HomeMy WebLinkAboutSW3170802_Plansheet (Set)_20171013PROP. BMP #2
(WETPOND)
PROP. BMP #1
(SAND FILTER)
P:\Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Design Drawings\Current\SHEETS\16157-SP.dwg, C0.0, 9/20/2017 4:16:08 PM, rrovillos, 1:1
Digitally signed by
Anthony Brent
Cowan
Date: 2017.09.20
16:18:56-04'00'
WEDDINGTON-MATTHEWS ROAD(SR #1344)H
E
M
B
Y
R
O
A
D
(S
R
#
1
3
4
6
)
B
E
U
L
A
H
C
H
U
R
C
H
R
O
A
D
(S
R
#
1
3
4
6
)
BROM
L
E
Y
D
R
I
V
E
FLOOD CERTIFICATION
THIS IS TO CERTIFY THAT THE PROPERTY SHOWN ON THIS
PLAT IS LOCATED WITHIN ZONE "X" ; AND IS NOT WITHIN A
SPECIAL FLOOD HAZARD AREA AS SHOWN ON MAPS
PREPARED BY THE FEDERAL EMERGENCY MANAGEMENT
AGENCY, FEDERAL INSURANCE ADMINISTRATION, COMMUNITY
NUMBER 3710447700L, DATED FEBRUARY 19,2014.
P:\Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Design Drawings\Current\SHEETS\16157-GP.dwg, C1.0, 9/20/2017 11:34:40 AM, rrovillos, 1:1
Digitally signed by
Anthony Brent Cowan
Date: 2017.09.20
15:47:41-04'00'
“”
’
“”
’
’ P:\Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Design Drawings\Current\SHEETS\16157-SP.dwg, C1.1, 9/20/2017 9:49:12 AM, rrovillos,
Digitally signed by
Anthony Brent
Cowan
Date: 2017.09.20
16:05:07-04'00'
P:\Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Design Drawings\Current\SHEETS\16157-SP.dwg, C1.2, 9/20/2017 1:41:33 PM, rrovillos, 1:1
Digitally signed
by Anthony
Brent Cowan
Date:
2017.09.20
15:48:29-04'00'
P:\Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Design Drawings\Current\SHEETS\16157-SP.dwg, C1.3, 9/20/2017 2:14:59 PM, rrovillos, 1:1
30' WALKING TRAIL ESMT.
30' WALKING TRAIL ESMT.
Digitally signed by
Anthony Brent Cowan
Date: 2017.09.20
15:50:08-04'00'
Digitally signed by
Anthony Brent Cowan
Date: 2017.09.20
12:24:38-04'00'
Digitally signed by
Anthony Brent Cowan
Date: 2017.09.20
12:26:10-04'00'
Digitally signed by
Anthony Brent Cowan
Date: 2017.09.20
12:26:32-04'00'
Digitally signed by
Anthony Brent
Cowan
Date: 2017.09.20
12:26:59-04'00'
Digitally signed by
Anthony Brent
Cowan
Date: 2017.09.20
12:27:24-04'00'
Digitally signed by
Anthony Brent Cowan
Date: 2017.09.20
12:28:25-04'00'
Digitally signed by
Anthony Brent Cowan
Date: 2017.09.20
12:28:51-04'00'
Digitally signed by
Anthony Brent
Cowan
Date: 2017.09.20
12:29:11-04'00'
MATCHLINE "A"MATCHLINE "A"P:\Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Design Drawings\Current\SHEETS\16157-RP.dwg, C3.0, 9/19/2017 5:53:03 PM, rrovillos, 1:1
Digitally signed by
Anthony Brent
Cowan
Date: 2017.09.20
12:29:54-04'00'
MATCHLINE "A"MATCHLINE "A"P:\Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Design Drawings\Current\SHEETS\16157-RP.dwg, C3.1, 9/19/2017 5:50:25 PM, rrovillos, 1:1
Digitally signed by
Anthony Brent Cowan
Date: 2017.09.20
12:30:19-04'00'
PROP. BMP #2
(WETPOND)
PROP. BMP #1
(SAND FILTER)
GLEN
C
O
E
D
R
.
