Loading...
HomeMy WebLinkAboutSW3170802_Plansheet (Set)_20171013PROP. BMP #2 (WETPOND) PROP. BMP #1 (SAND FILTER) P:\Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Design Drawings\Current\SHEETS\16157-SP.dwg, C0.0, 9/20/2017 4:16:08 PM, rrovillos, 1:1 Digitally signed by Anthony Brent Cowan Date: 2017.09.20 16:18:56-04'00' WEDDINGTON-MATTHEWS ROAD(SR #1344)H E M B Y R O A D (S R # 1 3 4 6 ) B E U L A H C H U R C H R O A D (S R # 1 3 4 6 ) BROM L E Y D R I V E FLOOD CERTIFICATION THIS IS TO CERTIFY THAT THE PROPERTY SHOWN ON THIS PLAT IS LOCATED WITHIN ZONE "X" ; AND IS NOT WITHIN A SPECIAL FLOOD HAZARD AREA AS SHOWN ON MAPS PREPARED BY THE FEDERAL EMERGENCY MANAGEMENT AGENCY, FEDERAL INSURANCE ADMINISTRATION, COMMUNITY NUMBER 3710447700L, DATED FEBRUARY 19,2014. P:\Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Design Drawings\Current\SHEETS\16157-GP.dwg, C1.0, 9/20/2017 11:34:40 AM, rrovillos, 1:1 Digitally signed by Anthony Brent Cowan Date: 2017.09.20 15:47:41-04'00' “” ’ “” ’ ’ P:\Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Design Drawings\Current\SHEETS\16157-SP.dwg, C1.1, 9/20/2017 9:49:12 AM, rrovillos, Digitally signed by Anthony Brent Cowan Date: 2017.09.20 16:05:07-04'00' P:\Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Design Drawings\Current\SHEETS\16157-SP.dwg, C1.2, 9/20/2017 1:41:33 PM, rrovillos, 1:1 Digitally signed by Anthony Brent Cowan Date: 2017.09.20 15:48:29-04'00' P:\Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Design Drawings\Current\SHEETS\16157-SP.dwg, C1.3, 9/20/2017 2:14:59 PM, rrovillos, 1:1 30' WALKING TRAIL ESMT. 30' WALKING TRAIL ESMT. Digitally signed by Anthony Brent Cowan Date: 2017.09.20 15:50:08-04'00' Digitally signed by Anthony Brent Cowan Date: 2017.09.20 12:24:38-04'00' Digitally signed by Anthony Brent Cowan Date: 2017.09.20 12:26:10-04'00' Digitally signed by Anthony Brent Cowan Date: 2017.09.20 12:26:32-04'00' Digitally signed by Anthony Brent Cowan Date: 2017.09.20 12:26:59-04'00' Digitally signed by Anthony Brent Cowan Date: 2017.09.20 12:27:24-04'00' Digitally signed by Anthony Brent Cowan Date: 2017.09.20 12:28:25-04'00' Digitally signed by Anthony Brent Cowan Date: 2017.09.20 12:28:51-04'00' Digitally signed by Anthony Brent Cowan Date: 2017.09.20 12:29:11-04'00' MATCHLINE "A"MATCHLINE "A"P:\Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Design Drawings\Current\SHEETS\16157-RP.dwg, C3.0, 9/19/2017 5:53:03 PM, rrovillos, 1:1 Digitally signed by Anthony Brent Cowan Date: 2017.09.20 12:29:54-04'00' MATCHLINE "A"MATCHLINE "A"P:\Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Design