Loading...
HomeMy WebLinkAbout20171041 Ver 1_Mac-post contract field notes_20170815Meeting Notes Date: August 15, 2017 Type of Site: NCDMS Stream Site Prepared By: Mac Haupt Sponsor/Provider: Resource Environmental Solutions Meeting Type: NCDMS Technical Site Review County: Surry Action ID: Basin and HUC: Yadkin - 03040101 Project Name: Little Sebastian Coordinates: 36.3965 1 °N -80.8584 °W Attendees: RES -Daniel I., Daniel R., Cara C., Frasier M., David G. COE-Todd WRC- Olivia Munzer DMS -Paul, Harry, Kirsten Notes, Sketch, etc.: Listed in visiting order: JN2-13- E2 proposed, approach ok, alot of cattle pressure, lots of impact on channel, mostly wooded JN2-A-R proposed, did not think this reach needed R, E1 and E2, mainly E2 map showed ephemeral channel above this reach, however, it looked at least intermittent if not perennial and in good shape, suggested preservation (10:1) JN1-A- E2 proposed, one side, some buffer existing on proposed work side, not much animal pressure, table and volleyball poles up ... said E2 and 5:1 (above confluence with JN2-13), below confluence, still one-sided, however, more cattle pressure and active pasture, said E2 and 3:1 JN1-13- R proposed, upper 250 feet E1?, rest of reach R ok, may need to do R up to bottom of JN1-A because of elevations in design. Should bring this out in the design/mit pin review stage JN3-B- R proposed, moving stream to low part of valley (if property owner negotiations will allow, this is what should be done) JN3-A- E2 proposed, already has most of its buffer and channel in good condition, said E2 at 5:1(?) then rode in truck to lower site: MC1-E2 proposed, recommended to split this section, above crossing E2 at 2.5:1 ok, below crossing 3:1 (one sided) BS1- E2 and R proposed, even though approach was somewhat fragmented, the approach was ok, the channel and banks were heavily impacted by cattle Action Items: Page 1 Notes, Sketch, etc.: Page 2