Loading...
HomeMy WebLinkAbout20170904 Ver 1_More Info Received_20171003Strickland, Bev From: Danielle Birmingham <dbirmingham@harthickman.com> Sent: Tuesday, October 03, 2017 4:14 PM To: Barnes, Kyle W CIV USARMY CESAW (US) Cc: Matt Ingalls; Scarbraugh, Anthony; Kelly Hoyt Subject: [External] RE: Jamesville Road Solar, Pulp Mill Road, Martin Co. Attachments: Jamesville Pulp Mill - Road Crossing - 2017.10.03.pdf, Culvert Calculations - 2017-09-26.pdf CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you verify that the attachment and content are safe. Send all suspicious email as an attachment to report.spam@nc.gov. Good afternoon Kyle, Please find the attached redesigned impact plan along with culvert calculations for the SunEnergy Jamesville Road Solar Project. The culvert has been shifted approximately 10-12' to the west from the original placement to better align with the current stream channel. This has also reduced the proposed impact to 105 If (rather than 116 If). Headwalls have been added to both ends of the culvert pipe. Please let me know if you require any additional information. We look forward to hearing from you. Thank you, Danielle Danielle (Birmingham) Clark, Assistant Project Environmental Scientist Hart & Hickman, PC 2923 South Tryon Street, Suite 100 1 Charlotte, NC 28203 Direct 704-526-2048 Mobile 518-598-2862 1 Main 704-586-0007 www.harthickman.com 10 hart hickman SMARTER ENVIROHMENTAa SOLUTIONS APlease consider the environment before printing this e-mail From: Barnes, Kyle W CIV USARMY CESAW (US) [mai Ito: Kyle.W.Barnes@usace.army.mi1] Sent: Monday, September 25, 2017 8:49 AM To: Danielle Birmingham <dbirmingham@harthickman.com> Cc: Matt Ingalls <Mingalls@harthickman.com>; Scarbraugh, Anthony <anthony.scarbraugh@ncdenr.gov> Subject: RE: Jamesville Road Solar, Pulp Mill Road, Martin Co. Thank you. Kyle Barnes Regulatory Project Manager US Army Corps of Engineers Wilmington District Washington Field Office 910-251-4584 We at the U.S. Army Corps of Engineers Regulatory Branch are committed to improving service to our customers. We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at: http://corpsmapu.usace.army.mil/cm apex/f?p=136:4:0<http://corpsmapu.usace.army.mil/cm apex/f?p=136:4:0> Thank you for taking the time to visit this site and complete the survey. -----Original Message ----- From: Danielle Birmingham [mailto:dbirmingham@harthickman.com] Sent: Wednesday, September 20, 2017 6:35 PM To: Barnes, Kyle W CIV USARMY CESAW (US) <Kyle.W.Barnes@usace.army.mil> Cc: Matt Ingalls <Mingalls@harthickman.com> Subject: [EXTERNAL] RE: Jamesville Road Solar, Pulp Mill Road, Martin Co. Hi Kyle, We are working on getting an update on the redesign of the impact plan from the engineer. I will forward that to you as soon as possible. Thanks, Danielle Danielle (Birmingham) Clark, Assistant Project Environmental Scientist Hart & Hickman, PC 1 2923 South Tryon Street, Suite 100 1 Charlotte, NC 28203 Direct 704-526-2048 1 Mobile 518-598-2862 1 Main 704-586-0007 Blockedwww.harthickman.com <Blockedhttp://www.harthickman.com/> P Please consider the environment before printing this e-mail From: Barnes, Kyle W CIV USARMY CESAW (US) [mailto:Kyle.W.Barnes@usace.army.mil] Sent: Wednesday, September 20, 2017 1:40 PM To: Danielle Birmingham <dbirmingham@harthickman.com> Subject: RE: Jamesville Road Solar, Pulp Mill Road, Martin Co. Danielle, Can you give me an update on this project? Kyle Barnes Regulatory Project Manager US Army Corps of Engineers Wilmington District Washington Field Office 910-251-4584 We at the U.S. Army Corps of Engineers Regulatory Branch are committed to improving service to our customers. We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at: Blockedhttp://corpsmapu.usace.army.miI/cm_apex/f?p=136:4:0 <Blockedhttp://corpsmapu.usace.army.miI/cm_apex/f?p=136:4:0> <Blockedhttp://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0%3e> Thank you for taking the time to visit this site and complete the survey. -----Original Message ----- From: Danielle Birmingham [mailto:dbirmingham@harthickman.com] Sent: Thursday, August 24, 2017 11:32 AM To: Barnes, Kyle W CIV USARMY CESAW (US) <Kyle.W.Barnes@usace.army.mil> <mailto:Kyle.W.Barnes@usace.army.mil%3e> Cc: Matt Ingalls <Mingalls@harthickman.com> <mailto:Mingalls@harthickman.com%3e> ; 'Kelly Hoyt' <kelly.hovt@sunenergvl.com> <maiIto: kelIV. hoyt@sunenergyl.com%3e> ; Scarbraugh, Anthony <anthony.scarbraugh@ncdenr.gov> <mailto:anthony.scarbraugh@ncdenr.gov%3e> Subject: [Non-DoD Source] RE: Jamesville Road Solar, Pulp Mill Road, Martin Co. Good morning Kyle, Thank you for your comments below. We are working with the applicant's engineer to quickly resolve these concerns and we plan to address your comments within the next couple days. Danielle Danielle (Birmingham) Clark, Assistant Project Environmental Scientist Hart & Hickman, PC 1 2923 South Tryon Street, Suite 100 1 Charlotte, NC 28203 Direct 704-526-2048 1 Mobile 518-598-2862 1 Main 704-586-0007 Blocked Blockedwww.harthickman.com <BlockedBlockedhttp://www. harthickman.com/> P Please consider the environment before printing this e-mail From: Barnes, Kyle W CIV USARMY CESAW (US) [mailto:Kyle.W.Barnes@usace.army.mil] Sent: Thursday, August 24, 2017 7:34 AM To: Danielle Birmingham <dbirmingham@harthickman.com> <mailto:dbirmingham@harthickman.com%3e> Cc: Matt Ingalls <Mingalls@harthickman.com> <mailto:Mingalls@harthickman.com%3e> ; 'Kelly Hoyt' <kelly.hovt@sunenergvl.com> <maiIto: kelIV. hoyt@sunenergyl.com%3e> ; Scarbraugh, Anthony <anthony.scarbraugh@ncdenr.gov> <mailto:anthony.scarbraugh@ncdenr.gov%3e> Subject: RE: Jamesville Road Solar, Pulp Mill Road, Martin Co. Danielle, I have major concerns that the inlet end of the culvert will have severe erosion issues. There will be unstable soil at that point where the old channel was filled in and there is no headwall. The slopes from the upstream watershed are steep and the flashiness of that system has potential to compromise the crossing. Please describe how you will address this issue. With this issue your PCN request is incomplete. Kyle Barnes Regulatory Project Manager US Army Corps of Engineers Wilmington District Washington Field Office 910-251-4584 We at the U.S. Army Corps of Engineers Regulatory Branch are committed to improving service to our customers. We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at: BlockedBlockedhttp://corpsmapu.usace.army.miI/cm_apex/f?p=136:4:0 <BlockedBlockedhttp://corpsmapu.usace.army.miI/cm_apex/f?p=136:4:0> <BlockedBlockedhttp://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0%3e> Thank you for taking the time to visit this site and complete the survey. -----Original Message ----- From: Danielle Birmingham [mailto:dbirmingham@harthickman.com] Sent: Tuesday, August 22, 2017 3:53 PM To: Barnes, Kyle W CIV USARMY CESAW (US) <Kyle.W.Barnes@usace.army.mil> <mailto:Kyle.W.Barnes@usace.army.mil%3e> <mailto:KVIe.W.Barnes@usace.army.mil%3e> <mailto:Kyle.W.Barnes@usace.army.mil%3e%3e> Cc: Matt Ingalls <Mingalls@harthickman.com> <mailto:Mingalls@harthickman.com%3e> <maiIto: MIngaIIs@harthickman.com%3e> <mailto:Mingalls@harthickman.com%3e%3e> Subject: [Non-DoD Source] RE: Jamesville Road Solar, Pulp Mill Road, Martin Co. Good afternoon Kyle, Please see the attached road crossing exhibit from the applicant's engineer. I double-checked with the engineer and because the stream is slightly angled at the impact location, the total impact to the stream is 116 linear feet even though the proposed pipe length and outlet protection totals 110 linear feet. There are no other impacts to the stream that are not quantified in the PCN. I did check the scale on the attached document and it appears to be correct. Please let me know if you require any additional information or documentation for your review. Thank you! Danielle Danielle (Birmingham) Clark, Assistant Project Environmental Scientist Hart & Hickman, PC 1 2923 South Tryon Street, Suite 100 1 Charlotte, NC 28203 Direct 704-526-2048 1 Mobile 518-598-2862 1 Main 704-586-0007 Blocked Blocked Blockedwww.harthickman.com <BlockedBlockedBlockedhttp://www. harthickman.com/> P Please consider the environment before printing this e-mail From: Barnes, Kyle W CIV USARMY CESAW (US) [mailto:Kyle.W.Barnes@usace.army.mil] Sent: Monday, August 21, 2017 3:47 PM To: Danielle Birmingham <dbirmingham@harthickman.com> <mailto:dbirmingham@harthickman.com%3e> <mailto:dbirmingham@harthickman.com%3e> <mailto:dbirmingham@ha rthickman.com%3e%3e> Subject: RE: Jamesville Road Solar, Pulp Mill Road, Martin Co. Danielle, I've reviewed the PCN and everything is complete. The only part I'm not following is the total impact length. You indicate 781f of pipe and 321f of rip rap outlet protection. The PCN indicates 1161f of impacts but your total as indicated on EX2.0 is 1101f. The scale on the EX2.0 sheet is slightly off so scaling the document is not going to be right. Are there other impacts that aren't quantified in the PCN? Kyle Barnes Regulatory Project Manager US Army Corps of Engineers Wilmington District Washington Field Office 910-251-4584 We at the U.S. Army Corps of Engineers Regulatory Branch are committed to improving service to our customers. We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at: BlockedBlockedBlockedhttp://corpsmapu.usace.army.miI/cm_apex/f?p=136:4:0 <BlockedBlockedBlockedhttp://corpsmapu.usace.army.miI/cm_apex/f?p=136:4:0> <BlockedBlockedBlockedhttp://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0%3e> Thank you for taking the time to visit this site and complete the