Loading...
HomeMy WebLinkAbout20171225 Ver 1_401 Application_20170925O�0� W AT �9�G y Office Use Only: Corps action ID no. DWQ project no. Form Version 1.3 Dec 10 2008 Pre -Construction Notification (PCN) Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: ®Section 404 Permit El Section 10 Permit 1b. Specify Nationwide Permit (NWP) number: NWP 14 or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? ❑ Yes ® No 1d. Type(s) of approval sought from the DWQ (check all that apply): ® 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization 1e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ❑ Yes ® No For the record only for Corps Permit: ❑ Yes ® No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. ❑ Yes ® No 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ❑ Yes ® No 1h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ® No 2. Project Information 2a. Name of project: Hanover Solar Farm 2b. County: Maysville 2c. Nearest municipality / town: Onslow 2d. Subdivision name: 2e. NCDOT only, T.I.P. or state project no: 3. Owner Information 3a. Name(s) on Recorded Deed: The Redd Family of North Carolina, LLC 3b. Deed Book and Page No. 3318-273 & 002-162 3c. Responsible Party (for LLC if applicable): Brenda Redd �F P 3d. Street address: 2200 Castle Pines Dr. - P E RES Mt�IN 3e. City, state, zip: Raleigh NC, 27604 401 &6 3f. Telephone no.: 919-802-4519 3g. Fax no.: 3h. Email address: 12paws.bv@gmail.com Page 1 of 11 PCN Form — Version 1.3 December 10, 2008 Version 4. Applicant Information (if different from owner) 4a. Applicant is: ❑ Agent ❑ Other, specify: Developer 4b. Name: Mr. Geoff Fallon 4c. Business name (if applicable): Hanover Solar, LLC 4d. Street address: 3250 Ocean Park Boulevard 4e. City, state, zip: Santa Monica CA, 90405 4f. Telephone no.: 310.581.6299 4g. Fax no.: 4h. Email address: conchilla@ccrenew.com 5. Agent/Consultant Information (if applicable) 5a. Name: Bradley S. Luckey 5b. Business name (if applicable): Pilot Environmental Inc. 5c. Street address: PO Box 128 5d. City, state, zip: Kemersville, NC 27285 5e. Telephone no.: 336.708.4997 5f. Fax no.: 5g. Email address: bluckey@pilotenviro.com Page 2 of 11 PCN Form —Version 1.3 December 10, 2008 Version B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): 533800773620 & 533800891010 1 b. Site coordinates (in decimal degrees): Latitude: 35.80652 Longitude: - 77.20701 (DD.DDDDDD) (-DD.DDDDDD) 1 c. Property size: 65 acres 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to Grants Creek proposed project: 2b. Water Quality Classification of nearest receiving water: Class C 2c. River basin: j White Oak 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: The site contains an existing paved driveway (Hampshire Lane), agricultural fields and wooded land. The site is located in a rural area of Maysville, Onslow County, North Carolina 3b. List the total estimated acreage of all existing wetlands on the property: —3.11 ac 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: streams= -1,640 & open water drainage ditch= -7,325'/0.85 ac 3d. Explain the purpose of the proposed project: The purpose of the proposed project is to provide access and interconnection during development and long term maintenance of the site as a solar farm. 3e. Describe the overall project in detail, including the type of equipment to be used: The overall project consists of development of the site with a proposed solar farm. In order to provide safe access and interconnection to the site, access roads and five crossings are necessary. To facilitate development of the site and construction of the proposed stream crossing, grading the site is necessary. Graders, haulers, excavators and other heavy equipment will be used during site construction. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / ®Yes [-I No El Unknown project (including all prior phases) in the past? Comments: SAW -2016-01353 4b. If the Corps made the jurisdictional determination, what type ®Preliminary F] Final of determination was made? 4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company: Pilot Enviromental, Inc. Name (if known): Michael Brame/David Brame Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. USACE JD SAW 2016-01353 dated 9.20.17 5. Project History 5a. Have permits or certifications been requested or obtained for ❑ Yes ❑ No ® Unknown this project (including all prior phases) in the past? 5b. If yes, explain in detail according to "help file" instructions. Page 3 of 11 PCN Form —Version 1.3 December 10, 2008 Version 6. Future Project Plans 6a. Is this a phased project? ❑ Yes ® No 6b. If yes, explain. The project is not part of a phased project. Impacts to streams/wetlands, outside of those proposed in this appilication, are not anticipated as a result of the proposed project. Page 4 of 11 PCN Form —Version 1.3 December 10, 2008 Version C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ® Wetlands ® Streams - tributaries ❑ Buffers ® Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number — Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ — non -404, other) (acres) Temporary W1 ®P ®T Fill/Pump Around PFO ® Yes ❑ No ® Corps ❑ DWQ 0.006/0.004 W2 ®P ®T Fill/Pump Around PFO ❑ Yes ® No ® Corps ❑ DWQ 0.003/0.002 W3 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W4 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W5 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W6 ❑ P ❑ T ❑ Yes ❑ No ❑ Corps ❑ DWQ 2g. Total wetland impacts 0.009/0.006 2h. Comments: Crossing 1 will permanently impact 0.006 acres of wetlands and temporarily impact 0.004 acres of wetlands. Crossing 2 will permanently impact 0.003 acres of wetlands and temporarily impact 0.002 acres of wetlands. Crossing 1 includes the removal of existing 35 liner feet of 36" RCP and Crossing 2 includes the removal of existing 22 linear feet of 15" RCP. Areas of temporary impact will be restored to similar pre -construction conditions and re -planted with native herbaceous vegetation. 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) or intermittent DWQ — non -404, width (linear Temporary (T) (INT)? other) (feet) feet) S1 ®P ®T Fill/Pump Around Unnamed ® PER ❑ INT ® Corps ❑ DWQ 14 30/15 S2 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S3 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S4 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S5 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S6 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ 3h. Total stream and tributary impacts 30/15 3i. Comments: Crossing 1 will permanently impact 30 linear feet of perennial stream channel for culvert and rip -rap fill and Page 5 of 11 PCN Form — Version 1.3 December 10, 2008 Version temporarily impact 15 linear feet of perennial stream channel for culvert pump -around. Crossing 1 includes the removal of existing 35 linear feet of 36" RCP. Areas of temporary impact will be restored to similair pre -construction conditions and re- planted. 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. 4b. 4c. 4d. 4e. Open water Name of waterbody impact number — (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or Temporary 01 ®P ®T Unnamed Fill/Pump Around Ditch 0.002/0.001 02 ®P ®T Unnamed Fill/Pump Around Ditch 0.004/0.003 03 ®P ®T Unnamed Fill/Pump Around Ditch 0.014/0.005 04 SPOT Unnamed Fill/Pump Around Ditch 0.015/0.005 4E Total open water impacts 0.035/0.0015 4g. Comments: Crossing 2 will permanently impact 0.002 acres of open water drainage ditch for culvert and rip -rap fill and temporarily impact 0.001 acres for culvert pump -around. Crossing 3 will permanently impact 0.004 acres of open water drainage ditch for culvert and rip -rap fill and temporarily impact 0.002 acres for culvert pump -around. Crossings 2 and 3 include the removal of existing 22 linear feet of 15" RCP from each crossing location. Crossing 4 will permanently impact 0.014 acres of open water drainage ditch for culvert and rip -rap fill and temporarily impact 0.005 acres for culvert pump - around. Crossing 5 will permanently impact 0.015 acres of open water drainage ditch for culvert and rip -rap fill and temporarily impact 0.005 acres for culvert pump -around. Areas of temporary impact will be restored to similar pre -construction conditions and re -planted. 5. Pond or Lake Construction If pond or lake construction proposed, then complete the chart below. 5a. 5b. 5c. 5d. 5e. Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or purpose (acres) number of pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 5f. Total 5g. Comments: Construction of ponds/lakes are not proposed. 5h. Is a dam high hazard permit required? ❑ Yes No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: Page 6 of 11 PCN Form — Version 1.3 December 10, 2008 Version 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. ❑ Neuse El Tar-Pamlico ®Other: White Oak Project is in which protected basin? ❑ Catawba ❑ Randleman 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number— Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) or for Stream name mitigation (square feet) (square feet) Temporary impact re wired? B1 ❑P❑T El Yes ❑ No B2 ❑ P ❑ T ❑ Yes ❑ No B3 ❑P❑T El Yes ❑ No 6h. Total buffer impacts 6i. Comments: Buffer impacts are not proposed. D. Impact Justification and Mitigation 1. Avoidance and Minimization 1 a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. Due to the development and use of the site as a solar farm, access roads and five WoUS crossing are necessary. The road widths have been designed to the minimal width necessary to safely accommodate heavy equipment and tractor trailers. Crossings 1, 2 and 3 have been designed to cross in locations of existing culverts, thus minimizing impact to streams and open water drainage ditches located on the site. The crossings will utilize head/end walls which further minimizes impacts to streams, wetlands and open water drainage ditches. The solar array and necessary infrastructure (overhead/underground voltage lines, inverters, etc.) have been designed to avoid impacts to jurisdictional streams, wetlands and ponds. There are approximately 3.11 acres of wetlands, 1,640 linear feet of perennial stream channel and 0.85 acres of open water drainage ditches located on the site. The remaining approximate 3.10 acres of wetlands, 1,610 linear feet of perennial stream and 0.81 acres of open water drainage ditches are being avoided. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. The impact limits will be staked and silt fence will be used. Temporary coffer dams will be installed up-gradient of the proposed culverts. During construction, water will be pumped around the construction footprints. Appropriate bank protection will be provided in the channel during construction and all excess excavated material will be immediately removed from the crossing areas. Upon completion of the culvert installations, the temporary sand bag coffer dams will be removed and flow will be diverted through the culverts. Following construction, disturbed banks will be restored to similar pre-construction conditions, matted and seeded/live staked. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for ❑ Yes ® No impacts to Waters of the U.S. or Waters of the State? 2b. If yes, mitigation is required by (check all that apply): ❑ DWQ ❑ Corps ❑ Mitigation bank 2c. If yes, which mitigation option will be used for this ElPayment to in-lieu fee program project? ❑ Permittee Responsible Mitigation Page 7 of 11 PCN Form — Version 1.3 December 10, 2008 Version 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type Quantity 3c. Comments: 4. Complete if Making a Payment to In -lieu Fee Program 4a. Approval letter from in -lieu fee program is attached. ❑ Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: ❑ warm ❑ cool ❑cold 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non -riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Mitigation is not proposed. 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ❑ Yes ® No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund). 6h. Comments: Buffer mitigation is not proposed. Page 8of11 PCN Form — Version 1.3 December 10, 2008 Version E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1 a. Does the project include or is it adjacent to protected riparian buffers identified ❑ Yes ® No within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why. ❑ Yes ❑ No Comments: 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? <10 % 2b. Does this project require a Stormwater Management Plan? ❑ Yes ® No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: Based on the % impervious, a stormwater management plan is not requried. 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: ❑ Certified Local Government 2e. Who will be responsible for the review of the Stormwater Management Plan? ® DWQ Stormwater Program ❑ DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? ❑ Phase II ❑ NSW 3b. Which of the following locally -implemented stormwater management programs ❑ USMP apply (check all that apply): ❑ Water Supply Watershed ❑ Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ® No attached? 4. DWQ Stormwater Program Review ❑ Coastal counties ❑ HQW 4a. Which of the following state -implemented stormwater management programs apply ❑ ORW (check all that apply): ❑ Session Law 2006-246 ❑ Other: 4b. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 9 of 11 PCN Form — Version 1.3 December 10, 2008 Version F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1a. Does the project involve an expenditure of public (federal/state/local) funds or the ❑ Yes ® No use of public (federal/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ® No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c. If you answered yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval ❑ Yes ® No letter.) Comments: We are not aware of a NEPA/SEPA being requried. 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑ Yes ® No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after -the -fact permit application? ❑ Yes ® No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ❑ Yes ® No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. We are not aware of additional development that will impact nearby downstream water quality. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non -discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. Wastewater will not be generated by the proposed project. Page 10 of 11 PCN Form —Version 1.3 December 10, 2008 Version 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ❑ Yes ® No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ® Yes ❑ No impacts? ® Raleigh 5c. If yes, indicate the USFWS Field Office you have contacted. ❑ Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? USFWS Letter dated, 8.4.17 (attached). 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ® No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? Based on our knowledge of the site, the site is not located in or near an area designated as essential fish habitat. Best management practices and the use of temporary sediment and erosion control devices will prevent sediment from entering down -gradient waterbodies which may contain fish. 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ❑ Yes ® No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? SHPO reviewed the proposed project as part of a state clearinghouse review of the project. SHPO letter dated 9.6.17 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA -designated 100 -year floodplain? ® Yes ❑ No 8b. If yes, explain how project meets FEMA requirements: No Rise Certification letter dated 8.4.17 (attached) 8c. What source(s) did you use to make the floodplain determination? FEMA FIRM 3720532800k and No Rise Certification Digitally signed by Bradley S. Luckey DN: cn=Bradley S. Luckey, o=Pilot Environmental, lnc.,ou, Bradley S. Luckey emall=bluckey@pilotenviro.com,r—US 9.22.17 Date: 2017.09.22 07:34:04 -04'00' Applicant/Agent's Printed Name Applicant/Agent's Signature Date (Agent's signature is valid only if an authorization letter from the applicant isprovided.) Page 11 of 11 PCN Form — Version 1.3 December 10, 2008 Version DocuSign Envelope ID: A9299FD9-CE72-4DB8-A2AE-A8546DDFD699 AGENT AUTHORIZATION This form authorizes PEI to act as our agent in stream/wetland matters including U.S. Army Corps of Engineers and North Carolina Division of Water Resources field verification and permitting. Property Address: Applicant Information: Name: Address: Telephone Number: Fax Number: E-mail Address: 238 Hampshire Lane Maysville, NC 28555 Hanover Solar, LLC 3250 Ocean Park Blvd. Suite 355 Santa Monica, CA 90405 (310) 581-6299 818-971-9428 DocuSigned by: 9/19/2017 Signature: Date: 0 1 2 3 4 5 6 7 1 8 91 10 H . 1 '� L 1 N VICINITY MAP ,n..uoo t u, o w � oNs, -go 11 1 1 J" Y oo�.. 