BRAEMER
D
R
.DORNOCH DR
.
P:\Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Design Drawings\Current\SHEETS\16157-GP.dwg, C4.0, 9/20/2017 1:46:05 PM, rrovillos, 1:1
Digitally signed by
Anthony Brent
Cowan
Date: 2017.09.20
15:51:36-04'00'
MATCHLINE - (SEE SHT. C4.2 FOR CONTINUATION)
P:\Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Design Drawings\Current\SHEETS\16157-GP.dwg, C4.1, 9/20/2017 1:48:26 PM, rrovillos, 1:1
Digitally signed by
Anthony Brent Cowan
Date: 2017.09.20
15:52:30-04'00'
MATCHLINE - (SEE SHT. C4.1 FOR CONTINUATION)MATCHLINE - A (SEE INSET)INSET "A"MATCHLINE "A"MATCHLINE - (SEE SHT. C4.1 FOR CONTINUATION)
P:\Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Design Drawings\Current\SHEETS\16157-GP.dwg, C4.2, 9/20/2017 2:07:15 PM, rrovillos, 1:1
Digitally signed by
Anthony Brent Cowan
Date: 2017.09.20
15:53:44-04'00'
EMERGENCY SPILLWAY X-SECTION
BMP #1 (SAND FILTER)
BMP #1 OUTLET PIPE PROFILEOUTLET STRUCTURE
ANTI-FLOTATION DEVICE DETAIL
BEST MANAGEMENT PRACTICES SAND FILTER / DETENTION POND DETAILS
SAND FILTER MEDIA SECTION
BMP (SAND FILTER) FOREBAY BERM DETAIL
CONCRETE ANTI-SEEP COLLAR TYPICAL DETAIL
PIPE CRADLE DETAIL
PIPE CRADLE JOINT
SECTION E-EE
P:\Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Design Drawings\Current\BASE\16157-B-BMP.dwg, C5.0-BMP 1, 9/20/2017 2:17:54 PM, rrovillos, 1:1
Digitally signed by
Anthony Brent Cowan
Date: 2017.09.20
15:54:53-04'00'
EMERGENCY SPILLWAY X-SECTION
BMP #1 (SAND FILTER)
BMP #1 OUTLET PIPE PROFILEOUTLET STRUCTURE
ANTI-FLOTATION DEVICE DETAIL
BEST MANAGEMENT PRACTICES SAND FILTER / DETENTION POND DETAILS
SAND FILTER MEDIA SECTION
BMP (SAND FILTER) FOREBAY BERM DETAIL
CONCRETE ANTI-SEEP COLLAR TYPICAL DETAIL
PIPE CRADLE DETAIL
PIPE CRADLE JOINT
SECTION E-EE
P:\Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Design Drawings\Current\BASE\16157-B-BMP.dwg, C5.0-BMP 1, 9/26/2017 9:55:42 AM, rrovillos, 1:1
Digitally signed by
Anthony Brent Cowan
Date: 2017.09.27
11:20:03-04'00'
EMERGENCY SPILLWAY X-SECTION
BMP #2 (WET POND)
CONCRETE RISER DETAIL BMP#2
684.00
42"
683.90
693.17
692.50
688.50
8"
689.50
687.00
684.006"
RISER PLAN VIEW
FOREBAY SPILLWAY DETAIL SECTION A-A
BMP #2 OUTLET PIPE PROFILE (SECTION A - A')
POND SIDE VIEW (NORTH SIDE)
SOUTH, EAST & WEST SIDE VIEW
BMP #2 OUTLET STRUCTURE
ORIFICE AND WEIR DETAIL PIPE CRADLE DETAIL
PIPE CRADLE JOINT
CONCRETE ANTI-SEEP COLLAR TYPICAL DETAIL
SECTION E-EE
PROP. BUFFER IMPACT CHANNEL
FOR WETPOND BMP #2 OUTLET FLOW TO STREAM
BMP #2 CROSS SECTION B - B'
P:\Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Design Drawings\Current\BASE\16157-B-BMP.dwg, C5.1-BMP 2, 9/20/2017 2:23:01 PM, rrovillos, 1:1
Digitally signed by
Anthony Brent
Cowan
Date: 2017.09.20
15:57:49-04'00'
EMERGENCY SPILLWAY X-SECTION
BMP #2 (WET POND)
CONCRETE RISER DETAIL BMP#2
684.00
42"
683.90
693.17
692.50
688.50
8"
689.50
687.00
684.006"
RISER PLAN VIEW
