Loading...
HomeMy WebLinkAbout20171192 Ver 1_More Info Requested_20171005Moore, Andrew W From: Moore, Andrew W Sent: Thursday, October 05, 2017 8:51 AM To: 'Craig Orange' Cc: adam@pcels.com Subject: RE: [External] Whitmire Trucking 401 WQC Craig, On September 20, 2017, the Division of Water Resources (Division) received your application dated July 20, 2017, requesting a 401 Water Quality Certification from the Division for the subject project. The Division has determined that your project is on hold until the following item is addressed: 1. Per condition 11.9 of GC 4092, all work must be done "in the dry". Therefore, dewatering methods will be necessary to temporarily dewater the stream channel during pipe installation. Please provide a construction sequence that details the method of dewatering to be utilized at the site and the sequence of construction events to be followed to ensure compliance with this condition. [15A NCAC 02H .0502(b)(3)] Pursuant to Title 15A NCAC 02H .0502(c), the applicant shall furnish all of the above requested information for the proper consideration of the application. Feel free to contact me if you have any questions. Andrew W. Moore, P.G. Environmental Specialist — Asheville Regional Office Water Quality Regional Operations Section NCDEQ — Division of Water Resources 828 296 4684 office email: Andrew.W.Moore@ncdenr.gov 2090 U.S. Hwy. 70 Swannanoa, N.C. 28778 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Craig Orange [mailto:craig@pcels.com] Sent: Monday, October 02, 2017 12:05 PM To: Moore, Andrew W <andrew.w.moore@ncdenr.gov> Cc: adam@pcels.com Subject: [External] Whitmire Trucking 401 WQC CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you verify that the attachment and content are safe. Send all suspicious email as an attachment to report.spam@nc.gov. Andrew, I trust you are doing well. Our office submitted a PCN application for a 401 certification to Raleigh for the Whitmire Trucking project for a culvert crossing of Line Creek. During a recent conversation with Zan, he mentioned that he forwarded the application onto you. I was wondering if you would be able to provide an anticipated time to complete your review. If you have any questions or require any additional information, please do not hesitate to contact me. Regards, Craig Craig S. Orange Project Manager Pesterfield Land Resource Consultants, PLLC 2 Gerber Road STE 202-C Asheville, NC 28803 Office: 828-252-8423 Mobile: 828-460-6292 www.pcels.com Pesterfield Land Resource Consultants