1� II 1 1 11 F I W MzZz 1 1 l 1 I ( W zLLm� JuwsacrawL 1 1 1 � 1 � 1 RRORERTY BaJMOARr b - �-: Nom `^ oz,�n I I t b SITE LOCATI(Ml o x e G �rs_� I I I two � 03 1 1 I 1 ( I T IMPACT AREA #5 m 1 I ( to PERMANENT DITCH IMPACT: 44 LF -665 SF(0.015 AC) SCALE 1"= 5000' U NAL 1 (SEE SHEET EX.2) SITE DATA 11 I \ \' 1 533BOpOp1010 THE FEW FAMO.Y OF SITE BELEGRA�DES ANSBORO RO I 'l.: ` t> CIIOIML ` V ZGNM OMSLOW COlk1TY NORTHCAR(LMIALLC RASflRENT PRELIMFNARISEDA MAYSVILLE,NC30655 LAND U9E PFEISOLAR IMY ACREg ..SAC 1 ~ --�� SOIAR ENERGY osoTUlBEonrEn SOLAR AREA F .... 1 1 . I �� SYSTEM PARCEL LINE SET��:S "•PRE.IMINARY ARE SUBJECT t37.7AC TO CHANGE"' 5Fµ _ SOFT P � 1 MlSID1i �� / R 25 FT 1 \ I 1 11' IIT® SII ' 1 I i 4] 11 ... _ •{'/ ID OSTUVIAWCE AMauNr AMOUNTAMOUNT AMOUNT _I'/i/'/ _- ® II 1 II II 11 I I II _ _ - _ -. / np,ct N1 AYNMar4 PFr Tm ILF) T. ." (L� 250 (0006 SAMA 3012 190 0DM Siv.12o12 \ .... y t I I I IMPACT AREA #3 p 1 wm.FTal DStnMn aciN n.m P«m.mm 60 errpor.ry 30 Aoo 0.009 - slM.lzolz W7 PERMIT DRAWING NO) I6As6o FOR corlsrRuc:T:oN CONMATAM („) J E J I I 11 PERMANENT DITCH IMPACT: E \ 1 I I I / �, nyacl N2 .EI WlrtlanE PMm.n.M 125 0003 SMet2 oft 1 1 I (SEES18 LF - SHE90 ET \ IMPACT AREA #4 F I I EX..004 AC) -- = na,rt•z..n vA„M,a T—.n m 0002 sIM,12or2 l \ PERMANENT DITCH IMPACT: 1 1 1 (SEE SHEET EX.2) -' / / aPx1 Nz .5M,h.11 "Il22 3 rb 000z SIMM 2orz 1 I ) ---- ,-. 11 1 47 LF - 630 SF (0.014 AC) I 1 1 / / o I 1 - _ �� ... 1 ..I \ (SEE SHEET EX.2) I ( I / / F ` I 11/� I a3 JDDMn MiiC1 -J M1 HOacI M.JD Ok„ afy P.mMrMM zz anPv.ry Porrnn,nl 1E 190 000a t 1 47 630 12 Pr SMM2ocf2 1 SI,e.12of2 Nq W p W DITCH I I I .Er-^ i I JURISOICTIOHAL I // ..� I —_—� ---OROH. '1 I Yyxl 11 TOTAL.DWEfLMD MAPACT .npa.ry hrman.nl .mponry 0W5 ZOO 6E5OOtS m 0.009 SMel2 oft LuI~jl K 2 W 1y Q U UJ "OF _ — — _ -- \ — / --- -- h 1 \ _ _. ...1 ® II/// TOTAL JO BT PACT IMPACT A^mpo fW 00 aoo O.aw 15 -2 CI) Z X11 \� \ \i\ �\ \ \` TOTAL �rmlrl.nt N 112 1.EM 0.010 =K N (6W -— /ay 1 ®I o IMPACT •mponry W 10 0 q o' C EiIT OFFSEMIT \` _ ,, ..... / IMPACT AREA #2 '\\V \\ "~��` JURISDICTICWAL PERENNIAL / / I / '� PERMANENT WETLAND IMPACT: C `. STREAM IF 125 SIC (0.003 AC) M IT PERMANENT DITCH IMPACT: 3 LF - 80 SF (0.002 AC) ` JVRISOCTIONAL / // // / (SEE SHEET EX.2) E-A�T1NG 0ON01T1O'� 100 YR FLOODPUIN LEGEND —,m —,05 — PaoPosso couDRloNs BASRJ AREA — _ — _ — /- BUILDING SETBACK ------ GRAVEL ACCESS �` OVERHEAD ELECTRICA_ TREEi.m TREELIKE OVERHEAD ELECTRICAL--o.—oc— _�6- MAJOR CONTOURS PROPERTY LWE --� / ,� ` -- __ _. _ _ _ \ \ \ I.d,..• .�� / �� W MINOR CONTOURS SECURITY FENCE EGRESS AND UTILITY / / \ \ - j/ PROPERTY BOUNDARY ----—u—ue— LMR OF DISTURBANCE J B / / / , /°F / #1 PROPERTY(AO.DIFIERI RIGHT -0F- STREETCENTERLNJE — — — — — — VEGETATIVE BUFFER C� EASEMENTIBUFFER OFFSET — — — — — — n/ LL B O'^ LV lig Z LO � 00 N IMPACT AREA PERMANENT WETLAND IMPACT: JURISDICTIONALRIPARMN BUFFER - w ----- ----J VJ W V 260 SF (0.006 AC) PERMANENT STREAM IMPACT: JURISDICTIONAL STREAM = _ _ _ -J _ Z 30 LF, 400 SF (0.009 AC) (SEE SHEET EX.2) ,pJRISDICTIONAL WEIIAND _ — '— — , 1�1 �y (n W d. J 0 Q5 N GRAPHIC SCALE NORTH N A 9-19-17 WRB KPB OVE9a LL ACAREACdbdmywdig \ KI■■w, .wsbdsi'=150' EX -1 0 , 2 3 4 5 6 7 8 9 10 0 1 1 2 \ \ / (IYP.) (NO •YCRFASFJ / .. / \. s / f•1 --T EaTSTMc H //�EXIS MG JURWACTAONAL \ -J NEiIAb (ryp.) ZD / / �//DITCH ITrP) - / r 3 4 EX1S"NG JURISONCl/ONIL --�F '1 \ wrDN rrm, /� ' 3VJURISDCW)NAL \ / ; / / i� / \ $ ga 1h 2, 5 g 7 ,. m1 mn 1 �I .m (III- a Z■i <A� p �a ^$ . q ~ 8 Y.•. [Ila I NAM n ` : t� H Q TEMPORARY VJETUFD AMMCT. / / /'/ \\-- "COFFER OAM WITH PUMP MOUND IEEE '. / J TN39HEET)(1109i-o.002 AC) / �// //-'OFFSET(rYP.I TEMPORARY JURISdC110NAL \ l \/ dTCH WACT 16LF, 2s 6P-O.Wt ACI / �$ $ s s s u I r•y�• 1 nr nr s.•r r. i '6� $ g� • • • -----_- r • , u'v� aPo /DETAIAA__ (IOLFTEL \ \ MPORARYSTREMIO.PACT) / \\ 1D i'' , / \ r F4WAArNENT JUTtMO1CT101M, �' J .\ , DITGH MIPACT (TOTAL 20LF. / a g APAP. I - ' s rn ro ^j( a^ -- r •F i u W J u=" 32LF35.OD)CLASS MRCP TOJ��LT�.-35LF / \ \ i7(SFE DETK WSF'O.W2AC) \\ / BHEETI <.� / / u ..Y. " 1 rw MusAu .ra Ynn y 1.I aan +e•••nm+F. an.. _ _ _____ mu: Z�jN ¢ $ W /� // PIIECAST CONCRETE / \ J/ ENOWNLRYPA(SEE y/� d PERMANENT MRSDICTDNAL \ DETNL THIS SMEEn / WETLAND IMPACT �(+ MAMENT/ 11159E-O.W3 AC) d STREAM IMPACTRISDgTgNAL / ♦ PROPBtTY �) J /. BOUNDARYTPA /�� PRECAST CONCRETE 9 ENDWALL (TYP.) (3EE /��r ✓ (' / DETAG TRIS SHEET) / / I / ' 1 E p { L (. rw r. ay! :riw•. i w•li i� ia'w�m JCJ� NTN [LEIY/TIDY nl.I .awl�rA�r� ni rarrla �:Qji rt ® E + =Y C C OI C - - -- nu �Y �r• IIS' '-_ Y7111nw ! R! I F g w = Q ur TQUx w W✓:. .•N U < g ESSTWG GRAVEL /✓ d (WLF.IWBF-O.o0BAC) / ROA. fTYP.J - `. /� �'- G '•-,A s , - 'V'\ d—✓ \/ y% / q / / /�1--.--w—tB lu wnEra Y - / / �'J / i / CdarRtlCT �' y 32 LF 21.0 (D) GlA9S N RCP / / 1 ✓ .' /j, (EXIST,NG i3'RCP-_22 /f / roBE REAIOVEO /�.sn.r w DI6MLL 11lIEI •M. mlrtr P. IPF., n 1 . r �I Gj m w LL9 L 3L -wig A �� �—•y xae rb:r a !� G W s = a m $ b, ✓� / PROTECTION (SEE DETAIL X w1 / ✓ Jam, ,�\ THIS SHEET) EATSTOIO MAIM R / ROAD(TYP.)✓ J/ ✓ tC� PERMANENT JURISDICTIONAL A - ? ,.rr•.= . (� n.: • $F- i 7 RI t�• �•- w 2 cr ¢mIQ WV d/� \/ /✓/ /y/ / V TEMPORARY JURISDICTIONAL ✓/ P. / ) VIETIAND IMPACT 11259E-D.W3 ACI ��$ K' L GNI ---r $ o W 0 WETLAND MPACT Jb� ISO SF -0.001 Ac) \ f5 LF TEMPORARY STREAM WALT) / \ ✓ ` ri/ / _ •. �. % �. TEMPORARY WETLANp WPACf. / j - COFFER DAA1 WITH PUMP \ ri•.r • •rr•r mos r •.sr..ae r E.rrar • BECTSdN A -A l ►ITE OIITLLFI RTN DITDIF Tam pl K,r } m —� �' A PERAINNEWETUNONI TM7NK AROUND (SEE DETAIL 1111$ / / /✓/ \' •. SHEETI(W SF -0.002 AC) /676.02!IM r n uAr Y R,r A•r. IFYMY •Ter3r Y� E�Fld !.■ OYIIET IIITYo11T 6ITDY T 30 JURISDICTIONAL \ (115SF-0.073AC) /✓ / \ /'Y OFFSET(TYP.) ; , / \ •- /✓ /✓ / \.. .. ,_ .�/ ii ni MOTES �i If lk 4 F / IMPACTAREA 61 ISGME ASPDTm) ✓ / / / IMPACTAREA M2 / / 1 / ISCAIF As NOTEDI / ��' ^ � a.�.—� n.r c';_I a� —t" ___ ___� . • i-- • Y<w2� L_ 1 _T ¢ _All �3 • 8 6€ ✓!j �� r.�.y as ga y n IR �■ pppp y� ISE LlAe3 A ER093W CDATROL STONE cm sTRWNYML eraM. MA. •wr sE tD ilEn.cuNT�nDLpETUNEFTDYE fOR CMNSTALCT TOP K •ERY A YIntYW OF 111! OHE FWD MELOID TME 9MWLOER M A -' A DivER910N POTYT I ///� J YKMIEIOF 33001 —11 A TOTAL IIlEl Eq I'llTRA11 / R011 F =` '6b oF; c F y Y 30'JIIRBDIGT%Y1AL J PROPOSED 3ECUPott 3PJURISD`CWDNAL OFFSET ITYP.I P I ' �� IP •eP. AUN } n r, Il�L 1y w OF TIM .—ID vOLU1E WY x 1-1.10 3Y UP 011 IgSSTREAY COXTROL3. ur ` OFFBE'f (TYPJ y FENCE (TYP.1 // / _ 1 FXrSPNG JUf3SO1CTIQNAL -- - (TVP.) as �'.I• g� w -- S JURISDICTIONAL �/ p{CH WPACT (fOTAL:p LF. / 1IW 6h O.WAC) '� / 171L1 OUTLET PROTECTION �y/�. (SEE MAL Ma SFIEET) / / \ / J / E / 1 1 TEMOYCOFTERDAMWMPPERMANENT AROUND (SEE DETAIL THIS 3"UT) t 110 LF OF IEMPDRARYIMPACT) 1 {`1 ( 1 s •a y1 A : IR 8 O I I I �I �I 1 1 4 wlr wwr ar M� ` g4< i �m p i ■ r rN. 3rRWt WL 3r0K\\ EAM •EAY ■ r� PERMIT DRAWING HOT EASED FOR CONSTRUIO CTN T' SLF TEMIPORMr -//J / '.// J JUDSDICTOML"' / CONSTRUCT DITCH RPACT 321E 119 (DI CI.ASSNRCP % -RCP• ��—m—La� �u•_1r_ 1 ''- 1 1 4Sw� C IJ5♦yi� $+ tttEEE •' E a w Y Fc i3 a «< G E ITN •j\ •' YiY. RMwMr faquLDu P FIW �z M, E J 52 R �% �. 1 (ESSTMG IS -72 Lf / TO SEREMDVED) // //J / • M r r r .M r r • rrr Y y y< IR DIYEMIOY •OIYT D' �,' FLq j r.•••n IDI .._ _. a N Q o W _ 1- *�—GON9TRUCT 1 - 3z LF u•D ry) CONCRETE ENOWALL FOR 1 PRECAST CONCRETE - ENDWALL ITYP.I (BEE CLA55 MRCP SINGLE PIPE CULVERT (TY'P.1 - _ + (SEEDETKTHIS SIEETI r `1 --y) -}n. .. .-.__ I 1 +� A __. _ _ _ 1 = 1 r.r • .r r :v ��. r.• .. n n.. .e + n 1 • 18 .0 •OIYExi WN,ISL •iorR raE�O•-21' ILK W% fECTION Z yJ w W J / DETAR THIS SHEET) 1 P IIIRIRR 1 1636.0 w N x p Z. / j / �/ / r / /J 6'` /./ PERMANEM JIINISDICTIONAL �NO-� u—Is DITCH MPACT(TOTAL:MLF. I� ITI 111 6 11 fmR Q : u O w 4 TEMPORARY COFFER DAM rmH PL1Mi / / 8859E-0.016 ACI _ g �� } MANAGING THE WATERCOURSE: / 6 AROUND (BEE DETAIL THIS SHEET) LF OF TEMPORARY YIAGT) - i D ' `r / / t2SE DETA PROTECTION .n- -1\ (SEE OETK THIS SHEET) 1� � P>d �y$ ffiIEE € y a���i BYPASS PUMPING 0_ }1 D / EX13nNGJ0'PRNADE ROAD ROWITYP) / •. SLFTEEi01FARr USE CLAS T RIP PAP FOR 9TRLICTLIL, ,-" f 9TOMF. , C G UY W. 5 OR M. ^_ Y. -_. , E GSTIN(i 50'MiRESSfGRE55 i AND Ui0.11YEA361ETT(TY'P.s / J •\ =_ _ •R1Po8DICfgINI `- DITCH (.PACT Sl STONE FOR A' IIOT 0_.PLACE SEDTYf3T 0•A tM -.. ,'. A LIVE B. ' s "' ".. ••• "�`•-- IMPACT AREA 63 / .. IMPACT AREA 65 6 " IN3rAlI D Wu FIBER LAPFLE9 Nw --._. °T"t A•nc�A , F.