HomeMy WebLinkAboutNC0024295_Comments Response for Primnary Review_20171011�andDesign 223 North Graham Street Charlotte, NC 28202, PROJECT 1014381 CONNESTEE FALLS - DATE 10/11/2017 CWS 1014381 SUBJECT Connestee Falls WWTP #1 TRANSMITTAL ID 00006 NCO024295 PURPOSE For your review and comment VIA Overnight FROM ECEIV _DINCDEQIDWR OCT 12 2017 w�tel uUdllLy �erm►iting Section NAME COMPANY EMAIL PHONE Steven Bond v 223 North Graham Street LandDesign, Inc - sbond@landdesign com 704-333-0325 Charlotte, NC 28202 Charlotte TO NAME COMPANY EMAIL PHONE Bing Bal Archdale Building, NCDEQ/DWR NC DEQ / Division of 1617 Mail Service Center Water Resources / Bing Bai@ncdenr.gov (919) 807-6389 Water Quality Raleigh, NC, 27699-1617 Permitting United States of America REMARKS Mr. Bal, Please find enclosed the response to your preliminary comments and the revised sheets. Steve Bond Page 1 of 2 Transmittal DATE 10/11/2017 TRANSMITTAL ID 00006 DESCRIPTION OF CONTENTS QTY DATED TITLE NOTES 1 10/11/2017 C1 0 pdf 1 10/11/2017 C3 0 pdf 1 10/11/2017 C9 0 pdf 1 1 10/11/2017 10/11/2017 C9 1 pdf C9.2.pdf j 1 10/11/2017 C10 0 pdf 1 10/11/2017 C10.1.pdf 1 10/11/2017 C10 2 pdf 1 10/4/2017 Comment Response_10 3 2017 pdf Page 2 of 2 LaudDesign. CREATING PLACES THAT MATTER Tuesday, October 3, 2017 Bing Bal, Ph D Engineer NPDES Complex Permitting NC DEQ / Division of Water Resources / Water Quality Permitting 1617 Mail Service Center, Raleigh, NC, 27699-1617 Comment Response For Preliminary Review of the application for Authorization to Construct for the Connestee Falls WWTP #1 comments dated 9/29/217 Dear Mr Bai, Listed below in red are LandDesign's responses to the review Comment Drawings Chapter 9 and 10 were not submitted Please submit all missing documents/drawings The missing drawings are enclosed Chapter 10 was mistakenly left out of the documents that were sent The Chapter 9 drawing sheets are the General Arrangement Drawings provided by the manufacturer I have added the LandDesign title block to these sheets to be consistent and avoid confusion Comment Please describe how the EQ basin operates such as to maintain continuous flow to filters and maintain low level for each SBR cycle to gravity decant in a timely fashion You show that each reactor will recycle 4 times a day which means the EQ basin must be available for decanting Continuous flow may not be maintained to the filter and UV systems during periods of very low flow Each filter and UV unit controls outflow by means of a weir If there is no inflow to the filter the water level is maintained above the cloth media until flow resumes If there is no inflow to the UV unit, the water level is maintained above the lamps until flow resumes Enclosed are additional calculations showing the flows into and out of the Post EQ basin at the design flowrate Flow out of the tank is controlled by means of a modulating plug valve and electromagnetic flow meter The plug valve will be controlled through the SBR control panel to ensure that the flow to the filters is released at a rate similar to the plant influent rate while ensuring that there is sufficient space available when each reactor begins a decant cycle The total cycle time per SBR batch is 6 hours A reactor receives influent flow for the first 3 hours The react, settle and decant phases occur over the remaining 3 hours While one reactor is filling, treatment processes are occurring in the other There is no shortening of the LANDDESIGN.COM 223 N GRAHAM STREET - CHARLOTTE NC 28802 - 704 333 0325 CHARLOTTE - WASHINGTON DC - DALLAS - ORLANDO - SAN FRANCISCO SBR cycle times for plant Influent flows up to 0 54 MGD This means that the Post EQ can be allowed to decant at a rate approximately equal to the reactor influent rate because there are 3 hours between SBR decant cycles At the permitted flow of 0 36 MGD, Influent enters each SBR reactor at 250 gallons per minute The fill cycle