT50' EOT TAPER RT/LT 50' EOT EXI ST.20'4' FDPS4' FDPSTAPER 8:1 GREU, TL-3 TAPER8:1 GREU, TL-3 10'10'0807060504030250201000102025EXIST.20'4' FDPS4' FDPSTAPER 8:1 TAPER 8:1 GREU, TL-3 GREU, TL-3 10'10'INC 24'+00.0050 60 70 80 50 60 70 80 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 -L- RR SPIKE IN 30" PINE ELEV. = 66.23 -L- STA 17+55.40, 82.31' LT BM#1NAD 8 3/ NA 2 0 1 1 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED SHEET NO.PROJECT REFERENCE NO. HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER 417BP.2.R.82 R/W SHEET NO.8/17/999/21/2017...\17BP.2.R.82_hyd_buffers_psh4.dgnHNTBNC License No: C-1554 Raleigh, North Carolina 27609 343 E. Six Forks Road, Suite 200 HNTB NORTH CAROLINA, P.C. NOTE: ALL DRIVEWAY RADII ARE 10' UNLESS OTHERWISE NOTED ON THE PLANS. -L- STA 12+00.00 BEGIN PROJECT 17BP.2.R.82 -L- STA 18+50.00 END PROJECT 17BP.2.R.82 -L- LEFT DITCH RIGHT DITCH SHEET 4 OF 7 PERMIT DRAWING DESIGN DISCHARGE DESIGN FREQUENCY BASE DISCHARGE CFS YRS YRS BASE FREQUENCY OVERTOPPING ELEVATION OVERTOPPING FREQUENCY OVERTOPPING DISCHARGE CFS CFS YRS FT FT FT DESIGN HW ELEVATION BASE HW ELEVATION CULVERT HYDRAULIC DATA = 310 = 25 = 60.3 = 480 = 100 = 60.9 = >700(+) = >500(+) = 64.10 BUFFER IMPACTS ALLOWABLE IMPACTS ZONE 1 ALLOWABLE IMPACTS ZONE 2 LEGEND TOBTOBTOBTOBHCNARB YRREBWARTSQ2 Q1 Q3 Q4 ZONE 2 BUFFER IMPACTS = 461 SF ZONE 1 BUFFER IMPACTS = 913 SF ZONE 2 BUFFER IMPACTS = 387 SF ZONE 1 BUFFER IMPACTS = 895 SF ZONE 2 BUFFER IMPACTS = 532 SF ZONE 1 BUFFER IMPACTS = 835 SF ZONE 2 BUFFER IMPACTS = 803 SF ZONE 1 BUFFER IMPACTS = 1065 SF WATTLE BARRIER COIR FIBER WATTLE BARRIER COIR FIBER -L- STA. 18+50 (LT/RT) BEGIN / END SAFETY FENCE -L- STA. 12+00 (LT) BEGIN / END SAFETY FENCE -L- STA. 17+90 (RT) BEGIN / END SAFETY FENCE L ALBC 32'-9"x8'-6" C 1 @ -L- STA 15+19.00 ( Not to Scale) SPECIAL LATERAL 'V' DITCH D DETAIL 1 Ground Natural Slope Fill3:1 3:1Min. D= 1.5 Ft. FROM -L- STA. 13+00 TO STA. 15+03 LT FROM -L- STA. 12+00 TO STA. 15+05 RT FROM -L- STA. 15+31 TO STA. 17+50 LT FROM -L- STA. 15+32 TO STA. 17+50 RT ( Not to Scale) RIP RAP AT EMBANKMENT DETAIL 2 Grade Ditch ? GEOTEXTILE Type of Liner= Class 'I' Rip-Rap 10'min. 1.0'min. -L- 15+03 LT -L- 15+05 RT -L- 15+31 LT -L- 15+32 RT EST. 9 TONS EST. 15 SYGF SEE DETAIL 2 RIP RAP AT EMBANKMENT EST. 11 TONS EST. 18 SYGF SEE DETAIL 2 RIP RAP AT EMBANKMENT EST. 10 TONS EST. 17 SYGF SEE DETAIL 2 RIP RAP AT EMBANKMENT EST. 11 TONS EST. 18 SYGF SEE DETAIL 2 RIP RAP AT EMBANKMENT SEE DETAIL 3 IMPROVEMENTS CULVERT CHANNEL SEE DETAIL 4 IMPROVEMENTS CULVERT CHANNEL SEE DETAIL 1 SPECIAL LAT. 'V' DITCH SEE DETAIL 1 SPECIAL LAT. 'V' DITCH SEE DETAIL 1 SPECIAL LAT. 'V' DITCH SEE DETAIL 1 SPECIAL LAT. 'V' DITCH SILL DETAIL 12' 1'2.0' O45 9'9' FOR CULVERT BOTTOM BACKFILL EST. 135 TONS CLASS 'I' RIP-RAP DETAIL 3 D= Varies (To Top of Bank) (UPSTREAM) CULVERT CHANNEL IMPROVEMENTS EST. 30 TONS CLASS 'I' RIP-RAP EST. 40 SY MATTING EST. 30 CY EXCAVATION Natural Ground Natural Ground D 2:1 Ma x.2:1 Max. Bed 1' Above Floodplain Bench Class 'I' Rip-Rap Rip-Rap Class 'I' Class 'I' Rip-Rap -L- STA. 15+19 RT (Not to Scale) Channel Bed 12' Class 'I' Rip-Rap w/ Seed Mix Coir Fiber Matting w/ Seed Mix Coir Fiber Matting DETAIL 4 D= Varies (To Top of Bank) (DOWNSTREAM) CULVERT CHANNEL IMPROVEMENTS EST. 70 TONS CLASS 'I' RIP-RAP EST. 60 SY MATTING EST. 100 CY EXCAVATION Natural Ground Natural Ground D 2:1 Ma x.2:1 Max. Bed 1' Above Floodplain Bench Class 'I' Rip-Rap Rip-Rap Class 'I' Class 'I' Rip-Rap -L- STA. 15+19 LT (Not to Scale) Channel Bed 12' Class 'I' Rip-Rap w/ Seed Mix Coir Fiber Matting w/ Seed Mix Coir Fiber Matting 15" RCP-III REMOVE RETAIN RETAIN RETAIN 15" RCP-III REMOVE