Loading...
HomeMy WebLinkAbout20070812 Ver 2_Questions about Public Hearing_20081231Re: questions about public hearing for Alcoa FERC permit Subject: Re: questions about public hearing for Alcoa FERC permit From: "Steven Scroggin" <sscroggi@gmail.com> Date: Wed, 31 Dec 2008 15:01:37 -0500 To: "John Dorney" <john.dorney@ncmail.net> John, I am a visiting assistant professor of economics at Virginia Tech. I live in Winston-Salem and participate in CHANGE (Communities Helping All Neighbors Gain Empowerment), a coalition of 50 civic and church groups engaged in grassroots organizing and action, primarily in Forsyth County. I'd like to know more about the Alcoa hearing in order to determine whether this is a matter in which CHANGE may have an interest. I understand that there have been extensive discussions about recreational use of the system, and some discussion of environmental issues. Neither is a central focus of CHANGE. We would be more interested in how much Alcoa proposes to pay for use of the Yadkin River system, where that money goes, and whether the system could or should be treated as an asset of the people of the Yadkin basin and North Carolina. I'd like to know the prior history of this matter before NCDEQ and elsewhere--the legislature and FERC, and who, aside from the applicant, has had concerns similar to those I've expressed. You may not be the best person to address these questions, in which case, I hope you'll put me in touch the the right folks. Steve Scroggin 421 Spring Lake Farm Cir Winston-Salem, NC 27101 (336) 724-6106 (home) On Wed, Dec 31, 2008 at 12:23 PM, John Dorney <john.dorney@ncmail.net> wrote: Susan Massengale forwarded me your query about the public hearing scheduled for January 15th. Attached please find a copy of the Public Notice. If you have any questions, please email me or call me at 919-733-9646. Thankx 1 of 1 12/31/2008 3:47 PM GENERAL ASSEMBLY OF NORTH CAROLINA SESSION 2007 S SENATE BILL 1046 Judiciary II (Criminal) Committee Substitute Adopted 5/8/07 Third Edition Engrossed 5/14/07 House Committee Substitute Favorable 7/11/07 House Committee Substitute #2 Favorable 7/25/07 PROPOSED HOUSE COMMITTEE SUBSTITUTE 51046-CSRN-29 [v.3] D 7/10/2008 8:18:44 AM Short Title: Yadkin Project Study. (Public) Sponsors: Referred to: March 21, 2007 1 A BILL TO BE ENTITLED 2 AN ACT TO STUDY THE IMPACTS ON THE STATE OF NORTH CAROLINA OF 3 THE POTENTIAL ISSUANCE OF A FIFTY YEAR LICENSE BY THE 4 FEDERAL ENERGY REGULATORY COMMISSION FOR THE OPERATION 5 OF THE YADKIN HYDROELECTRIC PROJECT. 6 The General Assembly of North Carolina enacts: 7 SECTION 1. The Environmental Review Commission shall appoint a 8 subcommittee to study the impacts on the State of the potential grant of a fifty year 9 license by the Federal Energy Regulatory Commission ("FERC") to Alcoa Power 10 Generating, Inc. ("APGI") in FERC Relicensing Project No. P-2197-0000. The 11 subcommittee and the Commission shall consider and develop proposals regarding all 12 of the following issues: 13 (1) Analysis the socioeconomic impacts of Alcoa's decision to discontinue 14 its job producing manufacturing activities at its Badin facility that 15 relied on the use of low-cost Yadkin River hydroelectric power. 16 (2) Assurance of an adequate, clean future water supply for the region. 17 (3) Utilizing electricity generation to serve as an economic engine for 18 Piedmont North Carolina. 19 (4) The allocation of water from the Yadkin Hydroelectric Project. 20 (5) Any other related issues that the Commission deems appropriate. 21 SECTION 2. The Commission shall submit an interim report to the 2009 22 General Assembly upon its convening. The Commission shall make a final report to the 23 2011 General Assembly upon its convening. Each report shall include findings and any General Assembly of North Carolina Session 2007 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 recommendations, including legislative proposals that would assist in implementing the recommendations. SECTION 3. Nothing in this act shall preclude the Governor or any State agency or department from taking any action necessary to protect the interest of the State in the current relicensing procedure for the Yadkin Hydroelectric Project before FERC or any related proceeding. SECTION 4. The Department of Environment and Natural Resources (DENR) shall not take any final action on Alcoa Power Generating, Inc.'s Section 401 Water Quality Certification for FERC Relicensing Project No. P-2197-0000 before the General Assembly acting upon the Commission's recommendations or May 1, 2009, whichever occurs sooner. 15A NCAC 02H .0507 (a) and (b) shall not apply to the application for Alcoa Power Generating, Inc.'s Section 401 Water Quality Certification for FERC Relicensing Project No. P-2197-0000. Nothing in this act shall preclude DENR's ability to provide notices, conduct hearings, or take any other actions in preparation for potentially issuing or denying a 401 Water Quality Certification for FERC Relicensing Project No. P-2197-0000. SECTION 5. This act is effective when it becomes law. Page 2 Senate Bill 1046 S 1046-CSRN-29 [v.3]