Loading...
HomeMy WebLinkAboutNC0064734_Compliance Evaluation Inspection_20170927Water Resources ENVIRONMENTAL QUALITY September 27, 2017 Mr Martin Lashua Carolina Water Service, Inc of NC Post Office Box 240908 Charlotte, North Carolina 28224 SUBJECT Compliance Evaluation Inspection Bradfield Farms WWTP NPDES Permit NCO064734 Cabarrus County, NC Dear Mr Lashua, ROY COdr, Governor MICHAEL S REGAN Secretary S. JAY ZIMMERMAN Director On September 26, 2017, Roberto Scheller of this Office conducted an inspection at the subject facility This inspection was conducted as a Compliance Evaluation Inspection (CEI) to insure compliance with permit requirements and conditions At the time of inspection facility appeared to be well maintained and operated We wish to thank you and your staff for assistance regarding this inspection The enclosed report should be self-explanatory, however, should you have any questions, please do not hesitate to contact myself of Roberto Scheller at (704) 235-2204 or roberto scheller@ncdenr gov Enclosure Inspection Report cc Wastewater Branch File Sincerely, r W Corey Basinger, Regional Supervisor / Water Quality Regional Operations Sectio Division of Water Resources, NCDEQ / State of North Carolina I Environmental Quality I Water Resources 1 Water Quality Regional Ope Mooresville Regional Office) 610 East Center Avenue, Suite 3011 Mooresville, North Carolina Lo_ 704 663 1699 �\ United States Environmental Protection Agency Form Approved EPA Washington, D C 20460 OMB No 2040-0057 Water Compliance Inspection Report Approval expires a-31-98 Section A National Data System Coding (i e , PCS) Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type 1 IN 2 15 1 3 I NCO064734 I11 12 17/09/26 17 18 I C 19 I G j 201 I 211111 1 1 1 1 1 1 II I I I I I I I I I I I I I I I I I I I I I I I II 1 1 1 1 1166 Inspection Work Days Facility Self -Monitoring Evaluation Rating B1 QA Reserved -- 67 70 LJ [, j 71 [_j72 LN] 73 I X74 75 80 L I Section B Facility Data Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include Entry Time/Date Permit Effective Date POTW name and NPDES permit Number) 09 55AM 17/09/26 14/02/01 Bradfield Farms WWTP 3822 Tearoyal Ct Exit Time/Date Permit Expiration Date Charlotte NC 28215 11 10AM 17/09/26 18/11/30 Name(s) of Onsite Representabve(s)/Titles(s)/Phone and Fax Number(s) Other Facility Data Larry Darnell Henry/ORC/704-361-0641/ Name, Address of Responsible Officiallritle/Phone and Fax Number Contacted Carl Daniel, PO Box 240908 Charlotte NC 282240908//800-525-7990/7045258174 No Section C Areas Evaluated Dunng Inspection (Check only those areas evaluated) Permit Flow Measurement Operations & Maintenance Records/Reports Self -Monitoring Program Sludge Handling Disposal Facility Site Review Effluent/Receiving Waters Laboratory Section D Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) (See attachment summary) Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date Roberto Scheller MRO WQ//252-946-6481/ k.1 Y - a22 1-7 Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date ,y W Corey Basinger MRO WQ//704-235-2194/ EPA F r 3560-3 (Rev 9-94) Previous editions are obsolete + / v 2f$�or 7w,%— Page# NPDES yr/mo/day 31 NCO064734 I11 12 17/09/26 17 Inspection Type 18 ICI Section D Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) 1 Page# 2 Permit. NCO064734 Owner -Facility Bradfield Farms WWTP Inspection Date 09/26/2017 Inspection Type Compliance Evaluation Permit Yes No NA NE (If the present permit expires In 6 months or less) Has the permittee submitted anew ❑ ❑ 0 ❑ application? 