Loading...
HomeMy WebLinkAbout19910022 Ver 2_Staff Comments_20171006Burdette, Jennifer a From: Homewood, Sue Sent: Friday, October 06, 2017 12:42 PM To: Burdette, Jennifer a Subject: 91-0022 v2 SMP condition language.docx Attachments: 91-0022 v2 SMP condition language.docx Feel free to suggest any language tweaks. The Division approves the SMP consisting of an underground detention system, discharge pump, and linear pond and all associated stormwater conveyances, inlet and outlet structures, and grading and drainage patterns depicted on plan sheets dated June 9, 2017, which are incorporated by reference and are enforceable by the Division. The following conditions also apply [15A NCAC 02H .0506(b)(5)]: a. The Permittee shall not modify the stormwater management plan, including to but not limited to the modification of the built upon area directed to the stormwater detention system, without prior approval to the Division. b. The Permittee shall conduct quarterly inspections of the wetland for any visual indication of erosion occurring downslope of the pond outlet and/or the level spreader. Records of the inspections shall be kept by the Permittee and available to the Division upon request. c. If any erosion problems are observed in the wetlands downslope of the stormwater discharge points, then the Permittee shall immediately repair and correct any problems evident within the pond outlet and/or level spread to prevent further damage to the receiving wetland. The Permittee shall contact the Fayetteville Regional Office to determine what corrective actions may be necessary within the wetlands. Please be aware that corrective actions within the wetlands may require you to obtain a 404 Permit from the Corps and a 401 Certification from the Division.