Loading...
HomeMy WebLinkAboutCedar Point Mitigation SiteNCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F Easley, Governor James H Gregson, Director William G Ross Jr, Secretary s J . May 5, 2008 Mr Philip S Harris, III, PE NC Department of Transportation Project Development and Environmental Analysis Office of Natural Environment 1598 Mail Service Center Raleigh, NC 27699-1598 Re Cedar Point Mitigation Site, CAMA Permit No 19-02 Carteret County Dear Mr Hams This letter is in response toyour correspondence dated April 3, 2008 requesting to discontinue monitoring and the regulatory release of the Cedar Point Mitigation Site in Carteret County A CAMA Mayor Permit was issued on February 12, 2002 to NCDOT for the replacement of a deteriorating breakwater and restoration of coastal marsh with the intention of providing for future wetland mitigation needs A tidal channel was excavated to improve the hydrology of the wetland restoration area In accordance with the DCM Field Investigation Report, approximately 2,718 square feet of low marsh and 1,400 square feet of high marsh were excavated for the new tidal channel and low marsh restoration In addition, approximately 10,340 square feet of shallow bottom was excavated and filled to install and obtain the necessary grade behind the breakwater, and approximately 31,200 square feet of high ground was excavated adjacent to Highway 24 and behind the new breakwater to install the tidal channel and restore the low coastal marsh In accordance with Condition No 2 of CAMA permit No 19-02, the results of a wetland delineation, once hydraulic and vegetative success criteria are achieved, was to be subnutted to DCM for approval Also, Condition No 26 states that, "The final mitigation credits generated at this site will be determined by the difference between the results of the pre and post-construction wetland delineations required by Condition No 2 of this CAMA permit " In order to close out the site, please provide the results of a post-construction wetland delineation and an analysis of the amount of coastal wetlands restored, and schedule an on-site meeting with the appropriate agencies Based on confirmation of the results and concurrence from the NC Division of Water Quality (DWQ), the NC Division of Marine Fisheries (DMF), and the NC Wildlife Resources Commission (WRC), DCM will then be able to authorize the discontinuation of monitoring and closure of the site 400 Commerce Avenue, Morehead City, North Carolina 28557-3421 Phone 252-808-2808 \ FAX 252-247-3330 \ Internet www nccoastalmanagement net An Equal opportunity \ Affirmative Action Employer - 50% Recycled \ 10% Post Consumer Paper Cedar Point Mitigation Site CAMA Permit No 19-02 page 2 If you have any questions or concerns contact Steve Sollod at 919-733-2293, extension 230 or via e-mail at steve sollod@ncmail net Sincerely, Doug Huggett Mayor Permits and Consistency Unit Manager cc Mr Randy Griffin, NCDOT Mr Stephen Lane, DCM Mr Mike Marshall, DMF Ms Kathy Matthews, EPA Mr Steve Sollod, DCM Mr David Wainwright, DWQ Mr Garcy Ward, DWQ Mr William Wescott, USACE Mr Travis Wilson, WRC