0 ❑ ❑ ❑ Is the facility as described In the permit? ❑ M ❑ ❑ # Are there any special conditions for the permit? 0 ❑ ❑ ❑ Is access to the plant site restricted to the general public? M ❑ ❑ ❑ Is the Inspector granted access to all areas for Inspection? 0 ❑ ❑ ❑ Comment Permit was Issued on February 1, 2014 and expires on November 30, 2018 It was noted that sampling for Total Residual Chlorine should be removed from permit Record Keeping Yes No NA NE Are records kept and maintained as required by the permit? 0 ❑ ❑ ❑ Is all required Information readily available, complete and current? 0 ❑ ❑ ❑ Are all records maintained for 3 years (lab reg required 5 years)? 0 ❑ ❑ ❑ Are analytical results consistent with data reported on DMRs? M ❑ ❑ ❑ Is the chain -of -custody complete? 0 ❑ ❑ ❑ Dates, times and location of sampling Name of Individual performing the sampling Results of analysis and calibration Dates of analysis Name of person performing analyses M Transported COCs M Are DMRs complete do they Include all permit parameters? M ❑ ❑ ❑ Has the facility submitted Its annual compliance report to users and DWQ? ❑ ❑ ❑ ❑ (If the facility Is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified operator ❑ ❑ M ❑ on each shift? Is the ORC visitation log available and current? 0 ❑ ❑ ❑ Is the ORC certified at grade equal to or higher than the facility classification? 0 ❑ ❑ ❑ , Is the backup operator certified at one grade less or greater than the facility classification? M ❑ ❑ ❑ Is a copy of the current NPDES permit available on site? 0 ❑ ❑ ❑ Facility has copy of previous year's Annual Report on file for review? ❑ ❑ ❑ M Comment Records reviewed were well orgmized and readily available for review Operations & Maintenance Yes No NA NE Is the plant generally clean with acceptable housekeeping? M ❑ ❑ ❑ Page# 3 Permit NCO064734 Inspection Date 09/26/2017 Operations & Maintenance Owner - Facility Bradfield Farms WWTP Inspection Type Compliance Evaluation Does the facility analyze process control parameters, for ex MLSS, MCRT, Settleable Solids, pH, DO, Sludge Judge, and other that are applicable? Comment Treatment facility appeared to be well operated and maintained Laboratory Are field parameters performed by certified personnel or laboratory? Are all other parameters(excluding field parameters) performed by a certified lab? # Is the facility using a contract lab? # Is proper temperature set for sample storage (kept at less than or equal to 6 0 degrees Celsius)? Incubator (Fecal Coliform) set to 44 5 degrees Celsius+/- 0 2 degrees? Incubator (BOD) set to 20 0 degrees Celsius +/- 1 0 degrees? Yes No NA NE ■ ❑ ❑ ❑ Yes No NA NE E ❑ ❑ ❑ N ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ ❑ ❑ ❑ ■ ❑ ❑ ❑ E Comment Labatory analysis is performbe by K&W Labatories in Midland NC (Lab Cert # 559) Field prameters are performed under Field Lab Certification #5228 Pump Station - Influent Yes No NA NE Is the pump wet well free of bypass lines or structures? E ❑ ❑ ❑ Is the wet well free of excessive grease? ❑ ❑ ❑ E Are all pumps present? E ❑ ❑ ❑ Are all pumps operable? E ❑ ❑ ❑ Are float controls operable? E ❑ ❑ ❑ Is SCADA telemetry available and operational? ❑ ❑ E ❑ Is audible and visual alarm available and operational? E ❑ ❑ ❑ Comment Audible and visual alarm were operational at time of Inspection Bar Screens Yes No NA NE Type of bar screen a Manual ❑ b Mechanical Are the bars adequately screening debris? ❑ ❑ ❑ Is the screen free of excessive debris? ❑ ❑ ❑ Is disposal of screening in compliance? E ❑ ❑ ❑ Is the unit In good condition? E ❑ ❑ ❑ Comment Facility has fine screen and appeared to be operating properly at time of inspection Page# 4 Permit NCO064734 Owner -Facility Inspection Date 09/26/2017 Inspection Type Bradfield Farms WWiP Compliance Evaluation Is the capacity adequate? S ❑ Equalization Basins Yes No NA NE Is the basin aerated? 