Loading...
HomeMy WebLinkAboutMayo - SOIL BTV_Tech Memo_20171005TECHNICAL MEMORANDUM Date: August 4, 2017 File: 1026.105 To: Kimberlee Witt (Duke Energy) Cc: Kathy Webb (SynTerra) From: Jerry Wylie (SynTerra) Subject: Background Threshold Va ues for Soil Mayo Steam Electric Plant — Roxboro, NC An updated background soil dataset was provided to the North Carolina Department of Environmental Quality (NCDEQ) for Mayo Steam Electric Plant (Mayo) on May 26, 2017. Additionally, the revised Statistical Methods for Developing Reference Background Concentrations for Groundwater and Soil at Coal Ash Facilities (statistical methods document) (HDR Engineering, Inc. and SynTerra Corporation, May 2017) was provided to NCDEQ. On July 7, 2017, NCDEQ provided a response letter (Zimmerman to Draovitch, July 7, 2017) for each Duke Energy coal ash facility that identified soil and groundwater data appropriate for inclusion in the statistical analysis to determine background threshold values (BTVs) for both media. As outlined in the NCDEQ July 7, 2017 letter, Duke Energy is required to provide BTVs for each media within 30 days from receipt of the NCDEQ letter for facilities submitting Comprehensive Site Assessments (CSAs) by October 31, 2017, and 60 days from receipt of the NCDEQ letter for all other facilities. The background threshold values for groundwater are provided under separate cover. The revised background soil datasets provided to NCDEQ on May 26, 2017 incorporated comments provided in a letter by NCDEQ (Zimmerman to Draovitch, April 28, 2017). NCDEQ requested that Duke Energy collect a minimum of 10, rather than the previously planned eight, valid background samples prior to the determination of BTVs for each constituent. For soil datasets with less than 10 valid samples available for BTV determination, no formal upper tolerance limit (UTL) statistics will be run and the provisional BTV (PBTVs) for a constituent will be computed to be either: 4? The highest value, or 0 If the highest value is above an order of magnitude greater than the geometric mean of all values, then the highest value should be considered an outlier and removed from further use and the PBTV is computed to be the second highest value. P:\Duke Energy Progress.1026\Statistics_CAMA\Background Determinations for NCDEQ July 72017\BTV TECH MEMO \ Mayo \ Soil \ Mayo - SOIL BTV_FINAL.docx Background Threshold Values for Soil August 4, 2017 Mayo Steam Electric Plant Page 2 of 4 Soil samples meeting the following criteria are considered valid for use in statistical determinations of BTVs: Sample was collected from a location that is not impacted by coal combustion residuals or coal associated materials; '47 Sample was collected from a depth not less than 0.5 feet below ground surface; '47 Sample was collected from a location that is not impacted by other potential anthropogenic sources of constituents; and ,07 Sample is collected from the unsaturated zone, greater than one foot (ft) above the seasonal high water table elevation. Additional site -specific requirements related to the Mayo background soil dataset as outlined in the July 7, 2017 NCDEQ letter have been incorporated into the soil background dataset. This technical memorandum summarizes the revised background groundwater datasets and statistically determined BTVs. Statistical determinations of BTVs were performed in accordance with the revised Statistical Methods for