Loading...
HomeMy WebLinkAbout20150610 Ver 3_More Info Received_20171002Homewood, Sue From: Cutler, James D <James.Cutler@amecfw.com> Sent: Monday, October 02, 2017 10:04 AM To: Homewood, Sue Cc: Harmon, Richard G; steve.cahoon@duke-energy.com; Ruhl, Cedric Subject: [External] Dan River Attachments: DAN RIVER BANK ARMORING DESIGN.pdf CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you verify that the attachment and content are safe. Send all suspicious email as an attachment to report.spam@nc.gov. Hi Sue: RE: Dan River IP Application/Certification - RAI response Please find herein the updated engineering drawings as requested by you (i.e., for the dewatering/pump around for the installation of the culverts and the stream stabilization work adjacent to the culvert work). The updated drawings identify the 20 feet of temporary disturbance and the diversion detail. Please do not hesitate to contact me if you have any questions. Jim Cutler This message is the property of Amec Foster Wheeler plc and/or its subsidiaries and/or affiliates and is intended only for the named recipient(s). Its contents (including any attachments) may be confidential, legally privileged or otherwise protected from disclosure by law. Unauthorised use, copying, distribution or disclosure of any of it may be unlawful and is strictly prohibited. We assume no responsibility to persons other than the intended named recipient(s) and do not accept liability for any errors or omissions which are a result of email transmission. If you have received this message in error, please notify us immediately by reply email to the sender and confirm that the original message and any attachments and copies have been destroyed and deleted from your system. If you do not wish to receive future unsolicited commercial electronic messages from us, please forward this email to: unsubscribe@amecfw.com and include "Unsubscribe" in the subject line. If applicable, you will continue to receive invoices, project communications and similar factual, non-commercial electronic communications. Please click http://amecfw.com/email-disclaimer for notices and company information in relation to emails originating in the UK, Italy or France. W —E- -F DNR C901.XXX.001 IREV, 0 RAILROAD BRANCH CREEK BANK EROSION STABILIZATION IMPROVEMENTS DAN RIVER STEAM STATION DUKE ENERGY ISSUE No. DR -134 900 S. EDGEWOOD ROAD ROCKINGHAM COUNTY. NORTH CAROLINA ♦�kk"A Q�`Qo 210'1 JS sa '.US-hB-ErA-L- - ----'-US 58 h, � N / - � r;':; �SBJ � �albnsvrllr.Hwy I- � I 1 a D Ridgeway -=' Cascade �I i - - - NORTH CAROLINA - - - - - - '- - I ' 1 i Pelham e I i I 307 m _ I m Jg1 I a' r I nllui DAN RIVER COMBINED CYCLE STEAM STATION rJadI 11 i�l illi I. I I � 1 j -- Rejd��:llle ti J 2 Hill! c ,� N I o7 I z �) I � I ' I E' SITE VICINITY MAP - 1" = 5 MILES MAP SOURCE: ESRI WORLD TOPOGRAPHIC BASEMAP ., 0000 St Eden `o 311 °&olm cwi Mai N Oak H41s 1 V Gfanl St Oolli Evantac nl tan sl 6e``P� Nell `'', Wilson Sl d Dogwootl Or rtx, is a htrahaad- h,airrari a 1.1-0 at n WY s I. Wn4s ooyQ r m a o E Arhor Ln'oo a0 311 N e Hams Pl 'l f� oleande'o' l DAN RIVER COMBINED CYCLE STEAM STATION aWrr - Krv%/, si food Ol <,� .1 ! �p,d0e° G SITE VICINITY MAP - 1" = 2000' MAP SOURCE: ESRI WORLD TOPOGRAPHIC BASEMAP CONTACT INFORMATION OWNER: DUKE ENERGY CAROLINAS, INC ADDRESS: 400 SOUTH TRYON STREET CHARLOTTE, NORTH CAROLINA 28201 ENGINEER AMEC FOSTER WHEELER ADDRESS: 2801 YORKMONT ROAD, SUITE 100 CHARLOTTE, NORTH CAROLINA 28208 PHONE: 704-357-8600 Latitude: 36°29'11. 1 6"N, Longitude: 79°43'1 5.57"W 4 41<, .t ti._'1• i rn: Ire-�`irl, '" �. e',;�': r4iii -y" �.4 40 DAN RIVER COMBINED r a L. CYCLE STEAM STATION k:. it ov 3 7U 40AI �._. r T, ' kIl s � � i e PROPOSED BANK REPAIRS 411 •'1'_ ���`� SITE VICINITY MAP - 111 = 750' MAP SOURCE: ESRI WORLD TOPOGRAPHIC BASEMAP DRAWING INDEX SHEET NUMBER SHEET TITLE .001 COVER SHEET .002 GENERAL NOTES .003 SITE AERIAL .004 EXISTING CONDITIONS .005 BANK ARMORING DESIGN PLAN .006 EROSION CONTROL .007 DETAILS PROJECT DESCRIPTION: CONSTRUCT BANK ARMORING IMPROVEMENTS ON THE WEST BANK OF RAILROAD BRANCH CREEK BETWEEN THE TWO EXISTING ACCESS ROAD CULVERT CROSSINGS. FOR ACCESS ROAD DETAILS REFER TO DRAWINGS DNR_C901.001.001 THROUGH DNR C901.001.007 UNDER SEPARATE COVER. TOTAL DISTURBED AREA: 0.23 ACRE RIVER BASIN: ROANOKE RIVER TOTAL LINEAR FEET OF STREAM IMPACTS: 120 L.F. REV DATE JOB NO. PROJECT TYPE