0 ❑ ❑ ❑ Is the basin free of bypass lines or structures to the natural environment? E ❑ ❑ ❑ Is the basin free of excessive grease? 0 ❑ ❑ ❑ Are all pumps present? N ❑ ❑ ❑ Are all pumps operable? 0 ❑ ❑ ❑ Are float controls operable? ❑ ❑ ❑ 0 Are audible and visual alarms operable? ❑ ❑ ❑ 0 # Is basin size/volume adequate? ❑ ❑ ❑ Comment Aerobic Digester Yes No NA NE Is the capacity adequate? S ❑ ❑ ❑ Is the mixing adequate? N ❑ ❑ ❑ Is the site free of excessive foaming in the tank? N ❑ ❑ ❑ # Is the odor acceptable? 0 ❑ ❑ ❑ # Is tankage available for properly waste sludge? N ❑ ❑ ❑ Comment Sludge is pumped from aerobic digester and dewatered before disposal Solids are removed ❑ Is the DO level acceptable? by L & L Environmental for final desposal by land application ❑ 0 Is the DO level acceptable?(1 0 to 3 0 mg/1) Aeration Basins Yes No NA NE Mode of operation Ext Air Type of aeration system Diffused Is the basin free of dead spots? 0 ❑ ❑ ❑ Are surface aerators and mixers operational? ❑ ❑ 0 ❑ Are the diffusers operational? 0 ❑ ❑ ❑ Is the foam the proper color for the treatment process? N ❑ ❑ ❑ Does the foam cover less than 25% of the basin's surface? 0 ❑ ❑ ❑ Is the DO level acceptable? ❑ ❑ ❑ 0 Is the DO level acceptable?(1 0 to 3 0 mg/1) ❑ ❑ ❑ 0 Comment 30 minute settability test Indicates that MLSS settle out well with a clear supernatant above settled solids Secondary Clarifier Yes No NA NE Is the clarifier free of black and odorous wastewater? E ❑ ❑ ❑ Page# 5 Permit NC0064734 Inspection Date 09/26/2017 Owner - Facility Bradfield Farms WWTP Inspection Type Compliance Evaluation Secondary Clarifier Is the site free of excessive buildup of solids In center well of circular clarifier? Are weirs level? Is the site free of weir blockage? Is the site free of evidence of short-circuiting? Is scum removal adequate? Is the site free of excessive floating sludge? Is the drive unit operational? Is the return rate acceptable (low turbulence)? Is the overflow clear of excessive solids/pin flo3? Is the sludge blanket level acceptable? (Apprcxlmately % of the sidewall depth) Yes No NA NE ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ M ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ ❑ ❑ ❑ N Comment At time of Inspection effluent from secondary clarifier was clear with few suspended solids Pumps -RAS -WAS Yes No NA NE Are pumps In place? 0 ❑ ❑ ❑ Are pumps operational? M ❑ ❑ ❑ Are there adequate spare parts and supplies on site? ❑ ❑ M ❑ Comment Filtration (High Rate Tertiary) Yes No NA NE Type of operation Cross flow ❑ ❑ Is the filter media present? M ❑ ❑ ❑ Is the filter surface free of clogging? M ❑ ❑ ❑ Is the filter free of growth? M ❑ ❑ ❑ Is the air scour operational? ❑ ❑ M ❑ Is the scouring acceptable? ❑ ❑ M ❑ Is the clear well free of excessive solids and filter media? M ❑ ❑ ❑ Comment Flltere consists of membrane cloth filter Disinfection - UV Yes No NA NE Are extra UV bulbs available on site? M ❑ ❑ ❑ Are UV bulbs clean? 