Loading...
HomeMy WebLinkAbout20171244 Ver 1_401 Application_20171017September 18, 2017 Mr. Raleigh Bland US Army Corps of Engineers 2407 West 5`h Street Washington, NC 27889 Mr. Anthony Scarbraugh NCDEQ DWR WQROS 943 Washington Square Mall Washington, NC 27889 2 0 1 7 1 2 4 4 Subject: Tammy Edwards Project Bulkhead, Pier, Boat Lift and Boat Ramp Pitt County Dear Mr. Bland and Mr. Scarbraugh: Please find attached is my PCN for the proposed project. I have tried to fill the application out to the best of my ability with my contractors advice and yours. I would like to talk about each part of my project in detail to give you a better understanding. My contractor is George Linton and you may contact him at 252-943-7154 if you have any questions for him. First: I would like to bulkhead my shoreline with vinyl material. The lengths (DEPTH) will vary depending on the shoreline. The bulkhead will wrap around my property from property line to property line. It is estimated to be approximately 932 linear feet of bulkhead. This will include the ends coming back into the property at four different locations by eight feet: each of the property lines and at the drainage swale that discharges into Reedy Branch. The bulkhead and tye backs will be vibrated in. All hardware will be either galvanized steel or stainless steel. The bulkhead will extend into the water from the shoreline on average two feet. Because of the length, the project will be completed within the life of the permit (which I believe is good for three years). After each stage, the bulkhead will be backfilled, graded and seeded. All measures will be taken to prevent any settlement from getting into the Tar River and Reedy Branch. There is one area along my waterfront that I would like to fill and straighten. This area is approximately 4,900 square feet. This area is always receiving trash and debris which is caught from upstream. The area is shallow in depth and is mucky on the bottom. I wish to straighten my property by bulkheading this portion of my property (please see drawings) I propose to put my boat ramp in this area. All fill material will be from off-site. Second: The boatramp will be located in the area described above. Vinyl bulkhead will be placed around the boat ramp. The ramp size will be twenty feet long and ten feet wide. The ramp will be made from pressure treated wood with separation between the slats. The only impervious material that will be part of my project is the driveway that will go through the Tar/Pamlico Buffer. I propose 500 square feet of impervious feet. 300 through zone one and 200 through zone two. Again, all pilings and vinyl will be vibrated in. Third: The boat lift will entail four pressure treated pilings spaced thirteen feet apart in a rectangle. There will be no roof on the pilings. The lift will entail a boat hoist manufactured for this purpose. Fourth: The pier will be built to have access to the boat lift. The walkway will be five feet four inches and the platform will be sixteen feet by sixteen feet. The total length will be fifty feet from the bulkhead. All materials will be made from wood. If you should have any questions, please give me a call or Mr. George Linton. Thanks for your consideration on my project. Sincerely, Tammy Edwards oe° �N �r C? Y Office Use Only: Corps action ID no. DWQ project no. Form Version 1.4 January 2009 Page 1 of 10 PCN Form — Version 1.4 January 2009 Pre -Construction Notification (PCN) Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps:T_ ❑X Section 404 Permit ❑ Section 10 Permit 1b. Specify Nationwide Permit (NWP) number: or General Permit (GP) number: 1 c. Has the NWP or GP number been verified by the Corps? N Yes ❑X No 1 d. Type(s) of approval sought from the DWQ (check all that apply): ❑X 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑X Riparian Buffer Authorization 1 e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ❑ Yes ❑X No For the record only for Corps Permit: ❑ Yes ❑X No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. ❑ Yes ❑X No 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. N Yes ❑X No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ❑X No 2. Project Information 2a. Name of project: TAMMY LYNN EDWARDS 2b. County: PITT 2c. Nearest municipality / town: GRIMESLAND 2d. Subdivision name: N/A 2e. NCDOT only, T.I.P. or state project no: N/A 3. Owner Information 3a. Name(s) on Recorded Deed: TAMMY EDWARDS 3b. Deed Book