DES I DFTR I CHKD I ENGR I APPD INCHES 1 2 3 TENTHS 10 20 30 4 5 6 Plotted By: Bell, Josh Sheet Set: DAN RIVER BANK ARMORING DESIGN Layout: .001 COVER SHEET September 28, 2017 08: 04: 02am 0: \Duke\DanRiver\781015041 8—Dan River OnCaII\P1ansheets\DR-0134 BankArmoringDeslgn\.001 COVER SHEET.dwg DAN RIVER STEAM STATION ROCKINGHAM COUNTY, NORTH CAROLINA N NC STATE MAP MAP SOURCE: USGS COUNTY DIGITAL MAPS Environment & Infrastructure 2801 YORKMONT ROAD 4v amec SUITE 100 CHARLOTTE, NC 28208 foster TEL: (704) 357-8600 FAX: (704) 357-8638 wheeler LICENSURE: NC ENG: F-1253 NC GEOLOGY: C-247 TITLE RAILROAD BRANCH CREEK BANK STABILIZATION DUKE ENERGY ISSUE NO. DR -134 DAN RIVER STEAM STATION COVER SHEET FOR DRAFT FOR REVIEW SEAL SCALE: AS SHOWN DES: RFK DUKE�\A ARO � DWG TYPE: DWG DFTR : RFK b� r� ENER(107' Y� JOB NO: 7810150418 CHKD: JMB DATE: 04/17/2017 ENGR: JMB L 032667 gZII1 FILENAME: .001 COVER SHEET.dwg APPD: JMB "i •, -I DWG SIZE DRAWING NO. REVISION ® /y��. Qj ,ti ANSI D j �,� 22"x34" DNR C 9 01. XXX . 0 01 0 DESCRIPTION 7 8 9 10 0 0 TZ I I C� X X 6 O 10 Fq F 2 3 PROJECT DESCRIPTION 0 THE PROPOSED AREA OF CONSTRUCTION UNDER DR -134 SCOPE OF WORK WILL INCLUDE: THE REMOVAL OF TREES AND WOODY VEGETATION, THE INSTALLATION OF BANK ARMORING ALONG THE WEST BANK OF RAILROAD BRANCH CREEK, PARALLEL TO SECONDARY ASH BASIN DAM EMBANKMENT INSTALLATION OF REQUIRED EROSION/SEDIMENT CONTROL MEASURES. THE TOTAL PROPOSED CLEARING AREA (DISTURBED AREA) IS APPROXIMATELY 0.23 ACRE. THE FOLLOWING DRAWINGS INCLUDE DR -134 SCOPE OF WORK ONLY. EROSION AND SEDIMENTATION CONTROL NARRATIVE THE EROSION AND SEDIMENT CONTROL MEASURES FOR THIS PROJECT INVOLVE THE PLACEMENT OF A VARIETY OF EROSION AND SEDIMENT CONTROL MEASURES AT STRATEGIC LOCATIONS THROUGHOUT THE DEVELOPMENT. THESE MEASURES A INCLUDE: 1. FILTREXX SOXX (OR EQUIVALENT) 2. TEMPORARY CONSTRUCTION ENTRANCES 3. PERMANENT SEED THESE MEASURES ARE TO BE INSTALLED PRIOR TO CLEARING. ALL EROSION CONTROL MEASURES SHALL BE PROPERLY MAINTAINED UNTIL THE COMPLETION OF ALL CONSTRUCTION ACTIVITIES AND ALL DISTURBED AREAS HAVE BEEN STABILIZED. ADDITIONAL CONTROL MEASURES MAY BE REQUIRED DURING CONSTRUCTION IN ORDER TO CONTROL EROSION AND/OR OFFSITE SEDIMENTATION. ALL TEMPORARY CONTROL MEASURES SHALL BE REMOVED ONCE CONSTRUCTION IS COMPLETE AND THE SITE IS STABILIZED. EROSION CONTROL MEASURE NOTES 1. TEMPORARY CULVERTS HAVE BEEN INSTALLED AT TWO (2) LOCATIONS WITHIN THE RAILROAD BRANCH CREEK. THE INSTALLATION OF THESE CULVERTS WAS PERMITTED BY THE USACE AND NCDEQ. 2. THE EXISTING, GRAVEL ACCESS ROAD ALONG THE CREST OF THE ADJACENT DIKE WILL SERVE AS THE ACCESS POINT FOR THE PROJECT, AND AS THE CONSTRUCTION ENTRANCE. 3. PLACE FILTREXX SOXX (OR EQUIVALENT) DOWN -GRADIENT OF THE CONSTRUCTION AREA AS NOTED ON THE PLANS AND AS INDICATED IN THE DETAILS. 4. EROSION AND SEDIMENT CONTROL MEASURES SHALL BE CONSTRUCTED AND MAINTAINED PER THE LATEST VERSION OF NCDEQ "EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL." GENERAL NOTES 1. ALL EROSION CONTROL MEASURES SHALL BE PROPERLY MAINTAINED DURING CONSTRUCTION UNTIL THE COMPLETION OF CONSTRUCTION ACTIVITIES AND DISTURBED AREAS HAVE BEEN STABILIZED. TEMPORARY EROSION CONTROL MEASURES SHALL BE REMOVED ONCE CONSTRUCTION IS COMPLETE AND THE SITE IS STABILIZED. 2. SEDIMENT AND EROSION CONTROL MEASURES AND PLANTED AREAS SHALL BE INSPECTED BY DUKE ENERGY OR THEIR _C REPRESENTATIVE EVERY SEVEN (7) CALENDAR DAYS AND AFTER EACH RAINFALL OCCURRENCE THAT EXCEEDS ONE-HALF (0.5) INCH IN A 24-HOUR PERIOD. DAMAGED OR INEFFECTIVE MEASURES SHALL BE REPAIRED OR REPLACED, AS NECESSARY, AS SOON AS PRACTICAL. 3. IF NECESSARY SEEDED AREAS SHALL BE FERTILIZED, RESEEDED AS NECESSARY AND MULCHED ACCORDING TO THE SEEDING PLAN TO MAINTAIN A VIGOROUS, DENSE VEGETATIVE COVER. SEEDED AREAS SHALL BE INSPECTED PERIODICALLY BY DUKE ENERGY UNTIL FINAL GROUND COVER HAS BEEN ESTABLISHED. THE CONTRACTOR IS RESPONSIBLE FOR RESTORING VEGETATION TO ITS ORIGINAL CONDITION, OR BETTER, FOR UP TO A YEAR. SEEDING SHALL BE CONSISTENT WITH REQUIREMENTS OF THE VEGETATION MAINTENANCE AND IMPLEMENTATION PLAN (VMIP) FOR THE DAN RIVER STATION. 4. THE OWNER OR THEIR AGENT SHOULD ADHERE TO THE SELF -INSPECTION PROGRAM FOR EROSION AND SEDIMENT CONTROL (EFFECTIVE OCTOBER 1, 2010). DETAILS OF THE PROGRAM AND RECOMMENDED INSPECTION FORMS CAN BE FOUND AT THE FOLLOWING WEBSITE: WWW.DLR.ENR.STATE.NC.US/PAGES/SEDIMENTATION_NEW.HTML 5. THE OWNER'S CONTRACTOR IS RESPONSIBLE FOR NOTIFYING UTILITY COMPANIES TO LOCATE ALL UNDERGROUND UTILITIES PRIOR TO ANY CONSTRUCTION. 