0 ❑ ❑ ❑ Is' UV Intensity adequate? M ❑ ❑ ❑ Is transmittance at or above designed level? ❑ ❑ ❑ N Page# 6 1 Permit. NCO064734 Owner - Facility: Bradfield Farms WWTP Inspection Date 09/26/2017 Inspection Type Compliance Evaluation Disinfection - UV Yes No NA NE Is there a backup system on site? ❑ ❑ ❑ Is effluent clear and free of solids? ❑ ❑ ❑ Comment Effluent evaulated at end of UV and was clear with no visible suspended solids Effluent Sampling Yes No NA NE Is composite sampling flow proportional? 0 ❑ ❑ ❑ Is sample collected below all treatment units? 0 ❑ ❑ ❑ Is proper volume collected? ❑ ❑ ❑ M Is the tubing clean? 0 ❑ ❑ ❑ # Is proper temperature set for sample storage (kept at less than or equal to 6 0 degrees 0 ❑ ❑ ❑ Celsius)? M ❑ ❑ ❑ Is the facility sampling performed as required by the permit (frequency, sampling type 0 ❑ ❑ ❑ representative)? Comment Sampler temperature was noted at 3 - 4 degree C Effluent Pipe Yes No NA NE Is right of way to the outfall properly maintained? 0 ❑ ❑ ❑ Are the receiving water free of foam other than trace amounts and other debris? N ❑ ❑ ❑ If effluent (diffuser pipes are required) are they operating properly? ❑ ❑ M ❑ Comment Effluent at point of discharge was clear with no visible suspended solids No foam or floating ❑ ❑ debris was noted at discharge pooint at time of inspection ❑ ❑ M Standby Power Yes No NA NE Is automatically activated standby power available? ❑ ❑ ❑ Is the generator tested by interrupting primary power source? ❑ ❑ ❑ Is the generator tested under load? ❑ ❑ ❑ Was generator tested & operational during the Inspection? ❑ ❑ M ❑ Do the generator(s) have adequate capacity to operate the entire wastewater site? M ❑ ❑ ❑ Is there an emergency agreement with a fuel vendor for extended run on back-up power? M ❑ ❑ ❑ Is the generator fuel level monitored? 0 ❑ ❑ ❑ Comment Page# 7 Water Resources ENVIRONMENTAL QUALITY September 27, 2017 Mr Martin Lashua Carolina Water Service, Inc of NC Post Office Box 240908 Charlotte, North Carolina 28224 SUBJECT Compliance Evaluation Inspection Bradfield Farms WWTP NPDES Permit NCO064734 Cabarrus County, NC Dear Mr Lashua, ROY COOPER Governor MICHAEL S. REGAN Secretary S. JAY ZIMMERMAN Director On September 26, 2017, Roberto Scheller of this Office conducted an inspection at the subject facility This inspection was conducted as a Compliance Evaluation Inspection (CEI) to insure compliance with permit requirements and conditions At the time of inspection facility appeared to be well maintained and operated We wish to thank you and your staff for assistance regarding this inspection The enclosed report should be self-explanatory; however, should you have any questions, please do not hesitate to contact myself of Roberto Scheller at (704) 235-2204 or roberto scheller@ncdenr gov Enclosure Inspection Report cc Wastewater Branch File Sincerely, e W Corey Basinger, Regional Supervisor Water Quality Regional Operations Section Division of Water Resources, NCDEQ State of North Carolina I Environmental Quality I Water Resources I Water Quality Regional Operations Mooresville Regional Office) 610 East Center Avenue, Suite 3011 Mooresville, North Carolina 28115 704 663 1699 United States Environmental Protection Agency Form Approved EPA Washington, D C 20460 OMB No 2040-0057 Water Compliance Inspection Report Approval expires 8-31-96 Section A National Data System Coding (i e , PCS) Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type 1 [ti_] 2 15 I 3 I NC0064734 I11 12 17/09/26 17 18 ISI 19 1 s 201 211111 I I I I I III L I I I I I I I I I I I I I I I I I I I I I III