—Lt / ISCAIf AS NOTED) (SCALE AS NI<g L (� SAI YtaPnOpp IR TM RDIAAY 9TANOARO ORAY[1S ND ,6•D. - --'-` ,.t-- LL P t FI ' 1 1 GENERAL NOTES 1. JU1119DICTMkY1 WETLAND DELYEATION PROVIDED W PILOT ENVIRONM I_ Mc. ' � I 2. DISTURBANCE AT THE JURISDICTIONAL WETLAND, DITCH AND STREAM IMACTS SHALL SE MINIMIZED TO THE EXTENT PRACTICABLE FOR THE PROPOSED IMPROVEMENTS. gQyOI F tl1! 1 3. TME CONSTRUCTION SHALL BE CONSTRUCTED M ACCORDANCE WITH ALL USAGE AND NCOEO STANDARDS. >� $ I I. Ip •:. f nu r C 11 ' 1. ALL TEMPORARY EROSION CONTROL MEASURES SHALL SE MAINTAINED M PROPER WOFI. CONDITION THRWOHOIT CONSTRUCTION. < I .uNo• ry1r AIS .wrn.a o==A­­-PP­---` C ` INSTALL SILT —1 WITH DRAMSINACCOROANCEWTH I) F EROSION CONTROL PERMIT MPORARY 5. INSTALL TESILT FENCE STONE OUTLETS AT LOW CE POINTS IN SLT PENCE AS FESSMY, 8. ADDITIONAL EF..N CONTROL MEASURES AMDKIR MODIFKATIOFLS TO PROPOSE. MEASURES MAr r cm..Vcm..erA.eu.n.cmm - F 1 BE NECESSARY BASED UPON ACTUAL FEW CONDITIONS. LEGEND TEMPORARY COFFER DAM VYT1 PIIGP I2 o _ _ 1W YRfL000a66FING C2H2RION9 - w — �m - PROPOSFDCONOITgNS GRAVEL ACCESS bELFCT6YAFMI FDIi ROM. FWYEDGRADE WTERML WMti11SICip11 COVER U J J AROUND(SEEDETAILTHMSHEET) 5 L TEMPORARY (10 Li Of TEMPORARY HAPACT) IT(%1 JURISDICT10NP1 '. r'•� DITCH IMPACTDELECTRICAL B `' ....,�f_. - _ - MAIDS CONTOURS ARMOR COMMASSMw. TREELINE /YYWYYY, OVERHEAD ELECTRICAL eEcuRlrY FENCE -I � - -- - -I - - _ _ - B I ✓ \r IVILIOUTLETPROTECTION PERMANENT JURISDICTgINL I i 1 (SEE DETAIL THIS SHEET) DTFCHLPACT(TCTKI7LF, l6\` _ _ _ PROPERTY SoLDMY ��� PROPERTY IADJOIER) 20NE-1 UFFEit-3p JURISDICTIONAL IM ARAN y = i LIMIT O DISTURBANCE EASEAENTa1JFFER OFFSET -y u- DRCHaTREAMMJETIAND TEMPORARY IMPACT -- R M ADE_ owT)M1) (DIRCP(TYF.1 -� BI' �) B m' 6 2%DRNI � 5:, �/ M B Q ZL, J L/% JOO O :\/ �y UNL.L) 63E-0.011 AC) CONCREEN OU�CUVERT(Vp.) ZONE2SUFER-O�IMPACT JURISD"CTIONAL RIPARIAN ���1 — --- TON �� DINL PRE TREK DITCH Z -----__ (WE OETK5HEET) _ 3II I �I�—IJ+�•.•1-- -.CONSTRUCT T 1 _ V�Y U)-32LFIM(D) CLASS N RCP _ - _ JURISDICTIONAL—. -',J JURISDIGTgNAL WETLAND _ — _ '— WTLANp PERAWEM l IMPACT - - - MDM VEI FINI9XE0 GRADE SELECT BAC4ILL r1P+COV9f CROSS SECTION S$ YATERUL IM•07 TO SUlFl \T / // I IOIRCP.CU44N ETaaMy / i --HEA------L---�-- � IVAAESN \I _-- > 4• J OGRADE Q� ` I (TIP) STOLE PPDIOFE7 EA9TgIG TPN' CID� ICI RCP a -- DOEHISTREhl WAFT PRpTEC.a-'`OD MDDITgN•L EPLECEMEENTOFTHE BTREAAUSTSI ROR BOTTOM OF LEMOTN i'OR ECAST iJJNEDElONM1 DITCH BY 20%(6'1 OF THE CULVERT OIPA£TER (�AGSTmEs6HT1 I,TTW s�'M0f"'MB0Ti0 ce) +• NL q GRAPHIC SCALE NORTH N .YYY\ r\ \ MTDHrsmFAM vARYs � CROSSING SECTION A -A ' wn 9.1317 WRB • KPB IMPACT AREA M4 -�---_ \ 1• = 20 INOTTOSCALE, PIPE CROSSING CROSS SECTION (NOT TO SCALE) IMPACT AREA n DETAILS 0 1 2 3 4 5 6 7 8 9 10 E"_2 United States Department of the Interior Catherine Carston Pilot Environmental Inc. PO Box 128 Kernersville, NC 27258 FISH AND WILDLIFE SERVICE Raleigh FS Field Office Post Office Box 33726 Raleigh, North Carolina 27636-3726 August 4, 2017 Re: Hanover Solar Farm (Additional Area) — Onslow County, NC Dear Mrs. Carston: This letter is in response to your request for information on your proposed solar project, listed above. Our comments are submitted pursuant to, and in accordance with, provisions of the Endangered Species Act (the Act). Based on the information provided and other information available, it appears that the proposed action is not likely to adversely affect any federally -listed endangered or threatened species, their formally designated critical habitat, or species currently proposed for listing under the Act at these sites. We believe that the requirements of section 7(a)(2) of the Act have been satisfied for your project. Please remember that obligations under section 7 consultation must be reconsidered if: (1) new information reveals impacts of this identified action that may affect listed species or critical habitat in a manner not previously considered; (2) this action is subsequently modified in a manner that was not considered in this review; or, (3) a new species is listed or critical habitat determined that may be affected by the identified action. However, the Service is concerned about the potential impacts the proposed action might have on aquatic species. Aquatic resources are highly susceptible to sedimentation. Therefore. we recommend that all practicable measures be taken to avoid adverse impacts to aquatic species, including implementing directional boring methods and stringent sediment and erosion control measures. An erosion and sedimentation control plan should be submitted to and approved by the North Carolina Division of Land Resources, Land Quality Section prior to construction. Erosion and sedimentation controls should be installed and maintained between the construction site and any nearby down -gradient surface waters. We recommend maintaining natural, vegetated buffers on all streams and creeks adjacent to the project site. The Service recommends that solar facilities be sited in areas that are previously disturbed, or sites that do not impact mature forest, wetlands, or streams. The North Carolina Wildlife Resources Commission has developed a Guidance Memorandum (a copy can be found on our website at (http://www.fws.gov/raleigh) to address and mitigate secondary and cumulative impacts to aquatic and terrestrial wildlife resources and water quality. We recommend that you consider this document in the development of your projects and in completing an initiation package for consultation (if necessary). In addition, we encourage the use of natural vegetation management practices (such as sheep grazing) and the planting or seeding of native pollinator plant species where possible on the site, and other efforts to improve habitat for various species (such as bird houses and bat boxes). Please note our specific recommendations, below. Invasive Exotic Species — the Service is concerned with the introduction and spread of invasive exotic species in association with the proposed project. Without active management, including the revegetation of disturbed areas with native species, the project area will likely be a source for the movement of invasive exotic plant species. Exotic species are a major contributor to species depletion and extinction, second only to habitat loss. Exotics are a factor contributing to the endangered or threatened status of more than 40 percent of the animals and plants on the Federal List of Endangered and Threatened Wildlife and Plants.' it is estimated that at least 4,000 exotic plant species and 2,300 exotic animal species are now established in the United States, costing more than $130 billion a year to control. Additionally, the U.S. Government has many programs and laws in place to combat invasive species (see www.invasivespecies.gov) and thus cannot spend money to counter these efforts. Specifically, Section 2(a)(3) of Executive Order 13112 Invasive Species (February 3, 1999) directs federal agencies to "not authorize, fund, or carry out actions that it believes are likely to cause or promote the introduction or spread of invasive species in the United States or elsewhere," Despite their short-term erosion control benefits, many exotic species used in soil stabilization seed mixes are persistent once they are established, thereby preventing the reestablishment of native vegetation. Many of these exotics plants; are also aggressive invaders of nearby natural areas, where they are capable of displacing already established native species. Therefore, we strongly recommend that only native plant species be used in association with all aspects of this project. Pollinator Recommendations — Although solar energy production is a fast-growing Renewable energy source that can lessen overall impacts to natural resources when compared to conventional energy sources (coal, oil, gas, etc.), we believe solar farms can adversely affect valuable natural resources if they are not properly planned and constructed. impacts to natural resources from the construction, operation, and maintenance of solar farms include: the removal of forests and riparian buffers; creation of monotypic habitat; introduction of invasive species; use of herbicides; creation of large, clear open spaces; and barriers created from fencing. Recent evidence indicates that pollinators, especially native bees and monarch butterflies, are in serious decline. Habitat losses and diminished native food sources have decreased the populations and diversity of pollinators throughout the country. For these reasons, we recommend that solar facilities be sited in areas that are