Developing Reference Background Concentrations for Groundwater and Soil at Coal Ash Facilities (statistical methods document) (HDR Engineering, Inc. and SynTerra Corporation, May 2017). SOIL BACKGROUND DATA Soil samples were collected from soil borings conducted at the Mayo Plant during the 2015 Comprehensive Site Assessment (CSA). Background soil sample locations are presented in Figure 1. The background dataset provided to NCDEQ on May 26, 2017 included pooled soil samples collected from multiple depth intervals. Only samples collected from background locations at depth intervals greater than one ft above the seasonal high water table were included in the dataset. The background soil dataset has been further revised from the May 26, 2017 submittal based on input from NCDEQ in the July 7, 2017 letter. NCDEQ determined the following samples are not appropriate for use in determining BTVs: 47 MW-03BR (0.8-1.25) and MW-15BR (0.5-1) — collected downgradient of the ash basin; C7 MW-11BR and MW-13BR —per IHSB Guidance —collected from depth interval 0-2 ft below ground surface and deemed too shallow (included sampled soil less than 0.5 below ground surface); 0 Samples collected at SB-02 and SB-03 — collected from borings possibly advanced through coal ash; E7 SB-05 and SB-06 — collected adjacent to the 1981 landfill. P:\Duke Energy Progress. 1026\Statistics—LAMA\Background Determinations for NCDEQ July 72017\BTV TECH MEMO \ Mayo \ Soil \ Mayo - SOIL BTV_FINAL.docx Background Threshold Values for Soil August 4, 2017 Mayo Steam Electric Plant Page 3 of 4 Prior to statistical determinations, the background soil dataset was re -screened for outliers to adjust for the removal samples from the dataset. A revised background soil dataset identifying valid samples and statistical outliers are presented as Table 1. The revised background dataset was used to determine PBTVs for naturally occurring inorganic constituent in Site soil. Additional soil samples were collected on July 18, 2017 to satisfy the minimum number of soil samples and to provide values for antimony, selenium and thallium below the PSRG Protection of Groundwater values. The dataset will be screened for outliers once the additional samples are included in the dataset. The analysis of the additional background soil samples are not complete at the time of this technical memo. Therefore, as previously stated, PBTVs for soil constituents were computed and are provided in Table 2. Boring logs associated with the additional soil samples are included in Attachment 1. Additional analytical data will be submitted to the NCDEQ Regional Office if received and processed in sufficient time for review prior to the preparation of the updated CSA report. LIST OF FIGURES Figure 1- Background Soil Sample Locations - Mayo Steam Electric Plant LIST OF TABLES Table 1- Background Unsaturated Soil Data Summary - Mayo Steam Electric Plant Table 2 - Background Threshold Values for Soil - Mayo Steam Electric Plant LIST OF ATTACHMENTS Attachment 1- Soil Boring Logs (Additional Samples) P:\Duke Energy Progress. 1026\Statistics—LAMA\Background Determinations for NCDEQ July 72017\BTV TECH MEMO \ Mayo \ Soil \ Mayo - SOIL BTV_FINAL.docx nt.c.c '-. - -.r: _ ter.. _� s,M. �rq.r �=a:��R S: ^f77 yM:Ir � :;F r7 n.•qI •;.� h>. .r 1'._ ,. t • .• .�... � rT;4- � -,.,y .t -. �• .t'� P � y - P. � ,.: bpi 4[^'.�i YT " t � �4sfj�$,r .'