I I I I 1166 Reserved— Inspection Work Days Facility Self -Monitoring Evaluation Rating B1 QA —Reserved-- 67 70 71 I —1 I 72 I N 1 73 I I X74 75 Ll 80 67 LJ LJ I I I Section B FacilityData Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include Entry Time/Date Permit Effective Date POTW name and NPDES permit Number) 09 55AM 17/09/26 14/02/01 Bradfield Farms WWTP Exit Time/Date Permit Expiration Date 3822 Tearoyal Ct 11 10AM 17/09/26 18/11/30 Charlotte NC 28215 Name(s) of Onsite Representative(s)fritles(s)/Phone and Fax Number(s) Other Facility Data /// Larry Darnell Henry/ORC1104-361-0641/ Name, Address of Responsible OfficiaUTitle/Phone and Fax Number Contacted Carl Daniel,PO Box 240908 Charlotte NC 282240908//800-525-7990/7045258174 No Section C Areas Evaluated Dunng Inspection (Check only those areas evaluated) Permit 0 Flow Measurement Operations & Maintenance Records/Reports Self -Monitoring Program 0 Sludge Handling Disposal Facility Site Review Effluent/Receiving Waters Laboratory Section D Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) (See attachment summary) Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date Roberto Scheller MRO WQ//252-946-6481/ Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date W Corey Basinger MRO WQ//704-235-2194/ EPA F r 3560-3 (Rev 9-94) Previous editions are obsolete 2f$�or r Page# NPDES yr/mo/day 31 NCO064734 111 121 17/09/26 117 1-ispection Type 18 ICI Section D Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) 1 i i, Page# 2 Permit NCO064734 Owner - Facility Bradfield Farms WWTP Inspection Date 09/26/2017 Inspection Type* Compliance Evaluation Permit Yes No NA NE (if the present permit expires In 6 months or less) Has the permittee submitted a new ❑ ❑ 0 ❑ application? 0 ❑ ❑ ❑ Is the facility as described in the permit? ❑ M ❑ ❑ # Are there any special conditions for the permit? 0 ❑ ❑ ❑ Is access to the plant site restricted to the general public? 0 ❑ ❑ ❑ Is the Inspector granted access to all areas for Inspection? M ❑ ❑ ❑ Comment Permit was Issued on February 1 2014 and expires on November 30 2018 It was noted that sampling for Total Residual Chlorine should be removed from permit Record Keeping Yes No NA NE Are records kept and maintained as required by the permit? M ❑ ❑ ❑ Is all required information readily available, complete and current? 0 ❑ ❑ ❑ Are all records maintained for 3 years (lab reg required 5 years)? E ❑ ❑ ❑ Are analytical results consistent with data reported on DMRs? 0 ❑ ❑ ❑ Is the chain -of -custody complete? 0 ❑ ❑ ❑ Dates, times and location of sampling Name of individual performing the sampling Results of analysis and calibration Dates of analysis Name of person performing analyses Transported CDCs Are DMRs complete do they include all permit parameters? ❑ ❑ ❑ Has the facility submitted its annual compliance report to users and DWQ? ❑ ❑ ❑ ❑ (If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified operator ❑ ❑ E ❑ on each shift? Is the ORC visitation log available and current? 0 ❑ ❑ ❑ Is the ORC certified at grade equal to or higher than the facility classification? 