Loading...
HomeMy WebLinkAbout19931059 Ver 1_More Info Letter_20081217O?OF W A rF9QG r J ? o c Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Coleen H. Sullins, Director Division of Water Quality December 17, 2008 DWQ# 93-1059 Guilford County CERTIFIED MAIL: 7008 0150 0002 7876 8508 RETURN RECEIPT REQUESTED Mr. Robert Ponton Larco Construction PO Box 16279 Winston-Salem, NC 27115 Re: Section 401 Water Quality Certification and Major Variance approval application Dear Mr. Larco: The North Carolina Division of Water Quality (Division) received additional information related to your application for a 401 Water Quality Certification and final approval of your Randleman Buffer Major Variance for Larco Construction in High Point. We have reviewed this information and additional information is necessary in.order that we may determine your project's compliance with 15A NCAC 2H.0500 and the conditions of the major variance approval. The Division will require this information in order to process your application to impact protected wetlands and/or streams on the subject property. Therefore, we will place this project on hold as incomplete until we receive this additional information, and if we do not receive the additional information requested below, we will have to move toward denial of your application as required by 15A NCAC 211.0506. Please provide the following information so that we may continue to review your project. Please provide legal documentation to indicate that the stream and buffer restoration area will be protected in perpetuity. This may be in the form of a conservation easement, deed restriction, or other legally binding mechanism. 2. The stream restoration design indicates that the upper most cross-vane is immediately followed by a constructed riffle. Cross-vanes should be designed with pools below them. Please revise the plan or explain the rationale for a riffle below the structure and how the riffle bed material will remain stable below the vane. 3. All BMPs used at this site must be designed in accordance with the most recent version of the NC BMP Manual, available at: http://h2o.enr.state.nc.us/su/bmp forms.htm. For every proposed BMP, please provide a completed BMP Supplement Form, with all the required items, also available at the above web site. You must include both the Design Summary and the Required Items Checklist along with all the required items listed therein One N Carolina JVatura!!y North Carolina Division of Water Quality 585 Waughtown Street Phone (336) 771-5000 Customer Service Winston-Salem Regional Office Winston-Salem, NC 27107 Fax (336) 771-4630 1-877-623-6748 Internet: www.ncwaterquality.org An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper Mr. Robert Ponton Larco Construction December 17, 2008 Page 2 4. Please show the new impervious surface that will be added as a result of the 401 and variance approval for widening the expansion roadway. Please clearly show all NEW impervious surface as a result of the expansion of this facility and ensure that all stormwater from these areas are directed to properly designed BMPs with diffuse flow outlets. The filter strip is too steep to allow for diffuse flow downslope of the proposed wet detention pond. Please provide an analysis of alternatives that may meet diffuse flow (such as alternative location of the stormwater system, or BMP outlet, or modifications to the filter strip area if the vegetation is grass). If no other options are available, the Division may approve a stormwater plan that does not include diffuse flow provided all alternatives are evaluated and the designed BMP meets 85% TSS removal. Please respond in writing within 30 calendar days of the date of this letter by sending a copy of this information to Sue Homewood at the address on this letterhead, and a copy to Ian McMillan N. C. Division of Water Quality, Wetlands/401 Certification Unit, 1650 Mail Service Center, Raleigh, NC 27699-1650. If you will not be able to provide the requested information within that timeframe, please provide written confirmation that you intend to provide the requested information, and include a specific timetable delineating when the requested materials will be provided. If we do not hear from you in 30 calendar days, we will assume that you no longer want to pursue this project and we will consider the project as returned. This letter only addresses the application review and does not authorize any impacts to wetlands, waters or protected buffers. Please be aware that any impacts requested within your application are not authorized (at this time) by the DWQ. If you have any questions, please contact Sue Homewood, DWQ, Winston-Salem Regional Office, at 336- 771-4964 or sue.homewood@ncmail.net. Sincerely, 1 Sue Homewood DWQ Winston-Salem Regional Office cc: Andy Williams, Corps of Engineers, Raleigh Regulatory Field Office Lisa Meadows, DMP, 6415 Old Plank Rd, High Point, NC 27265 HARP, 9305D Onroe Rd, Charlotte, NC 28270 DWQ Winston-Salem Regional Office DWQ Wetlands/401 Unit