�a, .r�,81\��ct`�? •! t. �r ''s'�r�a:'?.,,, ��d,z�y", p5 �y sr Y t. 10, • •�+ f F t 'FP r +�� �` � ' � ^ , ��� � +, s�4 ir.;t' � +e„'!•'''�`gy__+���, A+�y''y;.�SdA�, ".. f4 r f MAYO LAKE BGSB-5: 1 • '• BGSB-3 •'..r BGSB-4 �. BGSB-2 } 1_4166 -r� - as r t BGSB-8 0 •• 250 . 500 1,000 GRAPHIC SCALE IN FEET 148 RIVER STREET, SUITE 220 PHONE i •99 umsvitermoro.c. n ' • dp PROJECT MANAGER: I WYLIE RA CHECKED DONOVAN l'S�- TABLE 1 BACKGROUND UNSATURATED SOIL DATA SUMMARY MAYO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC, ROXBORO, NC Analytical Parameter pH Aluminum Antimony Arsenic Barium Beryllium Boron Cadmium Calcium Chloride Chromium Cobalt Copper Iron Lead Magnesium Manganese Mercury Molybdenum Nickel Cash; Potassium Selenium Sodium Strontium Sulfate Thallium Vanadium Zinc Reporting Units S.U. mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg PSRG Protection of Groundwater NE NE 0.9 5.8 580 63 45 3 NE NE 360000 0.9 700 150 270 NE 65 1 NE 130 NE NE 2.1 NE NE NE 0.28 6 1200 Sample ID Sample Collection Date Analytical Results MW-08BR (0JS-1.25) 02/11/2015 6.0 14500 --- <3.2 147 0.82 -,63.4 <0.38 1120 <309 62.2 21.3 34.7 24700 8.9 10500 1230 <0.0096 <12.7 29.4 <30.9 6590 --- -12-78 13.2 <309 --- 50.6 88.9 MW-08BR(25.5-26) 02/11/2015 7-4 23700 --- <2.7 193 0.39 31j <0.33 3748 <272 449 32.9 45.7 31300 2j 29900 933 <0. 0089 <10.9 4 -57 <27.2 5450 --- 173 33.6 <272 --- 75.8 59.4 MW-10BR (0.75-1.0) 02/23/2015 6.3 7640 --- 1.4 81.8 0.4 13.6j 0.1j 1210 NA 41.9 12.4 28.9 18600 9.8 5590 527 0.0053j <0.57 16.3 NA 2660 1.4 93.4 9.4 --- --- 35.1 61.3 MW-12D (1-2) 04/26/2015 4.9 11000 --- 3.6j 19.6 <0.3 27.4 <0.72 <150 <302 43.6 <6 12.4 31200 6.8 139j 22.1 0.036 <3 0.83j <30.2 182j --- Q99 <3 <302 --- 61 5.2j MW-12D (25-26) 04/27/2015 5.9 3530 --- <6 67.4 <0.3 9.8j <0.72 <149 <301 3.2 6 22.4 11900 7.2 1190 395 <0.0095 <3 <1.5 <30.1 1520 --- F299 <3 <301 --- 8.2 15 SB-01 (1-2) 03/04/2015 6.3 7030 --- 1.2j 49.6 0.24 9.6 <0.17 655 <362 15.7 3.7 8.8 12400 9.6 1670 104 0.033 <0.7 2.5 <36.2 881 <1.4 35.4j 6 <362 --- 28.3 14.5 SB-01 (13.5-14.5) 03/04/2015 5.5 4960 --- 1.2j 61.5 0.56 <15.9 <0.15 270 1 <312 1 <1.6 8.9 20.6 8490 1 2.9 1 2440 1 678 <0.01 <3.2 <1.6 <31.2 1550 1.4 40.7j 8.3 <312 --- 17.8 13.2 Prepared by: JHG Checked by: JAW Notes: 64 - Indicates values omitted from dataset. --- - Value removed; non -detected concentration exceeds PSRG Protection of Groundwater. Indicates data removed /identified as an outlier. < - concentration not detected at or above the adjusted reporting limit. j - Estimated concentration above the adjusted method detection limit and below the adjusted reporting limit. mg/kg - milligrams per kilogram NA - Not analyzed NE - Not established PSRG Protection of Groundwater - NCDEQ IHSB Preliminary Soil Remediation Soil Remediation Goals Table - October 2016 S.U. - Standard Units P:\Duke Energy Progress. 1026\Statistics_CAMA\Background Determinations for NCDEQ July 7 2017\BTV TECH MEMO\Mayo\Soil\TM Tables\TABLE 1 - MAYO_BG Soils -Highlighted Outliers.xlsx Page 1 of 1 TABLE 2 BACKGROUND THRESHOLD VALUES FOR SOIL MAYO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC, ROXBORO, NC Parameter Reporting Unit PSRG Protection of Groundwater BTVt pH* S.U. NE 4.9 - 6.3 Aluminum mg/kg NE 23700 Antimony mg/kg 0.9 --- Arsenic mg/kg 5.8 6 Barium mg/kg 580 193 Beryllium mg/kg 63 0.82 Boron mg/kg 45 31 Cadmium mg/kg 3 0.72 Calcium mg/kg NE 1210 Chloride mg/kg NE 362 Chromium mg/kg 360,000 62.2 Cobalt mg/kg 0.9 32.9 