0 ❑ ❑ ❑ , Is the backup operator certified at one grade less or greater than the facility classification? M ❑ ❑ ❑ Is a copy of the current NPDES permit available on site? M ❑ ❑ ❑ Facility has copy of previous year's Annual Report on file for review? ❑ ❑ ❑ 0 Comment Records reviewed were well orginized and readily available for review Operations & Maintenance Yes No NA NE Is the plant generally clean with acceptable housekeeping? E ❑ ❑ ❑ Page# 3 Permit. NCO064734 Inspection Date 09/26/2017 Operations $ Maintenance Owner- Facility Bradfield Farms WWTP Inspection Type Compliance Evaluation Does the facility analyze process control parameters, for ex VILSS, MCRT, Settleable Solids, pH, DO, Sludge Judge, and other that are applicable? Comment Treatment facility appeared to be well operated and maintained Laboratory Are field parameters performed by certified personnel or labcratory? Are all other parameters(excluding field parameters) performed by a certified lab? # Is the facility using a contract lab? # Is proper temperature set for sample storage (kept at less than or equal to 6 0 degrees Celsius)? Incubator (Fecal Coliform) set to 44 5 degrees Celsius+/- 0 2 degrees? Incubator (BOD) set to 20 0 degrees Celsius +/-1 0 degrees? Yes No NA NE ■ ❑ ❑ ❑ Yes No NA NE N ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ ❑ ❑ ❑ ■ ❑ ❑ ❑ E Comment Labatory analysis is performbe by K&W Labatories in Midland NC (Lab Cert # 559) Field prameters are performed under Field Lab Certification #5228 Pump Station - Influent Yes No NA NE Is the pump wet well free of bypass lines or structures? 0 ❑ ❑ ❑ Is the wet well free of excessive grease? ❑ ❑ ❑ E Are all pumps present? N ❑ ❑ ❑ Are all pumps operable? E ❑ ❑ ❑ Are float controls operable? N ❑ ❑ ❑ Is SCADA telemetry available and operational? ❑ ❑ 0 ❑ Is audible and visual alarm available and operational? 0 ❑ ❑ ❑ Comment Audible and visual alarm were operational at time of Inspection properly at time of inspection Bar Screens Yes No NA NE Type of bar screen a Manual ❑ b Mechanical U Are the bars adequately screening debris? N ❑ ❑ ❑ Is the screen free of excessive debris? E ❑ ❑ ❑ Is disposal of screening In compliance? 0 ❑ ❑ ❑ Is the unit In good condition? 0 ❑ ❑ ❑ Comment. Facility has fine screen and appeared to be operating properly at time of inspection Page# 4 Permit* NCO064734 Owner - Facility Inspection Date 09/26/2017 Inspection Type Bradfield Farms WWTP Compliance Evaluation Is the capacity adequate? S ❑ Equalization Basins Yes No NA NE Is the basin aerated? N ❑ ❑ ❑ Is the basin free of bypass lines or structures to the natural environment? E ❑ ❑ ❑ Is the basin free of excessive grease? 0 ❑ ❑ ❑ Are all pumps present? N ❑ ❑ ❑ Are all pumps operable? S ❑ ❑ ❑ Are float controls operable? ❑ ❑ ❑ N Are audible and visual alarms operable? ❑ ❑ ❑ 0 # Is basin size/volume adequate? E ❑ ❑ ❑ Comment Aerobic Digester Yes No NA NE Is the capacity adequate? S ❑ ❑ ❑ Is the mixing adequate? E ❑ ❑ ❑ Is the site free of excessive foaming In the tank? 0 ❑ ❑ ❑ # Is the odor acceptable? Are the diffusers operational? ❑ ❑ ❑ # Is tankage available for properly waste sludge? 0 ❑ ❑ ❑ ❑ Comment Sludge Is pumped from aerobic digester and dewatered before disposal Solids are removed ❑ by L & L Environmental for final desposal by land application ❑ ❑ ❑ E Aeration Basins Yes No NA NE Mode of operation Ext Air Type of aeration system Diffused Is the basin free of dead spots? 0 ❑ ❑ ❑ Are surface aerators and mixers operational? ❑ ❑ N ❑ Are the diffusers operational? E ❑ ❑ ❑ Is the foam the proper color for the treatment process? 0 ❑ ❑ ❑ Does the foam cover less than 25% of the basin's surface? N ❑ ❑ ❑ Is the DO level acceptable? ❑ ❑ ❑ E Is the DO level acceptable?