HomeMy WebLinkAboutCape Fear- SOIL BTV MEMO_FINALTECHNICAL MEMORANDUM
Date: September 5, 2017 File: 1026.103
To: Ryan Czop (Duke Energy)
Cc Kathy Webb (SynTerra)
From: Chris Suttell (SynTerra)
Subject: Background Threshold Values for Soil
Cape Fear Steam Electric Plant Station — Moncure, NC
An updated background soil dataset was provided to the North Carolina Department of
Environmental Quality (NCDEQ) for Cape Fear Steam Electric Plant (Cape Fear) on May 26,
2017. Additionally, the revised Statistical Methods for Developing Reference Background
Concentrations for Groundwater and Soil at Coal Ash Facilities (statistical methods document) (HDR
Engineering, Inc. and SynTerra Corporation, May 2017) was provided to NCDEQ. On July 7, 2017,
NCDEQ provided a response letter (Zimmerman to Draovitch, July 7, 2017) for each Duke
Energy coal ash facility that identified soil and groundwater data appropriate for inclusion in
the statistical analysis to determine background threshold values (BTVs) for both media. As
outlined in the NCDEQ July 7, 2017 letter, Duke Energy is required to provide BTVs for both
media within 60 days from receipt of the NCDEQ letter for facilities submitting Comprehensive
Site Assessments (CSAs) later than October 31, 2017. BTVs for groundwater are provided under
separate cover.
Updated background soil datasets provided to NCDEQ on May 26, 2017 incorporated
comments provided in a letter by NCDEQ (Zimmerman to Draovitch, April 28, 2017). NCDEQ
requested that Duke Energy collect a minimum of 10, rather than the previously planned eight,
valid background samples prior to the determination of BTVs for each constituent. For soil
datasets with less than 10 valid samples available for BTV determination, no formal upper
tolerance limit (UTL) statistics could be run and the provisional BTV (PBTVs) for a constituent
was computed to be either:
01 The highest value, or
y If the highest value is above an order of magnitude greater than the geometric mean
of all values, then the highest value should be considered an outlier and removed
from further use and the PBTV is computed to be the second highest value.
Soil samples meeting the following criteria are considered valid for use in statistical
determinations of BTVs:
01 Sample was collected from a location that is not impacted by coal combustion
residuals or coal associated materials;
P: \ Duke Energy Progress.1026 \ 103. Cape Fear Ash Basin GW Assessment\ 35.Background Determination
Reports \ Soil \ Cape Fear- SOIL BTV MEMO_FINAL.docx
Background Threshold Values- Soil September 5, 2017
Cape Fear Steam Electric Plant
Page 2 of 3
01 Sample was collected from a depth not less than 0.5 feet below ground surface;
h Sample was collected from a location that is not impacted by other potential
anthropogenic sources of constituents; and
y Sample is collected from the unsaturated zone, greater than one foot (ft) above the
seasonal high water table elevation.
Additional site-specific requirements related to the Cape Fear background soil dataset as
outlined in the July 7, 2017 NCDEQ letter have been incorporated into the soil background
dataset.
This technical memorandum summarizes the revised background soil datasets and statistically
determined BTVs. Statistical determinations of BTVs were performed in accordance with the
revised Statistical Methods for Developing Reference Background Concentrations for Groundwater and
Soil at Coal Ash Facilities (statistical methods document) (HDR Engineering, Inc. and SynTerra
Corporation, May 2017).
SOIL BACKGROUND DATA
Soil samples were collected from soil borings conducted at Cape Fear during the 2015
Comprehensive Site Assessment (CSA). Additionally, soil samples collected in 2013 by
Geosyntec as part of a voluntary assessment are included in the background dataset.
Background soil sample locations are presented in Figure 1. The background dataset provided
to NCDEQ on May 26, 2017 included pooled soil samples collected from multiple depth
intervals. Only samples collected from background locations at depth intervals greater than one
foot above the seasonal high water table were included in the dataset. The background soil
dataset has been further revised from the May 26, 2017 submittal based on input from NCDEQ
in the July 7, 2017 letter. NCDEQ determined the following samples are not appropriate for use
in determining BTVs:
h MW-05BR SB (0-2), MW -09 SB (0-2), MW-10BR SB (0-2), MW-12BR SB (0-2), MW -15 SB
(0-2), MW -20 SB (0-2), MW -22 SB (0-2), and MW -23 SB (0-2) — collected too shallow;
,Ci BG -04 (Geosyntec) (2.0-2.5) and BG -05 (Geosyntec) (2.0-2.5) — collected downgradient of
the 1985 Ash Pond.
After these samples were removed from the dataset, the remaining background soil dataset was
re -screened for outliers prior to statistical determinations. A revised background soil dataset
identifying valid samples and statistical outliers are presented as Table 1. Currently, the
background dataset does not meet the minimum requirement of 10 samples to use formal
statistics to derive BTVs. PBTVs were determined to be either the maximum value, or, if the
maximum value was above an order of magnitude greater than the geometric mean of all
values, the second highest value. PBTVs for constituents in site soil are provided in Table 2.