Copper mg/kg 700 45.7 Iron mg/kg 150 31300 Lead mg/kg 270 9.8 Magnesium mg/kg NE 5590 Manganese mg/kg 65 1230 Mercury mg/kg 1 0.036 Molybdenum mg/kg NE 12.7 Nickel mg/kg 130 29.4 Nitrate (as N) mg/kg NE 36.2 Potassium mg/kg NE 6590 Selenium mg/kg 2.1 1.4 Sodium mg/kg NE 173 Strontium mg/kg NE 33.6 Sulfate mg/kg 250 362 Thallium mg/kg 0.28 --- Vanadium ni 6 75.8 Zinc mg/kg 1200 88.9 Prepared by: JHG Checked by: LWD Notes: S.U. = Standard Unit mg/kg = milligrams per kilogram * = Upper and lower threshold values calculated for parameter NE = Not Established = Not applicable; dataset contains zero valid samples t Indicates value is provisional; dataset contains less than 10 valid samples P:\Duke Energy Progress. 1026\Statistics_CAMA\Preli mi nary Background Determinations for NCDEQ July 7 2017\BTV TECH MEMO\Mayo\Soil\TM Tables\TABLE 2 - Mayo PBG Soil Page 1 of 1 Background Threshold Values for Soil August 4, 2017 Mayo Steam Electric Plant ATTACHMENT 1 SOIL BORING LOGS (ADDITIONAL SAMPLES) P: \ Duke Energy Progress.1026 \ Statistics_CAMA \ Background Determinations for NCDEQ July 7 2017\ BTV TECH MEMO \ Mayo \ Soil \ Mayo - SOIL BTV_FINAL.docx 1% PROJECT: Mayo Steam Electric Plant WELL / BORING NO: BGSB-2 PROJECT NO: 1026.105 STARTED: 7/18/17 COMPLETED: 7/18/17 DRILLING COMPANY: Geologic Exploration NORTHING: 1011195.19 EASTING: 2028866.64 DRILLING METHOD: GeoProbe G.S. ELEV: ft M.P. ELEV: NA ft BOREHOLE DIAMETER: 3 IN DEPTH TO WATER: NA ft TOC TOTAL DEPTH: 15.0 ft BGS NOTES: LOGGED BY: A. Lefitz CHECKED BY: E. Yurkovich v = C� co co W d O- o Cn_ z OJ o f WELL CONSTRUCTION w v Q O DESCRIPTION 2 U D a Q p C� < �— m0 MIL Dense, brown orange, clayey sandy silt. 5 ML Dense, brown orange, clayey sandy silt. 10 ML Dense, brown orange, clayey sandy silt. 15 20 25 30 35 40 45 Coordinates obtained with hand held GPS unit. CLIENT: Duke Energy Progress, LLC. SynTerra 148 River Street, Suite 220 PROJECT LOCATION: Roxboro, NC ra Greenville, South Carolina 29601 �Ter•Phone:864-421-9999 PAGE 1 OF 1 PROJECT: Mayo Steam Electric Plant WELL / BORING NO: BGSB-3 PROJECT NO: 1026.105 STARTED: 7/18/17 COMPLETED: 7/18/17 DRILLING COMPANY: Geologic Exploration NORTHING: 1011932.94 EASTING: 2029323.42 DRILLING METHOD: GeoProbe G.S. ELEV: ft M.P. ELEV: NA ft BOREHOLE DIAMETER: 3 IN DEPTH TO WATER: NA ft TOC TOTAL DEPTH: 9.0 ft BGS NOTES: LOGGED BY: A. Lefitz CHECKED BY: E. Yurkovich v = co w a O^ a U) z OJ ❑ E WELL CONSTRUCTION w v 0 Q O DESCRIPTION g U ❑ a s ❑ r < W" m0 Orange brown, sandy silt with rock and white gray ML saprolite to partially weathered rock, dry, some relic J. structure present. 5 White gray saprolite, dry. Auger refusal at 9 feet below ground surface. 10 15 20 25 30 35 40 45 Coordinates obtained with hand held GPS unit. f CLIENT: Duke Energy Progress, LLC. ra 48 RPROJECT LOCATION: Roxboro, NC 148 River Street, Suite 220 ���.ra Greenville, South Carolina 29601 Phone:864-421-9999 PAGE 1 OF 1 PROJECT: Mayo Steam Electric Plant WELL / BORING NO: BGSB-4 PROJECT NO: 1026.105 STARTED: 7/18/17 COMPLETED: 7/18/17 DRILLING COMPANY: Geologic Exploration NORTHING: 1011758.59 EASTING: 2028843.84 DRILLING METHOD: GeoProbe G.S. ELEV: ft M.P. ELEV: NA ft BOREHOLE DIAMETER: 3 IN DEPTH TO WATER: NA ft TOC TOTAL DEPTH: 15.0 ft BGS NOTES: LOGGED BY: A. Lefitz CHECKED BY: E. Yurkovich v = co w a O^ a U) z OJ ❑ E WELL CONSTRUCTION w v 0 Q O DESCRIPTION g U ❑ a s ❑ r < W" m0 ML Brown sandy silt with vegetation, moist. MILRed orange, clayey sandy silt with highly weathered rock, moist to dry. 5 MIL Red orange, clayey sandy silt with highly weathered J. rock, moist to dry. Lighter color with depth. 