Drawings\Current\SHEETS\16157-RP.dwg, C3.1, 9/19/2017 5:50:25 PM, rrovillos, 1:1 Digitally signed by Anthony Brent Cowan Date: 2017.09.20 12:30:19-04'00' PROP. BMP #2 (WETPOND) PROP. BMP #1 (SAND FILTER) GLEN C O E D R . BRAEMER D R .DORNOCH DR . P:\Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Design Drawings\Current\SHEETS\16157-GP.dwg, C4.0, 9/20/2017 1:46:05 PM, rrovillos, 1:1 Digitally signed by Anthony Brent Cowan Date: 2017.09.20 15:51:36-04'00' MATCHLINE - (SEE SHT. C4.2 FOR CONTINUATION) P:\Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Design Drawings\Current\SHEETS\16157-GP.dwg, C4.1, 9/20/2017 1:48:26 PM, rrovillos, 1:1 Digitally signed by Anthony Brent Cowan Date: 2017.09.20 15:52:30-04'00' MATCHLINE - (SEE SHT. C4.1 FOR CONTINUATION)MATCHLINE - A (SEE INSET)INSET "A"MATCHLINE "A"MATCHLINE - (SEE SHT. C4.1 FOR CONTINUATION) P:\Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Design Drawings\Current\SHEETS\16157-GP.dwg, C4.2, 9/20/2017 2:07:15 PM, rrovillos, 1:1 Digitally signed by Anthony Brent Cowan Date: 2017.09.20 15:53:44-04'00' EMERGENCY SPILLWAY X-SECTION BMP #1 (SAND FILTER) BMP #1 OUTLET PIPE PROFILEOUTLET STRUCTURE ANTI-FLOTATION DEVICE DETAIL BEST MANAGEMENT PRACTICES SAND FILTER / DETENTION POND DETAILS SAND FILTER MEDIA SECTION BMP (SAND FILTER) FOREBAY BERM DETAIL CONCRETE ANTI-SEEP COLLAR TYPICAL DETAIL PIPE CRADLE DETAIL PIPE CRADLE JOINT SECTION E-EE P:\Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Design Drawings\Current\BASE\16157-B-BMP.dwg, C5.0-BMP 1, 9/20/2017 2:17:54 PM, rrovillos, 1:1 Digitally signed by Anthony Brent Cowan Date: 2017.09.20 15:54:53-04'00' EMERGENCY SPILLWAY X-SECTION BMP #1 (SAND FILTER) BMP #1 OUTLET PIPE PROFILEOUTLET STRUCTURE ANTI-FLOTATION DEVICE DETAIL BEST MANAGEMENT PRACTICES SAND FILTER / DETENTION POND DETAILS SAND FILTER MEDIA SECTION BMP (SAND FILTER) FOREBAY BERM DETAIL CONCRETE ANTI-SEEP COLLAR TYPICAL DETAIL PIPE CRADLE DETAIL PIPE CRADLE JOINT SECTION E-EE P:\Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Design Drawings\Current\BASE\16157-B-BMP.dwg, C5.0-BMP 1, 9/26/2017 9:55:42 AM, rrovillos, 1:1 Digitally signed by Anthony Brent Cowan Date: 2017.09.27 11:20:03-04'00' EMERGENCY SPILLWAY X-SECTION BMP #2 (WET POND) CONCRETE RISER DETAIL BMP#2 684.00 42" 683.90 693.17 692.50 688.50 8" 689.50 687.00 684.006" RISER PLAN VIEW FOREBAY SPILLWAY DETAIL SECTION A-A BMP #2 OUTLET PIPE PROFILE (SECTION A - A') POND SIDE VIEW (NORTH SIDE) SOUTH, EAST & WEST SIDE VIEW BMP #2 OUTLET STRUCTURE ORIFICE AND WEIR DETAIL PIPE CRADLE DETAIL PIPE CRADLE JOINT CONCRETE ANTI-SEEP COLLAR TYPICAL DETAIL SECTION E-EE