time is 3 hours per SBR batch The total volume of a batch at the permitted flow Is 45,000 gallons (250 gpm x 3 hr x 60 min/hr) The working height in the Post EQ tank is the difference between the level that flow enters the tank and the low water level (LWL) The LWL in the Post EQ Is determined by the water surface elevation of the cloth media filter For the purpose of the Post EQ hydraulic calculations, the LWL is assumed to be the level of the overflow weir in the filter Under normal operating conditions up to and Including the peak flow of 0 90 MGD, the water level in the filter will not reach this elevation The maximum height between this elevation and the Inlet from the SBR reactors Is 8 58 feet This equates to a working storage volume of 73,489 gal The decant rate from the SBR reactor to the Post EQ Is approximately 15,000 gpm At this rate, it will require 30 minutes for a 45,000 gallon batch to decant from the SBR Into the Post EQ tank Assuming that the flow out of the Post EQ to the filters begins as soon as decant begins and is equal to the SBR Influent rate of 250 gpm, the maximum water level In the Post EQ tank will be approximately 4 8 feet above the LWL 56% of the working storage volume will have been used at his level At 0 54 MGD (375 gpm) the total SBR batch volume is 67,500 gallons (375 gpm x 3 hr x 60 min/hr) It will require 45 minute to decant the SBR to the Post EQ at a flow rate of 1,500 gpm Assuming that the flow out of the Post EQ to the filters begins as soon as decant begins and is equal to the SBR Influent rate of 375 gpm, the maximum water level In the Post EQ tank will be approximately 6 8 feet above the LWL 79% of the working storage volume will have been used at his level LANDDESIGN.COM 923 N GRAHAM STREET CHARLOTTE NC 28002 704 333 0395 CHARLOTTE WASHINGTON DC DALLAS ORLANDO - SAN FRANCISCO At the peak flow of 0 90 MGD (625 gpm) the SBR cycle times change because the maximum batch volume is 67,500 gallons The fill time at 625 gpm is 108 minutes (67,500 gal / 625 gpm) The time between SBR decant cycles will also be 108 minutes Assuming that the flow out of the Post EQ to the filters begins as soon as decant begins and is equal to the SBR Influent rate of 625 gpm, the maximum water level in the Post EQ tank will be approximately 7 4 feet above the LWL 83% of the working storage volume will have been used at his level Please see the enclosed stage -storage calculations for more detail Comment Please confirm the EQ Basin discharge elevation above the EQ basin floor The EQ basin discharge will be located approximately 12" (C/L elevation) above the tank floor The outlet has been added to the hydraulic profile for clarity Comment What will the water level be In the hydraulic profile as related to flow? Does TWL mean water level at peak hourly flow of 0 9 MGD? TWL does refer to the water surface elevation at peak flow The labels on the hydraulic profile have been updated to clearly indicate the flow rate associated with each water level provided Comments State regulations require all open top treatment units maintain at least 12" freeboard under design and peak hourly flow Under peak flow condition 0 9 MGD please provide water level and freeboard Information for fine screen, operation of a single filter tank, operation of a single UV disinfection channel, and the flow monitoring weir box What Is the estimated free board for the fine screen, the filter tanks, a single UV channel, and effluent monitoring weir box under normal operations at 0 36 MGD A table is enclosed that provides a summary of the WSEL at the permitted and peak flows Please refer to the enclosed influent screen drawings for WSEL of the influent channel Comment The backwash water from cloth filters are send to existing sewer, where does the sewer go? The existing sanitary sewer returns to the existing lift station The backwash water will be recycled through the