6. STABILIZATION MEASURES SHALL BE INITIATED AS SOON AS PRACTICABLE IN PORTIONS OF THE SITE WHERE CONSTRUCTION D ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY CEASED, BUT IN NO CASE MORE THAN SEVEN (7) DAYS FOR PERIMETER AREAS AND SLOPES GREATER THAN 3H:1V AND NO MORE THAN FOURTEEN (14) DAYS FOR OTHER AREAS AFTER WORK HAS CEASED. 7. CONSTRUCTION ENTRANCES/EXITS WILL BE USED AT DOT/PUBLIC ROAD CROSSINGS. THE CONTRACTOR MUST TAKE NECESSARY ACTION TO MINIMIZE THE TRACKING OF MUD ONTO THE PAVED ROADWAY CONSTRUCTION AREAS. THE CONTRACTOR SHALL DAILY REMOVE MUD/SOIL FROM PAVEMENT, AS MAY BE REQUIRED. F STANDARDS ALL EROSION AND SEDIMENTATION CONTROLS SHALL BE IN ACCORDANCE WITH THE NORTH CAROLINA SEDIMENTATION POLLUTION CONTROL ACT OF 1973. CONSTRUCTION DETAILS AND SPECIFICATIONS WITHIN THIS PLAN WERE DERIVED FROM THE EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL DATED JUNE, 2006, PREPARED BY THE NORTH CAROLINA SEDIMENTATION CONTROL COMMISSION, NCDEQ AND NCAES. SEEDING: 1. SEE SEEDING SPECIFICATION ON THIS SHEET. 2. TEMPORARY OR PERMANENT SEEDING SHALL BE PERFORMED AS PER NCDEQ'S REQUIREMENT WITHIN 14 CALENDAR DAYS OF COMPLETION OF GRADING. AREAS THAT FALL UNDER MORE STRINGENT CRITERIA SHALL BE STABILIZED WITHIN 7 CALENDAR DAYS. CONSTRUCTION SEQUENCE 1. HOLD PRECONSTRUCTION MEETING. 3. INSTALL EROSION CONTROL MEASURES ALONG PERIMETER OF DISTURBANCE LIMITS. (SEE SHEET .006). 4. FILTREXX SOXX (OR EQUIVALENT) SHALL BE TURNED UP THE SLOPE TO PROMOTE CONTAINMENT AND TO PREVENT CONCENTRATION OF FLOW. 5. FILTREXX SOXX (OR EQUIVALENT) SHALL BE MOVED ONLY TO PROVIDE EQUIPMENT ACCESS, BUT SHALL BE REPLACED PRIOR TO ANY LAND DISTURBANCE ABOVE THE SECTION OF FILTREXX SOXX (OR EQUIVALENT). 6. ALL VEGETATION SHALL BE REMOVED (BUSHES, TREES AND SHRUBS) TO BE FLUSH OR WITHIN 6 INCHES OF THE GROUND. 7. SEDIMENT CONTROL MEASURES SHALL NOT BE REMOVED UNTIL AREAS HAVE BEEN STABILIZED. 1O TWO SEPARATE PROJECTS INDENTIFIED AS "DR -131" AND "DR -134" WILL BE PERFORMED BY DUKE ENERGY INCLOSE PROXIMITY OF EACH OTHER. THE SCOPE OF DR -131 INCLUDES INSTALLATION OF TWO PERMANENT CULVERTS WITHIN RAILROAD BRANCH CREEK AND PROVIDING ACCESS ROAD ALONG THE TOE OF SECONDARY ASH BASIN PARALLELING DAN RIVER. THIS IS INCLUDED UNDER SEPARATE COVER. FOR DR -131 SCOPE OF WORK REFER TO DRAWINGS DNR_C901.001.001 THROUGH DNR_C901.001.007. INCHES 1 2 3 ITENTHS 10 20 30 I 5 DEFINITION CONTROLLING RUNOFF AND EROSION ON DISTURBED AREAS BY ESTABLISHING PERENNIAL VEGETATIVE COVER WITH SEED. PURPOSE TO REDUCE EROSION AND DECREASE SEDIMENT YIELD FROM DISTURBED AREAS, AND TO PERMANENTLY STABILIZE SUCH AREAS IN A MANNER THAT IS ECONOMICAL, ADAPTS TO SITE CONDITIONS, AND ALLOWS SELECTION OF THE MOST APPROPRIATE PLANT MATERIALS. SPECIFICATIONS SEEDBED REQUIREMENTS ESTABLISHMENT OF VEGETATION SHOULD NOT BE ATTEMPTED ON SITES THAT ARE UNSUITABLE DUE TO EXCESSIVE SOIL COMPACTION, INAPPROPRIATE SOIL TEXTURE, POOR DRAINAGE, CONCENTRATED OVERLAND FLOW, OR STEEPNESS OF SLOPE UNTIL MEASURES HAVE BEEN TAKEN TO CORRECT THESE PROBLEMS. TO MAINTAIN A GOOD STAND OF VEGETATION, THE SOIL MUST MEET CERTAIN MINIMUM REQUIREMENTS AS A GROWTH MEDIUM. THE EXISTING SOIL SHOULD HAVE THESE CRITERIA: • ENOUGH FINE-GRAINED (SILT AND CLAY) MATERIAL TO MAINTAIN ADEQUATE MOISTURE AND NUTRIENT SUPPLY (AVAILABLE WATER CAPACITY OF AT LEAST .05 INCHES WATER TO 1 INCH OF SOIL). • SUFFICIENT PORE SPACE TO PERMIT ROOT PENETRATION • SUFFICIENT DEPTH OF SOIL TO PROVIDE AN ADEQUATE ROOT ZONE. THE DEPTH TO ROCK OR IMPERMEABLE LAYERS SUCH AS HARDPANS SHOULD BE 12 INCHES OR MORE, EXCEPT ON SLOPES STEEPER THAN 2:1 WHERE THE ADDITION OF SOIL IS NOT FEASIBLE. • A FAVORABLE PH RANGE FOR PLANT GROWTH, USUALLY 6.0 - 6.5. • FREE FROM LARGE ROOTS, BRANCHES, STONES, LARGE CLODS OF EARTH, OR TRASH OF ANY KIND. CLODS AND STONES MAY BE LEFT ON SLOPES STEEPER THAN 3:1 IF THEY ARE TO BE HYDRO SEEDED. IF ANY OF THE ABOVE CRITERIA ARE NOT MET - I.E., IF EXISTING SOIL IS TOO COARSE, DENSE, SHALLOW OR ACIDIC TO FOSTER VEGETATION - SPECIAL AMENDMENTS ARE REQUIRED. THE SOIL CONDITIONERS DESCRIBED BELOW MAY BE BENEFICIAL OR, PREFERABLY, TOPSOIL MAY BE APPLIED. SEEDBED PREPARATION INSTALL NECESSARY MECHANICAL EROSION AND SEDIMENTATION CONTROL PRACTICES BEFORE SEEDING, AND