Loading...
HomeMy WebLinkAboutNC0023876_Pretreatment Comliance Inspection_20171004Water Resources Environmental Quality October 4, 2017 Mr. Robert C. Patterson, Jr., P E. Water Resources Director City of Burlington P.O. Box 1358 Burlington, NC 27216 Subject: Pretreatment Compliance Inspection City of Burlington Alamance County NPDES #: NC0023876/South WWTP & NC0023868/East WWTP Dear Mr. Patterson. ROY COOPER Governor MICHAEL S. REGAN Secretary C T A V 7TNANAFRAAANT On September 18, 2017 a Pretreatment Compliance Inspection was performed by Jim Gonsiewski, Winston-Salem Regional Office and Deborah Gore, DWR PERCS Unit. Ms. Kristy King was present at the inspection. The purpose of the inspection is to determine the effectiveness of the pretreatment program by an in-depth review of the files, including industrial monitoring data, appropriate data management and adherence to the Enforcement Response Plan Background The City has seventeen (17) significant industrial users (SIUs), two (2) of which are categorical. Both treatment plants are permitted for 12 0 MGD LTMP/STMP File Review Monitoring is being conducted per the approved long term monitoring plan. Pretreatment Program Element Review The next HWA due date is April 1, 2020 and the next industrial waste survey (IWS) is due July 2, 2021. Industrial User Permit (IUP) File Review Three permit files were reviewed. All requested information was readily available. The inspection is considered satisfactory and in compliance. Ms. King's assistance during the inspection is greatly appreciated State of North Carolina I Environmental Quality 1617 Mail Service Center I Raleigh, North Carolina 27699-1617 919-707-9000 Thank you for your continued cooperation with the Pretreatment Program. Please do not hesitate to contact me at 919-807-6383 [Deborah.GDre@ncdenr.gov] if you have any questions or concerns. Sincerely, Deborah Gore PERCS Unit Supervisor Cc• Central Files Kristy King, City of Burlington (via email) Jim Gonsiewski, WSRO (via email) PERC Files (electronic) LK. NORTH CAROLINA DIVISION OF WATER RESOURCES PRETREATMENT COMPLIANCE INSPECTION (PCI) REPORT Water Resources ENVIRONMENTAL QUALITY BACKGROUND INFORMATION 1Complete Prior To PCI• Review Prol4ram Info Database Sheet s - 1 Control Authority (POTW) Name City of Burlington 2 Control Authority Representative(s) Kristy Km 3 Title(s) Pretreatment S eciahst 4 Last Inspection Date 09/13/2016 Inspection Type (Check One) PCI 5 Has Program Completed All Requirements from the Previous Inspection and Program Info Sheet(s)9 YES 6 Is POTW under an Order That Includes Pretreatment Conditions? NO Order Type, Number, Parameters ICIS CODING Main Program Permit Number MM/DD/YY N I C1 0 1 0 1 2 1 3 1 8 17 1 6-J 109 1 18 117-1 Are Milestone Dates Being Met? ❑ YES ❑ NO 7 Current Number Of Significant Industrial Users (SIUs)9 17 0 8 Number of SIUs With No IUP, or With an Expired IUP9 0 9 Number of SNs Not Inspected By POTW in the Last Calendar Year? 0 10 Number of SIUs Not Sampled By POTW in the Last Calendar Year9 Number SNs In SNC For Limits Violations During Either of the Last 2 Semi -Annual Periods9 0 11 of 12 Number of SNs in SNC For Reporting During Either of the Last 2 Semi -Annual Periods? 0 0 13 Number of SIUs in SNC with Pretreatment Schedule? 0 14 Number of SNs on Schedules9 2 15 Current Number Of Categorical Industrial Users (CIUs)? 0 I TT__Wt__,cOTT T�—CNM9 POTW INTERVIEW 17 Since the Last PCI, has the POTW had any NPDES Limits Violations If Yes, What are the Parameters and How are these Problems Being Addressed 18 Since the Last PCI, has the POTW had any Problems Related to an Industrial Discharge (Interference, Pass -Through, Blockage, Citizens' Complaints, Increased Sludge Production, Etc )9 If Yes, How are these Problems Being Addressed9 19 Which Industries have been in SNC for Limits or Reporting during SNC fo either of the Last 2 Semi -Annual Periods9 Not Been Published for SNC fo; Public Notice?(May refer to PAR if Excessive SIUs in SNC) Not Pu 20 Which Industries are on Compliance Schedules or Orders? For all SNs on an Order, Has a Signed Copy of the Order been sent to the Division9 21 Are Any Permits or Civil Penalties Currently Under Adjudication? If Yes, Which Ones9 NO NO Limits N/A Reporting N/A dished N/A None NO LTMP/STMP FILE REVIEW: 22 Is LTMP/STMP Monitoring Being Conducted at Appropriate Locations and Frequencies YES 23 Are Correct Detection Levels being used for all LTMP/STMP Monitoring? YES 24 Is LTMP/STMP Data Maintained in a Table or Equivalent? YES Is Table Adequate9 YES 25 All LTMP/STMP effluent data reported on Discharge Monitoring Report'? YES 26 If NO to 23 - 26, list