SBR LANDDESIGN COM 993 N GRAHAM STREET CHARLOTTE NC 98909 704 333 0375 CHARLOTTE WASHINGTON DC - DALLAS ORLANDO - SAN FRANCISCO Comment What is the purpose of the designated new "Bioretention Area"? The biorentention area provides stormwater treatment It has no function associated with the operation of the treatment plant Comment On the bottom of drawing "OMINIPAC SEQUENCING BATCH REACTOR PLAN VIEW", what is the pipe originating from the digester and going through post -EQ basin? This is dust for my own education This pipe is used to draw supernatant from the top of the digester Decanted supernatant is returned to the lift station Sincerely, C..i Steven Bond LANDDESIGN.COM 993 N GRAHAM STREET CHARLOTTE NC 98902 704 333 0395 CHARLOTTE WASHINGTON DC DALLAS ORLANDO • SAN FRANCISCO Hydraulic Profile Summary Project Name Connestee Falls WWTP #1 SBR Reactor Flow WSEL Top of Tank Free Board 0 36 MGD 264511 265000 489 0 90 MGD 264750 265000 250 Digester Flow WSEL Top of Tank Free Board 0 36 MGD 264750 265000 250 0 90 MGD 264750 265000 250 Post EQ Flow WSEL Top of Tank Free Board 0 36 MGD 263305 265000 1695 0 90 MGD 263565 265000 1435 Cloth Media Filter -Effluent Tank Flow WSEL Top of Tank Free Board 0 36 MGD 262575 262700 1 25 0 90 MGD 262587 262700 1 13 Cloth Media Filter - Influent Head Box Flow WSEL Top of Tank Free Board 0 36 MGD 262808 262908 1 00 0 90 MGD 262808 262908 1 00 'The water level in the influent head box varies from 2625 85 to a maximum of 2628 08 As solids are deposited on the filter elements, headloss increases and the water rises in the tank The back wash I I operation is initiated either by a timer or at a preset WESEL The overflow weir provided is only to be used in the event of an emergency 6" of free board is provide from the overflow weir to the top of the tank I Ultraviolet Disinfection Flow WSEL Top of Channel Free Board 0 36 MGD 262285 262320 035 0 90 MGD 262291 262320 029 The hydraulic maximum without flooding the ballast enclosure is I 197 MGD and 5 MGD before it spills out of the channels. Weir Box Flow WSEL Top of Box Free Board 0 36 MGD 262001 262050 049 0 90 MGD 262020 262050 030 1 15 MGD 262027 262050 023 *There are no treatment units downstream of the weir box and the flow to the box consists of treated effluent There is little opportunity for flow to be restricted and create a situation where the weir box would overtop The maximum free flow capacity of the weir before the box over tops is 1 63 MGD This is 3 5 times the future permited flow of 0 46 MGD Based on this, the free board is adequate for this installation C Post Equilization Basin at Permitted Flow (1.0 x 0.36 MGD), 250 gpm Time, hr:min SBR Influent Flow, MGD 0 360 Vol. In, gal Fill Time, hr 3 SBR Influent Flow, gpm 25000 Average Q out, gpm SBR Decant Rate to Post EQ, gpm 1,500 Total Reactor Batch Volume 45,000 gal Time to decant SBR, min 30 Post EQ Area, SF 1,145 Estimated Q out, gpm 2500 Post EQ Working Height, ft 858 Driving Head Require, ft 042 Post EQ Working Volume, cuft 9,824 Max % Working Vol Used 56% Post EQ Working Volume, gal 73,489 Volume Stored above LWL Just Before Next Decant Begins 3,750 gal Post EQ Storage, gal/ft 8,565 Time, min Time, hr:min Q in, gpm Vol. In, gal Added Head, ft Total Driving Head, ft Q out, gpm Average Q out, gpm Vol Out, gal Stored Volume, gal Total Stored Above LWL, gal Height Above LWL, ft Storage Available, gal % Working Vol. Used IL Initial Stored Volume Above LWL 3,750 0.44 69,739 5% 0 000 1,500 3,000 035 0 79 2500 2500 500 2,500 6,250 073 67,239 9% 2 002 1,500 3,000 035 1 08 2500 2500 500 2,500 8,750 1 02 64,739 12% 4 0 04 1,500 3,000 0 35 1 37 250 0 2500 500 2,500 11,250 1 31 62,239 15% 6 006 1,500 3,000 035 1 66 2500 2500 500 2,500 13,750 1 61 59,739 19% 8 008 1,500 3,000 035 1 96 2500 2500 500 2,500 16,250 1 90 57,239 22% 10 010 1,500 3,000 035 225 2500 250.0 500 2,500 18,750 219 54,739 26% 12 0'12 1,500 3,000 035 