previously disturbed (fallow fields, closed industrial sites, etc.) or sites that do not impact mature forests, streams, or wetlands. To offset the overall impacts of solar facilities and/or to increase the habitat and species diversity within the solar facility area, we further recommend the following measures be implemented into project design: N Sow native seed mixes with plant species that are beneficial to pollinators throughout the site. Taller growing pollinator plant species should be planted around the periphery of the site and anywhere on the site where mowing can be restricted during the summer months. Taller plants, left un -mowed during the summer, would provide benefits to pollinators, habitat to ground nesting/feeding birds, and cover for small mammals. Low growing/groundcover native species should be planted under the solar panels and between the rows of solar panels. This would provide benefits to pollinators while also minimizing the amount of maintenance such as mowing and herbicide treatment. Using a seed mix that includes milk weed species (milk weed is an important host plant for monarch butterflies) is especially beneficial. The following website provides a comprehensive list of native plant species that benefit pollinators: https:Hmail.google.com/mail/u/0/gadvancedsearch/subject=pollinator&subset=all&has=a nita&within=l d&sizeoperator—s_sl&sizeunit=s_smb/I4f0366dba7d3bda?projector=l . Additional information regarding plant species, seed mixes, and pollinator habitat requirements can be provided upon request. 2. Create openings in fencing to allow passage for small mammals and turtles. 3. If possible, the solar field should be designed with open areas spread throughout the project site and planted and maintained with taller/pollinator friendly plant species. This practice would benefit pollinators, create diversity throughout the site, and provide much needed shelter islands to aid in the movement of small mammals and birds. 4. Mitigate for the loss of forested habitat. Though the loss of forested habitat cannot be fully mitigated when cleared for solar facilities, we believe measures should be implemented into the design plans to offset the impacts of the project to the greatest extent practicable. We recommend the construction and placement of bat and bird boxes throughout the site along with perch poles that are large enough to be used by raptors. 5. Provide nesting sites for pollinator species. Different pollinators have different needs for nesting sites. Therefore, we recommend designing the solar facility to maintain a diverse array of habitats to accommodate varied pollinators from hummingbirds to butterflies to bees. Hummingbirds typically nest in trees or shrubs while many butterflies lay eggs on specific host plants. Most bees nest in the ground and in wood or dry plant stems. For additional information and actions that can be taken to benefit pollinators please visit the following website: http://www.fws.gov/Pollinators/pollinatorpages/votirticip.html The Service has established an on-line project planning and consultation process which assists developers and consultants in determining whether a federally -listed species or designated critical habitat may be affected by a proposed project. For future projects, please visit the Raleigh Field Office's project planning website at https://www.fws.g_ov/raleinh/py html. If you are only searching for a list of species that may be present in the project's Action Area, then you may use the Service's Information, Planning, and Consultation System (IPaC) website to determine if any listed, proposed, or candidate species may be present in the Action Area and generate a species list. The IPaC website may be viewed at https•//ecos.fws.yov/ipac/. The 3 IPaC web site contains a complete and frequently updated list of all endangered and threatened species protected by the provisions of the Endangered Species Act of 1973, as amended (16 U.S.C. 1531 et seq.)(Act), a list of federal species of concern 3 that are known to occur in each county in North Carolina, and other resources, if you have any questions or comments, please contact Kathy Matthews of this office at (919) 856-4520 ext. 27. Sincerely, etc Benjamin Field Supervisor )7! I Wilcove, D. S., D. Rothstein, J. Dubow, A. Phillips, and E. Losos. 1998. Quantifying threats to imperiled species in the United States. BioScience 48:607615. 2 Pimentel, D., L. Lach, R. Zuniga, and D. Morrison. 2000. Environmental and economic costs of nonindigenous species in the United States. BioScience 50:5365. 3 The term "federal species of concern" refers to those species which the Service believes might be in need of concentrated conservation actions. Federal species of concern receive no legal protection and their designation does not necessarily imply that the species will eventually be proposed for listing as a federally endangered or threatened species. However, we recommend that all practicable measures be taken to avoid or minimize adverse impacts to federal species of concern. 2 COUNTY: ONSLOW NORTH CAROLINA STATE CLEARINGHOUSE DEPARTMENT OF ADMINISTRATION }- INTERGOVERNMENTAL REVIEW 0- U O STATE NUMBER: 18-E-4600-0050 DATE RECEIVED: 08/21/2017 J AGENCY RESPONSE: 09/15/201' V REVIEW CLOSED: 09/20/2017 W LL 0 R11: ENERGY RELATED FACILITIES/ACTIVT_TIES MS RENEE GLEDHILL-EARLEY CLEARINGHOUSE COORDINATOR DEPT OF NATURAu & CULTURAL RESOURCE STATE HISTORIC PRESERVATION OFFICE MSC 4617 - ARCHIVES BUILDING RALEIGH NC REVIEW DISTRIBUTION DEPT OF AGRICULTURE DEPT OF ENVIR. QUALITY - COASTAL MG DEPT OF ENVIRONMENTAL QUALITY DEPT OF NATURAL & CULTURAL RESOURCE DEPT OF TRANSPORTATION DNCR - NATURAL HERITAGE PROGRAM DPS - DIV OF EMERGENCY MANAGEMENT EASTERN CAROLINA COUNCIL FAUG 2 5 2u;7 HISTORIC PRESERVATION OFFICE PROTECT INFORMATION APPLICANT: North Carolina Department of Commerce TYPE: State Environmental Policy Act Environmental Review P� N N N CL fA DESC: Amended Application of Hanover Solar, LLC for Certificate to construct a 5 MW Solar Photovoltaic Electric Generating Facility in Onslow Co. Docket #SP -7921 Sub 0. - View document at http://starwl.ncuc.net/NCUC/portal/ncuc/page/Dockets/portal.aspx, Type SP -7921 Sub 0 in the Docket Number search line. Located off Hampshire Lane, east of Belgrade-Swansboro Road and approximately .55 miles north of the intersection of Tierce Lane and Pattie Lane in Maysville, NC Amended due to the addition of a preexisting access road that runs along Hampshire Lane, which will be widened. CROSS-REFERENCE NUMBER: 16-E-4600-0404 The attached project has been submitted to the N. C. State Clearinghouse for intergovernmental review. Please review and submit your response by the above indicated date to 1301 Mail Service Center, Raleigh NC 27699-1301. If additional review time is needed, please contact this office at (919)807-2425. AS A RESULT OF THIS REVIEW THE FOLLOWING IS SUBMITTED:rbq NO COMMENT COMMENTS ATTACHED SIGNED BY: DATE: Q AUG 2 8 gni? North Carolina Department of Public Safety WSEmergency Management Roy Cooper, Governor Erik A. Hooks, Secretary August 4, 2017 Cynthia Burley, Floodplain Administrator Onslow County Code Enforcement 604 College Street Jacksonville, NC 28540 Michael A. Sprayberry, Director Subject: Hampshire Road Improvements, Onslow County, North Carolina Dear Ms. Burley: The North Carolina Department of Public Safety Division of Emergency Management Risk Management National Flood Insurance Program (NCNFIP) staff has reviewed the information provided by Lloyd A. Tyndall, P.E. in support of a No -Rise Certification for proposed road improvements on Hampshire Road along Grants Creek in Onslow County. The certification is dated August 3, 2017. It was received in this office on August 3, 2017. Based on the information provided, the NCNFIP review indicates the report meets the requirements of the Federal Emergency Management Agency's (FEMA) guidance for a no -rise certification. The NCNFIP finds no objection to the conclusion of no increase in flood levels as contained in the certification. A floodplain development permit will be required prior to starting any site work. If you have any questions or concerns with the items herein, please contact me at (919) 825- 2300, by email at dan.brubakergri dps.gov or at the address shown on the footer of this document. MAILING ADDRESS: 4218 Mail Service Center Raleigh NC 27699-4218 www.ncem.org Sincerely, —D -ks 4n D. Brubaker, P.E., CFM NFIP Coordinator