PROP. BUFFER IMPACT CHANNEL FOR WETPOND BMP #2 OUTLET FLOW TO STREAM BMP #2 CROSS SECTION B - B' P:\Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Design Drawings\Current\BASE\16157-B-BMP.dwg, C5.1-BMP 2, 9/20/2017 2:23:01 PM, rrovillos, 1:1 Digitally signed by Anthony Brent Cowan Date: 2017.09.20 15:57:49-04'00' EMERGENCY SPILLWAY X-SECTION BMP #2 (WET POND) CONCRETE RISER DETAIL BMP#2 684.00 42" 683.90 693.17 692.50 688.50 8" 689.50 687.00 684.006" RISER PLAN VIEW FOREBAY SPILLWAY DETAIL SECTION A-A BMP #2 OUTLET PIPE PROFILE (SECTION A - A') POND SIDE VIEW (NORTH SIDE) SOUTH, EAST & WEST SIDE VIEW BMP #2 OUTLET STRUCTURE ORIFICE AND WEIR DETAIL PIPE CRADLE DETAIL PIPE CRADLE JOINT CONCRETE ANTI-SEEP COLLAR TYPICAL DETAIL SECTION E-EE PROP. BUFFER IMPACT CHANNEL FOR WETPOND BMP #2 OUTLET FLOW TO STREAM BMP #2 CROSS SECTION B - B' \\ISAACSGC01\Projects\Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Design Drawings\Current\BASE\16157-B-BMP.dwg, C5.1-BMP 2, 9/27/2017 1:49:09 PM, rrovillos, 1:1 Digitally signed by Anthony Brent Cowan Date: 2017.09.27 13:50:53-04'00' x x x x ZON E 1 ZON E 2 P:\Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Design Drawings\Current\BASE\16157-B-BMP.dwg, C5.2, 9/19/2017 5:02:44 PM, rrovillos, 1:1 Digitally signed by Anthony Brent Cowan Date: 2017.09.20 16:06:50-04'00'                              P:\Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Design Drawings\Current\DATA\16157-D-STM.dwg, C6.0, 9/19/2017 8:32:24 PM, rrovillos, Digitally signed by Anthony Brent Cowan Date: 2017.09.20 12:59:37-04'00'                             P:\Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Design Drawings\Current\BASE\16157-B-BMP.dwg, C6.1-PRE, 9/19/2017 5:15:55 PM, rrovillos, 1:1 Digitally signed by Anthony Brent Cowan Date: 2017.09.20 12:59:11-04'00'                             P:\Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Design Drawings\Current\BASE\16157-B-BMP.dwg, C6.2-POST, 9/20/2017 2:26:41 PM, rrovillos, 1:1 Digitally signed by Anthony Brent Cowan Date: 2017.09.20 15:58:38-04'00'                             P:\Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Design Drawings\Current\BASE\16157-B-BMP.dwg, C6.2-POST, 9/26/2017 10:31:51 AM, rrovillos, 1:1 Digitally signed by Anthony Brent Cowan Date: 2017.09.27 11:19:00-04'00' P:\Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Design Drawings\Current\DATA\16157-D-STM.dwg, C7.0, 9/19/2017 8:33:40 PM, rrovillos, 1:1 Digitally signed by Anthony Brent Cowan Date: 2017.09.20 13:19:31-04'00' P:\Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Design