254 2500 2500 500 2,500 21,250 248 52,239 29% 14 014 1,500 3,000 035 283 2500 2500 500 2,500 23,750 277 49,739 32% 16 016 1,500 3,000 035 312 2500 2500 500 2,500 26,250 306 47,239 36% 18 018 1,500 3,000 035 3 41 2500 2500 500 2,500 28,750 336 44,739 39% Time, min Time, hr:min Q in, gpm Vol. In, gal Added Head, ft Total Driving Head, ft Q out, gpm Average Q out, gpm Vol Out, gal Stored Volume, gal Total Stored Above LWL, gal Height Above LWL, ft Storage Available, gal % Working Vol. Used 20 020 1,500 3,000 035 3 71 2500 2500 500 2,500 31,250 365 42,239 43% 22 022 1,500 3,000 035 400 2500 2500 500 2,500 33,750 394 39,739 46% 24 0.24 1,500 3,000 035 429 2500 2500 500 2,500 36,250 423 37,239 49% 26 026 1,500 3,000 035 458 2500 2500 500 2,500 38,750 4 52 34,739 53% 28 028 1,500 3,000 035 4.87 2500 2500 500 2,500 41,250 482 32,239 560/6 30 030 0 0 000 4.82 2500 2500 500 -500 40,750 476 32,739 55% 32 032 0 0 000 4.76 250.0 2500 500 -500 40,250 470 33,239 55% 34 034 0 0 000 4.70 2500 2500 500 -500 39,750 464 33,739 54% 36 0.36 0 0 000 464 2500 250.0 500 -500 39,250 4.58 34,239 53% 38 038 0 0 000 458 2500 250.0 500 -500 38,750 452 34,739 53% 40 040 0 0 000 452 2500 2500 500 -500 38,250 447 35,239 52% 42 042 0 0 000 447 2500 2500 500 -500 37,750 4 41 35,739 51% 44 044 0 0 000 4 41 2500 250.0 500 -500 37,250 4.35 36,239 51% 46 046 0 0 000 435 25010 2500 500 -500 36,750 429 36,739 50% 48 048 0 0 000 429 2500 2500 500 -500 36,250 423 37,239 49% 50 050 0 0 000 423 2500 2500 500 -500 35,750 417 37,739 49% 52 052 0 0 000 4.17 2500 2500 500 1 500 35,250 412 38,239 48% 54 054 0, 0 000 412 2500 2500 500 1 -500 34,750 4.06 38,739 1 47% Time, min Time, hr:min Q in, gpm Vol. In, gal Added Head, ft Total Driving Head, ft Q out, gpm Average Q out, gpm Vol Out, gal Stored Volume, gal Total Stored Above LWL, gal Height Above LWL, ft Storage Available, gal % Working Vol. Used 56 0 56 0 0 000 406 2500 2500 500 -500 34,250 400 39,239 47% 58 0.58 0 0 000 400 2500 2500 500 -500 33,750 3 94 39,739 46% 60 1.00 0 0 000 3 94 2500 2500 500 -500 33,250 388 40,239 45% 62 1.02 0 0 000 388 2500 2500 500 -500 32,750 382 40,739 45% 64 1.04 0 0 0.00 382 2500 2500 500 -500 32,250 377 41,239 44% 66 1 06 0 0 000 377 250.0 2500 500 -500 31,750 3 71 41,739 43% 68 1.08 0 0 000 3 71 2500 2500 500 -500 31,250 365 42,239 43% 70 1 10 0 0 000 3.65 250.0 2500 500 -500 30,750 359 42,739 42% 72 1 12 0 0 000 3.59 250.0 2500 500 -500 30,250 353 43,239 41% 74 1 14 0 0 000 353 2500 2500 500 -500 29,750 347 43,739 40% 76 1 16 0 0 000 347 2500 2500 500 -500 29,250 3 41 44,239 40% 78 1 18 0 0 000 3 41 2500 2500 500 -500 28,750 336 44,739 39% 80 1 20 0 0 000 336 2500 2500 500 -500 28,250 330 45,239 38% 82 122 0 0 000 330 2500 2500 500 -500 27,750 324 45,739 38% 84 124 0 0 000 324 2500 2500 500 -500 27,250 318 46,239 37% 86 126 0 0 000 318 2500 2500 500 -500 26,750 312 46,739 36% 88 1 28 0 0 000 312 2500 2500 500 -500 26,250 306 47,239 36% 90 1 30 0 0 000 306 2500 2500 500 -500 25,750 3 01 47,739 35% Time, min Time, hr:min Q in, gpm Vol. In, gal Added Head, ft Total Driving Head, ft Q out, gpm Average Q out, gpm Vol Out, gal Stored Volume, gal Total Stored Above LWL, gal Height Above LWL, ft Storage Available, gal % Working Vol. Used 92 1.32 0 0 000 301 2500 2500 500 -500 25,250 295 48,239 34% 94 1 34 0 0 000 295 2500 2500 500 -500 24,750 289 48,739 34% 96 1.36 0 0 000 289 2500 2500 500 -500 24,250 283 49,239 33% 98 1 38 0 0 000 283 2500 250.0 500 -500 23,750 277 49,739 32% 100 1 40 0 0 000 277 2500 2500 500 -500 23,250 271 50,239 32% 102 142 0 0 000 271 2500 2500 500 -500 22,750 266 50,739 31% 104 1:44 0 0 000 266 2500 2500 500 -500 22,250 260 51,239 30% 106 1 46 0 0 000 260 2500 2500 500 -500 21,750 254 51,739 30% 108 1.48 0 0 000 254 2500 2500 500 -500 21,250 248 52,239 29% 110 1 50 0 0 000 248 2500 2500 500 -500 20,750 242 52,739 28% 112 1 52 0 0 000 242 2500 2500 500 -500 20,250 2.36 53,239 28% 114 1.54 