Risk Management 9 WEU cFy `F to y, NOR 111 CARM INA RM OFFICE LOCATION: 4105 Reedy Creek Road Raleigh, NC 27607 Telephone: (919) 825-2341 Fax: (919) 825-0408 U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action Id. SAW -2016-01353 County: Onslow U.S.G.S. Quad: NC -STELLA Property Owner: Size (acres) Nearest Waterway USGS RUC NOTIFICATION OF JURISDICTIONAL DETERMINATION Brenda Redd 2200 Castle Pines Drive Raleieh, NC 27604 65 Grants Creek 03020301 Agent: Michael T. Brame PO Box 128 Kernersville. NC 27285 Nearest Town Maysville River Basin White Oak River Coordinates Latitude: 34.8065218931764 Longitude: -77.2070154444539 Location description: The project area is located on the west side of Hampshire Ln, aonroximately 0.65 miles northeast of its intersection with Belerade-Swansboro Rd., MaysvMe. Onslow County North Carolina. Indicate Which of the Following Apply: A. Preliminary Determination X There are waters, including wetlands, on the above described project area, that may be subject to Section 404 of the Clean Water Act (CWA)(33 USC § 1344) and/or Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403). The waters, including wetlands, have been delineated, and the delineation has been verified by the Corps to be sufficiently accurate and reliable. Therefore this preliminary jurisdiction determination maybe used in the permit evaluation process, including determining compensatory mitigation. For purposes of computation of impacts, compensatory mitigation requirements, and other resource protection measures, a permit decision made on the basis of a preliminary JD will treat all waters and wetlands that would be affected in any way by the permitted activity on the site as if they are jurisdictional waters of the U.S. This preliminary determination is not an appealable action under the Regulatory Program Administrative Appeal Process (Reference 33 CFR Part 331). However, you may request an approved JD, which is an appealable action, by contacting the Corps district for further instruction. _ There are wetlands on the above described property, that may be subject to Section 404 of the Clean Water Act (CWA)(33 USC § 1344) and/or Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403). However, since the waters, including wetlands, have not been properly delineated, this preliminary jurisdiction determination may not be used in the permit evaluation process. Without a verified wetland delineation, this preliminary determination is merely an effective presumption of CWA/RHA jurisdiction overall of the waters, including wetlands, at the project area, which is not sufficiently accurate and reliable to support an enforceable permit decision. We recommend that you have the waters of the U.S. on your property delineated. As the Corps may not be able to accomplish this wetland delineation in a timely manner, you may wish to obtain a consultant to conduct a delineation that can be verified by the Corps. B. Approved Determination There are Navigable Waters of the United States within the above described project area subject to the permit requirements of Section 10 of the Rivers and Harbors Act and Section 404 of the Clean Water Act. Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. There are waters of the U.S. including wetlands on the above described project area subject to the permit requirements of Section 404 of the Clean Water Act (CWA)(33 USC § 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. _ We strongly suggest you have the waters of the U.S. including wetlands on your project area delineated. Due to the size of your property and/or our present workload, the Corps may not be able to accomplish this wetland delineation in a timely manner. For a more timely delineation, you may wish to obtain a consultant. To be considered final, any delineation must be verified by the Corps. _ The waters of the U.S. including wetlands on your project area have been delineated and the delineation has been verified by the Corps. We strongly suggest you have this delineation surveyed. Upon completion, this survey should be reviewed and verified by the Corps. Once verified, this survey will provide an accurate depiction of all areas subject to CWA jurisdiction on your property which, provided there is no change in the law or our published regulations, may be relied upon for a period not to exceed five years. _ The waters of the U.S. including wetlands have been delineated and surveyed and are accurately depicted on the plat signed by the Corps Regulatory Official identified below on . Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. There are no waters of the U.S., to include wetlands, present on the above described project area which are subject to the permit requirements of Section 404 of the Clean Water Act (33 USC 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. _ The property is located in one of the 20 Coastal Counties subject to regulation under the Coastal Area Management Act (CAMA). You should contact the Division of Coastal Management in Morehead City, NC, at (252) 808-2808 to determine their requirements. Placement of dredged or fill material within waters of the US and/or wetlands without a Department of the Army permit may constitute a violation of Section 301 of the Clean Water Act (33 USC § 1311). If you have any questions regarding this determination and/or the Corps regulatory program, please contact Rachel Cavito at 910-251-4487 or Rachel.A.Caoito(i)usace.armv.mil. C. Basis For Determination: The proiect area exhibits wetland criteria as described in the 1987 Corps Wetland Delineation Manual and appropriate Reeional Supplement. The water bodies exhibit ordinary high water marks as indicated by the absence of veeetation in the stream channel and the presence of bed and bank, sediment deposition and wrack lines. Site visit by Brennan Dooley 7/6/2016. Desktop review of additional property area by Rachel Caulto 9/6/2017. D. Remarks: E. Attention USDA Program Participants This delineation/determination has been conducted to identify the limits of Corps' Clean Water Act jurisdiction for the particular site identified in this request. The delineation/determination may not be valid for the wetland conservation provisions of the Food Security Act of 1985. If you or your tenant are USDA Program participants, or anticipate participation in USDA programs, you should request a certified wetland determination from the local office of the Natural Resources Conservation Service, prior to starting work. Corps Regulatory Official: Date: September 15, 2017 Expiration Date: N/A The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete our Customer Satisfaction Survey, located online at http://regulatory.usacesurvey.com/. SECTION I - The following identifies your rights and options regarding an administrative appeal of the above decision. Additional information may be found at hitp://www.usace.gM.miUMissions/CivilWorks/Re. ug latoryProgramandPermits.aspx or Corps regulations at 33 CFR Part 331. A: INITIAL PROFFERED PERMIT: You may accept or object to the permit. • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. • OBJECT: If you object to the permit (Standard or LOP) because of certain terms and conditions therein, you may request that the permit be modified accordingly. You must complete Section II of this form and return the form to the district engineer. Your objections must be received by the district engineer within 60 days of the date of this notice, or you will forfeit your right to appeal the permit in the future. Upon receipt of your letter, the district engineer will evaluate your objections and may: (a) modify the permit to address all of your concerns, (b) modify the permit to address some of your objections, or (c) not modify the permit having determined that the permit should be issued as previously written. After evaluating your objections, the district engineer will send you a proffered permit for your reconsideration, as indicated in Section B below. B: PROFFERED PERMIT: You may accept or appeal the permit • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. • APPEAL: If you choose to decline the proffered permit (Standard or LOP) because of certain terms and conditions therein, you may appeal the declined permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. C: PERMIT DENIAL: You may appeal the denial of a permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. D: APPROVED JURISDICTIONAL DETERMINATION: You may accept or appeal the approved JD or provide new information. • ACCEPT: You do not need to notify the Corps to accept an approved JD. Failure to notify the Corps within 60 days of the date of this notice, means that you accept the approved JD in its entirety, and waive all rights to appeal the approved JD. • APPEAL: If you disagree with the approved JD, you may appeal the approved JD under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the district engineer. This form must be received by the division engineer within 60 days of the date of this notice. NOTIFICATION OF ADIIIINISTRATIVE APPEAL OPTIONS AND PROCESS AND REQUEST FOR APPEAL Applicant: Brenda Redd File Number: SAW -2016-01353 Date: September 15, 2017 Attached is: See Section below ❑ INITIAL PROFFERED PERMIT Standard Permit or Letter ofpermission) A ❑ PROFFERED PERMIT (Standard Permit or Letter ofpermission) B PERMIT DENIAL C ❑ APPROVED JURISDICTIONAL DETERMINATION D ® PRELIMINARY JURISDICTIONAL DETERMINATION E SECTION I - The following identifies your rights and options regarding an administrative appeal of the above decision. Additional information may be found at hitp://www.usace.gM.miUMissions/CivilWorks/Re. ug latoryProgramandPermits.aspx or Corps regulations at 33 CFR Part 331. A: INITIAL PROFFERED PERMIT: You may accept or object to the permit. • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. • OBJECT: If you object to the permit (Standard or LOP) because of certain terms and conditions therein, you may request that the permit be modified accordingly. You must complete Section II of this form and return the form to the district engineer. Your objections must be received by the district engineer within 60 days of the date of this notice, or you will forfeit your right to appeal the permit in the future. Upon receipt of your letter, the district engineer will evaluate your objections and may: (a) modify the permit to address all of your concerns, (b) modify the permit to address some of your objections, or (c) not modify the permit having determined that the permit should be issued as previously written. After evaluating your objections, the district engineer will send you a proffered permit for your reconsideration, as indicated in Section B below. B: PROFFERED PERMIT: You may accept or appeal the permit • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. • APPEAL: If you choose to decline the proffered permit (Standard or LOP) because of certain terms and conditions therein, you may appeal the declined permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. C: PERMIT DENIAL: You may appeal the denial of a permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. D: APPROVED JURISDICTIONAL DETERMINATION: You may accept or appeal the approved JD or provide new information. • ACCEPT: You do not need to notify the Corps to accept an approved JD. Failure to notify the Corps within 60 days of the date of this notice, means that you accept the approved JD in its entirety, and waive all rights to appeal the approved JD. • APPEAL: If you disagree with the approved JD, you may appeal the approved JD under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the district engineer. This form must be received by the division engineer within 60 days of the date of this notice. E: PRELIMINARY JURISDICTIONAL DETERMINATION: You do not need to respond to the Corps regarding the preliminary JD. The Preliminary JD is not appealable. If you wish, you may request an approved JD (which may be appealed), by contacting the Corps district for further instruction. Also you may provide new information for further consideration by the Corps to reevaluate the JD. SECTION H - REQUEST FOR APPEAL or OBJECTIONS TO AN INITIAL PROFFERED PERMIT REASONS FOR APPEAL OR OBJECTIONS: (Describe your reasons for appealing the decision or your objections to an initial proffered permit in clear concise statements. You may attach additional information to this form to clarify where your reasons or objections are addressed in the administrative record.) ADDITIONAL INFORMATION: The appeal is limited to a review of the administrative record, the Corps memorandum for the record of the appeal conference or meeting, and any supplemental information that the review officer has determined is needed to clarify the administrative record. Neither the appellant nor the Corps may add new information or analyses to the record. However, you may provide additional information to clarify the location of information that is already in the administrative record. POINT OF CONTACT FOR QUESTIONS OR INFORMATION: If you have questions regarding this decision and/or the If you only have questions regarding the appeal process you may appeal process you may contact: also contact: District Engineer, Wilmington Regulatory Division, Mr. Jason Steele, Administrative Appeal Review Officer Attn: Brennan Dooley CESAD-PDO 69 Darlington Avenue U.S. Army Corps of Engineers, South Atlantic Division Wilmington, NC 28403 60 Forsyth Street, Room l OM 15 Atlanta, Georgia 30303-8801 Phone: 404 562-5137 RIGHT OF ENTRY: Your signature below grants the right of entry to Corps of Engineers personnel, and any government consultants, to conduct investigations of the project site during the course of the appeal process. You will be provided a 15 day notice of any site investigation, and will have the o ortuni to participate in all site investi ations. Date: Telephone number: Signature of appellant oragent. For appeals on Initial Proffered Permits send this form to: District Engineer, Wilmington Regulatory Division, Brennan Dooley, For Permit denials, Proffered Permits and approved Jurisdictional Determinations send this form to: Division Engineer, Commander, U.S. Army Engineer Division, South Atlantic, Attn: Mr. Jason Steele, Administrative Appeal Officer, CESAD-PDO, 60 Forsyth Street, Room 1OM15, Atlanta, Georgia 30303-8801 Phone: (404) 562-5137 In ■ Jurisdictional Ditch Perennial Stream f Wetlands DP -10 Data Point y � f � � ■ Culvert «e. , TRACT A - TRACT A WAS VERIFIED BY MR. BRENNAN DOOLEY WITH THE USACE ON JULY 6, 2016 (SAW 2016-01353). TRACT B - THE LOCATIONS OF FEATURES SHOWN ON TRACT B ARE PRELIMINARY. THEY HAVE NOT BEEN VERIFIED BY THE USACE AND/OR THE NCDEQ-DWR. THIS EXHIBIT INCLUDES GPS LOCATIONS OF DELINEATED FEATURES. Drawing 5 , Wetland Map Aerial Imagery from ESRIg Hanover Solar and Pilot GPS Data ; Approximate 65 Acre Tract O'fi�..,•�_ 4 Scale: V = 500' FgLMaysville, Onslow County, NC Date: 6.29.17 PILOT INV ■ONMINTAI.INC , Pilot Project 1965.1 ■ ■ ■ ■ PRELIMINARY JURISDICTIONAL DETERMINATION (PJD) FORM BACKGROUND INFORMATION A. REPORT COMPLETION DATE FOR PJD: September 15, 2017 B. NAME AND ADDRESS OF PERSON REQUESTING PJD: Brenda Redd, 2200 Castle Pines Drive, Raleigh, NC 27604 C. DISTRICT OFFICE, FILE NAME, AND NUMBER: Wilmington, Hanover Solar Farm, SAW -2016- 01353. PROJECT LOCATION(S) AND BACKGROUND INFORMATION: The project area is located on the west side of Hampshire Ln, approximately 0.65 miles northeast of its intersection with Belgrade-Swansboro Rd., Maysville, Onslow County, North Carolina. D. (USE THE TABLE BELOW TO DOCUMENT MULTIPLE AQUATIC RESOURCES AND/OR AQUATIC RESOURCES AT DIFFERENT SITES) State: NC County/parish/borough: Onslow City: Maysville Center coordinates of site (lat/long in degree decimal format): Lat.: 34.80652 Long.: -77.20701 Universal Transverse Mercator: Name of nearest waterbody: Grants Creek D. REVIEW PERFORMED FOR SITE EVALUATION (CHECK ALL THAT APPLY): ® Office (Desk) Determination. Date: 09/06/2017 ® Field Determination. Date(s): 07/06/2016 TABLE OF AQUATIC RESOURCES INREVIEW AREA WHICH "MAY BE" SUBJECT TO REGULATORY JURISDICTION. Site Latitude (decimal Longitude Estimated amount of Type of aquatic Geographic authority to Number degrees) (decimal degrees) aquatic resources in resources (i.e., which the aquatic resource review area (acreage wetland vs. non- "may be" subject (i.e., and linear feet, if wetland waters) Section 404 or Section applicable 10/404 SB 34.803778 -77.208992 1640 linear feet (If) Non -wetland Section 404 waters DA 34.805596 -77.205179 8301f Non -wetland Section 404 waters DB 34.806737 -77.205736 8281f Non -wetland Section 404 waters DC 34.806697 -77.206334 4571f Non -wetland Section 404 waters DD 34.806786 -77.206837 22821f Non -wetland Section 404 waters 170tl u01130S spuVpOM OJOs I'0 SSt�LOZ'LL- 699£0817£ DM VOV U0430S spuspOM sOJOU V67 Z6680Z'LL- 8LL£08'17£ Em },0yMIMS spuepaM amuLO'O ZZ990Z'LL- LZ£KWK VM VOt, u0►tOOS s"Jum pulapaen-UON J1088 817L£iZ'LL- Z98Z08'17£ 3Q t70t, uouOQS sioltm puepom-UON A 8tOZ 06I80Z'LL- 9tOL08'b£ gQ 1) The Corps of Engineers believes that there may be jurisdictional aquatic resources in the review area, and the requestor of this PJD is hereby advised of his or her option to request and obtain an approved JD (AJD) for that review area based on an informed decision after having discussed the various types of JDs and their characteristics and circumstances when they may be appropriate. 