Loading...
HomeMy WebLinkAboutRoxboro - BTV Soil Tech Memo_FINAL_20170804TECHNICAL MEMORANDUM Date: August 4, 2017 File: 1026.107 To: Kimberlee Witt (Duke Energy) Cc: Kathy Webb (SynTerra) From: Craig Eady (SynTerra) CL - Subject: Background Threshold Values for Soil Roxboro Steam Electric Plant — Semora, NC An updated background soil dataset was provided to the North Carolina Department of Environmental Quality (NCDEQ) for the Roxboro Steam Electric Plant (Roxboro) on May 26, 2017. Additionally, the revised Statistical Methods for Developing Reference Background Concentrations for Groundwater and Soil at Coal Ash Facilities (statistical methods document) (HDR Engineering, Inc. and SynTerra Corporation, May 2017) was provided to NCDEQ. On July 7, 2017, NCDEQ provided a response letter (Zimmerman to Draovitch, July 7, 2017) for each Duke Energy coal ash facility that identified soil and groundwater data appropriate for inclusion in the statistical analysis to determine background threshold values (BTVs) for both media. As outlined in the NCDEQ July 7, 2017 letter, Duke Energy is required to provide BTVs for both media within 30 days from receipt of the NCDEQ letter for facilities submitting Comprehensive Site Assessments (CSAs) by October 31, 2017, and 60 days from receipt of the NCDEQ letter for all other facilities. The background threshold values for groundwater are provided under separate cover. The updated background soil datasets provided to NCDEQ on May 26, 2017 incorporated comments provided in a letter by NCDEQ (Zimmerman to Draovitch, April 28, 2017). NCDEQ requested that Duke Energy collect a minimum of 10, rather than the previously planned eight, valid background soil samples prior to the determination of BTVs for each constituent. For soil datasets with less than ten valid samples available for BTV determination, no formal upper tolerance limit (UTL) statistics will be run and the provisional BTV (PBTV) for a constituent will be computed to be either: '47 The highest value, or ,07 If the highest value is above an order of magnitude greater than the geometric mean of all values, then the highest value should be considered an outlier and removed from further use and the PBTV is computed to be the second highest value. P:\Duke Energy Progress.1026\Statistics_CAMA\Background Determinations for NCDEQ July 72017\BTV TECH MEMO \ Roxboro \ Soil \ Roxboro - BTV Soil TM_FINAL.docx Background Threshold Values- Soil August 4, 2017 Roxboro Steam Electric Plant Page 2 of 3 Soil samples meeting the following criteria are considered valid for use in statistical determinations of BTVs: 47 Sample was collected from a location that is not impacted by coal combustion residuals or coal associated materials; 0 Sample was collected from a depth not less than 0.5 feet below ground surface; 1' Sample was collected from a location that is not impacted by other potential anthropogenic sources of constituents; and, Sample is collected from the unsaturated zone, greater than one foot (ft) above the seasonal high water table elevation. Additional site -specific requirements related to the Roxboro background soil dataset as outlined in the July 7, 2017 NCDEQ letter have been