Loading...
HomeMy WebLinkAbout20171075 Ver 1_More Info Received_20171003Action History (UTC -05:00) Eastern Time (US & Canada) Submit by Anonymous User 10/3/2017 12:13:15 PM (Supplemental Submital) Accept by Montalvo, Sheri A 10/3/2017 12:29:18 PM (NON -DOT - Existing Project) • The task was assigned to Montalvo, Sheri A 10/3/2017 12:13 PM itial Review of Submittal Staff Review: Submittal Type: r New Project r Pre -Application Submittal r More Information Response Water Resources ENVIRONMENTAL QUALITY New Project - Please check the new project type if you are trying to submit a new project that needs an official approval decision. Pre -Application Submittal - Please check the pre -application submittal if you just want feedback on your submittal and do not have the expectation that your submittal will be considered a complete application requiring a formal decision. More Information Response - Please check this type if you are responding to a request for information from staff and you have and ID# and version for this response. ID#* 20171075 Version 1 Is this project in a r Yes CAM A AEC area? * r No Reviewer List:* Sue Homewood:eads\slhomewood Select Reviewing Office:* Winston-Salem Regional Office - (336) 776-9800 Project Submittal Interim Form subnitted: 10/3/2017 Project Contact Information: Name: Alex Carter Vft is subrritting the infomB ion? Email Address: acarter@beesonengineering.com Project Information: Existing ID #:* Existing Version:* 20171075 1 Project Name: Sage Creek Subdivision Is this a public transportation project? f Yes r No County (ies)* Forsyth Describe the attachments: The files sent are in response to request for more information dated Sept. 25, 2017. They include the response letter, revised or amended plans and the amended page 4 of the PCN for permanent and temporary stream impacts. Please upload all files that need to be submited. 17-201 —C-0—CS—Rev-9-28-1 7. pdf 2.98MB 17-201 _C-1 _0_Rev_9-28-17. pdf 1.21 MB 17-201 _C-1 _1 _Rev_9-28-17. pdf 3.18MB 17-201 _C-2_1 _Rev_9-28-17. pdf 2.16MB 17-201 _C-2_2_Rev_9-28-17. pdf 1.33MB 17-201 _C-2_3_Rev_9-28-17. pdf 1.53MB 17-201 _C-2_4_Rev_9-28-17. pdf 985.85KB 17-201 _C-4_0_Rev_9-28-17. pdf 4.33MB 17-201 _C-4_1 _Rev_9-28-17. pdf 1.83MB DWR 2017-1075 Response to Hold 10-3-17.pdf 124.92KB PCN Amended Pg4 Impacts.pdf 254.4KB 17-201 _C-4_2_Rev_9-28-17. pdf 2.71 MB Only pdf files are accepted. V By checking the box and signing box below, I certify that • I have given true, accurate, and complete information on this form; • I agree that submission of this form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act) • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the form. Signature: O Cgka 503 High Street Winston Salem, NC 27101 336-748-0071 October 3, 2017 Sue Homewood Division of Water Quality 450 W. Hanes Mill Road, Suite 300 Winston Salem, NC 27105 RE: REQUEST FOR ADDITIONAL INFORMATION DWR#20171075 Sage Creek Residential Subdivision Dear Ms. Homewood: On September 24, 2017, CORVUS, LLC and myself received your request for additional information relating to the request for a 401 Water Quality Certification from the Division for the Sage Creek Residential Subdivision Project. Documents have been submitted to the portal (https://edocs.deq.nc.gov/Forms/Supplemental- Information-Form) as requested. Below is a response noted in underlined blue font to each request for additional information: 1. Please locate all wetlands as overlays on the site plan. Please note that wetlands may not be disturbed during grading of lots unless they have been approved through 404/401 permitting. Please also note that a Condition of the 401 approval will be that deed notifications will be required on all lots that have streams or wetlands present on them. [15A NCAC 02H .0502(b)]. Existing conditions plan sheet C-1.0 and Site plan sheet C- 1.1 have been revised to indicate the approximate location of the wetlands as shown on the Pilot Environmental reports. These areas will be further surveyed and noted on the subdivision plat to be recorded after construction is completed. 2. The culvert installation details indicate that proper dewatering techniques will be utilized during culvert installation, however temporary impacts from these activities have not been enumerated in the Impact Table of the PCN. Please ensure that the location of the temporary impacts are shown on the construction drawings and indicated in the impact table. [15A NCAC 02H .0502(b)(3)] Plan sheet C-4.1 has been revised to show the temporary impact areas. Page 4 of the PCN has been amended for design changes noted below and to better indicate the permanent and temporary stream impacts for each proposed crossing. 