10 ML Orange brown, sandy silt, moist to dry. 15 20 25 30 35 40 45 Coordinates obtained with hand held GPS unit. f CLIENT: Duke Energy Progress, LLC. ra 148 River Street, Suite 220 PROJECT LOCATION: Roxboro, NC 48 R ���.ra Greenville, South Carolina 29601 Phone:864-421-9999 PAGE 1 OF 1 PROJECT: Mayo Steam Electric Plant WELL / BORING NO: BGSB-5 PROJECT NO: 1026.105 STARTED: 7/24/17 COMPLETED: 7/24/17 DRILLING COMPANY: Geologic Exploration NORTHING: 1012015.36 EASTING: 2028472.6 DRILLING METHOD: GeoProbe G.S. ELEV: ft M.P. ELEV: NA ft BOREHOLE DIAMETER: 3 IN DEPTH TO WATER: NA ft TOC TOTAL DEPTH: 15.0 ft BGS NOTES: LOGGED BY: A. Lefitz CHECKED BY: E. Yurkovich v = co w a O^ a U) z OJ ❑ E WELL CONSTRUCTION w v 0 Q O DESCRIPTION g U LU ❑ a s ❑ (Q m 0 OL ML Brown topsoil with vegetation, moist. Light brown, sandy silt with clay lenses grading to following depth description, dry. Stiff, light orange brown, clayey silt, moist to dry. ML 5 ML Stiff, brown orange, clayey silt, moist to dry. 10 Same as above, grading to moderately stiff, brown ML orange, clayey silt, moist to dry saprolite with partially weathered rock. 15 20 25 30 35 40 45 Coordinates obtained with hand held GPS unit. f CLIENT: Duke Energy Progress, LLC. ra 148 River Street, Suite 220 PROJECT LOCATION: Roxboro, NC 48 R ���.ra Greenville, South Carolina 29601 Phone:864-421-9999 PAGE 1 OF 1 PROJECT: Mayo Steam Electric Plant WELL / BORING NO: BGSB-8 PROJECT NO: 1026.105 STARTED: 7/18/17 COMPLETED: 7/18/17 DRILLING COMPANY: Geologic Exploration NORTHING: 1009163.72 EASTING: 2028830.52 DRILLING METHOD: GeoProbe G.S. ELEV: ft M.P. ELEV: NA ft BOREHOLE DIAMETER: 3 IN DEPTH TO WATER: NA ft TOC TOTAL DEPTH: 9.5 ft BGS NOTES: LOGGED BY: A. Lefitz CHECKED BY: E. Yurkovich U = O w a O^ U) Oz E❑ WELL CONSTRUCTIONQOU) W DESCRIPTION ❑a s ❑ _ <LU 0 ML Brown silty sand with vegetation and rock fragments, ML Dense, brown orange, clayey silty sand, dry. 5 ML Light brown orange, silty sand with rock, dry. Light gray, sand and silt with rock. Geoprobe refusal at BAML 9.5 feet below ground surface. 10 15 20 25 30 35 40 45 Coordinates obtained with hand held GPS unit. f CLIENT: Duke Energy Progress, LLC. ra 48 RPROJECT LOCATION: Roxboro, NC 148 River Street, Suite 220 ���.ra Greenville, South Carolina 29601 Phone:864-421-9999 PAGE 1 OF 1 PROJECT: Mayo Steam Electric Plant WELL / BORING NO: BGSB-9 PROJECT NO: 1026.105 STARTED: 7/18/17 COMPLETED: 7/18/17 DRILLING COMPANY: Geologic Exploration NORTHING: 1009437.44 EASTING: 2029418.65 DRILLING METHOD: GeoProbe G.S. ELEV: ft M.P. ELEV: NA ft BOREHOLE DIAMETER: 3 IN DEPTH TO WATER: NA ft TOC TOTAL DEPTH: 15.0 ft BGS NOTES: LOGGED BY: A. Lefitz CHECKED BY: E. Yurkovich U az 0 U w a O o U) z OJ ❑ E WELL CONSTRUCTION W Q O U) DESCRIPTION g U a L ❑ a s ❑ _ < m 0 SM Dense, orange brown, silty sand with rock, saprolite with relic structure, dry. 5 SM Light gray, sandy silt, saprolite dry. 10 MIL Light gray, sandy silt, dry, partially weathered rock at 12.5 feet below ground surface. 15 20 25 30 35 40 45 Coordinates obtained with hand held GPS unit. f CLIENT: Duke Energy Progress, LLC. ra 148 River Street, Suite 220 PROJECT LOCATION: Roxboro, NC 48 R ���.ra Greenville, South Carolina 29601 Phone:864-421-9999 PAGE 1 OF 1