incorporated into the soil background dataset. This technical memorandum summarizes the revised background groundwater datasets and statistically determined BTVs. Statistical determinations of BTVs were performed in accordance with the revised Statistical Methods for Developing Reference Background Concentrations for Groundwater and Soil at Coal Ash Facilities (statistical methods document) (HDR Engineering, Inc. and SynTerra Corporation, May 2017). SOIL BACKGROUND DATA Soil samples were collected from soil borings conducted at the Roxboro Plant during the 2015 Comprehensive Site Assessment. Background soil sample locations are presented in Figure 1. The background dataset provided to NCDEQ on May 26, 2017 included pooled soil samples collected from multiple depth intervals. Only samples collected from background locations at depth intervals greater than one ft above the seasonal high water table were included in the dataset. The background soil dataset has been further revised from the May 26, 2017 submittal based on input from NCDEQ in the July 7, 2017 letter. NCDEQ determined samples collected from the depth interval 0-2 ft below ground surface at the following locations: MW-07, MW-08, MW-10BR, MW-13BR, MW-15BR, MW-16BR, and MW-18BR do not meet NCDEQ IHSB Guidance requirements and were deemed too shallow (included sampled soil less that 0.5 below ground surface); therefore, are not appropriate for use in determining BTVs. The background soil dataset included laboratory reporting limits for antimony and thallium above the NCDEQ IHSB Preliminary Soil Remediation Goals (PSRG) Protection of Groundwater values (dated October 2016). NCDEQ resquested the values for antimony and thallium be reported below the PSRG Protection of Groundwater values. Prior to statistical determinations, the background soil dataset was re -screened for outliers to adjust for the removal of samples from the dataset. A revised background dataset including updated outliers is presented in Table 1. Currently, the background dataset does not satisfy the P:\Duke Energy Progress. 1026\Statistics—LAMA\Background Determinations for NCDEQ July 72017\BTV TECH MEMO \ Roxboro \ Soil \ Roxboro - BTV Soil TM_FINAL.docx Background Threshold Values- Soil August 4, 2017 Roxboro Steam Electric Plant Page 3 of 3 minimum requirement of 10 samples to use formal statistics to derive BTVs. Therefore, PBTVs for soil constituents were computed to be either the maximum value, or, if the maximum value was above an order of magnitude greater than the geometric mean of all values, the second highest value. PBTVs for soil constituents are provided in Table 2. Additional soil samples were collected on July 19, 2017 to satisfy the minimum number of soil samples and to provide values for antimony and thallium below the PSRG Protection of Groundwater values. The analysis of the additional background soil samples are not complete at the time of this technical memo. Therefore, as previously stated, PBTVs for soil constituents were computed and are provided in Table 2. Boring logs associated with the additional soil samples are included in Attachment 1. Additional analytical data will be submitted to the NCDEQ Regional Office if received and processed in sufficient time for review prior to the preparation of the updated CSA report. LIST OF FIGURES Figure 1- Background Soil Sample Location Map LIST OF TABLES Table 1- Background Unsaturated Soil Data Summary Table 2 - Background Threshold Values for Soil LIST OF ATTACHMENTS Attachment 1- Soil Boring Logs (Additional Samples) P:\Duke Energy Progress. 