Drawings\Current\DATA\16157-D-STM.dwg, C7.1, 9/19/2017 8:34:59 PM, rrovillos, 1:1 Digitally signed by Anthony Brent Cowan Date: 2017.09.20 13:29:48-04'00' P:\Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Design Drawings\Current\DATA\16157-D-STM.dwg, C7.2, 9/20/2017 4:17:11 PM, rrovillos, 1:1 Digitally signed by Anthony Brent Cowan Date: 2017.09.20 16:18:37-04'00' MATCHLINE - (SEE SHEET C8.1 FOR CONTINUATION) WEDDINGTON-MATTHEWS ROAD (SR #1344) BMP#1 (SAND FILTER) OUTLET STRUCTURE W/ MOFIFICATION HEMBY ROAD(SR #1346)SEE MATCHLINE INSET "A"SEE MATCHLINE INSET "A"INSET "A" WEDDINGTON-MATTHEWS ROAD (SR #1344) P:\Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Design Drawings\Current\BASE\16157-B-EC.dwg, C8.0, 9/19/2017 8:23:23 PM, rrovillos, 1:1 TD Digitally signed by Anthony Brent Cowan Date: 2017.09.20 13:41:52-04'00' XXXXXXXX PRE-DEV. D.A.=7.34 ac. DIST. AREA=3.84 ac. SKIMMER BASIN #3 PRE-DEV. D.A.=4.44 ac. DIST. AREA=2.60 ac. SKIMMER BASIN #4 PRE-DEV. D.A.=5.43 ac. POST-DEV. D.A.=16.09 ac. DIST. AREA=7.25 ac. SKIMMER BASIN #5 D.A.=0.97 AC. D.A.=0.34 AC. LOT 17 LOT 18 LOT 19 LOT 20 LOT 21 LOT 22 LOT 23 LOT 24 LOT 25 LOT 26 LOT 27 LOT 28 LOT 29 LOT 30 LOT 31 LOT 32 LOT 33 LOT 34 LOT 35 SOUTH, EAST & WEST SIDE VIEW SKIMMER BASIN 2 AND BMP #2 OUTLET STRUCTURE ORIFICE AND WEIR DETAIL SEDIMENT BASIN PHASE POND SIDE VIEW NORTH SIDE NOTE: FOR ELEVATIONS, CONSTRUCTION DETAILS/SPECIFICATIONS ON THE BMP 2 OUTLET STRUCTURE, PIPE AND EMBANKMENT, SEE SHEET C5.1 MATCHLINE - (SEE SHEET C8.0 FOR CONTINUATION) SEE MATCHLINE INSET "A" SEE MATCHLINE INSET "A" INSET "A" NOTE: EXISTING DRIVEWAY TO HELMS PROPERTY TO REMAIN OPEN AT ALL TIMES. P:\Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Design Drawings\Current\BASE\16157-B-EC.dwg, C8.1, 9/20/2017 11:55:29 AM, rrovillos, 1:1 TD Digitally signed by Anthony Brent Cowan Date: 2017.09.20 13:33:50-04'00' XXXXXXXX PRE-DEV. D.A.=7.34 ac. DIST. AREA=3.84 ac. SKIMMER BASIN #3 PRE-DEV. D.A.=4.44 ac. DIST. AREA=2.60 ac. SKIMMER BASIN #4 PRE-DEV. D.A.=5.43 ac. POST-DEV. D.A.=16.09 ac. DIST. AREA=7.25 ac. SKIMMER BASIN #5 D.A.=0.97 AC. D.A.=0.34 AC. LOT 17 LOT 18 LOT 19 LOT 20 LOT 21 LOT 22 LOT 23 LOT 24 LOT 25 LOT 26 LOT 27 LOT 28 LOT 29 LOT 30 LOT 31 LOT 32 LOT 33 LOT 34 LOT 35 SOUTH, EAST & WEST SIDE VIEW SKIMMER BASIN 2 AND BMP #2 OUTLET STRUCTURE ORIFICE AND WEIR DETAIL SEDIMENT BASIN PHASE POND SIDE VIEW NORTH SIDE NOTE: FOR ELEVATIONS, CONSTRUCTION DETAILS/SPECIFICATIONS ON THE BMP 2 OUTLET STRUCTURE, PIPE AND EMBANKMENT, SEE SHEET C5.1 MATCHLINE - (SEE SHEET C8.0 FOR CONTINUATION) SEE MATCHLINE INSET "A" SEE MATCHLINE INSET "A" INSET "A" NOTE: EXISTING DRIVEWAY TO HELMS PROPERTY TO REMAIN OPEN AT ALL TIMES. P:\Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Design Drawings\Current\BASE\16157-B-EC.dwg, C8.1, 9/26/2017 1:34:29 PM, rrovillos, 1:1 Digitally signed by Anthony Brent Cowan Date: 2017.09.27 11:21:15-04'00' XXXXXXX X PRE-DEV. D.A.