and Page No. DEED BOOK 433 PAGE NO: 63 3c. Responsible Party (for LLC if applicable): N/A 3d. Street address: POKER HOUSE ROAD (PO BOX 369) 3e. City, state, zip: GRIMESLAND, NC 27837 3f. Telephone no.: 252-916-8351 3g. Fax no.: 3h. Email address: Page 1 of 10 PCN Form — Version 1.4 January 2009 4. Applicant Information (if different from owner) 4a. Applicant is: ❑ Agent ❑X Other, specify: OWNER 4b. Name: TAMMY LYNN EDWARDS 4c. Business name (if applicable): N/A 4d. Street address: PO BOX 369 4e. City, state, zip: GRIMESLAND, NC 27368 4f. Telephone no.: 252-916-8351 4g. Fax no.: 4h. Email address: 5. Agent/Consultant Information (if applicable) 5a. Name: 5b. Business name (if applicable): 5c. Street address: 5d. City, state, zip: 5e. Telephone no.: 5f. Fax no.: 5g. Email address: Page 2 of 10 B. Project information and Prior Project History 1. Property Identification la. Property identification no. (tax PIN or parcel ID): PARCEL #27368 PIN #5646183904 1b. Site coordinates (in decimal degrees): I Latitude: Longitude: 1c. Property size: 4.33 acres 2. Surface Waters 2a. Name of nearest body of water to proposed project: TAR RIVER 2b. Water Quality Classification of nearest receiving water: B NSW 2c. River basin: TAR/PAMLICO 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: THE SITE IS A SINGLE FAMILY RESIDENCE SITUATED ON 4.33 ACRES ADJACENT TO THE TAR RIVER NEAR THE GRIMESLAND BRIDGE. SHORELINE IS UNSTABLE AND SLOUGHING INTO RIVER. 3b. List the total estimated acreage of all existing wetlands on the property: 0 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 932 3d. Explain the purpose of the proposed project: 'To OUILO na \4HJEA►0 7'4d/Lj7- Nd 61- wJLr_ DNc prrzt4 % BC FLrz 7a sT-P i;-r,O-J /tN'o To IOQCZ1t;�% 719tlTA' '1164 10 beg IVV -,fo/K ,4�Utitt! I^/ rfnJb, To Zu r1. o 48b k -r Ll FT Lid # t -r R4oN P ^-4o A/ - 3e. Describe the overall project in detail, including the type of equipment to be used: ZU Lk H C-6 D W t I E- 0A) 440 004Zy -m4cje Ba.1TZiF7,26M7 R^Mto Vl A,J Q?/E2 ILL. at W a b p n/0 V l 4 Q 7'tV _.tel 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project(including all priorphases) in thepast? ❑ Yes © No ❑ Unknown Comments: 4b. If the Corps made the jurisdictional determination, what type of determination was made? Preliminary ❑ Final 4c. If yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: I Other: 4d. if yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? ❑Yes ®No ❑Unknown 5b. If yes, explain in detail according to `help file' instructions. 6. Future Project Plans 6a. Is this a phased project? ® Yes ❑ No 6b. If yes, explain. PROJECT WILL BE CONSTRUCTED OVER THE LIFE OF THE PERMIT. Page 3 of 10 PCN Form - Version 1.4 January 2009 C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ❑ Wetlands ❑ Streams — tributaries ❑X Buffers Q Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. Wetland impact number Permanent (P) or Temporary 2b. Type of impact 2c. Type of wetland 2d. Forested 2e. Type of jurisdiction Corps (404,10) or DWQ (401, other) 2f. Area of impact (acres) W1 - Choose one Choose one Yes/No - W2 - Choose one Choose one Yes/No - W3 - Choose one Choose one Yes/No - W4 - Choose one Choose one Yes/No - W5 - Choose one Choose one Yes/No - W6 - Choose one Choose one Yes/No - 2g. Total Wetland Impacts: 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Stream impact number Permanent (P) or Temporary (T) 3b. Type of impact 3c. Stream name 3d. Perennial (PER) or intermittent (INT)? 3e. Type of jurisdiction 3f. Average stream width (feet) 3g. Impact length (linear feet) S1 - Choose one - - S2 - Choose one - - S3 - Choose one - - S4 - Choose one - - S5 - Choose one - - S6 - Choose one - - 3h. Total stream and tributary impacts 3i. Comments: Page 4 of 10 PCN Form — Version 1.4 January 2009 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. Open water impact number Permanent (P) or Temporary T 4b. Name of waterbody (if applicable) 4c. Type of impact 4d. Waterbody type 4e. Area of impact (acres) 01 P TAR RIVER Bulkheads Other 0.1557 O2 P TAR RIVER Other Other 0.0046 03 P TAR RIVER Other Other 0.0039 04 P TAR RIVER Other Other 0.0102 4f. Total open water impacts 4g. Comments: 6. Pond or Lake Construction If pond or lake construction proposed, the complete the chart below. Sa. Pond ID number 5b. Proposed use or purpose of pond 5c. Wetland Impacts (acres) 5d. Stream Impacts (feet) 5e. Upland (acres) Flooded Filled Excavated Flooded Filled Excavated P1 Choose one P2 Choose one 5f. Total: 5g. Comments: 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. Project is in which protected basin? ❑ Neuse Q Tar -Pamlico ❑ Catawba ❑ Randleman ❑ Other: 6b. Buffer Impact number - Permanent (P) or Temporary 6c. Reason for impact 6d. Stream name 6e. Buffer mitigation required? 