1026\Statistics—LAMA\Background Determinations for NCDEQ July 72017\BTV TECH MEMO \ Roxboro \ Soil \ Roxboro - BTV Soil TM_FINAL.docx it u � � Q � I • ,>}p r �. - � a ,mow ILL I y b. r EAST ASH x BASIN Wll WEST ASH a�Yk.< BASIN r,, ♦'' jA ,� f it Y 4 4 t — a R, -:ti;et. JI I fC� r w► r s NOTES: P11-1, `V A I f'- MW=1'7BR"IZ "<Y €"o!�j_ . B r 1 1 f 1 �P\ �y { � +•'d9"wY � 7��� '� 1 � �p 1jr I GRA f YYY t f.8„• i _ i �.a..'� r'. � �• t y s 4• , �y ,fit 's ,i FIGURE 1 IN FEET BACKGROUND SOIL 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 SAMPLE LOCATIONS PHONE864-421-9999 ROXBORO STEAM ELECTRIC PLANT )mTerm Hnaw MANAGER: co e;�' DROECT MANAGERNC. EADY DATE: 07/27/2017 SEMORA, NORTH CAROLINA CHECKED BY: A. LEFITZ TABLE 1 BACKGROUND UNSATURATED SOIL DATA SUMMARY ROXBORO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC, SEMORA, NC Analytical Parameter pH Aluminum Antimony Arsenic Barium Beryllium Boron Cadmium Calcium Chloride Chromium Cobalt Copper Iron Lead Magnesium Manganese Mercury Molybdenum Nickel itrate N) (asReporting Potassium Selenium Sodium Strontium Sulfate Thallium Vanadium Zinc Units S.U. mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg PSRG Protection of Groundwater NE 0.9 5.8 580 63 45 3 NE NE 360000 0.9 700 150 270 NE 65 1 NE 130 NE NE 2.1 NE NE NE 0.28 6 1200 Sample ID Sample Collection Date Analytical Results MW-08 (14-16) 04/27/2015 7.6 4110 --- <5.2 49.3 0.23 j <13.1 <0.63 1830 <263 0.82 j 4.6 j 2.4 10200 <5.2 2910 222 <0.0086 <2.6 1.4 <26.3 836 --- 221 j 13.7 <263 --- 21.6 41.4 MW-08(21-23) 04/27/2015 7.3 14800 --- <5.7 128 1.1 <14.2 <0.68 11200 <283 17.4 15.3 0.78j 20500 6 14300 496 <0.0092 <2.8 31.7 <28.3 5680 --- 211j 97.2 <283 --- 43.1 78.6 MW-13BR (22-24) 03/04/2015 8.0 6730 --- <1.2 102 0.14 9.2 <0.14 3890 <299 8.7 8.1 41 13100 <1.2 4020 132 <0.01 <0.6 4.4 <29.9 2320 <1.2 389 13.2 <299 --- 59.3 25.1 MW-14BR (1-1.25) 02/25/2015 4.8 11000 --- <1.2 71.3 0.14 j <3.1 <0.15 593 <300 4.1 5.3 11.1 16100 4.8 4960 79.4 0.011 <0.62 3.4 <30 1110 <1.2 183 20.4 <300 --- 45.2 26.6 MW-14BR(31-31.5) 02/25/2015 8.8 8590 --- <1 170 0.11j <2.6 <0.12 2810 <254 9 8.6 23.1 12600 <1 6490 238 <0.0084 <0.51 6.5 <25.4 4830 <1 383 22.4 <254 --- 31 37.9 MW-14BR(37.5-38) 02/25/2015 8.0 12300 --- <1.1 198 0.25 <2.8 <0.13 6340 <286 54 15.8 17.7 15200 <1.1 13100 290 <0.0089 <0.55 53.7 <28.6 3860 <1.1 174 57.5 <286 --- 33.3 49.6 MW-17 (29-31) 04/21/2015 8.4 8530 --- <5.1 84.3 0.32 17.9 <0.61 5300 <250 4.8 5.7 5.7 19800 <5.1 5920 315 <0.0081 <2.5 7.9 <25 857 --- 183 j 18.8 <250 --- 23 56.4 MW-18 (31-33) 05/16/2015 7.3 3420 --- --- 31.3 0.221 <15 <0.72 581 <292 1.9 <6 4.8 7000 <6 686 353 <0.0092 <3 <1.5 <29.2 731 --- 222 j 8 <292 --- 3.1 j 18.7 MW-18 (37-38) 05/16/2015 7.3 3600 --- --- 18.4 0.18 j <15.3 <0.73 670 <296 1.31 <6.1 22.4 3410 <6.1 708 175 <0.0098 <3.1 <1.5 <29.6 486 --- <306 6.7 <296 --- <6.1 16.2 Prepared by: JHG Checked by: CDE Notes: 54 = Indicates values omitted from dataset. --- = Value removed; non -detected concentration exceeding PSRG Protection of Groundwater = Indicates data removed/identified as an outlier < = concentration not detected at or above the adjusted reporting limit. I = Estimated concentration above the adjusted method detection limit and below the adjusted reporting limit. mg/kg = milligrams per kilogram NA = Not analyzed NE = Not established PSRG Protection of Groundwater = NCDEQ IHSB Preliminary Soil Remediation Soil Remediation Goals Table - October 2016 S.U. = Standard Units P:\Duke Energy Progress. 1026\Statistics_CAMA\Preliminary Background Determinations for NCDEQ July 7 2017\BTV TECH MEMO\Roxboro\Soil\Tables\TABLE 1 - Roxboro BG Soil Dataset_Highlighted Outliers Page 1 of 1 TABLE 2 BACKGROUND THRESHOLD VALUES FOR SOIL ROXBORO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC, SEMORA, NC Parameter Reporting Unit PSRG Protection of Groundwater BTVt pH* S.U. NE 7.3 - 8.4 Aluminum mg/kg NE 14800 Antimony mg/kg 0.9 NA Arsenic mg/kg 5.8 6 Barium mg/kg 580 198 Beryllium mg/kg 63 1 Boron mg/kg 45 18 Cadmium mg/kg 3 0.7 Calcium mg/kg NE 11200 Chloride mg/kg NE 300 Chromium mg/kg 360,000 17 Cobalt mg/kg 0.9 16 Copper mg/kg 700 41 Iron mg/kg 150 20500 Lead mg/kg 270 6 Magnesium mg/kg NE 14300 Manganese mg/kg 65 496 Mercury mg/kg 1 0.01 Molybdenum mg/kg NE 3 Nickel mg/kg 130 35 Nitrate (as N) mg/kg NE 30 Potassium mg/kg NE 5680 Selenium mg/kg 2.1 1 Sodium mg/kg NE 389 Strontium mg/kg NE 97 Sulfate mg/kg 250 300 Thallium mg/kg 0.28 NA Vanadium mg/kg 6 59 Zinc mg/kg 1200 79 Prepared by: JHG Checked by: CDE / LWD Notes: S.U. = Standard Unit mg/kg = milligrams per kilogram * = Upper and lower threshold values calculated for parameter t = Indicates value is provisional; dataset contains less than 10 valid samples NE = Not Established NA = Not applicable; dataset contains zero valid samples P:\Duke Energy Progress.1026\Statistics_CAMA\Preliminary Background Determinations for NCDEQ July 7 2017\BTV TECH MEMO\Roxboro\Soil\Tables\TABLE 2 - Roxboro Soil Background Threshold Values Page 1 of 1 Background Threshold Values- Soil August 4, 2017 Roxboro Steam Electric Plant ATTACHMENT 1 SOIL BORING LOGS (ADDITIONAL SAMPLES) P: \ Duke Energy Progress.1026 \ Statistics_CAMA \ Background Determinations for NCDEQ July 7 2017\BTV TECH MEMO \ Roxboro \ Soil \ Roxboro - BTV Soil TM_FINAL.docx PROJECT: Roxboro Station WELL / BORING NO: BGSB-112 PROJECT NO: 1026.107 STARTED: 7/19/17 COMPLETED: 7/19/17 DRILLING COMPANY: Geologic Exploration NORTHING: 993900.7 EASTING: 1986193.02 DRILLING METHOD: GeoProbe G.S. ELEV: ft M.P. ELEV: NA ft BOREHOLE DIAMETER: 3 IN DEPTH TO WATER: NA ft TOC TOTAL DEPTH: 20.0 ft BGS NOTES: LOGGED BY: A. Lefitz CHECKED BY: E. Yurkovich w v ❑ v = 0 Q O r co DESCRIPTION w a g < O^ U a W" U) z OJ ❑ m0 ❑ E a s WELL CONSTRUCTION ML Moderately stiff to loose, orange brown, clayey silt, dry, saprolite to partially weathered rock. 5 ML Moderately stiff to loose, orange brown, clayey silt, dry, saprolite to partially weathered rock. Increase in partially weathered rock with depth. 