FOREBAY SPILLWAY DETAIL SECTION A-A
BMP #2 OUTLET PIPE PROFILE (SECTION A - A')
POND SIDE VIEW (NORTH SIDE)
SOUTH, EAST & WEST SIDE VIEW
BMP #2 OUTLET STRUCTURE
ORIFICE AND WEIR DETAIL PIPE CRADLE DETAIL
PIPE CRADLE JOINT
CONCRETE ANTI-SEEP COLLAR TYPICAL DETAIL
SECTION E-EE
PROP. BUFFER IMPACT CHANNEL
FOR WETPOND BMP #2 OUTLET FLOW TO STREAM
BMP #2 CROSS SECTION B - B'
\\ISAACSGC01\Projects\Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Design Drawings\Current\BASE\16157-B-BMP.dwg, C5.1-BMP 2, 9/27/2017 1:49:09 PM, rrovillos, 1:1
Digitally signed
by Anthony Brent
Cowan
Date: 2017.09.27
13:50:53-04'00'
x
x
x
x
ZON
E
1
ZON
E
2
P:\Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Design Drawings\Current\BASE\16157-B-BMP.dwg, C5.2, 9/19/2017 5:02:44 PM, rrovillos, 1:1
Digitally signed by
Anthony Brent
Cowan
Date: 2017.09.20
16:06:50-04'00'
P:\Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Design Drawings\Current\DATA\16157-D-STM.dwg, C6.0, 9/19/2017 8:32:24 PM, rrovillos,
Digitally signed by
Anthony Brent Cowan
Date: 2017.09.20
12:59:37-04'00'
P:\Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Design Drawings\Current\BASE\16157-B-BMP.dwg, C6.1-PRE, 9/19/2017 5:15:55 PM, rrovillos, 1:1
Digitally signed by
Anthony Brent Cowan
Date: 2017.09.20
12:59:11-04'00'
P:\Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Design Drawings\Current\BASE\16157-B-BMP.dwg, C6.2-POST, 9/20/2017 2:26:41 PM, rrovillos, 1:1
Digitally signed by
Anthony Brent Cowan
Date: 2017.09.20
15:58:38-04'00'
P:\Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Design Drawings\Current\BASE\16157-B-BMP.dwg, C6.2-POST, 9/26/2017 10:31:51 AM, rrovillos, 1:1
Digitally signed by
Anthony Brent Cowan
Date: 2017.09.27
11:19:00-04'00'
P:\Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Design Drawings\Current\DATA\16157-D-STM.dwg, C7.0, 9/19/2017 8:33:40 PM, rrovillos, 1:1
Digitally signed by
Anthony Brent Cowan
Date: 2017.09.20
13:19:31-04'00'
P:\Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Design Drawings\Current\DATA\16157-D-STM.dwg, C7.1, 9/19/2017 8:34:59 PM, rrovillos, 1:1
Digitally signed by
Anthony Brent Cowan
Date: 2017.09.20
13:29:48-04'00'
P:\Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Design Drawings\Current\DATA\16157-D-STM.dwg, C7.2, 9/20/2017 4:17:11 PM, rrovillos, 1:1
Digitally signed by
Anthony Brent
Cowan
Date: 2017.09.20
16:18:37-04'00'
MATCHLINE - (SEE SHEET C8.1 FOR CONTINUATION)
WEDDINGTON-MATTHEWS ROAD
(SR #1344)
BMP#1 (SAND FILTER) OUTLET STRUCTURE W/ MOFIFICATION
HEMBY ROAD(SR #1346)SEE MATCHLINE INSET "A"SEE MATCHLINE INSET "A"INSET "A"
WEDDINGTON-MATTHEWS ROAD
(SR #1344)
P:\Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Design Drawings\Current\BASE\16157-B-EC.dwg, C8.0, 9/19/2017 8:23:23 PM, rrovillos, 1:1
TD
Digitally signed by
Anthony Brent Cowan
Date: 2017.09.20
13:41:52-04'00'
XXXXXXXX
PRE-DEV. D.A.=7.34 ac.