6f. Zone 1 impact (square feet) 6g. Zone 2 impact (square feet B1 P ACCESS TO BOAT RAMP TAR RIVER No 300 200 B2 - Yes/No B3 - Yes/No B4 - Yes/No B5 Yes/No B6 - Yes/No 6h. Total Buffer Impacts: 300 200 6i. Comments: Page 5 of 10 D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ❑ Yes ❑ No 2b. If yes, mitigation is required by (check all that apply): ❑ DWQ ❑ Corps 2c. If yes, which mitigation option will be used for this project? ❑ Mitigation bank ❑Payment to in -lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type: Choose one Type: Choose one Type: Choose one Quantity: Quantity: Quantity: 3c. Comments: 4. Complete if Making a Payment to In -lieu Fee Program 4a. Approval letter from in -lieu fee program is attached. ❑ Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: Choose one 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non -riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 6 of 10 PCN Form — Version 1.4 January 2009 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires ❑ Yes No buffer mitigation? 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. 6c. 6d. 6e. Zone Reason for impact Total impact Multiplier Required mitigation (square feet) (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund). 6h. Comments: Page 7 of 10 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified QX Yes ❑ No within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why. NO PLAN IS REQUIRED. ALL FLOW WILL SHEET FLOW from property. ❑ YesX❑ No 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? 0.27% 2b. Does this project require a Stormwater Management Plan? ❑ Yes © No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: PROJECT IS NOT IN COASTAL COUNTY AND ALL STORMWATER WILL SHEETFLOW OFF PROPERTY. 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: 2e. Who will be responsible for the review of the Stormwater Management Plan? 3. Certified Local Government Stormwater Review 3a. In which localgovernment's jurisdiction is this project? ❑ Phase II 3b. Which of the following locally -implemented stormwater management programs ❑ NSW ❑ USMP apply (check all that apply): ❑ Water Supply Watershed ❑ Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 4. DWQ Stormwater Program Review ❑Coastal counties ❑HOW 4a. Which of the following state -implemented stormwater management programs applyHSession ORW (check all that apply): Law 2006-246 []Other: 4b. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 8 of 10 PCN Form — Version 1.4 January 2009 F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public (federal/state/local) funds or the ❑ Yes Q No use of public (federal/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State El Yes ❑ No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) ❑ Yes ❑ No Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑ Yes Q No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after -the -fact permit application? ❑Yes Q No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ❑Yes ❑X No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non -discharge or discharge) of wastewater generated from theproposed ro'ect, or available capacity of the subject facility. SFR IS SERVED BY SEPTIC TANK AND NITRIFICATION FIELD. Page 9 of 10 PCN Form — Version 1.4 January 2009 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ❑ Yes ❑X No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ❑ Yes ❑X No impacts? 5c. If yes, indicate the USFWS Field Office you have contacted. - 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? 'T L\ `t -V -k- 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ❑ Yes No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA -designated 100 -year floodplain? ❑ Yes ® No 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination? All h 1)v. Applicant/Agent's Printed Name Date Appli t/Agent's Signature (Agent's signature is valid only if an authorization letter from the applicant isprovided.) Page 10 of 10 F—Ad 4 Go - Ste- earth feet 200 meters 73 v 3At �11 --r� 0 G cro ct.� ,v ?f?ofoS EL > �� a1°rT )<Arr%p ,A2F -7*0 A ZY =i LL:E l?5 ol uL 4k.EA0 1 7 G u,4H A4 7 i 4 den