3. Please provide more details regarding avoidance and minimization of the temporary impacts associated with the sewer crossing at Caradco Rd. Please specify why this crossing cannot be realigned to cross the stream within the same footprint as the road culvert. [15A NCAC 02H .0506(f) and (g)] After further design study, the proposed sewer main has been re-aligned to avoid crossing the stream near Caradco Rd. Sheets C- 4.1 and other utility design sheets such as C-2.1 and C-2.4 show this revision. 503 High Street Winston Salem, NC 27101 336-748-0071 4. Per Condition I.2 of GC 4087, “the edge of the construction corridor shall not be installed parallel to and closer than 10 feet to top of bank”. It appears that portions of the sewerline at Monach Dr in the vicinity of Sta 3+00 may not meet this Condition. If installation of a line cannot meet this condition you may request a permit that exempts the Permittee in areas where it is clearly shown and justified. [15A NCAC 02H .0506(b)(3)] In order to avoid potential future conditions that are unsuitable, the proposed sewer main has been re-aligned away from the top of bank of Oil Mill Branch. Sheet C-4.2 has been added to further address this request and request #5. You will also find this revision on utility design sheet C-2.4. 5. Please provide a construction sequence and detail for the sewer line installations. Please ensure that the location of the temporary dewatering impacts are shown on the construction drawings and indicated in the impact table. [15A NCAC 02H .0502(b)(3)] Sheet C-4.2 has been added to address this request. The sheet includes a construction sequence and indicates the temporary stream impact area for the utility installation. Page 4 of the PCN has been amended for design changes and to better indicate the permanent and temporary stream impacts for each proposed crossing. 6. Condition I.3. of GC 4087 requires that all utility lines cross streams at a near perpendicular angle. Please provide a detail of the stream crossing adjacent to Caradco Rd. at a scale sufficient to show that this crossing meets this requirement. As noted in item #3, the proposed sewer main has been re-aligned to avoid crossing the stream. The water main design has been revised to adjust the bends to achieve a near perpendicular crossing of the stream. Sheets C-4.1 and other utility design sheets such as C-2.1 and C- 2.4 show this revision. 7. Please provide a stream restoration detail for the temporarily impacted areas (sewer crossings and dewatering impacts). Sheet C-4.2 has been added and includes a restoration detail for temporarily impacted areas. This detail includes the installation of a channel liner, native grass seeding and live cuttings. Each area requested has been addressed to the best of my professional knowledge and experience. To date, CORVUS, LLC or myself has not received any additional information requests or permitting documents from USACE on our PCN for permitting under NWP 12 and 29. Per our conversations, you were not expecting USACE to reply due to mobilizing for hurricane relief efforts. Please advise me if any additional requirements must be met in order to complete 404/401 permitting. Page 2 of 3 503 High Street Winston Salem, NC 27101 336-748-0071 Kindest Regards, Alex Carter, PE CC: Robert Weidl, CORVUS, LLC Jean Gibby, USACE Raliegh Regulatory Field Office (Via Email) Page 3 of 3 C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ❑ Wetlands ❑X Streams —tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of impact Type of wetland Forested Type of jurisdiction Area of number Corps (404,10) or impact Permanent (P) or DWQ (401, other) (acres) Temporary T W1 Choose one Choose one Yes/No - W2 Choose one Choose one Yes/No W3 Choose one Choose one Yes/No W4 Choose one Choose one Yes/No W5 Choose one Choose one Yes/No W6 Choose one Choose one Yes/No 2g. Total Wetland Impacts: 2h. Comments: None 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial (PER) or Type of Average Impact number intermittent (INT)? jurisdiction stream length Permanent (P) or width (linear Temporary (T) (feet) feet) S1 P Culvert Oil Mill Branch PER Corps 15 63 S2 P Culvert UT to Oil Mill Branch INT Corps 16 60 S3 T S1 Pump Around Oil Mill Branch PER Corps 15 17 S4 T San Sewer Install UT to Oil Mill Branch INT Corps 8 8 S5 T S2 Pump Around UT to Oil Mill Branch INT Corps 16 17 S6 T S4 Pump Around UT to Oil Mill Branch INT Corps 8 15 3h. Total stream and tributary impacts 180 3i. Comments: S1 is the crossing as approaching from Caradco Rd. S2 is the crossing as approaching site from Mercia Court. S3 - S6 are temporary impacts for pump arounds and public sewer extensions to be laid below stream bed level. Total permanent impacts from culverts is 123 LF, temporary impacts for pump around and sewer main installation are 57 LF. Pump arounds for UT to Oil Mill Branch may not be needed during no flow conditions in stream. Page 4 of 10 PCN Form — Version 1.4 January 2009 10/3/2017 10/3/2017 10/3/2017 10/3/2017 10/3/2017 10/3/2017 10/3/2017 10/3/2017 10/3/2017 10/3/2017