DIST. AREA=3.84 ac.
SKIMMER BASIN #3
PRE-DEV. D.A.=4.44 ac.
DIST. AREA=2.60 ac.
SKIMMER BASIN #4
PRE-DEV. D.A.=5.43 ac.
POST-DEV. D.A.=16.09 ac.
DIST. AREA=7.25 ac.
SKIMMER BASIN #5
D.A.=0.97 AC.
D.A.=0.34 AC.
LOT 17
LOT 18
LOT 19
LOT 20
LOT 21
LOT 22
LOT 23
LOT 24
LOT 25
LOT 26
LOT 27
LOT 28
LOT 29
LOT 30
LOT 31
LOT 32
LOT 33
LOT 34
LOT 35
SOUTH, EAST & WEST SIDE VIEW
SKIMMER BASIN 2 AND BMP #2 OUTLET STRUCTURE
ORIFICE AND WEIR DETAIL
SEDIMENT BASIN PHASE
POND SIDE VIEW NORTH SIDE
NOTE: FOR ELEVATIONS, CONSTRUCTION DETAILS/SPECIFICATIONS
ON THE BMP 2 OUTLET STRUCTURE, PIPE AND EMBANKMENT,
SEE SHEET C5.1
MATCHLINE - (SEE SHEET C8.0 FOR CONTINUATION)
SEE MATCHLINE INSET "A"
SEE MATCHLINE INSET "A"
INSET "A"
NOTE:
EXISTING DRIVEWAY TO HELMS PROPERTY
TO REMAIN OPEN AT ALL TIMES.
P:\Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Design Drawings\Current\BASE\16157-B-EC.dwg, C8.1, 9/20/2017 11:55:29 AM, rrovillos, 1:1
TD
Digitally signed by
Anthony Brent
Cowan
Date: 2017.09.20
13:33:50-04'00'
XXXXXXXX
PRE-DEV. D.A.=7.34 ac.
DIST. AREA=3.84 ac.
SKIMMER BASIN #3
PRE-DEV. D.A.=4.44 ac.
DIST. AREA=2.60 ac.
SKIMMER BASIN #4
PRE-DEV. D.A.=5.43 ac.
POST-DEV. D.A.=16.09 ac.
DIST. AREA=7.25 ac.
SKIMMER BASIN #5
D.A.=0.97 AC.
D.A.=0.34 AC.
LOT 17
LOT 18
LOT 19
LOT 20
LOT 21
LOT 22
LOT 23
LOT 24
LOT 25
LOT 26
LOT 27
LOT 28
LOT 29
LOT 30
LOT 31
LOT 32
LOT 33
LOT 34
LOT 35
SOUTH, EAST & WEST SIDE VIEW
SKIMMER BASIN 2 AND BMP #2 OUTLET STRUCTURE
ORIFICE AND WEIR DETAIL
SEDIMENT BASIN PHASE
POND SIDE VIEW NORTH SIDE
NOTE: FOR ELEVATIONS, CONSTRUCTION DETAILS/SPECIFICATIONS
ON THE BMP 2 OUTLET STRUCTURE, PIPE AND EMBANKMENT,
SEE SHEET C5.1
MATCHLINE - (SEE SHEET C8.0 FOR CONTINUATION)
SEE MATCHLINE INSET "A"
SEE MATCHLINE INSET "A"
INSET "A"
NOTE:
EXISTING DRIVEWAY TO HELMS PROPERTY
TO REMAIN OPEN AT ALL TIMES.