survey. -----Original Message ----- From: Danielle Birmingham [mailto:dbirmingham@harthickman.com] Sent: Wednesday, July 19, 2017 1:08 PM To: Barnes, Kyle W CIV USARMY CESAW (US) <Kyle.W.Barnes@usace.army.mil> <mailto:Kyle.W.Barnes@usace.army.mil%3e> <mailto:KVIe.W.Barnes@usace.army.mil%3e> <mailto:Kyle.W.Barnes@usace.army.mil%3e%3e> <mailto:Kyle.W.Barnes@ usace.army.mil%3e> <mailto:Kyle.W.Barnes@usace.army.mil%3e%3e> <mailto:Kyle.W.Barnes@ usace.army.mil%3e%3e> <mailto:Kyle.W.Barnes@usace.army.mil%3e%3e%3e> Cc: Matt Ingalls <Mingalls@harthickman.com> <mailto:Mingalls@harthickman.com%3e> <maiIto: MIngaIIs@harthickman.com%3e> <mailto:Mingalls@harthickman.com%3e%3e> <mailto:Mingalls@harthickman.com%3e> <mailto:Mingalls@harthickman.com%3e%3e> <mailto:Mingalls@harthickman.com%3e%3e> <mailto:Mingalls@harthickman.com%3e%3e%3e> ; Kelly Hoyt <kelly.hovt@sunenergvl.com> <maiIto: kelIV. hoyt@sunenergyl.com%3e> <maiIto: kelIV. hoyt@sunenergyl.com%3e> <maiIto: kelIV. hoyt@sunenergyl.com%3e%3e> <maiIto: kelIV. hoyt@sunenergyl.com%3e> <maiIto: kelIV. hoyt@sunenergyl.com%3e%3e> <maiIto: kelIV. hoyt@sunenergyl.com%3e%3e> <maiIto: kelIV. hoyt@sunenergyl.com%3e%3e%3e> ; Scarbraugh, Anthony <anthony.scarbraugh@ncdenr.gov> <mailto:anthony.scarbraugh@ncdenr.gov%3e> <mailto:anthony.scarbraugh@ncdenr.gov%3e> <mailto:anthony.scarbraugh@ncdenr.gov%3e%3e> <mailto:anthony.scarbraugh@ncdenr.gov%3e> <mailto:anthony.scarbraugh@ncdenr.gov%3e%3e> <mailto:anthony.scarbraugh@ncdenr.gov%3e%3e> <mailto:anthony.scarbraugh@ncdenr.gov%3e%3e%3e> Subject: [Non-DoD Source] RE: Jamesville Road Solar, Pulp Mill Road, Martin Co. Good afternoon Kyle, Great, thank you for the update. Feel free to let me know if you require any additional information. We look forward to your review. Danielle Danielle (Birmingham) Clark, Assistant Project Environmental Scientist Hart & Hickman, PC 1 2923 South Tryon Street, Suite 100 1 Charlotte, NC 28203 Direct 704-526-2048 1 Mobile 518-598-2862 1 Main 704-586-0007 Blocked Blocked Blocked Blockedwww.harthickman.com<BlockedBlockedBlockedBlockedhttp://www. harthickman.com/> P Please consider the environment before printing this e-mail From: Barnes, Kyle W CIV USARMY CESAW (US) [mailto:Kyle.W.Barnes@usace.army.mil] Sent: Wednesday, July 19, 2017 12:23 PM To: Danielle Birmingham <dbirmingham@harthickman.com> <mailto:dbirmingham@harthickman.com%3e> <mailto:dbirmingham@harthickman.com%3e> <mailto:dbirmingham@ha rthickman.com%3e%3e> <mailto:dbirmingham@harthickman.com%3e> <mailto:dbirmingham@ha rthickman.com%3e%3e> <mailto:dbirmingham@harthickman.com%3e%3e> <mailto:dbirmingham@harthickman.com%3e%3e%3e> Cc: Matt Ingalls <Mingalls@harthickman.com> <mailto:Mingalls@harthickman.com%3e> <mailto:Mingalls@harthickman.com%3e> <mailto:Mingalls@harthickman.com%3e%3e> <mailto:Mingalls@harthickman.com%3e> <mailto:Mingalls@harthickman.com%3e%3e> <mailto:Mingalls@harthickman.com%3e%3e> <mailto:Mingalls@harthickman.com%3e%3e%3e> ; Kelly Hoyt <kelly.hovt@sunenergvl.com> <maiIto: kelIV. hoyt@sunenergyl.com%3e> <mailto:kelly.hovt@sunenergvl.com%3e> <mailto:kelly.hovt@sunenergvl.com%3e%3e> <maiIto: kelIV. hoyt@sunenergyl.com%3e> <maiIto: kelIV. hoyt@sunenergyl.com%3e%3e> <maiIto: kelIV. hoyt@sunenergyl.com%3e%3e> <maiIto: kelIV. hoyt@sunenergyl.com%3e%3e%3e> ; Scarbraugh, Anthony <anthony.scarbraugh@ncdenr.gov> <mailto:anthony.scarbraugh@ncdenr.gov%3e> <mailto:anthony.scarbraugh@ncdenr.gov%3e> <mailto:anthony.scarbraugh@ncdenr.gov%3e%3e> <mailto:anthony.scarbraugh@ncdenr.gov%3e> <mailto:anthony.scarbraugh@ncdenr.gov%3e%3e> <mailto:anthony.scarbraugh@ncdenr.gov%3e%3e> <mailto:anthony.scarbraugh@ncdenr.gov%3e%3e%3e> Subject: RE: Jamesville Road Solar, Pulp Mill Road, Martin Co. Danielle, I have received the project information, PCN and JD information and marked it as received on July 17, 2017. 1 will be notifying you as to the completeness of the PCN application within the next 15 days. Kyle Kyle Barnes Regulatory Specialist US Army Corps of Engineers Wilmington District Washington Field Office 910-251-4584 We at the U.S. Army Corps of Engineers Regulatory Branch are committed to improving service to our customers. We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at: BlockedBlockedBlockedBlockedhttp://corpsmapu.usace.army.miI/cm_apex/f?p=136:4:0 <BlockedBlockedBlockedBlockedhttp://corpsmapu.usace.army.miI/cm_apex/f?p=136:4:0> <BlockedBlockedBlockedBlockedhttp://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0%3e> Thank you for taking the time to visit this site and complete the survey. -----Original Message ----- From: Danielle Birmingham [mailto:dbirmingham@harthickman.com] Sent: Monday, July 17, 2017 4:38 PM To: Barnes, Kyle W CIV USARMY CESAW (US) <Kyle.W.Barnes@usace.army.mil> <mailto:Kyle.W.Barnes@usace.army.mil%3e> <mailto:KVIe.W.Barnes@usace.army.mil%3e> <mailto:Kyle.W.Barnes@usace.army.mil%3e%3e> <mailto:Kyle.W.Barnes@ usace.army.mil%3e> <mailto:Kyle.W.Barnes@usace.army.mil%3e%3e> <mailto:Kyle.W.Barnes@ usace.army.mil%3e%3e> <mailto:Kyle.W.Barnes@usace.army.mil%3e%3e%3e> <mailto:Kyle.W.Barnes@usace.army.mil%3e> <mailto:Kyle.W.Barnes@usace.army.mil%3e%3e> <mailto:KVIe.W.Barnes@usace.army.mil%3e%3e> <mailto:Kyle.W.Barnes@usace.army.mil%3e%3e%3e> <mailto:Kyle.W.Barnes@usace.army.mil%3e%3e> <mailto:Kyle.W.Barnes@usace.army.mil%3e%3e%3e> <mailto:Kyle.W.Barnes@usace.army.mil%3e%3e%3e> <mailto:Kyle.W.Barnes@usace.army.mil%3e%3e%3e%3e> Cc: Matt Ingalls <Mingalls@harthickman.com> <mailto:Mingalls@harthickman.com%3e> <maiIto: MIngaIIs@harthickman.com%3e> <mailto:Mingalls@harthickman.com%3e%3e> <mailto:Mingalls@harthickman.com%3e> <mailto:Mingalls@harthickman.com%3e%3e> <mailto:Mingalls@harthickman.com%3e%3e> <mailto:Mingalls@harthickman.com%3e%3e%3e> <mailto:Mingalls@harthickman.com%3e> <mailto:Mingalls@harthickman.com%3e%3e> <mailto:Mingalls@harthickman.com%3e%3e> <mailto:Mingalls@harthickman.com%3e%3e%3e> <mailto:Mingalls@harthickman.com%3e%3e> <maiIto: MIngaIIs@harthickman.com%3e%3e%3e> <mailto:Mingalls@harthickman.com%3e%3e%3e> <maiIto: MIngaIIs@harthickman.com%3e%3e%3e%3e> ; Kelly Hoyt <kelly.hovt@sunenergvl.com> <maiIto: kelIV. hoyt@sunenergyl.com%3e> <maiIto: kelIV. hoyt@sunenergyl.com%3e> <maiIto: kelIV. hoyt@sunenergyl.com%3e%3e> <maiIto: kelIV. hoyt@sunenergyl.com%3e> <maiIto: kelIV. hoyt@sunenergyl.com%3e%3e> <maiIto: kelIV. hoyt@sunenergyl.com%3e%3e> <maiIto: kelIV. hoyt@sunenergyl.com%3e%3e%3e> <maiIto: kelIV. hoyt@sunenergyl.com%3e> <maiIto: kelIV. hoyt@sunenergyl.com%3e%3e> <maiIto: kelIV. hoyt@sunenergyl.com%3e%3e> <maiIto: kelIV. hoyt@sunenergyl.com%3e%3e%3e> <maiIto: kelIV. hoyt@sunenergyl.com%3e%3e> <maiIto: kelIV. hoyt@sunenergyl.com%3e%3e%3e> <maiIto: kelIV. hoyt@sunenergyl.com%3e%3e%3e> <maiIto: kelIV. hovt@sunenergyl.com%3e%3e%3e%3e> ; Scarbraugh, Anthony <anthony.scarbraugh@ncdenr.gov> <mailto:anthony.scarbraugh@ncdenr.gov%3e> <mailto:anthony.scarbraugh@ncdenr.gov%3e> <mailto:anthony.scarbraugh@ncdenr.gov%3e%3e> <mailto:anthony.scarbraugh@ncdenr.gov%3e> <mailto:anthony.scarbraugh@ncdenr.gov%3e%3e> <mailto:anthony.scarbraugh@ncdenr.gov%3e%3e> <mailto:anthony.scarbraugh@ncdenr.gov%3e%3e%3e> <mailto:anthony.scarbraugh@ncdenr.gov%3e> <mailto:anthony.scarbraugh@ncdenr.gov%3e%3e> <mailto:anthony.scarbraugh@ncdenr.gov%3e%3e> <mailto:anthony.scarbraugh@ncdenr.gov%3e%3e%3e> <mailto:anthony.scarbraugh@ncdenr.gov%3e%3e> <mailto:anthony.scarbraugh@ncdenr.gov%3e%3e%3e> <mailto:anthony.scarbraugh@ncdenr.gov%3e%3e%3e> <mailto:anthonv.scarbraui2h@ncdenr.gov%3e%3e%3e%3e> Subject: [Non-DoD Source] Jamesville Road Solar, Pulp Mill Road, Martin Co. Good afternoon Kyle, Please find the attached pre -construction notification for the Jamesville Road Solar project located at the intersection of Pulp Mill Road and Elwood Holliday Road in Jamesville, NC. Please confirm your receipt of this application package at your earliest convenience. I will also be sending out hardcopies to you and DEQ DWR this week. Feel free to contact me if you require any additional information. Thank you for your review! Danielle Danielle (Birmingham) Clark, Assistant Project Environmental Scientist Hart & Hickman, PC 1 2923 South Tryon Street, Suite 100 1 Charlotte, NC 28203 Direct 704-526-2048 1 Mobile 518-598-2862 1 Main 704-586-0007 Blocked Blocked Blocked Blocked Blockedwww.harthickman.com <BlockedBlockedBlockedBlockedBlockedhttp://www.harthickman.com/> P Please consider the environment before printing this e-mail NOTE: THIS ROAD CROSSING IS RESULTING IN £ A 105 LF INTERMITTENT STREAM DISTURBANCE. ` 'I ', II III PROPOANELRACK ` 1 I I I PANEL RACK , 1 IIw o 1 ISI aSsm 1 co N SI1 0 0 a I , l E� tt PROPOSED SILT FENCE (TYP) www PROPOSED 12'W X 401 X 32"D �Q I 1111 1 u � o0 a CLASS 2 RIP RAP OUTLET PROTECTION I I 1 I 111 1 I i a a �o DATE 06/16/17 PROPOSED CAST IN PLACE I / 1 1 DRAWNBY 1 CONCRETE ENDWALL / / / / 1 �GJ J. DOOLEY DESIGNED 6Y EXISTING LIMITS OF DISTURBANCE / // • ]. DOOLEY TO BE RELOCATED // ' \ / / • CHECKED EY R. BAKER FES #2 PROPOSED 56 LF OF 48" RCP / / // / /' • 1. SCALE UPHILL INVERT: 12.50' 13 3 r • • DOWNHILL INVERT: 11.50' / MINIMUM 1' OF COVER 13�" �'� 14a p is ^^ 1615 3:1 SLOPE-- LOPE17 17 PROPOSED RO D CROSSING U 17� 10' .8' X18.0' I _— J 10, ♦ 17.8'® PROPOSED ROAD CROSSING 19c5 O m 17 ��_ C ♦ 17 W ULUz X w615 (,,'16 Q z ♦ ♦ c'), O , _Z d `o zcQ I ♦ FES #1 , ,- (A J LU o O \ I I �, I STABILIZE BOTH THE NORTHERN J Q v I PROPOSED CAST IN PLACE 1 AND SOUTHERN SLOPES OF THE Z 0 I CONCRETE I 1 ENDWALL ROAD WIDENING WITH NORTH i > O e 1 % AMERICAN GREEN S75 MATTING zz W SCALE 1"=20' o ]OB NO. 37562 z NOR II , / 1 1 ♦ I / / ♦ I / / /' / ' 0 20 40' SHEET NO. EX2.0 / / /