0 0 000 236 2500 2500 500 -500 19,750 2.31 53,739 27% 116 1 56 0 0 0.00 231 2500 2500 500 -500 19,250 225 54,239 26% 118 1 58 0 0 000 225 2500 2500 500 -500 18,750 219 54,739 26% 120 200 0 0 000 219 2500 2500 500 -500 18,,250 213 55,239 25% 122 2.02 0 0 000 213 2500 2500 500 -500 17,750 2.07 55,739 24% 124 2.04 0 0 000 2.07 2500 2500 500 -500 17,250 201 56,239 23% 126 206 0 0 000 201 2500 2500 500 -500 1 16,750 1 96 56,739 23% Time, min Time, hr:min Q in, gpm Vol. In, gal Added Head, ft Total Driving Head, ft Q out, gpm Average Q out, gpm Vol Out, gal Stored Volume, gal Total Stored Above LWL, gal Height Above LWL, ft Storage Available, gal % Working Vol. Used 128 208 0 0• 000 1 96 2500 2500 500 -500 16,250 190, 57,239 22% 130 210 0 0 000 1 90 2500 2500 500 -500 15,750 1 84 57,739 21% 132 212 0 0 000 184 2500 2500 500 -500 15,250 1 78 58,239 21% 134 214 0 0 0.00 1 78 2500 2500 500 -500 14,750 1 72 58,739 20% 136 216 0 0 000 1 72 2500 2500 500 -500 14,250 1.66 59,239 19% 138 218 0 0 000 1 66 2500 2500 500 -500 13,750 1 61 59,739 19% 140 220 0 0 000 1 61 2500 2500 500 -500 13,250 1 55 60,239 18% 142 222 0 0 000 1 55 2500 2500 500 -500 12,750 149 60,739 17% 144 224 0 0 000 149 2500 2500 500 -500 12,250 1.43 61,239 17% 146 226 0 0 000 143 250.0 2500 500 -500 11,750 1 37 61,739 16% 148 228 0 0 000 1 37 2500 2500 500 -500 11,250 1 31 62,239 15% 150 230 0 0 000 1 31 250.0 2500 500 -500 10,750 1 26 62,739 15% 152 232 0 0 000 1 26 2500 2500 500 -500 10,250 1.20 63,239 14% 154 2.34 0 0 0 00 1 20 250 0 2500 500 -500 9,750 1.14 63,739 13% 156 236 0 0 000 114 2500 2500 500 -500 9,250 1 08 64,239 13% 158 238 0 0 000 1.08 2500 2500 500 -500 8,750 1 02 64,739 12% 160 240 0 0 000 1.02 2500 1 2500 500 -500 8,250 096 65,239 11% 162 2:42 0 0 000 0.96 2500 2500 500 -500 7,750 090 65,739 11% Time, min Time, hr:min Q in, gpm Vol. In, gal Added Head, ft Total Driving Head, ft Q out, gpm Average Q out, gpm Vol Out, galal Stored Volume, g Total Stored Above LWL ,gal Height Above LWL, ft Storage Available, gal % Working Vol. Used 164 244 0 0 000 090 2500 2500 500 -500 7,250 085 66,239 10% 166 2.46 0 0 0.00 085 2500 2500 500 -500 6,750 079 66,739 9% 168 248 0 0 000 079 2500 2500 500 -500 6,250 073 67,239 9% 170 250 0 0 000 073 2500 2500 500 -500 5,750 067 67,739 8% 172 252 0 0 000 067 2500 2500 500 -500 5,250 061 68,239 7% 174 254 0 0 000 061 2500 2500 500 -500 4,750 055 68,739 6% 176 256 0 0 000 055 2500 2500 500 -500 4,250 050 69,239 6% 178 258 0 0 000 050 2500 2500 500 -500 3,750 044 69,739 5% 180 300 0 0 000 044 2500 i mai volume in 4*,uuu i otal volume Uut 45,000 Post Equilization Basin at Design Flow (1.5 x 0.36 MGD), 375 gpm SBR Influent Flow, MGD 0 540 Fill Time, hr SBR Influent Flow, gpm 37500 SBR Decant Rate to Post EQ, gpm Total Reactor Batch Volume 67,500 gal Time to decant SBR, min Post EQ Area, SF 1,145 Post EQ Working Height, ft 8.58 Post EQ Working Volume, cuft 9,824 Post EQ Working Volume, gal 73,489 Post EQ Storage, gal/ft 8,565 3 1,500 45 Estimated Q out, gpm 3750 Driving Head Require, ft 089 Max % Working Vol Used 79% Volume Stored above LWL Just Before Next Decant Begins 7,875 gal Time, min Time, hr:min Q in, gpm Vol. In, gal Added Head, ft Total Driving Head, ft Q out, gpm Average Q out, gpm Vol Out, gal Stored Volume, gal Total Stored Above LWL, gal Height Above LWL, ft Storage Available, gal % Working Vol. Used Initial Stored Volume Above LWL 7,875 092 65,614 0 0.00 1,500 3,000 0.35 1 27 3750 -11% 3750 750 2,250 10,125 1 18 63,364 14% 2 0.02 1,500 3,000 0.35 1 53 3750 375.0 750 2,250 12,375 144 61,114 17% 4 0.04 1,500 3,000 0.35 1 80 3750 3750 750 2,250 14,625 1 71 58,864 20% 6 006 1,500 3,000 0.35 2.06 3750 3750 750 2,250 16,875 1 97 56,614 23% 8 008 1,500 3,000 035 232 3750 3750 750 2,250 19,125 223 54,364 26% 10 010 1,500 3,000 035 258 3750 3750 750 2,250 21,375 250 52,114 29% 12 012 1,500 3,000 035 285 3750 375.0 750 2,250 23,625 276 49,864 32% 