P:\Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Design Drawings\Current\BASE\16157-B-EC.dwg, C8.1, 9/26/2017 1:34:29 PM, rrovillos, 1:1
Digitally signed by
Anthony Brent Cowan
Date: 2017.09.27
11:21:15-04'00'
XXXXXXX
X
PRE-DEV. D.A.=5.40 ac.
POST-DEV. D.A.=5.97 ac.
DIST. AREA=4.80 ac.
SKIMMER BASIN #1
PRE-DEV. D.A.=5.17 ac.
POST-DEV. D.A.=5.10 ac.
DIST. AREA=2.29 ac.
SKIMMER BASIN #2
LOT 1
LOT 1
LOT 2
LOT 3
LOT 4
LOT 5
LOT 6
LOT 7
LOT 8
LOT 9
LOT 10
LOT 11
LOT 12
LOT 13
LOT 14
LOT 15
LOT 16
LOT 17
LOT 18
LOT 35
MATCHLINE - (SEE SHEET C8.3 FOR CONTINUATION)
WEDDINGTON-MATTHEWS ROAD
(SR #1344)HEMBY ROAD(SR #1346)BMP#1 (SAND FILTER) OUTLET STRUCTURE W/ MOFIFICATION
SEE MATCHLINE INSET "A"SEE MATCHLINE INSET "A"INSET "A"
WEDDINGTON-MATTHEWS ROAD
(SR #1344)
P:\Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Design Drawings\Current\BASE\16157-B-EC.dwg, C8.2, 9/19/2017 8:16:26 PM, rrovillos, 1:1
Digitally signed by
Anthony Brent
Cowan
Date: 2017.09.20
13:43:17-04'00'
XXXXXXXX
PRE-DEV. D.A.=7.34 ac.
DIST. AREA=3.84 ac.
SKIMMER BASIN #3
PRE-DEV. D.A.=4.44 ac.
DIST. AREA=2.60 ac.
SKIMMER BASIN #4
PRE-DEV. D.A.=5.43 ac.
POST-DEV. D.A.=16.09 ac.
DIST. AREA=7.25 ac.
SKIMMER BASIN #5
D.A.=0.97 AC.
D.A.=0.34 AC.
LOT 17
LOT 18
LOT 19
LOT 20
LOT 21
LOT 22
LOT 23
LOT 24
LOT 25
LOT 26
LOT 27
LOT 28
LOT 29
LOT 30
LOT 31
LOT 32
LOT 33
LOT 34
LOT 35
MATCHLINE - (SEE SHEET C8.0 FOR CONTINUATION)
SOUTH, EAST & WEST SIDE VIEW
SKIMMER BASIN 2 AND BMP #2 OUTLET STRUCTURE
ORIFICE AND WEIR DETAIL
SEDIMENT BASIN PHASE
NOTE: FOR ELEVATIONS, CONSTRUCTION
DETAILS/SPECIFICATIONS ON THE BMP 2 OUTLET
STRUCTURE, PIPE AND EMBANKMENT, SEE SHEET
C5.1
SEE MATCHLINE INSET "A"
SEE MATCHLINE INSET "A"
INSET "A"
NOTE:
EXISTING DRIVEWAY TO HELMS PROPERTY
TO REMAIN OPEN AT ALL TIMES.
POND SIDE VIEW NORTH SIDE
P:\Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Design Drawings\Current\BASE\16157-B-EC.dwg, C8.3, 9/20/2017 11:54:30 AM, rrovillos, 1:1
Digitally signed by
Anthony Brent
Cowan
Date: 2017.09.20
13:43:59-04'00'
XXXXXXXX
PRE-DEV. D.A.=7.34 ac.
DIST. AREA=3.84 ac.
SKIMMER BASIN #3
PRE-DEV. D.A.=4.44 ac.
DIST. AREA=2.60 ac.
SKIMMER BASIN #4
PRE-DEV. D.A.=5.43 ac.
POST-DEV. D.A.=16.09 ac.
DIST. AREA=7.25 ac.
SKIMMER BASIN #5
D.A.=0.97 AC.
D.A.=0.34 AC.