COMPLETE GRADING ACCORDING TO THE APPROVED PLAN. LIME AND FERTILIZER NEEDS SHOULD BE DETERMINED BY SOIL TESTS. DIRECTIONS, SAMPLE CARTONS, AND INFORMATION SHEETS ARE AVAILABLE THROUGH COUNTY AGRICULTURAL EXTENSION OFFICES. TESTING IS ALSO DONE BY COMMERCIAL LABORATORIES. WHEN SOIL TESTS RESULTS ARE NOT AVAILABLE, FOLLOW RATES SUGGESTED IN THE SEEDING SPECIFICATIONS SHOWN AT RIGHT. APPLICATION RATES USUALLY FALL INTO THE FOLLOWING RANGES: �eldel1101IexLelVOff1it0L7_104Mil06*1 to] 012 LIGHT -TEXTURED, SANDY SOILS: 1-1/2 TONS/ACRE HEAVY -TEXTURED, CLAYEY SOILS: 2-3 TONS/ACRE • FERTILIZER: GRASSES: 800-1200 LB/ACRE OF 10-10-10 (OR THE EQUIVALENT) GRASS -LEGUME MIXTURES: 800-1200 LB/ACRE OF 10-10-10 (OR THE EQUIVALENT) APPLY LIME AND FERTILIZER EVENLY AND INCORPORATE INTO THE TOP 4-6 INCHES OF SOIL BY DISKING OR OTHER SUITABLE MEANS. OPERATE MACHINERY ON THE CONTOUR. WHEN USING A HYDRO SEEDER, APPLY LIME AND FERTILIZER TO A ROUGH, LOOSE SURFACE. :Ze1�Le7:1�►16Y�L1yLy�y,:1[eliri>�y�q�11►[e_ COMPLETE SEEDBED PREPARATION BY BREAKING UP LARGE CLODS AND RAKING INTO A SMOOTH, UNIFORM SURFACE (SLOPES LESS THAN 3:1). FILL IN OR LEVEL DEPRESSIONS THAT CAN COLLECT WATER. BROADCAST SEED INTO A FRESHLY LOOSENED SEEDBED THAT HAS NOT BEEN SEALED BY RAINFALL. SEEDING SEEDING DATES GIVEN IN THE SEEDING MIXTURE SPECIFICATIONS ARE DESIGNATED AS "BEST" OR "POSSIBLE". SEEDINGS PROPERLY CARRIED OUT WITHIN THE "BEST" DATES HAVE A HIGH PROBABILITY OF SUCCESS. IT IS ALSO POSSIBLE TO HAVE SATISFACTORY ESTABLISHMENT WHEN SEEDING OUTSIDE THESE DATES. HOWEVER, AS YOU DEVIATE FROM THEM, THE PROBABILITY OF FAILURE INCREASES RAPIDLY. SEEDING ON THE LAST DATE SHOWN UNDER "POSSIBLE" MAY REDUCE CHANGES OF SUCCESS BY 30-50%. ALWAYS TAKE THIS INTO ACCOUNT IN SCHEDULING LAND -DISTURBING ACTIVITIES. USE CERTIFIED SEED FOR PERMANENT SEEDING WHENEVER POSSIBLE LABELING OF NON -CERTIFIED SEED IS ALSO REQUIRED BY LAW. LABELS CONTAIN IMPORTANT INFORMATION ON SEED PURITY, GERMINATION, AND PRESENCE OF WOOD SEEDS. SEEDS MUST MEET STATE STANDARDS FOR CONTENT OF NOXIOUS WEEDS. DO NO ACCEPT SEED CONTAINING "PROHIBITED" NOXIOUS WEED SEED. INOCULATE LEGUME SEED WITH THE RHIZOBIUM BACTERIA APPROPRIATE TO THE SPECIES OF LEGUME. APPLY SEED UNIFORMLY WITH A CYCLONE SEEDER, DROP -TYPE SPREADER, DRILL, CULTIPACKER SEEDER, OR HYDRO SEEDER ON A FIRM, FRIABLE SEEDBED. 4 5 REV I DATE I JOB NO Plotted By: Bell, Josh Sheet Set: DAN RIVER BANK ARMORING DESIGN Layout:.002 GENERAL NOTES September 28, 2017 08: 04: 50am 0: \Duke\DanRiver\781015041 8—Dan River On—Ca11\P1ansheets\DR-0134 BankArmoringDeslgn\.002 NOTES.dwg I I I 8 DNR C901.XXX. 002 REV. 0 WHEN USING A DRILL OR CULTIPACKER SEEDER, PLANT SMALL GRAINS NO MORE THAN 1 INCH PERMANENT SEEDING SPECIFICATIONS DEEP, GRASSES AND LEGUMES NO MORE THAN 1/2 INCH. EQUIPMENT SHOULD BE CALIBRATED IN THE FIELD FOR THE DESIRED SEEDING RATE. SEEDING MIXTURE WHEN USING BROADCAST -SEEDING METHODS, SUBDIVIDE THE AREA INTO WORKABLE SPECIES RATE (LB/ACRE) OPTIMUM DATES TO PLANT SECTIONS AND DETERMINE THE AMOUNT OF SEED NEEDED FOR EACH SECTION. APPLY (REMARKS) ONE-HALF THE SEED WHILE MOVING BACK AND FORTH ACROSS THE AREA, MAKING A UNIFORM PATTERN: THEN APPLY THE SECOND HALF IN THE SAME WAY, BUT MOVING AT RIGHT ANGLES TO THE FIRST PASS. BAHIA GRASS (ALONE) 40 MARCH. 20 - JUNE 15 (SLOW TO BECOME ESTABLISHED) MULCH ALL PLANTINGS IMMEDIATELY AFTER SEEDING. BAHIA GRASS (MIX)- 30 MARCH. 20 - JUNE 15 (SLOW TO BECOME ESTABLISHED) HYDRO SEEDING BERMUDA GRASS, HULLED (ALONE) 8-12 APRIL - JULY 15 (QUICK COVER, SOD F SURFACE ROUGHENING IS PARTICULARLY IMPORTANT WHEN HYDRO SEEDING, AS A FORMING, PARTIAL WINTERKILL) ROUGHENED SLOPE WILL PROVIDE SOME NATURAL COVERAGE FOR LIME, FERTILIZER, AND SEED. THE SURFACE SHOULD NOT BE COMPACTED OR SMOOTH. FINE SEEDBED BERMUDA GRASS, HULLED (MIX)* 4-6 APRIL - JULY 15 (QUICK COVER, SOD PREPARATION IS NOT NECESSARY FOR HYDRO SEEDING OPERATIONS: LARGE CLODS, FORMING, PARTIAL WINTERKILL) STONES, AND IRREGULARITIES PROVIDE CAVITIES IN WHICH SEEDS CAN LODGE. FESCUE, TALL, KY31 (ALONE) 40 AUG. 15 - OCT. (SELDOM SEED ALONE, NOT FOR DRY OR WET SITES) RATE OF WOOD FIBER (CELLULOSE) APPLICATION SHOULD BE AT LEAST 2,000 LB/ACRE. FESCUE, TALL, KY31 (MIX)* 20 AUG. 15 - OCT. (SELDOM SEED ALONE, NOT FOR DRY OR WET SITES) APPLY LEGUME INOCULANTS AT FOUR TIMES THE RECOMMENDED RATE WHEN ADDING SERICEA LESPEDEZA (SCARIFIED) 40 AUG. 20 - OCT. (GOOD