14 014 1,500 3,000 035 311 3750 3750 750 2,250 25,875 3.02 47,614 35% 16 016 1,500 3,000 035 337 375.0 3750 750 2,250 28,125 328 45,364 38% 18 0.18 1,500 3,000 035 363 3750 3750 750 2,250 30,375 355 43,114 41% Time, min Time, hr:min Q in, gpm Vol. In, gal Added Head, ft Total Driving Head, ft Q out, gpm Average Q out, gpm Vol Out, gal Stored Volume, gal Total Stored Above LWL, gal Height Above LWL, ft Storage Available, gal % Working Vol. Used 20 020 1,500 3,000 035 390 3750 375.0 750 2,250 32,625 3 81 40,864 44% 22 022 1,500 3,000 035 416 3750 3750 750 2,250 34,875 407 38,614 47% 24 024 1,500 3,000 035 442 3750 3750 750 2,250 37,125 433 36,364 51% 26 026 1,500 3,000 035 468 3750 3750 750 2,250 39,375 460 34,114 54% 28 028 1,500 3,000 035 495 3750 3750 750 2,250 41,625 486 31,864 57% 30 030 1,500 3,000 035 5 21 3750 3750 750 2,250 43,875 512 29,614 60% 32 032 1,500 3,000 035 547 3750 3750 750 2,250 46,125 539 27,364 63% 34 0:34 1,500 3,000 035 574 3750 3750 750 2,250 48,375 565 25,114 66% 36 036 1,500 3,000 035 600 3750 3750 750 2,250 50,625 5 91 22,864 69% 38 038 1,500 3,000 035 626 3750 3750 750 2,250 52,875 617 20,614 72% 40 040 1,500 3,000 035 652 3750 3750 750 2,250 55,125 644 18,364 75% 42 042 1,500 3,000 035 679 3750 3750 750 2,250 57,375 670 16,114 78% 44 044 750 1,500 018 687 3750 3750 750 750 58,125 6 79 15,364 79% 46 046 0 0 000 6 79 3750 3750 750 -750 57,375 670 16,114 78% 48 048 0 0 000 670 3750 3750 750 -750 56,625 6 61 16,864 77% 50 050 0 0 000 6 61 3750 3750 750 -750 55,875 652 17,614 76% 52 052 0 0 000 652 3750 3750 750 -750 55,125 644 18,364 75% 54 0'54 0 0 000 644 3750 3750 750 -750 54,375 635 19,114 74% Time, min Time, hr:min Q in, gpm Vol. In, gal Added Head, ft Total Driving Head, ft Q out, gpm Average Q out, gpm Vol Out, gal Stored Volume, gal Total Stored Above LWL, gal Height Above LWL, ft Storage Available, gal % Working Vol. Used 56 056 0 0 000 635 3750 3750 750 -750 53,625 626 19,864 73% 58 058 0 0 000 626 3750 3750 750 -750 52,875 617 20,614 72% 60 1 00 0 0 000 617 3750 3750 750 -750 52,125 609 21,364 71% 62 1 02 0 0 000 609 3750 3750 750 -750 51,375 600 22,114 70% 64 1 04 0 0 000 600 3750 3750 750 -750 50,625 591 22,864 69% 66 1 06 0 0 000 591 3750 3750 750 -750 49,875 582 23,614 68% 68 1 08 0 0 000 582 3750 3750 750 -750 49,125 574 24,364 67% 70 110 0 0 000 574 3750 3750 750 -750 48,375 565 25,114 66% 72 112 0 0 000 565 3750 3750 750 -750 47,625 556 25,864 65% 74 114 0 0 000 556 3750 3750 750 -750 46,875 547 26,614 64% 76 116 0 0 000 547 3750 3750 750 -750 46,125 539 27,364 63% 78 118 0 0 000 539 3750 3750 750 -750 45,375 530 28,114 62% 80 1 20 0 0 000 530 3750 3750 750 -750 44,625 521 28,864 61% 82 1 22 0 0 000 521 3750 3750 750 -750 43,875 512 29,614 60% 84 1 24 0 0 000 512 3750 3750 750 -750 43,125 503 30,364 59% 86 1 26 0 0 000 503 3750 3750 750 -750 42,375 495 31,114 58% 88 1 28 0 0 000 495 3750 3750 750 -750 41,625 486 31,864 57% 90 1 30 0 0- 000 486 3750 375 0 750 -750 40,875 477 32,614 56% Time, min Time, hr:min Q in, gpm Vol. In, gal Added Head, ft Total Driving Head, ft Q out, gpm Average Q out, gpm Vol Out, gal Stored Volume, gal Total Stored Above LWL, gal Height Above LWL, ft Storage Available, gal % Working Vol. Used 92 132 0 0 0.00 477 3750 3750 750 -750 40,125 468 33,364 55% 94 134 0 0 000 468 3750 3750 750 -750 39,375 460 34,114 54% 96 1 36 0 0 000 460 3750 3750 750 -750 38,625 451 34,864 53% 98 1 38 0 0 000 451 3750 3750 750 -750 37,875 442 35,614 52% 100 1 40 0 0 0.00 442 3750 3750 750 -750 37,125 433 36,364 51% 102 1 42 0 0 000 433 3750 3750 750 -750 36,375 425 37,114 49% 104 144 0 0 000 425 3750 3750 750 -750 35,625 416 37,864 48% 106 1.46 0 0 0.00 416 3750 3750 750 -750 34,875 407 38,614 47% 108 1 48 0 0 0.00 407 3750 3750 750 -750 34,125 398 39,364 46% 110 1 50 0 0 0.00 398 3750 3750750 -750 33,375 390 40,114 45% 112 1.52 0 0 000 390 3750 3750 750 -750 32,625 381 40,864 44% 114 1.54 0 0 000 381 