2) In any circumstance where a permit applicant obtains an individual permit, or a Nationwide General Permit (NWP) or other general permit verification requiring "pre- construction notification" (PCN), or requests verification for a non -reporting NWP or other general permit, and the permit applicant has not requested an AJD for the activity, the permit applicant is hereby made aware that: (1) the permit applicant has elected to seek a permit authorization based on a PJD, which does not make an official determination of jurisdictional aquatic resources; (2) the applicant has the option to request an AJD before accepting the terms and conditions of the permit authorization, and that basing a permit authorization on an AJD could possibly result in less compensatory mitigation being required or different special conditions; (3) the applicant has the right to request an individual permit rather than accepting the terms and conditions of the NWP or other general permit authorization; (4) the applicant can accept a permit authorization and thereby agree to comply with all the terms and conditions of that permit, including whatever mitigation requirements the Corps has determined to be necessary; (5) undertaking any activity in reliance upon the subject permit authorization without requesting an AJD constitutes the applicant's acceptance of the use of the PJD; (6) accepting a permit authorization (e.g., signing a proffered individual permit) or undertaking any activity in reliance on any form of Corps permit authorization based on a PJD constitutes agreement that all aquatic resources in the review area affected in any way by that activity will be treated as jurisdictional, and waives any challenge to such jurisdiction in any administrative or judicial compliance or enforcement action, or in any administrative appeal or in any Federal court; and (7) whether the applicant elects to use either an AJD or a PJD, the JD will be processed as soon as practicable. Further, an AJD, a proffered individual permit (and all terms and conditions contained therein), or individual permit denial can be administratively appealed pursuant to 33 C.F.R. Part 331. If, during an administrative appeal, it becomes appropriate to make an official determination whether geographic jurisdiction exists over aquatic resources in the review area, or to provide an official delineation of jurisdictional aquatic resources in the review area, the Corps will provide an AJD to accomplish that result, as soon as is practicable. This PJD finds that there "may be" waters of the U.S. and/or that there "may be" navigable waters of the U.S. on the subject review area, and identifies all aquatic features in the review area that could be affected by the proposed activity, based on the following information: SUPPORTING DATA. Data reviewed for PJD (check all that apply) Checked items should be included in subject file. Appropriately reference sources below where indicated for all checked items: ® Maps, plans, plots or plat submitted by or on behalf of the PJD requestor: Map: ® Data sheets prepared/submitted by or on behalf of the PJD requestor. ® Office concurs with data sheets/delineation report. ❑ Office does not concur with data sheets/delineation report. Rationale: ❑ Data sheets prepared by the Corps: ❑ Corps navigable waters' study: ❑ U.S. Geological Survey Hydrologic Atlas: ❑ USGS NHD data. ® USGS 8 and 12 digit HUC maps. ® U.S. Geological Survey map(s). Cite scale & quad name: USGS Stella Topographic Map ® Natural Resources Conservation Service Soil Survey. Citation: https://websoilsurvey sc.egov.usda.gov; Onslow County ® National wetlands inventory map(s). Cite name: USFWS NWI Map ❑ State/local wetland inventory map(s): ® FEMA/FIRM maps: National Flood Hazard Layer ❑ 100 -year Floodplain Elevation is: (National Geodetic Vertical Datum of 1929) ®Photographs: ®Aerial (Name & Date): 6/29/2017 or []Other (Name & Date): Site ❑ Previous determination(s). File no. and date of response letter: ❑ Other information (please specify): Field Determination. Date(s): IMPORTANT NOTE: The information recorded on this form has not necessarily been verified by the Corps and should not be relied upon for later jurisdictional determinations. Signature and date of Regulatory staff member completing PJD Signature and date of person requesting PJD (REQUIRED, unless obtaining the signature is impracticable) ' 1 Districts may establish timeframes for requester to return signed PJD forms. If the requester does not respond within the established time frame, the district may presume concurrence and no additional follow up is necessary prior to finalizing an action. • 4 _ • '\ `3 eta-: ..i r' � _ `r•». ,r,,.-�. '... .�._' - '� 4. "r.' +►--r+ ".. ,� .a.r . _ ,',. j r �f..•. ,.a.`"'r` rt- '"" -w -+s�;tu' y!` �9Yd• ^ .n � Y AA Cwn ch • �,y..= Aho - '.� o � �h-.._._, ,� .�, t„_ IQI w 4f1 y v 4 �> �a y LEGEND 1! U Site Boundary Drawing 1 USGS Topographic Map USGS Topographic Map Hanover Solar Stella, NC Quadrangle Approximate 65 Acre Tract �, Scale: 1" - 2 000' Maysville, Onslow County, NC PILOT ENVIRONMENTAL INC Pilot Project 1965.1 � N M Drawing 2 USDA Web Soil Survey of Onslow County NC Scale: 1" = 500' Mks P I L O T E N V I R 0 N M E N T A L I N C G3 LEGEND Site Boundary Web Soil Map Hanover Solar Approximate 65 Acre Tract Maysville, Onslow County, NC Pilot Project 1965.1 P �I�frSt p,•,.,.....,,.Y � r - . - may. , *$ �- .. A NoB Aug -kk GoA r Aub M x 1 .t _ Y F r' Sf Ma FoA AuB CrB�'.�. , Off'' StLy k"J J` GoA B a6 4 s� fw6A t � Wo oe LY �' 1 B aB g aB oA NoA M► 1 N 4 . y IWO 1l dam"' ,� ,�,. '.f_M1 �r •:,ty�y+: �> } , NaALEGEND' Site Boundary AuB �F Drawing 2A Published Soil Map USDA Soil Survey Hanover Solar of Onslow County, NC lApproximate 65 Acre Tract Published 1992, Sheet 21 PILOT "" Maysville, Onslow County, NC PILOT ENVI RON M ENTAL. INC CScale: 1I_ 400I Pilot Project 1965.1 PF014 Y Drawing 3 NWI Map USFWS NWIHanover Solar Wetlands Mapper Approximate 65 Acre Tract `:i ,�, Scale: 1" = 500' Maysville, Onslow County, NC PILOT ENVIR0NMENTAL.INC Pilot Project 1965.1 1 LEGEND Site Boundary �€ Freshwater Emergent Freshwater Forested/Shrub Estuarine and Marine Deepwater Estuarine and Marine° Freshwater Pond Lake 10, Riverine Other Drawing 3 NWI Map USFWS NWIHanover Solar Wetlands Mapper Approximate 65 Acre Tract `:i ,�, Scale: 1" = 500' Maysville, Onslow County, NC PILOT ENVIR0NMENTAL.INC Pilot Project 1965.1 AREArF MINIMAL FL+JC ,F a Drawing 4 Hanover Solar National Flood Hazard Layer`` Approximate 65 Acre Tract From FEMA Web Map Service ,' �, Scale: 1" = 500' PILOENVIRONMENTAL. /�'.- INC Maysville, Onslow County, NC Pilot Project 1965.1 s LEGEND & Site Boundary 1 %Annual Chance Flood Hazard MRegulatory Floodway Sped al Floodway Area of Undetermined Flood Hazard W W, 0.2% Annual Chance Flood Hazard 4fi� `Future filLx 1 Conditions 1%Annual Chance Flood Hazard ,Area with Reduced Risk Due to Levee FEMA FIRM Drawing 4 Hanover Solar National Flood Hazard Layer`` Approximate 65 Acre Tract From FEMA Web Map Service ,' �, Scale: 1" = 500' PILOENVIRONMENTAL. /�'.- INC Maysville, Onslow County, NC Pilot Project 1965.1 r + DID + 16 4 DE ` : + N �s + • + • i + + + s + + i i ' DC + • DB � s + TRA7C ISA s DE 1 DA G Di SB _ DP-] DF ,w r { rry f ��. WB WC WA 4:144MIC Site Boundary ■ ■ ■ ■ ■ ■ Jurisdictional Ditch Perennial Stream Wetlands DP -1 Q Data Point ■ Culvert TRACT A - TRACT A WAS VERIFIED BY MR. BRENNAN DOOLEY WITH THE USACE ON JULY 6, 2016 (SAW 2016-01353). TRACT B - THE LOCATIONS OF FEATURES SHOWN ON TRACT B ARE PRELIMINARY. THEY HAVE NOT BEEN VERIFIED BY THE USACE AND/OR THE NCDEQ-DWR. THIS EXHIBIT INCLUDES GPS LOCATIONS OF DELINEATED FEATURES. Drawing 5 Aerial Imagery from ESRI and Pilot GPS Data Scale: 1" = 500' Date: 6.29.17 .. P I L O T E N V I R 0 N M E N T A L. I N C Wetland Map Hanover Solar Approximate 65 Acre Tract Maysville, Onslow County, NC Pilot Project 1965.1