FOR SLOPES, INOCULANT TO A HYDRO SEEDER SLURRY. CUTS, AND FILLS THAT REQUIRE LOW MAINTENANCE) IF A MACHINERY BREAKDOWN OF 1/2 TO 2 HOURS OCCURS, ADD 50% MORE SEED TO THE TANK, BASED ON THE PROPORTION OF THE SLURRY REMAINING. THIS SHOULD COMPENSATE FOR DAMAGE TO SEED. BEYOND 2 HOURS, A FULL RATE OF NEW SEED MAY BE NECESSARY. *MIX MEANS 2 OR MORE LONG TERM SPECIES PLUS SHORT TERM SPECIES. LIME IS NOT NORMALLY APPLIED WITH A HYDRAULIC SEEDER BECAUSE IT IS ABRASIVE. IT CAN BE BLOWN ONTO STEEP SLOPES IN DRY FORM. SOIL AMENDMENTS APPLY LIME AND FERTILIZER ACCORDING TO SOIL TESTS, OR APPLY 4,000 LB/ACRE GROUND MAINTENANCE AGRICULTURAL LIMESTONE AND 1,000 LB/ACRE 10-10-10 FERTILIZER. GENERALLY, A STAND OF VEGETATION CANNOT BE DETERMINED TO BE FULLY ESTABLISHED UNTIL SOIL COVER HAS BEEN MAINTAINED FOR ONE FULL YEAR FROM PLANTING. INSPECT SEEDED AREAS FOR FAILURE AND MAKE NECESSARY REPAIRS AND RESEEDINGS WITHIN THE SAME SEASON, IF POSSIBLE. MULCH APPLY 4,000-5,000 LB/ACRE GRAIN STRAW OR EQUIVALENT COVER OF ANOTHER SUITABLE RESEEDING --IF A STAND HAS INADEQUATE COVER, RE-EVALUATE CHOICE OF PLANT MULCHING MATERIAL. ANCHOR MULCH BY TACKING WITH ASPHALT, ROVING, OR NETTING. MATERIALS AND QUANTITIES OF LIME AND FERTILIZER. RE-ESTABLISH THE STAND AFTER NETTING IS THE PREFERRED ANCHORING METHOD ON STEEP SLOPES. SEEDBED PREPARATION OR OVER- SEED THE STAND. CONSIDER SEEDING TEMPORARY, ANNUAL SPECIES IF THE TIME OF YEAR IS NOT APPROPRIATE FOR PERMANENT SEEDING. MAINTENANCE IF VEGETATION FAILS TO GROW, SOIL MUST BE TESTED TO DETERMINE IF ACIDITY OR RE -FERTILIZE IN THE SECOND YEAR UNLESS GROWTH IS FULLY ADEQUATE. MAY BE MOWED NUTRIENT IMBALANCE IS RESPONSIBLE. ONCE OR TWICE A YEAR, BUT MOWING IS NOT NECESSARY. RESEED, FERTILIZE, AND MULCH DAMAGED AREAS IMMEDIATELY. FERTILIZATION --ON THE TYPICAL DISTURBED SITE, FULL ESTABLISHMENT USUALLY REQUIRES RE -FERTILIZATION IN THE SECOND GROWING SEASON. FINE TURF REQUIRES ANNUAL MAINTENANCE FERTILIZATION. USE SOIL TESTS IF POSSIBLE OR FOLLOW THE GUIDELINES PROVISIONS FOR PERMANENT GROUNDCOVER SUFFICIENT TO RESTRAIN EROSION MUST BE GIVEN FOR THE SPECIFIC SEEDING MIXTURE. ACCOMPLISHED FOR ALL DISTURBED AREAS WITHIN 15 WORKING DAYS OR 90 CALENDAR DAYS (WHICHEVER IS SHORTER) FOLLOWING COMPLETION OF CONSTRUCTION OR DEVELOPMENT. TEMPORARY SEEDING SPECIFICATIONS SEEDING MIXTURE SPECIES RATE (LB/ACRE) OPTIMUM DATES TO PLANT RYE GRAIN (ALONE) 56 FEB. -MARCH; AUG. 15 - NOV. 20 (QUICK, DENSE COVER) RYE GRAIN (MIX)* 10 FEB. -MARCH; AUG. 15 - NOV, 20 (QUICK, DENSE COVER) BROWNTOP MILLET (ALONE) 40 APR. 20 - AUG. 15 (QUICK COVER) BROWNTOP MILLET (MIX)* 10 APR. 20 - AUG. 15 (QUICK COVER) BROWNTOP MILLET (ALONE) 50 AUG. 10 - OCT. 10 (COMPETITIVE, DENSE) BROWNTOP MILLET (MIX)* 8 AUG. 10 - OCT. 10 (COMPETITIVE, DENSE) *MIX MEANS 2 OR MORE LONG TERM SPECIES PLUS SHORT TERM SPECIES. SOIL AMENDMENTS FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 3,000 LB/ACRE GROUND AGRICULTURAL LIMESTONE AND 750 LB/ACRE 10-10-10 FERTILIZER. MULCH APPLY 4,000 LB/ACRE STRAW. ANCHOR MULCH BY TACKING WITH ASPHALT, ROVING OR A MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING. TOOL. MAINTENANCE RE -FERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, RE -FERTILIZE AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE. THE ANGLE FOR GRADED SLOPES AND FILLS SHALL BE NO GREATER THAN THE ANGLE THAT CAN BE RETAINED BY VEGETATIVE COVER OR OTHER ADEQUATE EROSION -CONTROL DEVICES OR STRUCTURES. IN ANY EVENT, SLOPES LEFT EXPOSED WILL, WITHIN 21 CALENDAR DAYS OF COMPLETION OF ANY PHASE OF GRADING, BE PLANTED OR OTHERWISE PROVIDED WITH TEMPORARY OR PERMANENT GROUND COVER, DEVICES, OR STRUCTURES SUFFICIENT TO RESTRAIN EROSION. PROVISIONS FOR PERMANENT GROUNDCOVER SUFFICIENT TO RESTRAIN EROSION MUST BE ACCOMPLISHED FOR ALL DISTURBED AREAS WITHIN 15 WORKING DAYS OR 90 CALENDAR DAYS (WHICHEVER IS SHORTER) FOLLOWING COMPLETION OF CONSTRUCTION OR DEVELOPMENT. PROJECT TYPE DES I DFTR I CHKD I ENGR I APPD 6 7 0 0 TZ N I l J X X O C) N 10 C) Environment & TITLE RAILROAD BRANCH CREEK BANK STABILIZATION Infrastructure DUKE ENERGY ISSUE NO. DR -134 2801 YORKMONT ROADDAN RIVER STEAM STATION F SUITE 100 amec CHARLOTTE, INC 28208 foster TEL: (704) 357-8600 GENERAL NOTES FAX: (704) 357-8638 wheeler LICENSURE: NC ENG: F-1253 FOR NC GEOLOGY: C-247 DRAFT FOR REVIEW SEAL SCALE: AS SHOWN DES: RFK o,fletilt A#R DUKE \AC1�`rDWG TYPE: DWG DFTR : RFK a 0 t R d 4ESS�p ,� R JOB NO: 7810150418 CHKD: JMB - _ ENERGY DATE: 04/17/2017 ENGR: JMB 032667 '��; 21 I FILENAME: .002 NOTES.dwg APPD: JMB �'•• Q, �✓ DWG SIZE DRAWING NO. REVISION 22"xx3434 " ANDNR C901.XXX.002 0 ,,r�'P,� ' �+ DESCRIPTION /`le a 8 9 10 2 3 4 5 6 7 8DNR C901.XXX.004 IRFV. 0 1 M _��� / i� � I III 1 �, A � � ` / 1 XXI z/z xGM vvWvv —A /iii TSTA i oGM GM o -- GM i \ \ \\\ \ \ GM o �- ==—G _-�G =----G XISTING 6" PNG GAS LINE I M W -G -- ----- ---- \ O \ — -G----- G ---- - ZONE AE 100 YEAR GM --G -� --G - t G ---� --- �- G _- \ FLOOD PLAIN LINE If If 8" PNG AS INEGM / / �� If v v u RAILROAD BRANCH CREEK v yvvv 1 v / `M W PROJECT AREA - � II --- I I/ I III I i l\ ' � C /1 FLOODWAY LINE ASH BAS N (SECONDARY CELL) \ 1 \ /y■\.\I \\\ IIII I M W / / \ IIII 111111 1� MW � I I I 111lllll` �J Iii% I ZONE AE 100 -YEAR FLOOD PLAIN LINE _ 1 'I i Q0 / >> - ' DR -131 PERMANENT CULVERT CROSSING X / FL DWAY LINE (ASSUMED INSTALLED - SEE NOTE 2.) X O / / O RNER / j m E-A / / / / LEGEND EXISTING CONTOUR LINES ---� ----(� EXISTING GAS LINES M W MONITORING WELL W GM OO GAS UTILITY MARKER 50 0 50 100 FT � I TITLERAILROAD BRANCH CREEK BANK STABILIZATION DUKE O �Environment & ENERGY ISSUE NO. DR -134 Infrastructure - / 2801 YORKMONT ROAD amec DAN RIVER STEAM STATION SUITE 100 F---------1 / / CHARLOTTE, NC 28208 f oste r TEL: (704) 357-8600 EXISTING CONDITIONS / Q / FAX:357-8638 wheeler / LICENSURE: / NC ENG. F-1253 FOR NC GEOLOGY: C-247 DRAFT FOR REVIEW ��I 7 SEAL NOTES: SCALE: AS SHOWN DES: RFK 1. SURVEY DATA SHOWN ON THIS SHEET IS FROM A DRAWING TITLED "AERIAL TOPOGRAPHIC SURVEY - DAN RIVER PLANT", PREPARED BY WSP, CARY NC. PHOTOGRAPHY DATE: APRIL 17, 2014. �DUKE 2. CONSTRUCTION OF ACCESS ROAD ALONG TOE OF SECONDARY ASH BASIN PARALLEL TO DAN RIVER IS INCLUDED IN DR -131 SCOPE OF WORK. IT IS EXPECTED THAT PROJECT DR -131 WILL BE CONSTRUCTED BEFORE THIS (DR -134) PROJECT. %%% C 4 c1 °�°� DWG TYPE: DWG DFTR : RFK REV DATE JOB NO. PROJECT TYPE DES DFTR I CHKD I ENGR I APPD INCHES 1 2 3 TENTHS 10 20 30 4 5 6 7 Plotted By: Bell, Josh Sheet Set: DAN RIVER BANK ARMORING DESIGN Layout:.004 EXISTING CONDITIONS September 28, 2017 08: 16: 09am Q:\Duke\DanRiver\7810150418-Dan River On -Call \Plansheets\DR-0134 BankArmoringDesign\.004 EXISTING CONDITIONS.dwg ES/p4l-s /t�'p JOB NO: 7810150418 CHKD: JMB / ENERGY DATE: 04/17/2017 ENGR: JMB 03266722 FILENAME: .004 EXISTING CONDITIONS.dwg APPD: JMB v••, �. Q,•:'v DWG SIZE DRAWING NO. REVISION . ANSI D ��•° UA M - ` ,.�� 22"x34" DNR C 9 01. XXX . 0 04 0 DESCRIPTION 8 9 10 F—F--� W E- F 2 3 4 5 (5 7 8 DNR C901.XXX. 005 REQ. 0 \ - MW / IIII III v v v vv ' � -G -----G -----G _ — — — — EXISTING 16" PNG GAS LINE; / / — \ -- Vl W I I \ \ \ \ I — G - -- ----- --> --G / / C --- EXISTING 8" PING GAS LINE GRAVEL ACCESS DRIVE ---------- --- -- I I s� / / 3 REALIGNMENT OF EXISTING GRAVEL DRIVE RAILROAD BRANCH CREEK 1 / / LIMITS OF DR -134 PROJECT JERSEY BARRIER TIE IN TO EXISTING GROUND AT 1H:1V GRAVEL ACCESS DRIVE (TYP.) � `� USING CLASS A �14 \RIPRAP \ 2,3 PROPOSED BANK ARMORING (SEE DETAIL .007 ( ) � /�l II 20' DIA. BUFFER AROUND I , / // _ \ ✓ \ \ \ MONITORING WELL," \ JERSEY BARRIER IAV \ --- V I � � I _ (TYP.) I � � - v ASH BASIN CLEAR TREES AND VEGETATION, \ \ \ V A A \I \\ (SECONDARY CELL) AND REMOVE STUMPS TO GRADE 1 FILL WITH I I I I \ CLASS A RIP RAP CLEAR TREES AND VEGETATION, AND REMOVE STUMPS TO GRADE I 1 SEE NOTES 2 AND 3 IIII%— I ��I I ZONE AE 100 -YEAR FLOOD PLAIN LINE 1 1 l I oo moi''/ /��/ / EX MON #28 STAKE NORTHING: 998772.41 �� / / I IIII PROPOSED PERMANENT / / / I FASTING: 1790960.69 / / / I / IIII CHANNEL CROSSING SEE NOTES 2 AND 3 LEGEND EXISTING CONTOUR LINES i --- EXISTING GAS LINES PROPOSED CONTOUR LINES GRADE TO TIE IN NO M W � MONITORING WELL GREATER THAN 4H:1 V GM O GAS UTILITY MARKER 30 0 30 60 FT FLOODWAY LINE ® TITLE Environment & RAILROAD BRANCH CREEK BANK STABILIZATION Infrastructure DUKE ENERGY ISSUE NO. DR -134 2801 YORKMONT ROADameC DAN RIVER STEAM STATION SUITE 100 CHARLOTTE, NC 28208 TEfoster L (704)357-8600 BANK ARMORING DESIGN PLAN FAX: (704) 357-8638 wheeler LICENSURE: NC ENG: F-1253 FOR N C GEOLOGY. C-247 DRAFT FOR REVIEW NOTES: SEAL SCALE: AS SHOWN DES: RFK 1. SURVEY DATA SHOWN ON THIS SHEET IS FROM A DRAWING TITLED "AERIAL TOPOGRAPHIC SURVEY - DAN RIVER PLANT", PREPARED BY WSP, CARY NC. PHOTOGRAPHY DATE: APRIL 17, 2014. %%""",, if, � DUKE 2. CONSTRUCTION OF ACCESS ROAD ALONG TOE OF SECONDARY ASH BASIN PARALLEL TO DAN RIVER IS INCLUDED IN DR -131 SCOPE OF WORK. IT IS EXPECTED THAT PROJECT DR -131 WILL BE CONSTRUCTED BEFORE THIS (DR -134) PROJECT. `,�� � CA , w DWG TYPE: DWG DFTR : RFK 3. FOR PURPOSES OF DR -134 DESIGN, IT IS ASSUMED THAT DR -131 SCOPE OF WORK IS IN PLACE. ���.