Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Proposed_Additional_Background_Soil_Locations_20170710
,s ' . �\ / ✓ \: \ \moo �I / :�' 41 •L`• ,a 40B I � i ��y.•� �F - - W- '4 CeB �.1 ° • +' f r ; ', "' �+ yh;• BGSB-5 �,r • ��'°f' 3• -_•}A sig �; • azo JA4r, I SmF t �• •., tx, y��;� v �c-` �, Hem^� �® SmD BGSB-4 BGSB-3� �' Weci WeD CeC � � •.. ' � / 'rim WeE CeC If CeB ' •' •,• CeC ►D.. '."�,1, } Ud6 BGSB-2ja CeB CeC 41' i SB -05 SmD x �� ' + MW-13BR w " ® s We ^'HeC • / `-� �/ /►' _r SB -06 �,SB=03 . BGSB-1F�,. .. ,. •o TaE RaC �� \\ HrB �Zac_ _BGSB-56= SB r _ -gory TaE Ce6? - BGSB-6� 1JL / c. - i INSET \ SmD —\,� BGSB-4•BGSB-3 i 1" = 400' — v CeC CeB HrC 41 1 R BGSB-2. Ipp—� CaC n� •♦� �`. HrB RaB R.c SB -03 C� BGSB-1 ♦�' .. ,,. CeC } Ra8 MW -11 BR \ JF +, Ur SmD BGSB Ce6 Rae I"' \ � /��� •_ y ,� CeC . Ra8 _w UdB CeC EnB:. CeB BGSB-90 WeE '" BGSB-80 BGS B-10• —cnn �• �f TaD Hrl Ra8 CeB �. WeD � _ � GeB �. °Ta D CeC --►i��wBGJB-% _ GeB GeB \'4� A. TaE a; WeE WeE •• 250 • •• 1,000 � CeC GRAPHIC SCALE IN FEET RaB- Tom.' STREET,148 RIVER • • CeB tM • } • •• .• GeCP PHONE CeB ,� _ GeC , •.. DATE: CeC - �... WeC. - PROJECT TaD-CHECKED DONOVAN ac \ r WeC _ ci 5A PROPOSED BACKGROUND SOIL SAMPLE LOCATIONS MAYO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC, ROXBORO NC Location Proposed Sample Collection Interval Feet b s BGS13-1 4-5 9- 10 14- 15 BGSB-2 4-5 9- 10 14- 15 BGSB-3 4-5 9- 10 14- 15 BGSB-4 4-5 9- 10 14- 15 BGSB-5 4-5 9- 10 14- 15 BGSB-6 4-5 9- 10 14- 15 BGSB-7 4-5 9- 10 14- 15 BGSB-8 4-5 9- 10 14- 15 BGSB-9 4-5 9- 10 14- 15 BGSB-10 4-5 9- 10 14- 15 Prepared by: RKD Checked by: JAW Notes• 1) bgs - below ground surface 2) Soil samples can only be collected at depths above refusal. The field geologist will determine depth intervals to be collected in the field. 3) Each anticipated sampling interval may not be collected. Soil sample collection will depend on specific site conditions, rig accessibility, and schedule compliance. P:\Duke Energy Progress. 1026\105. Mayo Ash Basin GW Assessment Plan\CAMA 2017 Sampling\Soil\Proposed BG Soil Sample List