3750 3750 750 -750 31,875 372 41,614 43% 116 1 56 0 0 000 372 3750 3750 750 -750 31,125 363 42,364 42% 118 1.58 0 0 000 3.63 3750 3750 750 -750 30,375 355 43,114 41% 120 200 0 0 0.00 355 3750 3750 750 -750 29,625 346 43,864 40% 122 2.02 0 0 000 346 3750 3750 750 -750 28,875 337 44,614 39% 124 204 0 0 000 337 3750 3750 750 -750 28,125 328 45,364 38% 126 2.06 0 0 0 00 3.28 375 0 3750 750 -750 27,375 320 46,114 37% Time, min Time, hr:min Q in, gpm Vol. In, gal Added Head, ft Total Driving Head, ft Q out, gpm Average Q out, gpm Vol Out, gal Stored Volume, gal Total Stored Above LWL, gal Height Above LWL, ft Storage Available, gal % Working Vol. Used 128 208 0 0 000 320 3750 375.0 750 -750 26,625 3.11 46,864 36% 130 210 0 0 000 311 3750 3750 750 -750 25,875 3 02 47,614 35% 132 212 0 0 000 302 3750 3750 750 -750 25,125 293 48,364 34% 134 2.14 0 0 000 293 3750 3750 750 -750 24,375 285 49,114 33% 136 216 0 0 000 2 85 3750 3750 750 -750 23,625 276 49,864 32% 138 218 0 0 000 2 76 375.0 3750 750 -750 22,875 267 50,614 31% 140 220 0 0 000 267 3750 3750 750 -750 22,125 258 51,364 30% 142 222 0 0 000 2 58 3750 3750 750 -750 21,375 250 52,114 29% 144 224 0 0 000 250 3750 3750 750 -750 20,625 2 41 52,864 28% 146 226 0 0 0.00 2 41 3750 3750 750 -750 19,875 232 53,614 27% 148 2.28 0 0 0.00 232 375.0 3750 750 -750 19,125 223 54,364 26% 150 2.30 0 0 000 223 3750 3750 750 -750 18,375 215 55,114 25% 152 2 32 0 0 000 215 3750 3750 750 -750 17,625 206 55,864 24% 154 234 0 0 000 206 3750 3750 750 -750 16,875 1 97 56,614 23% 156 2 36 0 0 000 1.97 3750 375.0 750 -750 16,125 1.88 57,364 22% 158 2.38 0 0 000 1 88 3750 3750 750 -750 15,375 1 80 58,114 21% 160 240 0 0 000 1 80 3750 3750 750 -750 14,625 1 71 58,864 20% 162 242 0 0 000 1 71 375 0 3750 750 -750 13,875 1 62 59,614 19% Time, min Time, hr:min Q in, gpm Vol. In, gal Added Head, ft Total Driving Head, ft Q out, gpm Average Q out, gpm Vol Out, gal Stored Volume, gal Total Stored Above LWL, gal Height Above LWL ft Storage Available, gal % Working Vol. Used 164 2.44 0 0 000 1 62 375.0 3750 750 -750 13,125 1 53 60,364 18% 166 246 0 0 000 1 53 3750 3750 750 -750 12,375 1 44 61,114 17% 168 248 0 0 000 144 375.0 3750 750 -750 11,625 1 36 61,864 16% 170 250 0 0 000 1 36 3750 3750 750 -750 10,875 1 27 62,614 15% 172 252 0 0 0.00 127 3750 3750 750 -750 10,125 118 63,364 14% 174 254 0 0 000 118 3750 3750 750 -750 9,375 1 09 64,114 13% 176 256 0 0 000 1 09 3750 - 3750 750 -750 8,625 1 01 64,864 12% 178 258 0 0 0.00 1 01 3750 375.0 750 -750 7,875 092 65,614 11% 180 300 0 0 000 092 3750 i ota volume in at,ouu jotaivoiumeuut 6/,bUU Post Equiliaation Basin at Peak Flow (2.5 x 0.36 MGD), 625 gpm SBR Influent Flow, MGD 0 900 Fill Time, hr 1 80 SBR Influent Flow, gpm 62500 SBR Decant Rate to Post EQ, gpm 1,500 Total Reactor Batch Volume 67,500 gal Time to decant SBR, min 45 Post EQ Area, SF 1,145 Post EQ Working Height, ft 858 Post EQ Working Volume, cuft 9,824 Post EQ Working Volume, gal 73,489 Post EQ Storage, gal/ft 8,565 Estimated Q out, gpm 6250 Driving Head Require, ft 261 Maximum % Full 83% Working Vol Stored Just Before Next Decant Begins, gal 22,365 Time, min Time, hr:min Q in, gpm Vol. In, gal Added Head, ft Total Driving Head, ft Q out, gpm Average Q out, gpm Vol Out, gal Stored Volume, gal Total Stored, gal Height Above LWL, ft Storage Available, gal % Working Vol. Used LL Initial Stored Volume Above LWL 22,365 2 61 51,124 30% 0 000 1,500 3,000 035 296 6250 6250 1,250 1,750 24,115 282 49,374 33% 2 002 1,500 3,000 035 317 6250 6250 1,250 1,750 25,865 302 47,624 35% 4 004 1,500 3,000 035 337 6250 6250 1,250 1,750 27,615 322 45,874 38% 6 006 1,500 3,000 035 357 6250 6250 1,250 1,750 29,365 343 44,124 40% 8 008 1,500 3,000 035 378 6250 625 0 1,250 1,750 31,115 363 42,374 42% 10 010 1,500 3,000 035 398 6250 6250 1,250 1,750 32,865 384 40,624 45% 12 012 1,500 3,000 035 419 6250 6250 1,250 1,750 34,615 404 38,874 47% 14 014 1,500 