(1 0 to 3 0 mg/1) ❑ ❑ ❑ 0 Comment 30 minute settability test Indicates that MLSS settle out well with a clear supernatant above settled solids Secondary Clarifier Yes No NA NE Is the clarifier free of black and odorous wastewater? E ❑ ❑ ❑ Page# 5 Permit. NC0064734 Owner-Facddy Bradfield Farms WWTP Are pumps in place? M ❑ Inspection Date: 09/26/2017 Inspection Type Compliance Evaluation Are pumps operational? 0 ❑ Secondary Clarifier Yes No NA NE Is the site free of excessive buildup of solids in center well of Circular clarifier? 0 ❑ ❑ ❑ Are weirs level? 0 ❑ ❑ ❑ Is the site free of weir blockage? M ❑ ❑ ❑ Is the site free of evidence of short-circuiting? M ❑ ❑ ❑ Is scum removal adequate? M ❑ ❑ ❑ Is the site free of excessive floating sludge? 0 ❑ ❑ ❑ Is the drive unit operational? M ❑ ❑ ❑ Is the return rate acceptable (low turbulence)? M ❑ ❑ ❑ Is the overflow clear of excessive solids/pin floc? M ❑ ❑ ❑ Is the sludge blanket level acceptable? (Approximately % of the sidewall depth) ❑ ❑ ❑ N Comment At time of Inspection effluent from secondary clarifier was clear with few suspended soilds Pumps -RAS -WAS Yes No NA NE Are pumps in place? M ❑ ❑ ❑ Are pumps operational? 0 ❑ ❑ ❑ Are there adequate spare parts and supplies on site? ❑ ❑ N ❑ Comment Filtration (High Rate Tertiary) Yes No NA NE Type of operation Cross flow ❑ ❑ Is the filter media present? M ❑ ❑ ❑ Is the filter surface free of clogging? ❑ ❑ ❑ Is the filter free of growth? ❑ ❑ ❑ Is the air scour operational? ❑ ❑ N ❑ Is the scouring acceptable? ❑ ❑ M ❑ Is the clear well free of excessive solids and filter media? 0 ❑ ❑ ❑ Comment Flltere consists of membrane cloth filter Disinfection - UV Yes No NA NE Are extra UV bulbs available on site? 0 ❑ ❑ ❑ Are UV bulbs clean? 0 ❑ ❑ ❑ Is' UV intensity adequate? M ❑ ❑ ❑ Is transmittance at or above designed level? ❑ ❑ ❑ N Page# 6 Permit. NCO064734 Owner -Facility Bradfield Farms V WTP Inspection Date. 09/26/2017 Inspection Type Compliance Evaluation Disinfection - UV Yes No NA NE Is there a backup system on site? M ❑ ❑ ❑ Is effluent clear and free of solids? N ❑ ❑ ❑ Comment- Effluent evaulated at end of UV and was clear with no visible suspended solids Effluent Sampling Yes No NA NE Is composite sampling flow proportional? 0 ❑ ❑ ❑ Is sample collected below all treatment units? 0 ❑ ❑ ❑ Is proper volume collected? ❑ ❑ ❑ M Is the tubing clean? 0 ❑ ❑ ❑ # Is proper temperature set for sample storage (kept at less than or equal to 6 0 degrees 0 ❑ ❑ ❑ Celsius)? ❑ ❑ ❑ Is the facility sampling performed as required by the permit (frequency, sampling type 0 ❑ ❑ ❑ representative)? Comment Sampler temperature was noted at 3 - 4 degree C Effluent Pipe Yes No NA NE Is right of way to the outfall properly maintained? M ❑ ❑ ❑ Are the receiving water free of foam other than trace amounts and other debris? 0 ❑ ❑ ❑ If effluent (diffuser pipes are required) are they operating properly? ❑ ❑ 0 ❑ Comment Effluent at point of discharge was clear with no visible suspended soilds No foam or floating ❑ ❑ debris was noted at discharge pooint at time of inspection ❑ Do the generator(s) have adequate Capacity to operate the entire wastewater site? ❑ Standby Power Yes No NA NE Is automatically activated standby power available? ❑ ❑ ❑ Is the generator tested by Interrupting primary power source? ❑ ❑ ❑ Is the generator tested under load? 0 ❑ ❑ ❑ Was generator tested & operational during the Inspection? ❑ ❑ 0 ❑ Do the generator(s) have adequate Capacity to operate the entire wastewater site? ❑ ❑ ❑ Is there an emergency agreement with a fuel vendor for extended run on back-up power? ❑ ❑ ❑ Is the generator fuel level monitored? M ❑ ❑ ❑ Comment Page# 7