Carpenter,Kristi
From:Brame, Bill Jr.
Sent:Monday, September 25, 2017 1:09 PM
To:Ward, Garcy
Subject:FW: Craven County Bridge 41
Hope this answers your questions. Let me know if it does not.
Bill Brame Jr
From: Matt Harvey \[mailto:MHarvey@wetherilleng.com\]
Sent: Monday, September 25, 2017 8:04 AM
To: Brame, Bill Jr.
Cc: Jones, Larry L
Subject: RE: Craven County Bridge 41
See replies in blue.
Thanks
-Matt
Our DWQ rep has some questions and comments about the permit plan on Craven 41:
-The impact table shows 4’ of stream impacts. Where are the impacts? These impacts
are from the proposed bent at Station 13+68 Lt., there are no impacts shown on the
plan sheet.
-A dissipator pad is shown in buffer zone 2 at site 3. Can it be moved out of the buffer?
Yes, the rip rap pad for a 15” diameter pipe is 5’ long and the cell is 11’ long. So, it
actually will not be inside the buffer. I’ll slide the rip rap pad back so it doesn’t show up
in the buffer.
-The pipe outlet at site 1 needs a dissipator pad. This system currently outlets onto a
dissapator pad.
Please do not hesitate to contact me if there are any questions about the above.
Bill Brame Jr
Division Environmental Specialist
North Carolina Department of Transportation
252 439 2800 office
bbrame@ncdot.gov
105 Pactolus Hwy
P.O. Box 1587
Greenville, NC 27835-1587
1
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third
parties.
2