3,000 035 439 6250 6250 1,250 11750 36,365 425 37,124 49% 16 016 1,500 3,000 035 460 6250 6250 1,250 1,750 38,115 445 35,374 52% 18 018 1,500 3,000 035 480 6250 6250 1,250 1,750 39,865 465 33,624 54% 20 020 1,500 3,000 035 500 6250 Time, min Time, hr:min Q in, gpm Vol. In, gal Added Head, ft Total Driving Head, ft Q out, gpm Average Q out, gpm Vol Out, gal Stored Volume, gal Total Stored, gal Height Above LWL, ft Storage Available, gal % Working Vol. Used 6250 1,250 1,750 41,615 486 31,874 57% 22 022 1,500 3,000 035 5 21 6250 6250 1,250 1,750 43,365 506 30,124 59% 24 0.24 1,500 3,000 035 5.41 625.0 6250 1,250 1,750 45,115 527 28,374 61% 26 026 1,500 3,000 035 5.62 6250 6250 1,250 1,750 46,865 5.47 26,624 64% 28 0:28 1,500 3,000 035 582 625.0 6250 1,250 1,750 48,615 568 24,874 66% 30 0.30 1,500 3,000 035 603 625.0 6250 1,250 1,750 50,365 588 23,124 69% 32 032 1,500 3,000 035 6.23 6250 6250 1,250 1,750 52,115 608 21,374 71% 34 034 1,500 3,000 035 643 6250 6250 1,250 1,750 53,865 629 19,624 73% 36 036 1,500 3,000 035 664 6250 6250 1,250 1,750 55,615 649 17,874 76% 38 038 1,500 3,000 035 684 6250 6250 1,250 1,750 57,365 6 70 16,124 78% 40 0.40 1,500 3,000 035 705 6250 625.0 1,250 1,750 59,115 6 90 14,374 80% 42 042 1,500 3,000 035 725 6250 6250 1,250 1,750 60,865 7.11 12,624 83% 44 044 750 1,500 018 728 6250 6250 1,250 250 61,115 7.14 12,374 83% 46 0.46 0 0 000 714 6250 6250 1,250 -1,250 59,865 699 13,624 81% 48 048 0 0 000 699 6250 6250 1,250 -1,250 58,615 684 14,874 80% 50 050 0 0 000 6.84 6250 6250 1,250 -1,250 57,365 670 16,124 78% 52 052 0 0 000 6 70 6250 6250 1,250 -1,250 56,115 655 17,374 76% 54 054 0 0 000 655 6250 6250 1,250 -1,250 54,865 6 41 18,624 75% 56 056 0 0 000 6 41 6250 Time, min Time, hr:min Q in, gpm Vol. In, gal Added Head, ft Total Driving Head, ft Q out, gpm Average Q out, gpm Vol Out, gal Stored Volume, gal Total Stored, gal Height Above LWL, ft Storage Available, gal % Working Vol. Used 6250 1,250 -1,250 53,615 626 19,874 73% 58 058 0 0 000 626 6250 625.0 1,250 -1,250 52,365 611 21,124 71% 60 1 00 0 0 000 6.11 625.0 6250 1,250 -1,250 51,115 597 22,374 70% 62 1 02 0 0 000 597 6250 625.0 1,250 -1,250 49,865 582 23,624 68% 64 1 04 0 0 000 582 6250 6250 1,250 -1,250 48,615 568 24,874 66% 66 1 06 0 0 000 568 6250 6250 1,250 -1,250 47,365 553 26,124 64% 68 1 08 0 0 000 553 6250 625.0 1,250 -1,250 46,115 538 27,374 63% 70 110 0 0 000 538 625.0 6250 1,250 -1,250 44,865 524 28,624 61% 72 112 0 0 000 524 6250 6250 1,250 -1,250 43,615 509 29,874 59% 74 114 0 0 000 509 6250 625.0 1,250 -1,250 42,365 495 31,124 58% 76 116 0 0 000 495 6250 625 0 1,250 -1,250 41,115 4.80 32,374 56% 78 118 0 0 000 480 6250 625.0 1,250 -1,250 39,865 465 33,624 54% 80 1 20 0 0 000 465 625.0 6250 1,250 -1,250 38,615 4.51 34,874 53% 82 1 22 0 0 000 451 6250 6250 1,250 -1,250 37,365 436 36,124 51% 84 1'24 0 0 000 436 6250 6250 1,250 -1,250 36,115 422 37,374 49% 86 126 0 0 000 422 6250 6250 1,250 -1,250 34,865 4.07 38,624 47% 88 1 28 0 0 000 407 625.0 6250 1,250 -1,250 33,615 392 39,874 46% 90 1 30 0 0 000 392 6250 6250 1,250 -1,250 32,365 3 78 41,124 44% 92 1 32 0 0 000 378 6250 Time, min Time, hr:min Q in, gpm Vol. In, gal Added Head, ft Total Driving Head, ft Q out, gpm Average Q out, gpm Vol Out, gal Stored Volume, gal Total Stored, gal Height Above LWL, ft Storage Available, gal % Working Vol. Used 6250 1,250 -1,250 31,115 363 42,374 42% 94 1 34 0 0 000 363 6250 6250 1,250 -1,250 29,865 349 43,624 41% 96 1 36 0 0 000 349 6250 6250 1,250 -1,250 28,615 334 44,874 39% 98 1 38 0 0 000 334 6250 6250 1,250 -1,250 27,365 319 46,124 37% 100 1 40 0 0 000 319 6250 6250 1,250 -1,250 26,115 305 47,374 36% 102 1 42 0 0 000 305 6250 6250 1,250 -1,250 24,865 290 48,624 34% 104 1 44 0 0 000 290 6250 6250 1,250 -1,250 23,615 276 49,874 32% 106 1 46 0 0 000 276 6250 6250 1,250 -1,250 22,365 261 51,124 30% 108 1 48 0 0 000 261 6250 Total Volume In 67,500 Total Volume Out 67,500