Loading...
HomeMy WebLinkAbout20060794 Ver 2_Staff Comments_2009010606-0794v2 The Vineyards at Tuscan Phase II AML Comments January 6, 2009 1. Please provide a copy of the overall site plan that depicts the location of Phase 2 with regard to Phase 1. 2. Please provide diffuse flow measures for both the east and west sides of the stream crossing at Sta 15+50 and the Northeast quadrant of the stream crossing at Sta 00+75 of Chestnut Ridge Road. This includes complete level spreader supplement forms and all required items, available at: http://li2o.enr.state.nc.us/su/bnip forms.htm.