HomeMy WebLinkAbout20150433 Ver 2_No Written Concurrence_20171016Water Resources
Environmental Quality
October 16, 2017
BuckleberrySolar, LLC
Attn: Mr. Geoff Fallon
3250 Ocean Park Boulevard
Santa Monica, CA 90405
Subject: BUCKLEBERRY SOLAR FARM
NO WRITTEN CONCURRENCE NEEDED
Dear Mr. Fallon:
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
S. JAY ZIMMERMAN
Director
DWR # 2015-0433 V2
PITT County
You have our approval, in accordance with the attached conditions to impact 0.04 acres of wetlands (0.03
acres permanent impacts and 0.01 acres temporary impacts), 37 linear feet of stream (22 linear feet of
permanent impacts and 15 linear feet of temporary impacts), 0.02 acres of waters (0.01 acres of
permanent impacts and 0.006 acres of temporary impacts), 2,575 square feet of Zone 1 and 1,630 square
feet of Zone 2 of the protected riparian buffer in order to install four crossings for accessibility to the
proposed solar farm as described in your application dated September 20, 2017 and received by the
Division of Water Resources (Division) on September 21, 2017. After reviewing your application, we have
decided that the impacts are below the threshold for written authorization as long as the conditions of
General Water Quality Certification Number 4092 (GC 4085) are met. This certification allows you to use
the Nationwide 3 when issued by the US Army Corps of Engineers. In addition, the impacts as proposed
within the Neuse River Riparian Buffer are considered an "Exempt' activity under 15A NCAC 02B.0233(6).
Please note that you should get any other federal, state or local permits before proceeding with your
project, including those required by (but not limited to) Sediment and Erosion Control, Non -Discharge,
and Water Supply Watershed regulations.
This approval is only valid for the purpose and design that you described in your application except as
modified below. If you change your project, you must notify us and you may be required to send us a
new application. If the property is sold, the new owner must be given a copy of this Certification and
approval letter and is thereby responsible for complying with all conditions. If total wetland fills for this
project (now or in the future) exceed one acre, compensatory mitigation may be required as described in
15A NCAC 2H .0506 (h) (6) and (7). This approval shall expire when the corresponding Nationwide Permit
expires or as otherwise provided in the General Certification. For this approval to be valid, you must
follow the conditions listed in the attached certification and any additional conditions listed below.
Conditions of Certification:
1. The applicant and/or authorized agent shall provide a completed Certificate of Completion form to
the Division within thirty (30) days of project completion (available at
"Nothing Compares -
State of North Carolina I Environmental Quality I Water Resources -Water Quality Regional Operations Section -Washington Regional Office
943 Washington Square Mall, Washington, North Carolina 27889
252-946-6481
BUCKLEBERRY SOLAR FARM
DWR# 2015-0433 V2
401APPROVAL
Page 2 of 3
http://PortaI.ncdenr.ore/web/wa/swp/ws/401/certsandPermits/aPPly/forms). [15A NCAC 02H
.0506(b)(5)]
This Certification can be contested as provided in Articles 3 and 4 of General Statute 150B by filing a
written petition for an administrative hearing to the Office of Administrative Hearings (hereby known as
OAH). A petition form may be obtained from the OAH at http://www,ncoah.com/ or by calling the OAH
Clerk's Office at (919) 431-3000 for information.
Within sixty (60) calendar days of receipt of this notice, a petition must be filed with the OAH. A petition
is considered filed when the original and one (1) copy along with any applicable OAH filing fee is received
in the OAH during normal office hours (Monday through Friday between 8:OOam and S:OOpm, excluding
official state holidays).
The petition may be faxed to the OAH at (919) 431-3100, provided the original and one copy of the petition
along with any applicable OAH filing fee is received by the OAH within five (5) business days following the
faxed transmission.
