HomeMy WebLinkAbout20171119 Ver 1_DCM Permit_20170928Permit Class
NEW
STATE OF NORTH CAROLINA
Department of Environmental Quality
and
Coastal Resources Commission
Vermit
Permit Number
112-17
RCC E_/ vco ;VCpFNR/OWR
OCT 11201?
for o, ual:'ty ko .
X Major Development in an Area of Environmelbai4leerrsec9e°na;
pursuant to NCGS 113A-118 �E91onalOyice
X Excavation and/or filling pursuant to NCGS 113-229
Issued to James Houlihan, 169 Flyway Dr. Hertford, NC 27944
tthorizing development in Perquimans County at Manmade canal adi. to Albemarle Sounds,
51-N Flyway Dr., Hertford , as requested in the permittee's application dated 6/26/17 (MP -1) and 8/9/17
attached
both dated 8/9/17.
its permit, issued on September 28, 2017 , is subject to compliance with the application (where
nsistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation
these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void.
Shoreline Stabilization - Bulkhead
I) The alignment of the authorized bulkhead shall be staked by the permittee and verified by a
representative of the Division of Coastal Management prior to the start of construction. ew expected
start of construction.
2) The bulkhead shall be constructed prior to any backfilling activities.
3) The bulkhead shall be structurally tight so as to prevent seepage of backfill materials through the
structure.
(See attached sheets for Additional Conditions)
This permit action may be appealed by the permittee or other Signed by the authority of the Secretary of DEQ and the
qualified persons within twenty (20) days of the issuing date. Chairman of the Coastal Resources Commission.
This permit must be accessible on-site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification not covered
hereunder requires further Division approval.
All work must cease when the permit expires on
December 31, 2020
In issuing this permit, the State of North Carolina agrees that
your project is consistent with the North Carolina Coastal
Management Program.
BraxfbffC. Davis, Director
Division of Coastal Management
This permit and its conditions are hereby accepted.
Signature of Permittee
Houlihan
Permit No. 112-17
Page 2 of 3
ADDITIONAL CONDITIONS
4) The fill material shall be clean and free of any pollutants except in trace quantities.
All backfill material shall be obtained from a high ground source and confined behind the permitted
bulkhead.
All fill material to be placed below normal water level shall be confined behind the permitted bulkhead.
Sedimentation and Erosion Control
A ground cover sufficient to restrain erosion shall be provided within 30 calendar days of any phase of
grading on cut or filled slopes. At a minimum, a silt fence shall be properly installed immediately
landward of the bulkhead cap immediately following completion of backfilling activities.
Dockine Facility
3) The authorized docking facility shall not exceed the quarter width of the water body as measured from
the corner of the authorized bulkhead directly across the canal.
>) The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S.
Coast Guard, through regulation or otherwise, on the authorized facilities. At minimum, permanent
reflectors shall be attached to the structure in order to make it more visible during hours of darkness or
inclement weather.
This permit authorizes a maximum of 1 formalized boat slip.
No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable
waters at or adjacent to the authorized work.
12) Should the Lot co -owned by the permittee to the northeast be sold prior to the initiation of the docking
facility, or sold prior to the commencement of the docking facility, the permittee shall obtain a written
agreement from the new owner(s) waiving the 15 foot riparian corridor setback and submit it to the
Division of Coastal Management prior to initiating construction of the docking facility.
Upland Development
3) Unless specifically altered herein, this permit authorizes the grading and other land disturbing activities
associated with the development of the above referenced property, including the movement of the
existing shed, all as expressly and specifically set forth in the attached permit application and workplan
drawings.
General
}) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the
written approval of the Division of Coastal Management.
._..............
James Houlihan Permit No. 112-17
Page 3 of 3
ADDITIONAL CONDITIONS
15) The permittee shall maintain the authorized work in good condition and in conformance with the terms
and conditions of this permit. The permittee is not relieved of this requirement if he abandons the
permitted activity without having it transferred to a third party.
16) The permittee and/or his or her contractor shall meet with a representative of the Division prior to
project initiation.
VOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits,
approvals or authorizations that may be required.
VOTE: The U.S. Army Corps of Engineers authorized the project by way of Programmatic General
Permit 198000291 (Action ID SAW -2017-01792).
TE: The N.C. Division of Water Resources authorized the proposed project by way of General Water
Quality Certification 4097 and assigned the project DWR Project No. 2017-1119.
VOTE: Future development of the permittee's property may require a modification of this permit.
Contact a representative of the Division at (252) 264-3901 prior to the commencement of any
such activity for this determination. The permittee is further advised that many non -water
dependent activities are not authorized within 30 feet of the normal water level.
VOTE: An application processing fee of $400 was received by DCM for this project. This fee also
satisfied the Section 401 application processing fee requirements of the Division of Water
Resources.