LOT 17
LOT 18
LOT 19
LOT 20
LOT 21
LOT 22
LOT 23
LOT 24
LOT 25
LOT 26
LOT 27
LOT 28
LOT 29
LOT 30
LOT 31
LOT 32
LOT 33
LOT 34
LOT 35
MATCHLINE - (SEE SHEET C8.0 FOR CONTINUATION)
SOUTH, EAST & WEST SIDE VIEW
SKIMMER BASIN 2 AND BMP #2 OUTLET STRUCTURE
ORIFICE AND WEIR DETAIL
SEDIMENT BASIN PHASE
NOTE: FOR ELEVATIONS, CONSTRUCTION
DETAILS/SPECIFICATIONS ON THE BMP 2 OUTLET
STRUCTURE, PIPE AND EMBANKMENT, SEE SHEET
C5.1
SEE MATCHLINE INSET "A"
SEE MATCHLINE INSET "A"
INSET "A"
NOTE:
EXISTING DRIVEWAY TO HELMS PROPERTY
TO REMAIN OPEN AT ALL TIMES.
POND SIDE VIEW NORTH SIDE
P:\Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Design Drawings\Current\BASE\16157-B-EC.dwg, C8.3, 9/26/2017 1:35:34 PM, rrovillos, 1:1
Digitally signed by
Anthony Brent
Cowan
Date: 2017.09.27
11:20:37-04'00'
IMPERVIOUS DIKE NOTES:
CONSTRUCTION SEQUENCE FOR STREAM CROSSING:
CONSTRUCTION SEQUENCE FOR IMPERVIOUS DIKE:7067
0
3
7037
0
6
7067037037
0
6 70170
4
70
2
70170
4
70
2
P:\Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Design Drawings\Current\BASE\16157-B-EC.dwg, C8.4, 9/20/2017 2:31:18 PM, rrovillos, 1:1
Digitally signed by
Anthony Brent Cowan
Date: 2017.09.20
15:59:12-04'00'
P:\Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Design Drawings\Current\SHEETS\16157-DE.dwg, C9.0, 9/19/2017 5:29:06 PM, rrovillos, 1:1
Digitally signed by
Anthony Brent
Cowan
Date: 2017.09.20
14:19:16-04'00'
P:\Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Design Drawings\Current\SHEETS\16157-DE.dwg, C9.1, 9/19/2017 5:29:06 PM, rrovillos, 1:1
Digitally signed by
Anthony Brent
Cowan
Date: 2017.09.20
14:19:36-04'00'
x
x
x
P:\Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Design Drawings\Current\SHEETS\16157-DE.dwg, C9.2, 9/19/2017 5:29:09 PM, rrovillos, 1:1
Digitally signed by
Anthony Brent
Cowan
Date: 2017.09.20
14:19:53-04'00'
P:\Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Design Drawings\Current\SHEETS\16157-DE.dwg, C9.3, 9/19/2017 5:29:11 PM, rrovillos, 1:1
Digitally signed by
Anthony Brent Cowan
Date: 2017.09.20
14:18:34-04'00'
P:\Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Design Drawings\Current\SHEETS\16157-DE.dwg, C9.4, 9/19/2017 5:29:13 PM, rrovillos, 1:1
Digitally signed by
Anthony Brent Cowan
Date: 2017.09.20
14:17:43-04'00'
P:\Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Design Drawings\Current\SHEETS\16157-DE.dwg, C9.4, 9/26/2017 1:37:01 PM, rrovillos, 1:1
Digitally signed by
Anthony Brent Cowan
Date: 2017.09.27
11:20:59-04'00'
³P:\Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Design Drawings\Current\SHEETS\16157-DE.dwg, C9.5, 9/20/2017 6:34:01 AM, rrovillos, 1:1
Digitally signed by
Anthony Brent Cowan
Date: 2017.09.20
14:18:04-04'00'
P:\Active Projects\Hopper Communities\Weddington Matthews Rd Dev 16157\Engineering\Design Drawings\Current\SHEETS\16157-DE.dwg, C9.6, 9/20/2017 2:11:52 PM, bcowan, 1:1
Digitally signed by
Anthony Brent
Cowan
Date: 2017.09.20
14:18:53-04'00'