Mailing address for the OAH:
If sending via US Postal Service: If sending via delivery service (UPS, FedEx,
etc.):
Office of Administrative Hearings Office of Administrative Hearings
6714 Mail Service Center 1711 New Hope Church Road
Raleigh, NC 27699-6714 Raleigh, NC 27609-6285
One (1) copy of the petition must also be served to DEQ:
William F. Lane, General Counsel
Department of Environmental Quality
1601 Mail Service Center
Raleigh, NC 27699-1601
This letter completes the review of the Division under section 401 of the Clean Water Act. Please contact
Anthony Scarbraugh at 252-948-3924 or anthonv.scarbrauehCalncdenr.gov if you have any questions or
concerns.
Sincerely,
oil
Robert Tankard, Assistant Regional Supervisor
Water Quality Regional Operations Section
Division of Water Resources, NCDEQ
BUCKLEBERRY SOLAR FARM
D W R# 2015-0433 V2
401APPROVAL
Page 3 of 3
Enclosures: GC 4092
Certification of Completion
Site Plan
cc: Gary Beecher, USACE Washington Regulatory Field Office (via email)
Samir Dumpor, DEMLR WaRO
Laserfiche
File
Bradley Luckey, Pilot Environmental, Inc. (via email: bluckey@pilotenviro.com)
� mswirewrrENu �:
r.E»cemc»Wu xEwo rtwor�, -
sarl„e.l�- �I
E:.rMm-
n.ros.00s Kl
I
IMPACT AREA 02
1 1'44EA5rV,Vry
C
1
i
I
1
III
� 1
— rr..E»Dwmexiw:—
MgMIFtF R./I,IKErEFrI —
`\ I�OS a.D,pKI
IOIaW�DA.[lp
CROSS SECTION AA
.I.. (I
I..
mlanana
D#N
o-"ER.ailarw�
—
CROSSING SECTKNJ BTf
pn,roswEl
�o"iEE'"imrtl1" --' anaDanona w»Nwx I
SMIYIIER»LKl
Renv.owKl __ _
AiW1pL,M4 q,W wP/Lf
iRME�lN EW .b 1 ITV DOp KI Ha �. IMI
F»PoM»Y"W�K,1 Snp
IaL aI.»Rrsem.0
wt Tk P
Y.6,EN,DK1
'
r 1wRILiC!✓a J
ronuo Dour
caxrneRErErvulr
la iceru arsseErl
� V.OMKI -
p[y@,E WE W.HRI
� I6Et [E,ri m54EE,
��, ���
rsle cerunr Nn
S
rtoru re EE.00a¢I
�
P -
.-�•
N»wY.MZFEVCECN4J
N.
.. IMPACT AREA 11
Mnuurr,Ep
EECtIDY A -A
\
\
1
\
DNDrMI
E \
IFUMIMII-nvILNuOiGTD'et�
vwannwoR(ro
\
IMfY YW
16tt LE,M M6bEE,1
I
I1r
\
\
1
\ 1
1
n.ros.00s Kl
I
IMPACT AREA 02
1 1'44EA5rV,Vry
C
1
i
I
1
III
� 1
— rr..E»Dwmexiw:—
MgMIFtF R./I,IKErEFrI —
`\ I�OS a.D,pKI
IOIaW�DA.[lp
CROSS SECTION AA
.I.. (I
I..
mlanana
D#N
o-"ER.ailarw�
—
CROSSING SECTKNJ BTf
pn,roswEl
�o"iEE'"imrtl1" --' anaDanona w»Nwx I
SMIYIIER»LKl
Renv.owKl __ _
AiW1pL,M4 q,W wP/Lf
iRME�lN EW .b 1 ITV DOp KI Ha �. IMI
F»PoM»Y"W�K,1 Snp
i
e T—
MANAGING THE WATERCOURSE:
BYPASS PUMPING
APPROVE®
North Carolina Environmental
Management Commission
Division of Water Resources
Date 10 /I420 1�
Permit# 2-u/F- 0YY3 112—
isnuxDla LEucELEx+arEKYE»,wsrrwoN
E«I�" �„�«,'�iIEWvl:aw.ERE,WrA�
PIPE CROSSING CROSS SECTION
IEgrIo1W[I
ۤ7e^
_1i9
¢9��
1
T!L
W ssvr amara mx,rL EIti
n.•ar _ra wNw
� P . IDIKNrD11N,r D.. .1
_
Y.6,EN,DK1
'
�_-.