violations 27 Should any Pollutants of Concern be Eliminated from or Added to LTMP/STMP9 NO If yes, which ones? Eliminated Added NC DWR Pretreatment Compliance Inspection (PCI) Form Updated December 2016 Page 1 28. PRETREATMENT PROGRAM ELEMENTS REVIEW— Please review POTW files, verify POTW has copy of Program Element in their files, complete with supporting documents and coy of PERCS Approval Letter, and dates consistent with Program Info Program Element Last Submittal Date In file? Last Approval Date In file Date Next Due, If Applicable Headworlo Analysis (HWA) 11/16/15 Yes 2/2/16 Yes 4/1/2020 Industrial Waste Survey (IWS) 8/2/16 Yes 9/19/16 Yes 7/2/2021 Sewer Use Ordinance (SUO) 1/31/13 Yes 3/1/13 Yes N/A Enforcement Response Plan (ERP) 7/29/08 Yes 10/3/08 Yes N/A Long Term Monitoring Plan (LTMP) 11/18/05 Yes 1/27/06 Yes N/A INDUSTRIAL USER PERMIT (IUP) FILE REVIEW (3 IUP FILE REVIEWS OR 1 FILE REVIEW AND 1 IU INSPECTION) 29 User Name Kayser Roth 2 Carolina Bio. Supply 11 3 Engineered Controls 30 IUP Number 0052 0065 F7776019 31 Does File Contain Current Permit? Yes Yes I Yes 32 Permit Expiration Date 6/30/2021 _][__12/31/2021 F12/31/2021 33 Categorical Standard Applied (I E 40 CFR, Etc ) Or N/A N/A N/A 433 17 34 Does File Contain Permit Application Completed Within One Year Prior Yes Yes Yes to Permit Issue Date9 35 Does File Contain an Inspection Completed Within Last Calendar Year? Yes Yes Yes 36 a Does the File Contain a Slug/Spill Control Plan? Yes Yes Yes b If No, is One Needed? (See Inspection Form from POTW) 37 For 40 CFR 413 and 433 TTO Certification, Does File Contain a Toxic N/A N/A Yes Organic Management Plan (TOMP)? j 38 a Does File Contain Original Permit Review Letter from the Division? Yes Yes IF Yes b All Issues Resolved? 39 Durmg the Most Recent Semi -Annual Period, Did the POTW Complete Yes Yes Yes its Sampling as Required by IiJP, including flow 40 Does File Contam POTW Samplmg Cham -Of -Custody Forms? Yes Yes Yes 41 Durmg the Most Recent Semi -Annual Period, Did the SIU Complete its Yes Yes Yes Sampling as Required by IUP, including flow? 41b Durmg the Most Recent Semi -Annual Period, Did SIU submit all reports Yes Yes Yes on time? 42a For categorical IUs with Combined Wastestream Formula (CWF), does N/A N/A N/A file include process/dilution flows as Required by IUP? 42b For categorical IUs with Production based limits, does file include N/A N/A N/A production rates and/or flows as Required by IUP? 43a During the Most Recent Semi -Annual Period, Did the POTW Identify None None Yes All Limits Non -Compliance from Both POTW and SIU Samplmg? 43b Durmg the Most Recent Semi -Annual Period, Did the POTW Identify None None None All Reportm� Non -Compliance from SIU Samplmg? 44 a Was the POTW Notified by SIU (Within 24 Hours) of All Self- a N/A a N/A a N/A Monitormg Violations b Did Industry Resample and submit results to POTW Within 30 Days?b N/A b N/A b Yes c If applicable, Did POTW resample within 30 days of becommg aware c N/A e N/A c N/A of SIU limit violations m the POTW's samr)lmg of the SIU? 46 During the Most Recent Semi -Annual Period, Was the SIU m SNC? No No No 47 During the Most Recent Semi -Annual Period, Was Enforcement Taken N/A N/A Yes as Specified in the POTW's ERP (NOVs, Penalties, tuning, etc )? 48 Does the File Contam Penalty Assessment Notices? N/A N/A N/A 49 Does The File Contam Proof Of Penalty Collection? N/A N/A N/A 50 a Does the File Contam Any Current Enforcement Orders? a N/A a N/A a N/A b Is SIU to Compliance with Order? b N/A b N/A b N/A 51 Did the POTW Representative Have Difficulty in Obtaining Any of This No No No Requested Information For Your NC DWR Pretreatment Compliance Inspection (PCI) Form Updated December 2016 Page 2 FILE REVIEW COMMENTS: 41 Ensure SIUs are reading water meter as required for sampling events 41b Appears reports are received on time, but make sure reports are date stamped to ensure compliance with report due dates OVERALL SUMMARY AND COMMENTS: Comments Discussed nonsignificant CIU definition Please contact PERCS if you think you have a CIU that meets the definition Discussed recent request from Advanced Environmental to discharge (via pump and haul) remediated groundwater from gasoline contaminated sources Reviewed the organics HWA If you have further concerns, contact PERCS to discuss Requirements Next headworks analysis (HWA) due 4/1/2020, next IWS summary due 7/2/2021 Recommendations NOD: NO NOV: NO QNCR: NO POTW Rating: Satisfactory PCI COMPLETED BY: Jim Gonsiewski (WSRO) and Deborah Gore (PERCS Unit) DATE: September 18, 2017 NC DWR Pretreatment Compliance Inspection (PCI) Form Updated December 2016 Page 3