P: \ Duke Energy Progress.1026 \ 103. Cape Fear Ash Basin GW Assessment\ 35.Background Determination
Reports \ Soil \ Cape Fear- SOIL BTV MEMO_FINAL.docx
Background Threshold Values- Soil September 5, 2017
Cape Fear Steam Electric Plant Page 3 of 3
NCDEQ requires analytical practical quantitation limit (PQL) soil analytical data be less than
the NCDEQ IHSB Preliminary Soil Remediation Goals (PSRG) Protection of Groundwater
standards (dated October 2016) for the data to be valid for calculating BTVs. Additional soil
samples will be collected to satisfy the minimum number of soil samples and to analyze all
constituents by a method whereby the PQL will be below the PSRG Protection of Groundwater
values. Once planned additional samples are included in the dataset, the dataset will be
screened for outliers and BTVs computed. Sampling of the additional background soil samples
is not complete at this time. Therefore, as previously stated, PBTVs were computed and are
provided in Table 2. Boring logs and analytical data for subsequent collection of background
soil samples will be submitted to the NCDEQ Regional Office if received and processed in
sufficient time for review prior to the preparation of the updated CSA report.
LIST OF FIGURES:
Figure 1 Background Soil Sample Location Map
LIST OF TABLES:
Table 1 Background Dataset for Soil
Table 2 Background Threshold Values for Soil
P: \ Duke Energy Progress.1026 \ 103. Cape Fear Ash Basin GW Assessment\ 35.Background Determination
Reports \ Soil \ Cape Fear- SOIL BTV MEMO_FINAL.docx
Background Threshold Values- Soil
Cape Fear Steam Electric Plant
FIGURE
September 5, 2017
P: \ Duke Energy Progress.1026 \ 103. Cape Fear Ash Basin GW Assessment\ 35.Background Determination
Reports \ Soil \ Cape Fear- SOIL BTV MEMO_FINAL.docx
NOTES:
2016 AERIAL ORTHOPHOTOGRAPHY OBTAINED FROM USDA FSA
NAIP VIA ESRI ON 07/18/2017, AERIAL DATED 06/20/2016.
DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH
CAROLINA STATE PLANE COORDINATE SYSTEM FIPS 3200
(NAD83/2011).
MW -22
BGSB-1
r r
W22 i
BGSB=2 r
r
1�
Milo
�1 MW -9 SB LEGEND
e , EXISTING & NCDEQ-ACCEPTED BACKGROUND
® SOIL SAMPLE LOCATION
PROPOSED BACKGROUND SOIL SAMPLE
LOCATION
WASTE BOUNDARY
\� COMPLIANCE BOUNDARY
i
COMBINED COMPLIANCE BOUNDARY
NPDES TREATMENT UNIT
DUKE ENERGY PLANT BOUNDARY
DITCH WITH FLOW DIRECTION
STREAM WITH FLOW DIRECTION
TOPOGRAPHIC CONTOURS (10' INTERVAL)
TOPOGRAPHIC CONTOURS (2' INTERVAL)
400 200 0 400 800
GRAPHIC SCALE IN FEET FIGURE 1
148 RIVER STREET, SUITE 220 BACKGROUND SOIL SAMPLE LOCATIONS
PHONEGREENVILLE,SOUTH CARouNA296°1 CAPE FEAR STEAM ELECTRIC POWER PLANT
PHONE 864-421-9999
synTerra WWW nterr n0r nnm MONCURE, NORTH CAROLINA
DRAWN BY: A. ROBINSON DATE: 08/01/2017
PROJECT MANAGER: K. WEBB
CHECKED BY: C. SUTTELL
P:\Duke Ener F—ress.1026\00 GIS BASE DATA\Ca e Fear\Ma Docs\Back round\Fi ure 1- Background Soil Sample Locations—d
Background Threshold Values- Soil
Cape Fear Steam Electric Plant
TABLES
September 5, 2017
P:\ Duke Energy Progress.1026 \ 103. Cape Fear Ash Basin GW Assessment\ 35.Background Determination
Reports \ Soil \ Cape Fear- SOIL BTV MEMO_FINAL.docx
TABLE 1
UNSATURATED BACKGROUND SOIL DATA SUMMARY
CAPE FEAR STEAM ELECTRIC PLANT
DUKE ENERGY PROGRESS, LLC, MONCURE, NC
Analytical Parameter
pH Aluminum Antimony Arsenic Barium Beryllium Boron Cadmium Calcium Chloride Chromium Cobalt Copper Iron Lead Magnesium Manganese Mercury Molybdenum Nickel (ats N) Potassium Selenium Sodium Strontium Sulfate Thallium Vanadium Zinc
Reporting Units