- TI.1 WrinwrRcnon
la iceru arsseErl
_ _ _
� I6Et [E,ri m54EE,
n Fun reECrl -
'
//
Nnwwm wuoaV J
S
�mxcreR Ewxu.rm
WLLUNiwI
�
"D
PD,u.T V... �V oDI KI
uEv'�u
I �s'E�'
N»wY.MZFEVCECN4J
i
e T—
MANAGING THE WATERCOURSE:
BYPASS PUMPING
APPROVE®
North Carolina Environmental
Management Commission
Division of Water Resources
Date 10 /I420 1�
Permit# 2-u/F- 0YY3 112—
isnuxDla LEucELEx+arEKYE»,wsrrwoN
E«I�" �„�«,'�iIEWvl:aw.ERE,WrA�
PIPE CROSSING CROSS SECTION
IEgrIo1W[I
ۤ7e^
_1i9
¢9��
1
T!L
W ssvr amara mx,rL EIti
n.•ar _ra wNw
� P . IDIKNrD11N,r D.. .1
�ctV
by�q.
D b,
N.
EECtIDY A -A
vu ow I Esr Eu ra srec,wL
�mvnEmir7HKOKIN-110Pl
Daammmmmoommmmm�
E ow,x»wr<»r,wxwmarEN.LNEnero. arr,,.Nnaauu Nr.cra»»u.ce �� p�
rrin ro»<Enma mK,aieLerW na mwaEDwlm.:x6x,E E
Jsisiiwli+9�e�`D sxEeaa•rc,ax waLrw»s,wc,DONuewo.rcemauLuaKE uoxcceo i -•
I -----------E e,.nowoa. ¢ j9
. ��,N l�m� xEsenuLrw+r,,rssox n»Lweon �i I i I of C
M,4LR.irNWY9»(flxCF EIpE W,ItIE/., l6NPoN,BN6a, rEµlyKRyJpr, I,
0 »DD,W4EPOaaI�CM,»MNAWrf AVDM4rpIKwIOq IOpWYD MAyFF6 WY
r HCF11NY V1lDL0.YI K,WLrrDCMnFW � �fi���a.�
----------- LEGEND C
YRNEarQy,ffi._ rIW DP]CaRSY1HfL8 NON,
1 Q
Ir —m—m— YllrCrf9Y
_I . la.0 N»ruw Sp TyrDnarr.rx DFFLNE ^^^^^^'^ —
sv
VUl �a,PE.W IR»•eMRYEescr
no,K. I'Ll v.00eaK' u»rR D»,aNs W<rEiaEIECIRau E
0 _ _.._ _ _ _ _ uewcoxrcw slcusnrErcE gy5 ��
g C Lj
Nae!»n Da.o»x. �._� uREEx,.rwrfAasr. 6R ___ T- �€ 9 B (LU
D �ICILIW r--.-- arxEMvn2,wo 1E X/1 =(V
IceEce,.E urNEEn rr�.}�{/Itp 'q ___ RrWrsNr»FK, 7}r,j��� I Y[I W J I`
M6aC1ttl4xINYW ( _ 1 tplE I BWEGWK( F� ]ir1'I�: r;1i E —J L)
cwcXE,EErsrruLrw ]¢ `8 Z
ssYtEM4CU.Snr1,M1-- .! ■e ' C
os,u nrmEnl .Neoc,EN.amwl _ _ _ _ w�lnw.n yam» _
.wrsw[,axuwE,lum,worYNu I s A—� i_ � W F
----- - '---------- - - - - IL
r srao Txv,a.r _ NA-! " y; ca O
rOEMun[ni I a m Ui C—�7
----_----- GRAPNIG SCALENORTH ;$ .� 'L— sa
N I m1 j� A 914.1]
nn DNuIEP1301.R
Tx S awN WRB
L nDna KPB
ACT AREA 13 1-•2P' .-.r m.r.n�W ",'.'d01, :':.i�s,au nr 1[cN�1�1 IMPACT AREA
DHTR !l DE�T/AILSS
1 I 5 8 ] 8 0 10 E^_<