•'FESSfO••.�!'�� .. ENERGY JOB NO: 7810150418 CHKD: JMB Q i DATE: 04/17/2017 ENGR: JMB = L 032667 FILENAME: .005 BANK ARMORING DESIGN PLAN.dwg APPD: JMB Col- �..: v DWG SIZE DRAWING NO. REVISION .!VGENI:. ��,` %, ��• ....h•�' �`, ANSI D UA iy • ,,. 22"x34" DNR C 9 01. XXX . 0 0 5 0 REV DATE JOB NO. PROJECT TYPE DES DFTR CHKD ENGR APPD DESCRIPTION "$m%0 INCHES 1 2 3 TENTHS 10 20 30 4 5 6 7 8 9 10 1 1 1 Plotted By: Bell, Josh Sheet Set: DAN RIVER BANK ARMORING DESIGN Layout:.005 ROAD DESIGN PLAN September 28, 2017 08: 22: 400m Q:\Duke\DanRiver\7810150418—Dan River On—Call\Plansheets\DR-0134 BankArmoringDesign\.005 BANK ARMORING DESIGN PLAN.dwg 0 0 Tz /v I co C) X X X O CD F-, F Plotted By: Bell, Josh Sheet Set: DAN RIVER BANK ARMORING DESIGN Layout:.006 EROSION CONTROL September 28, 2017 08:30: 00am Q:\Duke\DanRiver\7810150418—Don River On—Call\Plansheets\DR-0134 BankArmoringDesign\.006 EROSION CONTROL.dwg 2 TYPICAL EXISTING SLOPE CONDITION NOT TO SCALE 12" DIAMETER FILTREXX® CHECK DAM TWO (2) 2" X 2" X 36" WOODE STAKES PLACED 5'0.( MAX WATER LEVEL 4" MINIMUM FREEBOARD M 5 CONSTRUCTION NOTES FOR SLOPE REPAIR: 1. WIDTH OF REPAIR AREA TO BE FIELD DETERMINED AND STAKED BY ENGINEER PRIOR TO CONSTRUCTION. 2. CUT TREES LEAVING STUMPS NO HIGHER THAN 6" ABOVE EXISTING GROUND. PLACE GEOTEXTILE ON EXISTING GROUND AFTER CLEARING ACTIVITY. NO CUT OR FILL IS REQUIRED. 3. NONWOVEN GEOTEXTILE SHALL CONSIST OF NEEDLE PUNCHED POLYPROPYLENE YARNS AND BE RESISTANT TO BIOLOGICAL DEGRADATION AND NATURALLY OCCURRING CHEMICALS, ALKALI, AND ACIDS. NONWOVEN GEOTEXTILE SHALL MEET THE FOLLOWING MINIMUM REQUIREMENTS: PHYSICAL PROPERTY (TEST METHOD) TEST VALUE GRAB TENSILE STRENGTH (ASTM D4632) 205 LBS GRAB TENSILE ELONGATION (ASTM D4632) 50% TRAPEZOIDAL TEAR STRENGTH (ASTM D4533) 80 LBS UV RESISTANCE (500 HOURS) (ASTM D4355) 70% RETENTION APPARENT OPENING SIZE (ASTM D4751) 0.18 MM 4. GEOTEXTILE SHALL RUN HORIZONTALLY (PARALLEL TO SHORELINE) AND BE PLACED FROM BOTTOM OF EROSION AREA TO TOP SOCK THAT THE UPPER SECTIONS OVERLAP OVER TOP OF THE LONGER SECTIONS. 5. DROP DISTANCE FOR RIPRAP SHOULD BE LIMITED TO NO MORE THAN 3 FT. TO AVOID PUNCTURING THE GEOTEXTILE THROUGH THE BEDDING STONE. 6. MINIMUM RIPRAP THICKNESS MEASURED PERPENDICULAR TO EXISTING SLOPE SHALL BE 18". STAE DISCHARGE AREA �'7 I 7 DNR C901.XXX.007 IRFV. 0 2 007 12" DIAMETER FILTREXX® SOXXTM DEN STAKES BEDDING STONE AND RIP RAP INSTALLATION NOT TO SCALE E STREAM DISCHARGE HOSES DIVERSION PUMPS TWO (2) 2" X 2" X 36" WOODEN STAKES -= _ _ 12" DIAMETER P INTAKE PLACED 10' O.C. -- -= FILTREXX® SOXXTM P DEWATERING PUMP HOSE _ MAX WATER LEVEL A A 4" MINIMUM FREEBOARD FLOW ` FLOW SINGLE INSTALLATION SECTION INTAKE HOSE ----------------------- =---------- --- 12" DIAMETER COFFER DAM LEAN WATER ------------------------------- -- ----------------------------- -- _------------------------ FILTREXX® SOXXTM GENERAL NOTES: CROSSING DISCHARGE EXTENTS 1. COMPOST SOCKS SHALL BE INSTALLED AS NEEDED BASED ON FIELD CONDITIONS. VELOCITY 2. ADJOINING SECTIONS OF THE SILT SOXX SHALL BE OVERLAPPED A MINIMUM 18 INCHES DISSIPATOR MADE AND STAKED AT THE OVERLAP. OF RIPRAP OR WORK AREA SANDBAGS '_N: - THREE (3) 2" X 2" X 36" WOODEN STAKES PLACED 10' O.C. INSPECTION AND MAINTENANCE NOTES: PYRAMID INSTALLATION SECTION 1. ALL EROSION AND SEDIMENTATION CONTROL DEVICES AND PLANTED AREAS F SHALL BE INSPECTED EVERY SEVEN (7) CALENDAR DAYS AND AFTER EACH RAINFALL OCCURRENCE THAT EXCEEDS ONE-HALF (1/2) INCH WITHIN A 24-HOUR PERIOD. DAMAGED OR INEFFECTIVE DEVICES SHALL BE REPAIRED OR REPLACED, AS NECESSARY, AS SOON AS PRACTICAL. 2. REMOVE ACCUMULATED SEDIMENT WHEN IT REACHES 1/3 THE HEIGHT OF THE DEVICE. 3. REMOVED SEDIMENT SHALL BE PLACED IN STOCKPILE STORAGE AREAS OR SPREAD THINLY ACROSS DISTURBED AREA. STABILIZE THE REMOVED SEDIMENT AFTER IT IS RELOCATED. 4. REMOVE TEMPORARY E&SC MEASURES UPON STABILIZATION OF THE TRIBUTARY DRAINAGE AREA. REMOVE ALL CONSTRUCTION MATERIAL AND SEDIMENT, AND DISPOSE OF THEM PROPERLY. COMPOST SOCKS MAY BE ABANDONED BY CUTTING THE SOCK MATERIAL AND SPREADING THE COMPOST IN-PLACE. GRADE THE DISTURBED AREA TO DRAIN AND STABILIZE ACCORDINGLY. 