10 Moderately dense, dry, partially weathered rock with clay lenses. 15 Moderately dense, dry, partially weathered rock with clay lenses. Relic structure present. 20 25 30 35 40 45 Coordinates obtained with hand held GPS unit. f CLIENT: Duke Energy Progress, LLC. ra PROJECT LOCATION: Semora, NC 148 River Street, Suite 220 48 R ���.ra Greenville, South Carolina 29601 Phone:864-421-9999 PAGE 1 OF 1 PROJECT: Roxboro Station WELL / BORING NO: BGSB-14 PROJECT NO: 1026.107 STARTED: 7/19/17 COMPLETED: 7/19/17 DRILLING COMPANY: Geologic Exploration NORTHING: 996082.78 EASTING: 1984658.36 DRILLING METHOD: GeoProbe G.S. ELEV: ft M.P. ELEV: NA ft BOREHOLE DIAMETER: 3 IN DEPTH TO WATER: NA ft TOC TOTAL DEPTH: 10.0 ft BGS NOTES: LOGGED BY: A. Lefitz CHECKED BY: E. Yurkovich w v ❑ v = 0 Q O co D DESCRIPTION w a g < O^ U a W" U) z OJ ❑ m0 ❑ E a s WELL CONSTRUCTION ML Soil with vegetation and mulch, sandy silt, moist to d ML Loose to moderately dense, orange brown, sandy silt with clay lenses, moist to dry. CL Stiff, orange brown clayey silt to silty clay, dry. 5 Light gray brown, saprolite to partially weathered rock with relic structure observed. 10 15 20 25 30 35 40 45 Coordinates obtained with hand held GPS unit. f CLIENT: Duke Energy Progress, LLC. ra PROJECT LOCATION: Semora, NC 148 River Street, Suite 220 48 R ���.ra Greenville, South Carolina 29601 Phone:864-421-9999 PAGE 1 OF 1 PROJECT: Roxboro Station WELL / BORING NO: BGSB-18 PROJECT NO: 1026.107 STARTED: 7/19/17 COMPLETED: 7/19/17 DRILLING COMPANY: Geologic Exploration NORTHING: 986646.49 EASTING: 1982285.21 DRILLING METHOD: GeoProbe G.S. ELEV: ft M.P. ELEV: NA ft BOREHOLE DIAMETER: 3 IN DEPTH TO WATER: NA ft TOC TOTAL DEPTH: 13.0 ft BGS NOTES: LOGGED BY: A. Lefitz CHECKED BY: E. Yurkovich W ❑Q U = O O U) DESCRIPTION w a <LU O^ U) Oz ❑a 0 E❑ s WELL CONSTRUCTION 5 SM Light orange brown, loose, silty sand with rock and some clay lenses, dry. 10 SM Light gray, silty sand. Saprolite to Partially weathered rock. Geoprobe refusal at 13 feet below ground surface. 15 20 25 30 35 40 45 Coordinates obtained with hand held GPS unit. f CLIENT: Duke Energy Progress, LLC. ra PROJECT LOCATION: Semora, NC 48 R 148 River Street, Suite 220 ���.ra Greenville, South Carolina 29601 Phone:864-421-9999 PAGE 1 OF 1 PROJECT: Roxboro Station WELL / BORING NO: BGSB-2 PROJECT NO: 1026.107 STARTED: 7/18/17 COMPLETED: 7/18/17 DRILLING COMPANY: Geologic Exploration NORTHING: 987877.39 EASTING: 1976136.75 DRILLING METHOD: GeoProbe G.S. ELEV: ft M.P. ELEV: NA ft BOREHOLE DIAMETER: 3 IN DEPTH TO WATER: NA ft TOC TOTAL DEPTH: 8.5 ft BGS NOTES: LOGGED BY: A. Lefitz CHECKED BY: E. Yurkovich v = co w a O^ a U) z OJ ❑ E WELL CONSTRUCTION w v 0 Q O DESCRIPTION g U ❑ a s ❑ r < W" m0 Dense, orange brown, sandy silt, moist to dry. At 4.5 ML feet below ground surface, white, silty, saprolite to J. partially weathered rock, dry. 5 White, silty, saprolite to partially weathered rock. Geoprobe refusal at 8.5 feet below ground surface. 10 15 20 25 30 35 40 45 Coordinates obtained with hand held GPS unit. f CLIENT: Duke Energy Progress, LLC. ra 48 RPROJECT LOCATION: Semora, NC 148 River Street, Suite 220 ���.ra Greenville, South Carolina 29601 Phone:864-421-9999 PAGE 1 OF 1