=5.40 ac. POST-DEV. D.A.=5.97 ac. DIST. AREA=4.80 ac. SKIMMER BASIN #1 PRE-DEV. D.A.=5.17 ac. POST-DEV. D.A.=5.10 ac. DIST. AREA=2.29 ac. SKIMMER BASIN #2 LOT 1 LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 LOT 7 LOT 8 LOT 9 LOT 10 LOT 11 LOT 12 LOT 13 LOT 14 LOT 15 LOT 16 LOT 17 LOT 18 LOT 35 MATCHLINE - (SEE SHEET C8.3 FOR CONTINUATION) WEDDINGTON-MATTHEWS ROAD (SR #1344)HEMBY ROAD(SR #1346)BMP#1 (SAND FILTER) OUTLET STRUCTURE W/ MOFIFICATION SEE MATCHLINE INSET "A"SEE MATCHLINE INSET "A"INSET "A" WEDDINGTON-MATTHEWS ROAD (SR #1344) P:\Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Design Drawings\Current\BASE\16157-B-EC.dwg, C8.2, 9/19/2017 8:16:26 PM, rrovillos, 1:1 Digitally signed by Anthony Brent Cowan Date: 2017.09.20 13:43:17-04'00' XXXXXXXX PRE-DEV. D.A.=7.34 ac. DIST. AREA=3.84 ac. SKIMMER BASIN #3 PRE-DEV. D.A.=4.44 ac. DIST. AREA=2.60 ac. SKIMMER BASIN #4 PRE-DEV. D.A.=5.43 ac. POST-DEV. D.A.=16.09 ac. DIST. AREA=7.25 ac. SKIMMER BASIN #5 D.A.=0.97 AC. D.A.=0.34 AC. LOT 17 LOT 18 LOT 19 LOT 20 LOT 21 LOT 22 LOT 23 LOT 24 LOT 25 LOT 26 LOT 27 LOT 28 LOT 29 LOT 30 LOT 31 LOT 32 LOT 33 LOT 34 LOT 35 MATCHLINE - (SEE SHEET C8.0 FOR CONTINUATION) SOUTH, EAST & WEST SIDE VIEW SKIMMER BASIN 2 AND BMP #2 OUTLET STRUCTURE ORIFICE AND WEIR DETAIL SEDIMENT BASIN PHASE NOTE: FOR ELEVATIONS, CONSTRUCTION DETAILS/SPECIFICATIONS ON THE BMP 2 OUTLET STRUCTURE, PIPE AND EMBANKMENT, SEE SHEET C5.1 SEE MATCHLINE INSET "A" SEE MATCHLINE INSET "A" INSET "A" NOTE: EXISTING DRIVEWAY TO HELMS PROPERTY TO REMAIN OPEN AT ALL TIMES. POND SIDE VIEW NORTH SIDE P:\Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Design Drawings\Current\BASE\16157-B-EC.dwg, C8.3, 9/20/2017 11:54:30 AM, rrovillos, 1:1 Digitally signed by Anthony Brent Cowan Date: 2017.09.20 13:43:59-04'00' XXXXXXXX PRE-DEV. D.A.=7.34 ac. DIST. AREA=3.84 ac. SKIMMER BASIN #3 PRE-DEV. D.A.=4.44 ac. DIST. AREA=2.60 ac. SKIMMER BASIN #4 PRE-DEV. D.A.=5.43 ac. POST-DEV. D.A.=16.09 ac. DIST. AREA=7.25 ac. SKIMMER BASIN #5 D.A.=0.97 AC. D.A.