3 COMPOST FILTER SOCK 007 NOT TO SCALE REV DATE JOB NO. PROJECT TYPE TENTHS 10 20 30 4 5 6 INCHES 1 2 3 Plotted By: Bell, Josh Sheet Set: DAN RIVER BANK ARMORING DESIGN Layout: .007 DETAILS September 28, 2017 08: 31: 16am 0: \Duke\DanRiver\7810150418_Dan River On— Call \Plansheets\DR-0134 BankArmoringDesign\.007 DETAILS.dwg DESCRIPTION THE WORK SHOULD CONSIST OF INSTALLING A TEMPORARY PUMP AROUND AND SUPPORTING MEASURES TO DIVERT FLOW AROUND IN -STREAM CONSTRUCTION SITES. IMPLEMENTATION SEQUENCE SEDIMENT CONTROL MEASURES, PUMP -AROUND PRACTICES, AND ASSOCIATED CHANNEL AND BANK CONSTRUCTION SHOULD BE COMPLETED IN THE FOLLOWING SEQUENCE: 1. CONSTRUCTION SHOULD NOT BEGIN UNTIL ALL SEDIMENT AND EROSION CONTROL MEASURES HAVE BEEN INSTALLED. THE CONTRACTOR SHOULD STAY WITHIN THE LIMITS OF THE DISTURBANCE AS SHOWN ON THE PLANS AND MINIMIZE DISTURBANCE WITHIN THE WORK AREA WHENEVER POSSIBLE. 2 UPON INSTALLATION OF ALL SEDIMENT CONTROL MEASURES, THE CONTRACTOR SHOULD BEGIN WORK AT THE UPSTREAM SECTION AND PROCEED DOWNSTREAM BEGINNING WITH THE ESTABLISHMENT OF STABILIZED CONSTRUCTION ENTRANCES. IN SOME CASES, WORK MAY BEGIN DOWNSTREAM IF APPROPRIATE. WORK SHOULD NOT BE CONDUCTED IN THE CHANNEL DURING RAIN EVENTS. 3 SANDBAG DIKES SHOULD BE SITUATED AT THE UPSTREAM AND DOWNSTREAM ENDS OF THE WORK AREA AS SHOWN ON THE PLANS, AND STREAM FLOW SHOULD BE PUMPED AROUND THE WORK AREA. THE PUMP SHOULD DISCHARGE ONTO A STABLE VELOCITY DISSIPATER MADE OF RIPRAP OR SANDBAGS. 4 WATER FROM THE WORK AREA SHOULD BE PUMPED TO A SEDIMENT FILTERING MEASURE SUCH AS A DEWATERING BASIN, SILT BAG, OR OTHER APPROVED SOURCE. THE MEASURE SHOULD BE LOCATED SUCH THAT THE WATER DRAINS BACK INTO THE CHANNEL BELOW THE DOWNSTREAM SANDBAG DIKE. 5 THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING ACCESS TO AND MAINTAINING ALL EROSION AND SEDIMENT CONTROL DEVICES UNTIL THE SEDIMENT CONTROL INSPECTOR APPROVES THEIR REMOVAL. 6. AFTER CONSTRUCTION, ALL DISTURBED AREAS SHOULD BE REGRADED AND REVEGETATED AS PER THE PLANTING PLAN. EXPOSED WEATHERED OR V�V HARD ROCK (TYPICAL) PLAN VIEW DEWATERING DEVICE / SILT BAG (SEE DETAILS) SECTION A -A IMPERVIOUS SHEETING WORK AREA 6 FEET Ix,nY//� 1��//nvrin invrr��/� CROSS SECTION OF SANDBAG DIKE IMPERVIOUS SHEETING WORK AREA 6 FEET 0 n'//A /A�/rnviin�, invrrn M Y, /W/' CROSS SECTION OF STONE DIKE 4 \ PUMP AROUND DIVERSION DETAIL K NOT TO SCALE Environment & IT TITLERAILROAD BRANCH CREEK BANK STABILIZATION DUKE Infrastructure ENERGY ISSUE NO. DR -134 41, DAN RIVER STEAM STATION 2801 YORKMONT ROAD amec SUITE 100 CHARLOTTE, NC 28208 foster TEL: (704) 357-8600 DETAILS FAX: (704) 357-8638 wheeler LICENSURE: NC ENG: F-1253 FOR NC GEOLOGY: C-247 DRAFT FOR REVIEW SEAL SCALE: AS SHOWN DES: RFK DUKE% --\A CAA? P,,s DWG TYPE: DWG DFTR : RFK SSIO 'ENERGY JOB NO: 7810150418 CHKD: JMB Q Lr= DATE: 04/17/2017 ENGR: JMB 032667 a22i 1 FILENAME: .007 DETAILS.dwg APPD: JMB vo,. �..: v DWG SIZE DRAWING NO. REVISION •NGFN��• ���` ��• .... •' �`� ANSI D '(JA 22"x34" DNR C 9 01. XXX . 0 0 7 0 DES DFTR CHKD ENGR APPD DESCRIPTION 7 8 9 10 0 0 TZ /v I Q0 X X X 4 FT] 0 F STREAM DISCHARGE HOSES DIVERSION PUMPS r P INTAKE P DEWATERING PUMP HOSE ,,------, A A FLOW ` FLOW INTAKE HOSE I, COFFER DAM LEAN WATER DIKE PUMPS SHOULD CROSSING DISCHARGE EXTENTS ONTO A STABLE VELOCITY DISSIPATOR MADE OF RIPRAP OR WORK AREA SANDBAGS SECTION A -A IMPERVIOUS SHEETING WORK AREA 6 FEET Ix,nY//� 1��//nvrin invrr��/� CROSS SECTION OF SANDBAG DIKE IMPERVIOUS SHEETING WORK AREA 6 FEET 0 n'//A /A�/rnviin�, invrrn M Y, /W/' CROSS SECTION OF STONE DIKE 4 \ PUMP AROUND DIVERSION DETAIL K NOT TO SCALE Environment & IT TITLERAILROAD BRANCH CREEK BANK STABILIZATION DUKE Infrastructure ENERGY ISSUE NO. DR -134 41, DAN RIVER STEAM STATION 2801 YORKMONT ROAD amec SUITE 100 CHARLOTTE, NC 28208 foster TEL: (704) 357-8600 DETAILS FAX: (704) 357-8638 wheeler LICENSURE: NC ENG: F-1253 FOR NC GEOLOGY: C-247 DRAFT FOR REVIEW SEAL SCALE: AS SHOWN DES: RFK DUKE% --\A CAA? P,,s DWG TYPE: DWG DFTR : RFK SSIO 'ENERGY JOB NO: 7810150418 CHKD: JMB Q Lr= DATE: 04/17/2017 ENGR: JMB 032667 a22i 1 FILENAME: .007 DETAILS.dwg APPD: JMB vo,. �..: v DWG SIZE DRAWING NO. REVISION •NGFN��• ���` ��• .... •' �`� ANSI D '(JA 22"x34" DNR C 9 01. XXX . 0 0 7 0 DES DFTR CHKD ENGR APPD DESCRIPTION 7 8 9 10 0 0 TZ /v I Q0 X X X 4 FT] 0 F