S.U. mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg I mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg
PSRG Protection of Groundwater
NE NE 0.9 5.8 580 63 45 3 NE NE 360000 0.9 700 1 150 270 NE 65 1 NE 130 NE NE 2.1 NE NE NE 0.28 6 1200
Sample ID
Sample
Collection Date
BG -01 (Geosyntec) (2.0-2.5)
08/20/2013
---
25600
<0.0992
1.61
---
---
5.26 j
<0.053
---
---
27.2
---
7.95
---
19.2
---
234
0.0387 j
---
4.95
---
---
0.414 j
---
---
---
0.349
---
19.8
BG -02 (Geosyntec) (2.0-2.5)
08/20/2013
---
44400
<0.117
3.32
---
---
9 j
<0.0625
---
---
40.4
---
16.8
---
16.8
---
134
0.113 j
---
9.2
---
---
0.795 j
---
---
---
0.347
---
33
BG -03 (Geosyntec) (2.0-2.5)
08/20/2013
---
17600
<0.104
2.16
---
---
6.54 j
<0.0554
---
---
26.9
---
8.06
---
12.9
---
155
0.0536 j
---
3.44
---
---
0.638 j
---
---
---
0.159 j
---
16.6
MW -09 SB (2-3)
04/25/2015
5.6
7720
---
8.1
155
1.2
<13.3
<0.64
979
<265
4.3
31.9
8.8
20000
12.4
2500
324
0.007j
3.3
8.4
<26.5
237j
4.4j
166j
15.1
<265
---
9.7
67.8
MW -09 SB (6-7)
04/25/2015
6.7
9700
---
<5.7
224
0.73
<14.4
<0.69
2750
<291
5
11.4
17.4
24500
26.1
3420
1140
0.012
<2.9
5.7
<29.1
427
---
338
35.8
<291
---
10.8
154
MW -22 SB (3-4)
06/10/2016
5.2
15600
---
<1.4
48.4
0.27
---
<0.17
473
<301 D3
17.8
8.2
14.1
16500
6.1
1890
370
0.014
<0.55
7.8
<30.1 H3,D3
139
<1.4
165
7.3
<301 D3
---
42
28.3
Notes:
54 - Indicates values omitted from dataset.
Indicates data removed /identified as an outlier
--- - Non -detect value removed from dataset; concentration greater than PSRG Protection of Groundwater
< - concentration not detected at or above the adjusted reporting limit.
D3 - Sample was diluted due to the presence of high levels of non -target analytes or ther matrix interference.
H3 - Sample was received or analysis requested beyond the recognized method holding time.
j - Estimated concentration above the adjusted method detection limit and below the adjusted reporting limit.
mg/kg - milligrams per kilogram
NA - Not applicable; sample not collected or analyzed
NE - Not established
PSRG Protection of Groundwater - NCDEQ IHSB Preliminary Soil Remediation Soil Remediation Goals Table - October 2016
S.U. - Standard Units
Prepared by: JHG Checked by: MCM
P:\Duke Energy Progress. 1026\103. Cape Fear Ash Basin GW Assessment\35. Background Determination Reports\Soil\Table\TABLE 1 - Cape Fear BG Soil 032017 Page 1 of 1
TABLE 2
BACKGROUND THRESHOLD VALUES FOR SOIL
CAPE FEAR STEAM STATION
DUKE ENERGY PROGRESS, LLC, MONCURE, NC
Parameter
Reporting Unit
PSRG Protection of
Groundwater
BTVt
pH*
S. J.
NE
5.2 - 6.7
Aluminum
mg/kg
NE
44400
Antimony
mg/kg
0.9
0.117
Arsenic
mg/kg
5.8
8.1
Barium
mg/kg
580
224
Beryllium
mg/kg
63
1.2
Boron
mg/kg
45
14.4
Cadmium
mg/kg
3
0.69
Calcium
mg/kg
NE
2750
Chloride
mg/kg
NE
301
Chromium
mg/kg
360,000
40.4
Cobalt
mg/kg
0.9
31.9
Copper
mg/kg
700
17.4
Iron
mg/kg
150
24500
Lead
mg/kg
270
26.1
Magnesium
mg/kg
NE
3420
Manganese
mg/kg
65
370
Mercury
mg/kg
1
0.113
Molybdenum
mg/kg
NE
3.3
Nickel
mg/kg
130
9.2
Nitrate (as N)
mg/kg
NE
30.1
Potassium
mg/kg
NE
427
Selenium
mg/kg
2.1
4.4
Sodium
mg/kg
NE
338
Strontium
mg/kg
NE
35.8
Sulfate
mg/kg
NE
301
Thallium
mg/kg
0.28
0.349
Vanadium
mg/kg
6
42
Zinc
mg/kg
1200
154
Prepared by: HHS Checked by: OS
Notes;
* - Indicates upper and lower limit determined for parameter
t - Indicates value is provisional; dataset contains less than 10 valid samples
mg/kg - milligrams per kilogram
NE - Not Established
S.U. - Standard Unit
P:\Duke Energy Progress.1026\103. Cape Fear Ash Basin GW Assessment\35. Background Determination Reports\Soil\Table\TABLE 2 - Cape Fear Background Threshold Values
Page 1 of 1