=0.34 AC. LOT 17 LOT 18 LOT 19 LOT 20 LOT 21 LOT 22 LOT 23 LOT 24 LOT 25 LOT 26 LOT 27 LOT 28 LOT 29 LOT 30 LOT 31 LOT 32 LOT 33 LOT 34 LOT 35 MATCHLINE - (SEE SHEET C8.0 FOR CONTINUATION) SOUTH, EAST & WEST SIDE VIEW SKIMMER BASIN 2 AND BMP #2 OUTLET STRUCTURE ORIFICE AND WEIR DETAIL SEDIMENT BASIN PHASE NOTE: FOR ELEVATIONS, CONSTRUCTION DETAILS/SPECIFICATIONS ON THE BMP 2 OUTLET STRUCTURE, PIPE AND EMBANKMENT, SEE SHEET C5.1 SEE MATCHLINE INSET "A" SEE MATCHLINE INSET "A" INSET "A" NOTE: EXISTING DRIVEWAY TO HELMS PROPERTY TO REMAIN OPEN AT ALL TIMES. POND SIDE VIEW NORTH SIDE P:\Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Design Drawings\Current\BASE\16157-B-EC.dwg, C8.3, 9/26/2017 1:35:34 PM, rrovillos, 1:1 Digitally signed by Anthony Brent Cowan Date: 2017.09.27 11:20:37-04'00' IMPERVIOUS DIKE NOTES: CONSTRUCTION SEQUENCE FOR STREAM CROSSING: CONSTRUCTION SEQUENCE FOR IMPERVIOUS DIKE:7067 0 3 7037 0 6 7067037037 0 6 70170 4 70 2 70170 4 70 2 P:\Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Design Drawings\Current\BASE\16157-B-EC.dwg, C8.4, 9/20/2017 2:31:18 PM, rrovillos, 1:1 Digitally signed by Anthony Brent Cowan Date: 2017.09.20 15:59:12-04'00' P:\Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Design Drawings\Current\SHEETS\16157-DE.dwg, C9.0, 9/19/2017 5:29:06 PM, rrovillos, 1:1 Digitally signed by Anthony Brent Cowan Date: 2017.09.20 14:19:16-04'00' P:\Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Design Drawings\Current\SHEETS\16157-DE.dwg, C9.1, 9/19/2017 5:29:06 PM, rrovillos, 1:1 Digitally signed by Anthony Brent Cowan Date: 2017.09.20 14:19:36-04'00' x x x P:\Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Design Drawings\Current\SHEETS\16157-DE.dwg, C9.2, 9/19/2017 5:29:09 PM, rrovillos, 1:1 Digitally signed by Anthony Brent Cowan Date: 2017.09.20 14:19:53-04'00'  P:\Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Design Drawings\Current\SHEETS\16157-DE.dwg, C9.3, 9/19/2017 5:29:11 PM, rrovillos, 1:1 Digitally signed by Anthony Brent Cowan Date: 2017.09.20 14:18:34-04'00' P:\Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Design Drawings\Current\SHEETS\16157-DE.dwg, C9.4, 9/19/2017 5:29:13 PM, rrovillos, 1:1 Digitally signed by Anthony Brent Cowan Date: 2017.09.20 14:17:43-04'00' P:\Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Design Drawings\Current\SHEETS\16157-DE.dwg, C9.4, 9/26/2017 1:37:01 PM, rrovillos, 1:1 Digitally signed by Anthony Brent Cowan Date: 2017.09.27 11:20:59-04'00' ³P:\Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Design Drawings\Current\SHEETS\16157-DE.dwg, C9.5, 9/20/2017 6:34:01 AM, rrovillos, 1:1 Digitally signed by Anthony Brent Cowan Date: 2017.09.20 14:18:04-04'00' P:\Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Design Drawings\Current\SHEETS\16157-DE.dwg, C9.6, 9/20/2017 2:11:52 PM, bcowan, 1:1 Digitally signed by Anthony Brent Cowan Date: 2017.09.20 14:18:53-04'00'